05000336/LER-1997-009, Forwards LER 97-009-00,which Documents an Event That Occurred on 970325.Commitments Made within Ltr,Submitted

From kanterella
(Redirected from ML20140F596)
Jump to navigation Jump to search
Forwards LER 97-009-00,which Documents an Event That Occurred on 970325.Commitments Made within Ltr,Submitted
ML20140F596
Person / Time
Site: Millstone Dominion icon.png
Issue date: 04/24/1997
From: Price J
NORTHEAST NUCLEAR ENERGY CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML20140F600 List:
References
B16405, NUDOCS 9705050078
Download: ML20140F596 (2)


LER-1997-009, Forwards LER 97-009-00,which Documents an Event That Occurred on 970325.Commitments Made within Ltr,Submitted
Event date:
Report date:
Reporting criterion: 10 CFR 50.73(a)(2)(i)
3361997009R00 - NRC Website

text


.s

- ~

n--

n..-u-s -

I

~

Nordicast Hope Ferry Rd. (Route 156), Waterford, CT 06385 Nuclear Energy slaisione Nociear vower stauen i

Northeast Nuclear Energy Company l

e.O. Box 128 Waterford, Cr 06385-0128 (860) 447-1791 Fax (860) 444 4277 The Northeast Unlities System April 24,1997 Docket No. 50-336 B16405 l

Re: 10 CFR 50.73(a)(2)(i) l U.S. Nuclear Regulatory Commission Document Control Desk Washington, DC 20555 l

1 i

This letter forwards Licensee Event Report (LER) 97-009-00, documenting an event l

that occurred at Millstone Nuclear Power Station, Unit No. 2 on March 25,1997. This LER is being submitted pursuant to 10 CFR 50.73(a)(2)(i).

i

)

l The following are NNECO's commitments made within this letter.

B16405-01:

Operational surveillances, which verify the circuitry after the bistable, 4

will be revised prior to entry into Mode 4 from the current outage to properly test the CSAS actuation modules.

B16405-02:

In the response to NOV 336/98-08-07 (NNECO Commitment No.

B16076-2), Millstone Unit No. 2 committed to perform a review of Technical Specification surveillance procedures to ensure compliance with Technical Specifications surveillance requirements as part of the Operational Readiness Plan.

3

\\

($

Very truly yours, NORTHEAST NUCLEAR ENERGY COMPANY CM N 970505007s 970424 J.A.

re DR ADOCK 0500 6

cc: see page 2 083422-5 REV,124 l

-=.

-.._- =.

'U. S. Nuclear Regulatory Commission B16405/Page 2 Attachment: LER 97-009-00 cc:

W. D. Travers, Director of Special Projects H. J. Miller, Region i Administrator l

D. P. Beaulieu, Senior Resident inspector, Millstone Unit No. 2 D. G. Mcdonald, Jr., NRC Senior Project Manager, Millstone Unit No. 2 l