ML20140G570
| ML20140G570 | |
| Person / Time | |
|---|---|
| Site: | Waterford |
| Issue date: | 03/17/1983 |
| From: | Herr R NRC OFFICE OF INVESTIGATIONS (OI) |
| To: | |
| Shared Package | |
| ML20140B839 | List: |
| References | |
| FOIA-84-717 Q4-83-006, Q4-83-6, NUDOCS 8507130265 | |
| Download: ML20140G570 (7) | |
Text
.
c' #
UNITED STATES
[g NUCLEAR REGULATORY COMMISSION OFFICE OF INVESTIGATIONS FIELD orFICE. REGloN IV
$11 RYAN PLAZA DRIVE. SUITE 1000 D
$s
[
ARLINGTON, TEXAS 76011 REPORT OF INQUIRY Harch 17, 19S3
SUBJECT:
WATERFORD-3, LOUISI At'A POWER AND LIGHT COMPANY HARASSMENT OF QUALITY CONTROL INSPECTOR REPORT NUMBER:
Q4-83-006 (Transfer fron-4-82-013) 1.
On September 7,1982, Region IV requested investigation after Bill JONES, NRC Engineerino Assistance at Waterford-3, reported that an.indiv}idual
~~
identified as C
~ ~ ~ ~ ~'
~~~~
inspector, complained of being harassed.
JONES reported that on August 11, 1982 C _.) entered the NRC office at Waterford-3 and provided 7
a._sopy of a letter, dated (Gino alleaation; Lg., thattAttachment,f1),that i
' authored with the follo j stated "He was going to hang the sopsf a. itch"{
J JONES advised 3he_]etter also indicated that L.
asupsetwithf 7becaused would not sign off improper or incomp ete construction virk.
JONES further stated that (g program.ted in his letter that[he letter.in question was addresse lindica
_ldid not know or understand the
, JONES concluded that t
{,1 J JONES further statec that on, tsupra, wrote a memorandum, Attachment'(2),tet C
~ ] to advise him that (
J haE submitted a letter J,o him('
.3 compla1ning of Harassment by a construction supervisor.l
.sstated andrequestedthat{itatharassmentcfQCinspectorscannotbetole in his memorandum,t
}takeappropriateactionwithoutdelay.
2.
On February 1, 1983, Les CONSTABLE, NRC Resident Reactor Inspector at Wate-ford-3, was contactec by rer -tir.g irves:igator in order to arrarge an available work spa:e at hate-fcrc-3 rega-:ing the initiation t'f this been resolved and~this tjme, CONSTABLE advised that j;he alleaation has investication.
At 7
lhad been fired on or about(
CONSTABLE also sEted that the alleger had resigned f'or personal reiIsons
~
in September 1982.
C0h5 TABLE indicated that there was correspondence to this effect, and stated he would attempt to locate the proper correspon-dence to confirm these actions.
3.
On March 10,1983,(
, I supra, was contacted by reporting investigator and agreed to provide to the NRC all correspondence reoardine this matter.
On March 14, 1983, reportinc investigator received Attachment (3) through Attachment (6) from f ~ 7 describing the
~
~~
following actions:
A.
[
supra, wrote a memorandum, d
Attachment (3), to edvising him he had taken k,
j irriediate action. ' ~
a rlainec in his memorandum that he had corcuttec an inveT:~igatior, and as a result, he had relievec B507130265 850502 PDR FOIA BERNADE84-717 PDR
~
L.
s.
Q$E3-006
~
Page 2
.-. 7.from his present sition, and his duties'and s
voTvement with Mercury Company.
.".7alsoindica d hthad notifiedC l} Manager of Construction, tha
lhad been relieved of Tis duties.
.m B. W.__ _.
,,_fsupra, acknowledged morandum lett br Attachment (4), wherein he urred with by writing the remova of
- f. and stated in pajr, "We fin 9"!
~ ~ ~ ~ [
unacceptable to'the.
C.
sypra..wro a memorandum, Attachment'(5),
'L
.. with a copi hatconfirmed(~
J terminationwiththe[
)submittedhisresignationto h ~k
, see Attachment (6).
D.
the 4
Eric JOHf;50f; and other Region IV congnizant personnel were briefed regarding the results of this investigation and concurred that no further investigative action is necessary at this time.
Attachment (1)-
Attachment (2) -
' Attachment (3) -
Attachment (4) -
Attachment (5) -
Attachment (6) -.
FEErAREE Ev:
Ficharc t.,
herr, Director Office of Investigations Field Office Region IV cc:
W. Ward, 01:DF0 w/ attachments P. Baci, 01:DF0 w/ attachments J. Collins, RIV w/attachnents E. Johnson, RIV w/o attachments J. Gagliardo, RIV w/o attachments
- i e--
h M
\\
k u.s. mucuan natuLATony --
ac pow moe
~
INVESTIGATION STATUS RECORD
> Tauevious re w.
.o.nem.e n e,
.<=,i.=-iv c
e.
e = wn
,v m ev.. it no n.,
nn e
M soy,eso,tsng persec. Inde te **Peo Oiens.. en the statu..aee. Kaeo wie orsynet ersth th. m.e fae one,ws one esey to pe o ue,w
.s.
o% o, e,,,
n,.
n.
o m es sarsoon ua29 2
' ' " " ^ * * " ^ * ' " ~
' ~ ^ ' " "
Q4;B3-015 '
" =^naia w 'ut' OI FIELD OFFICE 1Eoa"'
OIR4-83-A-0067-REGION IV v.vinoon x.ornia w.6aso 'o
" WATERFORD-3 ALLEGED INTIMIDATION OF DRISKILL Tan. int;TcTANa.
OC INSPECTORS status so.c,r re.,,,,,-,e,sr enar w r
In July 1 h.W
~ ~
i - m i*' % 2 D I'i b.
calleged that he hao experienceo a nign personnel
%+
turnover at that ocation oue to in imidation complaints.
The alleger stated that intimidation by many unidentified supervisory personnel at Waterford ha _ created 7
untenable working' conditions for many personne1' he (the alleger)
DATE:
October 31, 1983 - Inquiry complete.
Report in preparation.
ECD:
November 1983 DATE:
November 30, 1983 - Inouiry complete and released to the region.
Region IV requested one additional investigative lead to be conducted.
This lead will be conducted and reported as a supplemental.
ECD:
Unknown DATE:
Decemoer 3D,19E3 - Inquiry compie:e anc released to the region.
Region IV requested one additional investigative lead to be conducted.
This lead will be conducted and reported as a supplemental.
ECD:
Unknown DATE:
January 31, 1984 - Inquiry complete and released to the region.
Region IV reauested one additional investigative lead to be conducted.
This lead will be conducted and reported as a supplemental.
ECD:
Unknown DATE:
February 29, 1984 - On Februa*y 24,1984,04-03-015(5) was CLOSED and releasec :: :ne Region IV staff.
7$
+
gposes ses,
.J u.s.auctsan asou6avony commession '
l INVESTIGATION STATUS RECORD svauenoms. m me.n = = =
.==e==== me wa=
y in.
ms ema,=
. m
, z em. u
=
e aw e =
me.,
-w, a.m.**== a.o me.
x
- m. w n= w -e
,= m
- ......,.. ors = *t w...... 's r v.. 9..
- ....2 w :.:. 0...,.. a. :.r.
c:.......
h.Ja=**a..., 3.g..
on.c 0I EIELD.0FFICE..
8.>
.:~..
L uvia,
v til ' U-
' ~ " " ~ ~ ~ ' "
~REGIOR IV 443!01'4'T
- y
'[***u*e',o, 7,
- **""***?"
. v*e*i.oo."c"*"
A-83-A-0083 v
.x.. or 7"
WATEFORD-3: plEGED IMPROPRIETIES IN THE PAUL OC decartment
'7 I
stArus ts cny==.,ia e c;p;,n
~-- -
~
i,0n Ju 20,1983, _an__g_1,1.eger was.interviegd and__provjded. the all.egations_tha_t/
~
at Waterford 3,(F L
DATE:
July 29, 1983 - Investigation is planned during the October / November 1983
. tina. frame. due to other higher pr.iority investigat. ions.
DATE:-August 31, 1983 - Investigation is planneyduring the Novemoer/ December 1983 time frame.
DATE.:
Septemcer 3D,1983 - Investigation is planned during the Maren/Aoril 1964 time frame, if investigative resources are available.
DATE:
October 31, 1983 -
Investigation is planned during the March / April 1984 time frame, if investigative resources are available.
ECD:
May 1984 DATE:
flovember 30, 1953 - Investigation is planned during the March / April 1984 f,
time frame, if investigative resources are available.
EDC:
May 1984 Gj_
l Page 2 of 2 e.
F_
- u. mmm m.o
- =,,='==
pfvEsnGAT10N STATUS RECORD savauenous: w*=== = === a====== *===r soon== emner mm e
.,. n
,, a.,,,"8#'8 8"*'d. Didhup % Ougs" h 9e subs M Esop to.W 588i 9e ens he auf seuf ese a
" 0! FIELD OFFICE REGION IV 4-83-014 OIR4-83-A-0083 E
- 's "== m e "=="
.."wwa
- * " ' WATERFORD-3: ALLEGFD. JMDDOPRTFTIES IN THE QC Department R J-PAUL
- ~ ~ -
.aru m
..,w w w t
December 30, 1983 - Investigation is planned during the March / April 1984 ECD: May 1984 jl DATE:
time frame, if investigative resources are available.
l 1
h DATE:
January 31, 1984 - Investigation is planned during the March / April 1984 time frame, if investigative resources am available.
ECD: May 1984 February 29, 1984 - Investigation is planned durino the March / April 1984 DATE:
time frame, if investigative resources are available.
ECD:
May 1984 DATE:
March 31,1984 - Investigation is scheduled to begin during first week of Acril 1984. On March 28, 1984, a meeting between investigators froa OIF0:RIII and RIV was held for investigative status update and case reassignment.
ECD: May 1084 DATE:
April 30, 1984 - Investigation assigned to OI:RIII investigator.
Investigation approximately 20% complete. Anticipate completion during November / December 1984 time frame.
ECD: Unknown.
DATE: May 31, 1984 - This investigation is approximately 50% complete.
Anticipate completion during November / December 1984 time frame.
ECD: Unknown
r.
UA. NUCLEAR AGOULATony commesicos esec Po nte M w
INVESTIGATION STATUS RECORD mestnuCnons: n= me m = m.
a.==s wa===, w*=,n
,==
e
..==,, i,.,=,, m u samass a=== e e<=e s=
= = a n=e s.a.s. =*==,= o.ae. ei v.=== w.m. r p
= = *=aa-=a on..ee
=
..cs
- =aa'a can 01 FIELD OFFICE
. 4 m us. es 4-83-014 o opinar-o.aaew.
REGION IV
~
OIR4-83-A-0083
_g_
- Ma
=.
- n. w.un
. v
"' WATERFORD -3: ALLEGED IMPROPRIETIES)IN a"'***a a nr nrpapmrNTY PAUL STATUS #5pmer&.Dr'. N FD8 e enef A 7 -d
/
This investigation is approximately 60% complete. Anticipate June 30. 1984 -
ECD: Unknown DATE:
completion during November / December 1984 time frame.
DATE:
July 31,1984 - This investigation is approximately 75% complete.
Anticipate completion during November / December 1984 time frame.
ECD:
Unknown 31, 1984 - This investigation is approximately 80% complete.
August DATE:
Anticipate completion during November / December 1984 time frame.
ECD:
Unknown l
]
i
....w..
r.g, e.
..a
,-s...C,
. e., g.
- m.. E,.
- e.,.
C,e. s.. a.
.. t.. e... a.
. c. e. s.
t.
n.
s..s,
.....s...
..- --. e..e. C '...,
n r....
- ^>*****....
6.**.*.
'. '. * * *. '.'*.*e t.
c.
.t c
s.op.C.
C.
C, r v s *. *~* - *. *. *. *. 5
- r...a ". *.
- s. s.
m..
~
................y g.
. q g. s...
m..........
.e g, go.
. C E '.. *. *. E.' *. *.
. s., r. c e x *.t *.* E ".
- r..
...e..
- 18.. E '
C*.' '. ;*.* *. i C *. ', *. B. t h i. *.. b -
..*****&"C'.'".
C o "...'.'..' *. E *.. *. m '. *. *
.e.
3
. e... g g e....g...y, g.. c. r, g, g. e.
. e.s.
l o w '. *.. *. " r. '..* *. *. '. C *.. *
- n..s.g.p..
.....e.
.e Ine NE* will not ioentify me by namE o. perscr.e'. t oer.tifie r ir. anv NEC
~
...c....
,,.,., e e.
. c.. e.,
w.....
. r...,. e..
.e...
e... y E,. s c..
.. ~..,
- n.,.n...
,.,t.....v.,. n..t.
., '. o r.
a *.1 w* *.. ~.s'cc.-
.2..
. u.. r a. r c. e..-.,t.
e.
.e e..t.:.
e.r.-...ee+ ee.. ar.v c4.c.
....+*- c ". t..- '. C.
. h c. f.1...* s... r. E e>Ce': tor c# ::ne Out..it te.enCles wr.1Cr ma.v rec.1re inis informatior in i
.. *.t e a r. E C,- *ntir ret CnsiClii:1EE U'.Ce"
.Ew Cr C;CiiC trus*,
c.
g...
w*.*..*.*.
'. 9 8.i..
- r. *... V
'.1 *. E *.. *.
. e. ; n 5 E r. f
- " c. r.. *. *. *..s g
.w
. z..... ; a..
1, r~'.
- v. e. ". E. s. e. E...\\...le5.
e.
C n r.C,. C. n s..e.
o
...j,.e :
,e
..4..,.
.4
+
e..,
. e,, e. t.. e. r,.....
g..,.-- cc, _,,., c.s
,y, u
y....
,ee..
.c.:..
. r. c..c. - ;... s c.
.c.c.
.c e.
c.
. #.... i c.c. g..
c e..- c -...r...c e
e
.o.
...r.. w.....
e.., c..s e..er
. r... n '. C ', t..." < -. *
. c.
- e. p.. g.. g e..e ec..z
~
C " *. * * '. *"
a
.v.
- k...
.. C Q c.
Lre=.cg*
e.
- p,
....C &. P.; &. F. *. y (.* f. *..&.* *. C. [
- h.,y
- D E.
( **
- d. e.t.* e..t
(**
e p
g c.c e w
- e e
c.
m.
p.
- ... r.. $ * %.*.3 * *, F. P.
.s.t
- e.. 3
- g gVC
- P, e.-...
- r. e....(
- 4
(.m F 9 &.. g A. *. kg *** et e., e......,C.P.,..
9.t t... &. =.
.y
.e a.
- g
.s 89,n.
g..
- p..
- y. g yC.3
.. g e.....y
... ~..
c --
3C a.
- ..e*C
{*
. g a. r * *...L e e. t.,. -
( *, f. *.' g e., g ", ).
g e * * *
- a. t.
e Pe.
4 t.
- ; C C. C
- c,. #..a C '. C.
- e.
.,g,..
...gg 4
...I..;,...*...
. 3 g....
.g
, c., p h C,..
C..;
b
..L
. y
- 3..
62.,.
.t
.L
. T
... ~........:.....
w-O..
e....
..J...
- g.......;
j..g,...
t.
L.
e 5 *.... ;, e. 2.,
..g.
y ;.." g. **. r. e :... -:..
e.g y.
,.;. g. g.
.g...
g 3
.g
.g;
..g.
g.,. ;.. g..... g. *..;
C..
m
.t
.O,,..
...;. :.,..*... 00 '; **.
.g,
..*e
.2**
,;3.,...
.-..:..e..
/
a.
m
.ph.
s
(
1 g
3.,.
- 4. 3, ;.
2....,
- ../
..-..e..c.,..
y y
A m.
3
.,t
-'N "m~
'g s
3.;
- g.
k
,