ML20140C338

From kanterella
Jump to navigation Jump to search

Requests Technical Assistance in Review of Certificate Amend Request for Deletion of Portsmouth Gaseous Diffusion Plant Tsr 2.2.4.1, Seal Exhaust Pump Overflows
ML20140C338
Person / Time
Site: Portsmouth Gaseous Diffusion Plant
Issue date: 06/04/1997
From: Pierson R
NRC OFFICE OF NUCLEAR MATERIAL SAFETY & SAFEGUARDS (NMSS)
To: Ting P
NRC OFFICE OF NUCLEAR MATERIAL SAFETY & SAFEGUARDS (NMSS)
References
TAC-L32031, NUDOCS 9706090217
Download: ML20140C338 (3)


Text

. ._. __ _ . . _ ,_ _ __ _._ _ _ _ _-- _ _ . .

,r yw oo e, 4 UNITED STATES j j j NUCLEAR REGULATORY COMMISSION WASHINoToN, D.C. 20066-0001 l

g

%, /g June 4, 1997 MEMORANDUM TO: Philip Ting, Chief Operations Branch Division of Fuel Cycle Safety and Safeguards

+

FROM: Robert C. Pierson, Chief Special Proj,ects Branch {f .

Division of Fuel Cycle Safety and Safeguards

SUBJECT:

TECHNICAL ASSISTANCE REQUEST- REVIEW OF CERTIFICATE AMENDMENT REQUEST FOR DELETION OF PORTSMOUTH i GASEOUS DIFFUSION PLANT (PORTS) TECHNICAL SAFETY  !

l REQUIREMENT (TSR) 2.2.4.1 ENTITLED, " SEAL EXHAUST PUMP OVERFLOWS" j The Special Projects Branch requests technical assistance in reviewing the following project:

Pioiect: USEC certificate amendment request (CAR), dated May 6,1997, to delete TSR 2.2.4.1 entitled, " Seal Exhaust Pump Overflows."

Casework /RITS/ TAC Nos: 70-7002120S/212AM/L32031 Reauested Action: TSR 2.2.4.1 requires seat exhaust pumps to have overflow lines to prevent a j criticality in the event that a mixture of oil and enriched uranium completely fills the pump  ;

cavities. According to USEC, updated Nuclear Criticality Safety Evaluations (NCSEs) and j Nuclear Criticality Safety Approvals (NCSAs) have determined that overflows are not needed to I prevent accidental criticalities associated with the accumulation of potentially uranium-laden oilin  ;

the seal exhaust pump cavities.

According to USEC, the amendment will allow installation of replacement seal exhaust pumps in X-330 and X-333 facilities. As such, USEC has requested the NRC to give high priority to this CAR.

The SPB target date for completion of this amendment is August 22,1997. To meet this target date, completion of your review in the form of recommendations based on independent confirmatory criticality computer code evaluations, by July 25,1997, is requested. The estimated schedule accounts for at least one request for additional information (RAl) to be generated by the primary reviewer no later than June 27,1997. If needed, a meeting with USEC on this subject could also be arranged before sending them our RAl.

A copy of the CAR (Attachment 1), and the pertinent NCSAs and NCSEs (Attachment 2), are attached. Yawar Faraz has already discussed this request with Jack Davis of your staff.

However, if another reviewer is assigned, please have him directly contact Mr. Faraz before June 9,1997, to further discuss this request.

Contacts: PM: Yawar H. Faraz,415-8113 LA: D. Amy Hoadley,415-8129

[0

{lf ll) ennnnm ~

1 9706090217 970604 PDR ADOCK 07007002 C PDR {f *

. Philip Ting 2-  !

Please provide the information requested below and return a completed copy to the Licensing Assistant (LA) or Project Manager (PM) before June 9,1997.

Name of Reviewer. Tr4c K R . M \/15 FCOB's Projected Completion Date: 7h5h9 FCOB Branch Chief Signature:

The above TAC No. should be referenced in future correspondence related to this request and on the RITS Report for recording staff time expended on this effort.

Docket 70-7002 Certificate GDP-2 1

Attachment 1: 5/6/97 Itr frm James H. Miller, USEC to C. J. Paperiello l Attachment 2: NCSA-0330_006.A00 request date 10/10/96 NCSE-0333_016.E00 review date 10/10/96 NCSA-0333_016.A00 request date 10/10/96 NCSE-0330_006.E00 review date 10/7/96

NCSA-0330_005.A00 request date 10/10/96 q NCSE-0330_005.E00 review date 10/7/96 Docket 70-7002 G:\ TAR 4120S.YHF i

DISTRIBUTION: w/o encl. (Control No: 120S) i i Docket 70-7002 L NRC File Centers PUBLIC SPB r/f FCSS r/f a NMSS//f CCox, Rlli GShear, Rlli MHorn JDavis, FCOB WSchwink, ,

FCORDHeartland, Rill i OFC SPB C s SPB h S PB_ , , SPBn NAME YFaraz:ij N MONdley in Rhhson j DATE 6/3/97 (/ /,0/97 [/((97 ( [ 97 .

I C = COVER E = COVER & ENCLOSURE N = NO COPY I

OFFICIAL RECORD COPY  ;

4 l

.  :. l l

Philip Ting  ! ,

i

Please provide the information requested below and return a completed copy to the Licensing j Assistant (LA) or Project Manager (PM) before June 9,1997.  ;

Name of Reviewer: ~fdCKk.b/M/$ j FCOB's Projected Completion Date: 7/25!f7 FCOB Branch Chief Signature: ' }[ 5[f~/f 2 i The above TAC No. should be referenced in future correspondence related to this request and l on the RITS Report for recording staff time expended on this effort. I Docket 70-7002 Certificate GDP-2 Attachment 1: 5/6/97 Itr frm James H. Mdler, USEC to C. J. Paperiello Attachment 2: NCSA-0330_006.A00 request date 10/10/96 NCSE-0333_016.E00 review date 10/10/96 NCSA-0333_016.A00 request date 10/10/96 NCSE-0330_006.E00 review date 10/7/96 NCSA-0330_005.A00 request date 10/10/96 NCSE-0330_005.E00 review date 10/7/96 l

e

--