Category:INVESTIGATION REPORTS
MONTHYEARML20211H0291986-08-0101 August 1986 Synopsis of Investigation Rept 4-84-043(S).Major Areas Investigated:Alleged Knowledge of Util President & Senior vice-president Nuclear Operations of Util Internal Investigation of Marijuana Use,Prior to 841120 ML20209G8531985-03-14014 March 1985 Inquiry Rept Q4-84-049.Major Areas Investigated:Allegations Re Intimidation of Util Employee by Util Const Manager. Inquiry Closed.Portions Deleted ML20195F3471985-02-26026 February 1985 Partially Withheld Investigation Rept 4-84-043.Contradictory Statements by Jm Cain,Rs Leddick & RP Barkhurst Noted. Major Areas Investigated:Alleged Concealment of Drug Abuse by Reactor Operators ML20210U8751985-02-13013 February 1985 Investigation Rept 4-83-030 on 831215.Major Areas Investigated:Allegations Re Improper Torquing of Bolts Associated W/Emergency Diesel Generator by Licensee.Torque Values Not Listed for Specific Bolts ML20133A0681984-08-29029 August 1984 Marked-up Allegation Investigation Repts 4-84-A-06/21 & 172, Rev 3,re Allegations A-126 & A-291 Concerning Tomkins- Beckwith Not Maintaining Matl Traceability on Supplemental Steel Used W/Pipe Hangers & Supports ML20132G4301984-08-29029 August 1984 Allegation Investigation Repts 4-84-a-06/21 & 172,Rev 3,re Allegations A-126 & A-291 Concerning Tompkins-Beckwith Not Maintaining Matl Traceability on Supplemental Steel Used W/Pipe Hangers & Supports.No Potential Violations Noted ML20137A3841984-08-17017 August 1984 Inquiry Rept Q4-84-036 on 840803.Area of Inquiry:Util Receipt of Falsified Applicant Resume ML20132H0931984-07-18018 July 1984 Allegation Investigation Repts 4-84-A-06/8,30 & 32,Draft 2 Re Allegations A-113,A-135 & A-137 Concerning Need for Review of Concrete Placement Records,Based on Ebasco Svcs, Inc 821209 Memo & Problems Noted in Nonconformance Repts ML20132H1051984-07-17017 July 1984 Allegation Investigation Repts 4-84-a-06/8,30 & 32,Draft 1 Re Allegations A-113,A-135 & A-137 Concerning Need for Review of Concrete Placement Records Based Ebasco Svcs,Inc 821209 Memo & Problems Noted in Nonconformance Repts ML20137U8471984-07-11011 July 1984 Allegation Investigation Repts 4-84-A-06/21 & 172,Rev 2 Re Allegations A-126 & A-291 Concerning Tompkins-Beckwith Failure to Maintain Matl Traceability on Supplemental Steel Used W/Pipe Hangers & Supports ML20132G3991984-07-11011 July 1984 Marked-up Allegation Investigation Repts 4-84-A-06/21,172, Rev 2,re Allegations A-126 & A-291 Concerning Tompkins- Beckwith Not Maintaining Matl Traceability on Supplemental Steel Used W/Pipe Hangers & Supports ML20132G6711984-07-11011 July 1984 Marked-up Allegation Investigation Repts A-84-A-06/8,30 & 32 Re Allegations A-113,A-135 & A-137 Concerning Need for Review of Concrete Placement Records,Based on Ebasco Svc,Inc 821209 Memo ML20137V0011984-07-10010 July 1984 Allegation Investigation Repts 4-84-A-06/21 & 172,Rev 1 Re Allegations A-126 & A-291 Concerning Tompkins-Beckwith Failure to Maintain Matl Traceability on Supplemental Steel Used W/Pipe Hangers & Supports ML20132G4131984-07-10010 July 1984 Marked-up Allegation Investigation Repts 4-84-A-06/21 & 172, Rev 1,re Allegations A-126 & A-291 Concerning Tompkins- Beckwith Not Maintaining Matl Traceability on Supplemental Steel.No Potential Violations Noted ML20137T5021984-06-27027 June 1984 Marked-up Allegation Investigation Repts 4-84-A-06/21 & 172, Rev 0 Re Allegations A-126 & A-291 Concerning Tompkins- Beckwith Failure to Maintain Matl Traceability on Supplemental Steel Used W/Pipe Hangers & Supports ML20137T6871984-06-27027 June 1984 Allegation Investigation Repts 4-84-A-06:21 & 172,Rev 0 Re Allegations A-126 & A-291 Concerning Tompkins-Beckwith Failure to Maintain Matl Traceability on Supplemental Steel Used W/Pipe Hangers & Supports ML20137V6341984-06-25025 June 1984 Rev 0 to Allegation Investigation Repts 4-84-A-06/114,184b, 184f,184o & 184p Re Allegations A-226,A-306b,A-306f,A-306o & A-306p Concerning Traceability Requirements of Permanent Attachment Matl Welded to Class 1 & 2 Piping ML20137T3751984-06-20020 June 1984 Draft 2 of Allegation Investigation Rept 4-84-A-06 Re Allegations A-126 & A-291 Concerning Failure to Maintain Matl Traceability on Supplemental Steel Used W/Pipe Hangers & Supports.No Potential Violations Noted ML20132E1461984-06-0606 June 1984 Rev 1 to Allegation Investigation Rept 4-84-A-06-53 Re Allegations A-158 & A-272 Concerning Issues Raised in Ebasco 830609 Memo on Ja Jones Const Co Qa/Qc Documentation. Expanded Review Performed by Util Adequate ML20140G5891984-02-24024 February 1984 Supplemental Inquiry Rept Q4-83-015(S) Re Alleged Intimidation of QC Personnel.Portions Deleted ML20140G5761983-11-0101 November 1983 Inquiry Rept Q4-83-015 Re Alleged Intimidation of QC Personnel.Portions Deleted ML20140G5701983-03-17017 March 1983 Inquiry Rept Q4-83-006 Re Util Harassment of QC Inspector. Portions Deleted ML20140G5571982-10-0808 October 1982 Inquiry Rept Q4-82-023 Re Alleged Discriminatory Hiring Practice at Facility.Portions Deleted ML20140G5501982-08-17017 August 1982 Inquiry Rept Q4-82-014 Re Alleged Discrimination by Tompkins-Beckwith,Inc.Portions Deleted 1986-08-01
[Table view] Category:TEXT-INSPECTION & AUDIT & I&E CIRCULARS
MONTHYEARIR 05000382/19990201999-10-21021 October 1999 Insp Rept 50-382/99-20 on 990815-0925.Non-cited Violations Noted.Major Areas Inspected:Operations,Maintenance, Engineering & Plant Support Activities IR 05000382/19990141999-10-19019 October 1999 Insp Rept 50-382/99-14 on 990913-17 & 1004-08.No Violations Noted.Major Areas Inspected:Operator Requalification Training Program PNO-IV-99-038A, on 990929,restart of Waterford 3 Occurred. Cause Identified as Failed Seal Water Heat Exchanger Baffle. New Battle & Seal Assembled Were Installed & Reactor Coolant Pump 2B Was Returned to Svc Satisfactorily1999-10-0101 October 1999 PNO-IV-99-038A:on 990929,restart of Waterford 3 Occurred. Cause Identified as Failed Seal Water Heat Exchanger Baffle. New Battle & Seal Assembled Were Installed & Reactor Coolant Pump 2B Was Returned to Svc Satisfactorily IR 05000382/19990181999-09-29029 September 1999 Insp Rept 50-382/99-18 on 990830-0902.Violations Noted.Major Areas Inspected:Implementation of NRC-approved Fire Protection Program IR 05000382/19990191999-09-27027 September 1999 Insp Rept 50-382/99-19 on 990830-0903.No Violations Noted. Major Areas Inspected:Plant Support PNO-IV-99-038, on 990910,operators Manually Tripped Reactor from 100% Power in Response to Indications of Failure of RCP 2B Seal.New Baffle & Seal Assembly Were Installed & Plant Was Returned to Power Operations on 9908101999-09-15015 September 1999 PNO-IV-99-038:on 990910,operators Manually Tripped Reactor from 100% Power in Response to Indications of Failure of RCP 2B Seal.New Baffle & Seal Assembly Were Installed & Plant Was Returned to Power Operations on 990810 IR 05000382/19990151999-09-14014 September 1999 Insp Rept 50-382/99-15 on 990719-23 with in Ofc Insp Until 0819.No Violations Noted.Major Areas Inspected:Assessment of 10CFR50.59 Safety Evaluation Program & Review of Previous Insp Findings Involving Tornado Missile Protection IR 05000382/19990071999-09-0808 September 1999 Insp Rept 50-382/99-07 on 990601-11.Noncited Violations Identified.Major Areas Inspected:Operations IR 05000382/19990161999-09-0101 September 1999 Insp Rept 50-382/99-16 on 990704-0814.Noncited Violations Noted.Major Areas Inspected:Operations,Maintenance, Engineering & Plant Support PNO-IV-99-032A, on 990801,Waterford 3 Operators Manually Tripped Reactor from 100% Power in Response to Indications of Failure of RCP 2B Seal.Pump Was Secured Immediately Following Plant Sd.New Baffle & Seal Assembly Was Installed1999-08-12012 August 1999 PNO-IV-99-032A:on 990801,Waterford 3 Operators Manually Tripped Reactor from 100% Power in Response to Indications of Failure of RCP 2B Seal.Pump Was Secured Immediately Following Plant Sd.New Baffle & Seal Assembly Was Installed IR 05000382/19990101999-08-11011 August 1999 Insp Rept 50-382/99-10 on 990719-23.Violations Noted.Major Areas Inspected:Solid Radioactive Waste Mgt & Radioactive Matl Transportation Programs PNO-IV-99-032, on 990801,Waterford 3 Operators Manually Tripped Reactor from 100% Power in Response to Indications of Failure of RCP 2B Seal.Pump Was Secured Immediately Following Plan Shutdown.Resident Inspectors Will Monitor1999-08-0303 August 1999 PNO-IV-99-032:on 990801,Waterford 3 Operators Manually Tripped Reactor from 100% Power in Response to Indications of Failure of RCP 2B Seal.Pump Was Secured Immediately Following Plan Shutdown.Resident Inspectors Will Monitor IR 05000382/19990131999-07-15015 July 1999 Insp Rept 50-382/99-13 on 990523-0703.Noncited Violations Noted.Major Areas Inspected:Aspects of Operations,Maint, Engineering & Plant Support Activities IR 05000382/19990121999-06-21021 June 1999 Insp Rept 50-382/99-12 on 990524-27.No Violations Noted. Major Areas Inspected:Operational Status of Licensee Emergency Preparedness Program IR 05000382/19990111999-06-18018 June 1999 Insp Rept 50-382/99-11 on 990524-28.No Violations Noted. Major Areas Inspected:Implementation of Liquid & Gaseous Radwaste Effluent Mgt Program,Status of Effluent Radiation Monitors & Counting Room Instruments ML20196C9461999-06-15015 June 1999 Notice of Violation from Insp Completed on 990422.Violation Noted:Licensee Failed to Consider Info Contained During Background Investigation Before Granting Temporary Unescorted Access to Contractor Employee IR 05000382/19990091999-06-0303 June 1999 Insp Rept 50-382/99-09 on 990411-0522.Violations Noted.Major Areas Inspected:Operations,Maint,Engineering & Plant Support ML20209B8581999-05-25025 May 1999 EN-98-046A:on 990524,staff Withdrew Proposed Civil Penalty in Amount of $110,000 Issued to Licensee.Action Based on Severity Level III Problems Associated with ECCS & Afws IR 05000382/19990061999-05-18018 May 1999 Insp Rept 50-382/99-06 on 990405-09.Non-cited Violations Identified.Major Areas Inspected:Issue Previously Identified During Architect Engineering Insp Which Documented NRC Insp Rept 50-382/98-201 IR 05000382/19990051999-05-10010 May 1999 Insp Rept 50-382/99-05 on 990228-0410.Non-cited Violations Noted.Major Areas Inspected:Operations,Maintenance, Engineering & Plant Support ML20206F4801999-05-0303 May 1999 Insp Rept 50-382/99-08 on 990405-07.One Apparent Violation Noted & Being Considered for Escalated Eas.Major Areas Inspected:Plant Support Including Licensee Access Authorization Program IR 05000382/19990041999-04-0909 April 1999 Insp Rept 50-382/99-04 on 990301-19.One Violation Occurred & Being Treated as Noncited Violation.Major Areas Inspected: Review of Licensee Implementation of Facility ISI Program & Followup Review of Reactor Trip Breaker Performance IR 05000382/19990021999-04-0505 April 1999 Insp Rept 50-382/99-02 on 990117-0227.Violations Noted. Major Areas Inspected:Operations,Maintenance,Engineering & Plant Support Activities IR 05000382/19990031999-03-26026 March 1999 Insp Rept 50-382/99-03 on 990308-12.Violations Noted.Major Areas Inspected:Radiation Protection Program Focusing on RF09 Refueling Outage Activities IR 05000382/19990011999-03-0303 March 1999 Partially Deleted Insp Rept 50-382/99-01 on 990125-29 & 0208-12 (Ref 10CFR73.21).Violations Noted.Major Areas Inspected:Plant Support ML20207F1581999-03-0303 March 1999 Notice of Violation from Insp on 990125-29 & 0208-12. Violation Noted:Inspector Determined That Waterford Audits SA-98-025.1 & SA-98-036.1,dtd 980916,were Conducted by Individuals Not Independent of Program Mgt Being Audited IR 05000382/19980181998-12-21021 December 1998 Insp Rept 50-382/98-18 on 981018-1128.No Violations Noted. Major Areas Inspected:Operations,Maint,Engineering & Plant Support IR 05000382/19980151998-11-24024 November 1998 Insp Rept 50-382/98-15 on 980906-1017.No Violations Noted. Major Areas Inspected:Aspects of Operations,Maint, Engineering & Plant Support Activities PNO-IV-98-054, on 981117,plant Shutdown Greater than 72 H Due to Unidentified Leak.Investigations by Licensee Verified That Leakage Occurred from RCP 2b Seal Area1998-11-19019 November 1998 PNO-IV-98-054:on 981117,plant Shutdown Greater than 72 H Due to Unidentified Leak.Investigations by Licensee Verified That Leakage Occurred from RCP 2b Seal Area IR 05000382/19980131998-11-17017 November 1998 Insp Rept 50-382/98-13 on 980831-0901 & 981005-08.No Violations Noted.Major Areas Inspected:Maint Using Guidance of Temp Instruction 2515/137, Insp of Medium-Voltage & Low-Voltage Power Circuit Breakers ML20155D0561998-10-29029 October 1998 Insp Rept 50-382/98-17 on 981005-08.Violations Noted. Major Areas Inspected:Routine Review of Radiation Protection Program Activities ML20155D0411998-10-29029 October 1998 Notice of Violation from Insp on 981005-08.Violation Noted: Inspectors Identified That Radiation Surveys to Evaluate Extent of Radiation Levels Had Not Been Performed Prior to Operations Personnel Entering Area ML20155D5111998-10-27027 October 1998 Partially Withheld Insp Rept 50-382/98-16 on 980914-18. Violations Noted.Major Areas Inspected:Licensee Physical Security Program.Portions Withheld (Ref 10CFR2.790) ML20155D5021998-10-27027 October 1998 Notice of Violation from Insp on 980914-18.Violation Noted: Performance Tests of Protected Area Detection Sys Identified That Two Detection Zones Did Not Meet Design Criteria to Detect Test Individuals ML20154L0831998-10-0909 October 1998 Notice of Violation from Insp on 980726-0905.Violation Noted:On 980721,NRC Inspectors Found Door 206,vital Area Portal,Unlocked & Not in Alarm at Central Alarm Station ML20154L1281998-10-0909 October 1998 Insp Rept 50-382/98-14 on 980726-0905.Violations Noted.Major Areas Inspected:Operations,Maint,Engineering & Plant Support PNO-IV-98-045, on 980926,Unit 3 Declared Unusual Event of Hurricane Warning in St Charles Parish.River Bend Station Continued to Operate at Full Power Since Hurricane Force Winds Were Not Predicted in Vicinity of Site1998-09-28028 September 1998 PNO-IV-98-045:on 980926,Unit 3 Declared Unusual Event of Hurricane Warning in St Charles Parish.River Bend Station Continued to Operate at Full Power Since Hurricane Force Winds Were Not Predicted in Vicinity of Site PNO-IV-98-040, on 980917,licensee Commenced Shutdown of Reactor in Order to Replace Pressurizer Code Safety Valve That Had Been Experiencing Increased Leakage.Licensee Plans to Restart Facility on 9809231998-09-18018 September 1998 PNO-IV-98-040:on 980917,licensee Commenced Shutdown of Reactor in Order to Replace Pressurizer Code Safety Valve That Had Been Experiencing Increased Leakage.Licensee Plans to Restart Facility on 980923 IR 05000382/19980121998-08-21021 August 1998 Insp Rept 50-382/98-12 on 980614-0725.No Violations Noted. Major Areas Inspected:Operations,Maint,Engineering & Plant Support IR 05000382/19992011998-07-27027 July 1998 Insp Rept 50-382/99-201 on 990511-0619.No Violations Noted Major Areas Inspected:Engineering IR 05000382/19980101998-07-20020 July 1998 Insp Rept 50-382/98-10 on 980622-26.No Violations Noted. Major Areas Inspected:Licensee Physical Security Program Including Access Authorization,Alarm Stations,Protected Area Access Control of Personnel & Packages & Vehicles ML20236P2431998-07-10010 July 1998 Notice of Violation from Insp on 980503-0613.Violation Noted:On 980521,AP UNT-005-013 Was Not Implemented in That Impairment to Fire Door D150 Was Not Controlled IR 05000382/19980091998-07-10010 July 1998 Insp Rept 50-382/98-09 on 980503-0613.Violations Noted.Major Areas Inspected:Aspects of Operations,Maint,Engineering & Plant Support Activities.Fire Door in Reactor Auxiliary Bldg Was Observed to Be Open W/No Controls in Place ML20249A9611998-06-16016 June 1998 Notice of Violation & Proposed Imposition of Civil Penalty in Amount of $100,000.Violation Noted:Licensee Identified That Calculated Peak Fuel Cladding Temp Would Have Exceeded 2200 F Using Licensing Basis Analysis & HPSI Flow ML20151R9131998-06-0909 June 1998 EN-98-046:on 980616,notice of Proposed Imposition of Civil Penalty in Amount of $110,000 Issued to Licensee.Action Based on Level III Problem Involving HPSI Flow Issues at Waterford-3 Facility IR 05000382/19980081998-05-29029 May 1998 Insp Rept 50-382/98-08 on 980322-0502.Violations Noted. Major Areas Inspected:Operations,Maintenance,Engineering & Plant Support ML20248F6801998-05-29029 May 1998 Notice of Violation from Insp on 980322-0502.Violation Noted:Licensee Failed to Establish Adequate Procedures for Operation of EDG When in No or Low Electrical Loading Condition in That No Specific Guidance Provided IR 05000382/19980991998-04-24024 April 1998 SALP Rept 50-382/98-99 for 961201-980321 ML20217B6731998-04-21021 April 1998 Notice of Violation from Insp on 980201-0321.Violation Noted:On Past Occasions,Engineer Operated Governor Valve on Emergency Feedwater Turbine W/O Direction or Concurrence of Shift Superintendent or Control Room Supervisor ML20217B6981998-04-21021 April 1998 Insp Rept 50-382/98-06 on 980201-0321.Violations Noted.Major Areas Inspected:Operations,Maint & Engineering 1999-09-08
[Table view] |
Text
_ - _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ . ___
[O# 's, UNITED STATES
,g NUCLEAR REGULATORY COMMISSION . . . . .
g,. , ,
- e y oFrict or investigation 5 FIELD OFFICE. REGloN iv -
$11 RYAN PLAZ A DRIVE. SulTE 1000 h,'yw, , , j* ARLINGTON. TEXAS 7901) (,
LEFORT GF II.QJIR)
"SUPPLEllEl.TAL" February 24, 1984 I
SUBJECT:
WATERFORD 3 NUCLEAR POWER PLAfiT, TAF1, LOUISIAt:A:
ALLEGED INTIMIDATI0ri 0F QUALITY C0ftTROL PER50filiEL REPORT NUMBER: 04-83-015(S)
- 1. The liuclear Regulatory Commission (NRC) Office of Investigations Field Office report number Q4-83-015, dated November 1, 983 re re en allecction that numerous former employees of the' -
- a at Waterford 3 nuclear power plant in aft, Louisiana, were sutjecteo to intimidation while employed at . Subsequent to issuance of the initial report concerning this matter, the NRC Recion IV Regional Administrator requested efforts be_ effected to obtain forwarding addresses of the individuals idertified by the alleger. This personnel records review w conducted by f;RC Resident Reactor Inspector Les C0t: STABLE at the
- 1. The reccrds review, supra, for addresses of individuals ' *$.tj.f_ied_ir) the '~
above rcferenced report disclosed "nc kncur. address" fo - * ~
T qd%S& ~ 'A
~
EM=. .
It;VESTIGAT0E'S f;0TE: h7- address was chtrir+c' et a icter dt c. TheresifIis cf er ir.terviee of - )
is reported infra.
s
- 3. On December 16, 1983, certified letters (return receipt requested) were sent to the rem
- ino i ht 81 individuals named by the allecer osf.
individutls er ,, gg -
..y 4.
.. ;, ,3 c w ,
. .. -c . . _ _ _
- rcfused to accept his ,1. tter sletter was returnec with the note, " addressee unknown." ~ ^ letter was returned with the note,
" unclaimed." M
,t dal) contacted the Office of Ir.vestigations Field Office, Regior. IV. Each was cuestioned relaftive to the ell.epation that they were intimicatec while enployed by s
the 1 Each of these' individuals der.iEV they were
.intiricitec or threatened during the performancc of their duties at b $r - 8507130277 850502 PDR FOIA 9[D BERNABE84-717 PDR' i)-
g
4
- f. Both inve been telephunictii) it.it rviewed and each reletcd inst 6nces of int dation /or 5:ron ative to activities at l!ctc.rford 3. The concerns o will be incorrcrticd into 01 Field Office investigaticr. nu er 4-84-01, a recently initiated it.vestication which ir. clue:es edditict.F.1 tllerotions of intimoatior 61 llaterford 3.
REPORTED BY: - ;. 1 aGA ?., 7 . k ,, C (
Donald D. Dristill, Investigator 01 Field Office, Region IV APPROVED BY: A 1 chard K. Herr,' Director 01 Field Office, Region IV cc: E. C. Gilbert, 01:DF0 J. T. Collins, RIV -
T. F . We s te rrr.a n , RI V
_y l
COI'E.0~f.d8C.'3.'.E l CC i.i A! .
u-C?N MDC.1. :r,_ L '. . .:,: :
i
- I
'I J
CC 7043 30s U.S. StVCLE A2 ElCUL A733Y C048wfS8t0*f INVESTIGATION STATUS RECORD iwstroCiio=s . 7* *- i. n. --.=*e *. .- .,~e.ai .a , m .= ed ..in..e . .. - = is.n , 30 d.vi. is a. e.*, w ..d m, g m.
30 der to.o*1 sag fees.d. tadeste '4ee Chmge" on the status bl.sk. Keep the .egnal wreth the es.e fele W esad oss so., to Waegwersees, o.v.c. .. 1 can aan, o,,,c, cm ~v'*ein o oeiaave an.evo. . . o.viou.t uce m i 01 FIELD OFFICE 04-84-017 7 e . .uevo. u .. - -
"^"'""'"'*" REGION IV OIF:4-84-A-0026 W .VgesDOR X =oTMtm ,
gusaggy A15'Gae i D 1O
)
FROST s'srvum wra. - ,,,, . , ,,,, a,,,,a n .,~. ... _ . _
On February 27,19E an alleger reed to n:eet with 01 Field Office _ _ .
representativet .,
,j_ ,
, . 9 5 99^ y ' > n g,+
~
'^ .ptgn n :.f"- .
L v; .-
-- -= - r
. _ - , . . f f. -is inquiry will be completed and ,
copies provided to Region IY for proper d'isposition.
DATE: March 31,1984 - This inquiry was CLOSED on March 13e 1984, and an investigation was opened on March 16, 1984, under Case No. 4-84-021.
1:
lI i'
pt l-
(criginal to source o nformation, NRC to retain sig* ' cory of dur.licatt original).
I have information that I wish to provide in confidence to the U. S. Nuclear ,
Reculatory Commission (NRC). I request an express pledge of confidentiality as
- a condition of providing this information to the NRC. I will not provide this information voluntarily to the NRC without such confidentiality bei'ng extended to me.
It is my understanding, consistent with its legal obligations, the NRC, by .
agreeing to this conf.identiality, will adhere to the following conditions:
(1 ) The NRC will not identify me by r.ame or personal. identifier in any HRC
~ initiated document, conversation, or communication released to the public which relates directly to the information provided by me. I understa'nd the term "public release" to encompass any distribution outside of the NRC with the exception of other public agencies which may require this information in
' futherance of their responsibilities under law or public trust. _
(2) The NRC will disclose my identity within the NRC only to the extent ,
required for the cqnduct of NRC related activities. .
(3) During the course of the inquiry or investigation the NRC will also make every effort consistent with the investigative needs of the Commission to avoid actions which would clearly be expected to result in~ the disclosure of my identity to persons subsequently contacted by the NRC. At a later stage I understand that even though the NRC will make every reasonable effort to protect my identity, -
my identification could be compelled by orders; or subpoenas issued by courts of law, hearing boards, or similar legal entities. In such cases,' the basis for .
granting this promise of confidentiality and any other relevant facts will be com .unicated to the authority ordering the disclosure in an effort to maintain &
my confidentiality. If this effort proves unsuccessful, a representative of the NRC will attempt to inform me of any su.ch action beforefisgl,osingfmyv identity.
1 aise understand that the NRC will consider me to have waived my.right to confidentiality if I t.ake, any action that may be reasonably expected to disclose my identity. I further understand that the NRC will consider me to have waived my rights to confidentiality if,I.. provide (or Aave previo6 sly p'rdvided) information
,. ic any otner party that contradicts the info'rr.ation that I provides to the NEC or if circumstances indicate that I am intentionally providing false information l to the NRC. .
Other Conditions: (if any) ,
] have read and fully understand the contents of this agreement. I acree with its provisions. ...
M b, /W i :" Date -
i- e ,
,,,.' J.
d . \ . .
V Agreed ic on behalf of the US Nuclear Regulatory Comission. 7, r .- ,
M y l A r;2__k - ,
--- 9 h m _____ Sirn m re