ML20138R272

From kanterella
Jump to navigation Jump to search
Answer Opposing Intervenors Suffolk County & State of Ny Petition for Review of ALAB-824 in Which Aslab Affirmed ASLB 850614 Partial Initial Decision That Three Tdi Emergency Diesel Generators Satisfy GDC 17.W/Certificate of Svc
ML20138R272
Person / Time
Site: Shoreham File:Long Island Lighting Company icon.png
Issue date: 12/26/1985
From: Sherwin Turk
NRC OFFICE OF THE EXECUTIVE LEGAL DIRECTOR (OELD)
To:
NRC COMMISSION (OCM)
References
CON-#485-639 ALAB-824, OL, NUDOCS 8512310145
Download: ML20138R272 (12)


Text

_____ __

k 0

1 UNITED STATES OF AMERICA i NUCLEAR REGULATORY COMMISSION cacNhf0 U

l i

BEFORE THE COMMISSION OEC 27 p7 5 In the Matter of )

LONG ISLAND LIGHTING COMPANY Docket No. 50-322-1

) (OL)

(Shoreham Nuclear Power Station, )

Unit 1) )

NRC STAFF'S ANSWER TO

" PETITION FOR REVIEW 0F APPEAL BOARD DECISION" FILED BY SUFFOLK COUNTY AND THE STATE OF NEW YORK On December 10, 1985, Intervenors Suffolk County and the State of New York ("Intervenors") filed a " Petition for Review of Appeal Board Decision" (" Petition"). Therein, the Intervenors request that the Commission take review of ALAB-824,1/i n which the Appeal Board affirmed the Licensing Board's Partial Initial Decision of June 14, 1985 ("PID"), 2_/

which held that the three Transamerica Delaval, Inc. ("TDI") emergency diesel generators ("EDGs") installed at the Shoreham nuclear plant satisfy the requirements of General Design Criterion 17 for the first fuel cycle.

Pursuant to 10 C.F.R. 5 ?.786(b)(3), the NRC Staff (" Staff") hereby files its answer to Intervenors' Petition. For the reasons more fully set forth below, the Staff opposes the Intervenors' Petition and recommends that it be denied.

~1/ Long Island Lighting Co. (Shoreham Nuclear Power Station, Unit 1),

ALAB-824, 22 NRC (slip op., November 21,1985).

2/ Long Island Lighting Co. (Shoreham Nuclear Power Station, Unit 1),

LBP-85-18, 21 NRC 1637 (June 14, 1985).

8512310145 851226 PDH ADOCK 05000322 G PDR

s l

INTRODUCTION Contentions challenging the adequacy of Shoreham's emergency diesel  ;

generators under GDC 17 were initially admitted by the Licensing Board l in 1983 and 1984. After evidentiary hearings on those contentions had l commenced. LI*:0 moved to reopen and supplement the record and, in con, junction with its motion, sought to amend its FSAR by reducing the maximum permitted load ratinos for the EDGs from their original con-tinuous duty ratings of 3500 KW (with a short time excursion rating of 3900 KW), to a " qualified load" of 3300 KW. M The Licensi c Board granted LILCO's motien by Order of December 4,1984, and offered the

~

parties an opportunity to challenge the lower " qualified load" rating proposed by LILCO.

On December 17, 1984, the Intervenors filed an additional conten-1 tion, which was then modified and admitted by the Licensing Board.

i This contention generally asserted that the EDGs with a " qualified load" of 3300 KW as the maximum permitted load did not provide sufficient capacity and capability to assure various safety functions because the qualified load did not encompass all of the loads that could be imposed

-3/ The concept of a "cualified load" was introduced by the Staff as an -interim licensing basis for TDI emergency diesel generators at Shoreham and other plants. The " qualified load" is that load which bounds the maximum emergency service load (MESL) for the diesel generators, at which certain key components have operated success-fully for at least 10,000,000 loading cycles, or approximately 740 hours0.00856 days <br />0.206 hours <br />0.00122 weeks <br />2.8157e-4 months <br />. The MESL is determined by summing the loads imposed by all equipment which will be connected for more than brief periods of time following the initiation of a LOOP /LOCA event (the design basis event for Shoreham). The MESL for each of the three Shoreham EDGs is 3253.3 KW, 3208.7 KW, and 3225.5 KW, respectively. See PID, 21 NRC at 1691-93.

l l

s 0 on the EDGs, including loads that may be imposed due to operator error.

SeePID,flNRCat 1689, 1691. O On January 25, 1985, the Intervenors filed certain testimony con-cerning the margin between the MESL and the maximum rated load capacity for EDGs at other boiling water reactors. On February 11, 1985, the Licensing Board granted LILC0's motion to strike those portions of the testimony, citing its January 18, 1985 OrderEl that "such litigation would be '. . . at least so remotely collateral to the material issues beforeusastobedigressivewithoutanyredeemingusefulness.'"5/

Reopened hearings began on February 12, 1985, and the record was closed on March 12, 1985.

~4/ The Intervenors had proposed that the contention include the following assertion:

(b) There is little or no margin between 3300 KW and the maximum emergency service loads for the EDGs, in sharp contract to emergency diesel generators at other nuclear plants where a substantial margin provides ade-quate assurance of requisite reliability under GDC 17.

In denying admission of this part of the proposed contention, the Licensing Board stated it was " unnecessarily redunda.nt," and that:

[T]o the extent admission of this part would arguably include consideration of the margin at other nuclear ,

plants, such litigation would be irrelevant or at '

least so remotely collateral to the material issues before us as to be digressive without any redeeming usefulness. 1

" Memorandum and Order Ruling on Admissibility of Emergency Diesel 1 Generator Load Contention," dated January 18, 1985, at 8.

5/ See n. 4, supra.

-6/ " Memorandum and Order Ruling on Motions to Strike Portions of Suffolk County and LILC0 Testimony," dated February 11, 1985, at 3.

e. _ . _ _ _ _ _ - __ __ ~ ,_ __

i i

i

OnJye14,1985, the Licensing Board issued its PID on emergency diesel generator issues, finding that the three TDI diesel generators at Shoreham satisfy the requirements of General Design Criterion 17, 10 C.F.R. Part 50, Appendix A. E The PID resolved all remaining issues in controversy necessary for the issuance of a low power operating license, and authorized the Staff to issue a low power license (up to 5% of rated power), upon making the findings specified in 10 C.F.R.

i50.57(a).8_/

7/ GDC 17 provides, as pertinent to the instant Petition, as follows:

, Criterion 17 - Electric Power Systems. An onsite electric

. power system and an offsite electric power system shall be provided to permit functioning of structures, systems, and components important to safety. The safety function for each system (assuming the other system is not functioning) shall be to provide sufficient capacity and capability to assure that (1) specified acceptable fuel design lirrits and design conditions of the reactor coolant pressure boundary are not exceeded as a result of anticipated operational occurrences and (2) the core is cooled and containment integrity and other vital functions are maintained in the event of postulated accidents.

The onsite electric power supplies, including the

' batteries, and the onsite electric electric distribution system, shall have sufficient independence, redundancy and

testability to perfonn their safety functions assuming a
single failure.

! As stated in the Introduction to 10 C.F.R. Part 50, Appendix A, the General Design Criteria " establish minimum requirements for the principal design criteria for water-cooled nuclear power plants

. similar in design and location to plants for which construction pennits have been issued by the Connission."

-8/ The PID also authorized the issuance of a full power operating license for the first fuel cycle, to the extent that such a license

depended upon resolution of the emergency diesel generator issues which were before the Licensing Board,

,i

'l l ,

On Ju,1y 17, 1985, Intervenors Suffolk County and the State of New York filed their brief on appeal from the PID. El Therein, they argued that the PID should be reversed on the sole ground that the Licensing -

Board had erroneously excluded evidence as to the capacity / power demand margin at other nuclear plants EI -- which, the Intervenors contended, would have demonstrated that GDC 17 had previously been " interpreted and applied [by the Staff] to require that . . . the maximum load at which EDGs are permitted to operate (' maximum permitted load') must be substantially higher than the EDGs' maximum emergency service loads

('MESL')" (Appeal Brief, at 1-2). On November 21, 1985, the Appeal Board issued ALAB-824, in which it upheld the Licensing Board's rulings and squarely rejected the Intervenors' appeal. Intervenors' Petition seeking review of that decision was filed on December 10, 1985.

DISCUSSION The standards governing the grant of petitions seeking Connission l review of Appeal Board decisions are well defined. The Commission's regulations provide that a party may file a petition for review "on the ground that the decision or action is erroneous with respect to an 9/ "Suffolk County and State of New York Brief in Support of Appeal of June 14, 1985, ASLB Decision" (" Appeal Brief"), dated July 17, 1985.

i 10_/ In their Appeal Brief, the Intervenors made passing reference, in a footnote, to the fact that the Licensing Board had limited their cross-examination of LILCO and Staff witnesses concerning the capa-city / power demand margin (Appeal Brief, at 10 n.10). However, as noted by the Appeal Board during oral argument, the Appeal Brief directly addressed only the Licensing Board's exclusion of evidence and failed to indicate clearly that the Intervenors were appealing from a limitation of cross-examination. See Transcript of Oral Argument September 26, 1985, at Tr. 12, TG 18. See also Appeal Brief, at 1-2, 6, 8-13, and 14.

~- . __ _ _

- important question of fact, law, or policy." 10 C.F.R. 9 2.786(b)(1).

While the grant of such a petition is within the discretion of the Commission, as set forth in 10 C.F.R. 6 2.786(b)(4), it is clear thtt a petition seeking review of matters of law or policy, such as the instant Petition, must present an important question which merits the i

Comission's review:

(i) A petition for review of matters of law or policy will not ordinarily be granted unless it appears the case involves an important matter that could signifi-cantly affect the environment, the public health and safety, or the common defense and security, constitutes an important antitrust question, involves an important procedural issue, or otherwise raises important ques-tions of public policy.

10 C.F.R. 9 2.786(b)(4)(i). The Staff submits that the Intervenors' Petition seeking Commission review of ALAB-824 fails to satisfy this standard and should be denied.

A. The Exclusion of Evidence.

~

The Intervenors' first complaint concerns the Licensing Board's determination to exclude evidence as to the capacity and capability of EDGs installed at other nuclear plants, b The Intervenors contend that

-11/ In their Petition, the Intervenors also challenge the Licensing Board's refusal to admit a portion of their EDG load contention concerning the capacity / power demand margins at other nuclear plants, and assert that the Appeal Board " inexplicably" failed to address this matter (Petition, at 3, 6). However, contrary to their assertion (Id., at 5), the Intervenors made only passing reference to this matter in their Appeal Brief, and never asserted that the Licensing Board had erred in this regard or that they wished to appeal on this ground (see Appeal Brief, at 8 n.8).

Similarly, this matter was not raised during oral argument (see generally, Transcript of Oral Argument, September 26, 1985, at 11).

Accordingly, this issue may not be raised before the Commission at this time. 10 C.F.R. 6 2.786(b)(4)(iii); Long Island Lighting Co.

(FOOTNOTE CONTINUED ON NEXT par,5)

4 the rejected evidence would have demonstrated that the Staff has inter-preted and applied GDC 17 to require a substantial capacity / power demand margin for the EDGs at other RWR plants, and that the EDGs at Shoreham fail to comply with that purported Staff interpretation of GDC 17 (Petition, at 4, 7-8). E These assertions fail to present an "important question" that requires Commission review. The Licensing Board's action in excluding the testimony was carefully reviewed and squarely upheld by the Appeal Board in ALAB-824, and no further review of that action is warranted.

The Appeal Board correctly detennined that "the evidence in question could not serve its intended purpose and, therefore, was properly excluded." (ALAB-824, slip op. at 3). As noted by the Appeal Board, the testimony and Table excluded by the Board established only that the

27 identified BWRs " possess emergency generators with widely varying capacity / power demand margins," not all of which could be characterized -

(FOOTNOTE CONTINUED FROM PREVIOUS PAGE)

(Shoreham Nuclear Power Station, Unit 1), Docket No. 50-322-OL-3, Order dated December 19, 1985, at 1 ("the Commission will not review issues 'that could have been but were not raised' before theAppealBoard").

-12/ In a related vein, the Intervenors again assert that they were improperly restricted from conducting certain cross-examination concerning the capacity)and BWRs (Petition, at 4, 6 . ThecapabilityLicensingofBoardEDGscorrectly installedruled at other that this issue was collateral to the issue before it, i.e., the issue of whether Shoreham's TDI EDGs comply with GDC 17. Accordingly,

+

even assuming, arguendeo, that the cross-examination issue had been raised before the Appeal Board (see n. 10, supra), to the extent that Intervenors' Petition addresses this issue, it is governed by the discussion above concerning the exclusion of Intervenors' direct testimony as to the capacity / power demand margins at other ,

nuclear plants. l l

1

-- ... . - - , , , - - - . . - - - - - , ,.,--.,.,,.,.--.--,,.-..-..---w - . - - - . _ . .

i 4 l

as"substytial"(Id.,at8). In addition, as noted by the Appeal Board, not all licensed BWRs, and no PWRs, were included in the Table, and at least one other plant possesses a capacity / power demand margin which is  !

less than those possessed by the Shoreham EDGs (Id., at 8-9). E l Moreover, as further noted by the Appeal Roard, the Staff has denied that it had ever interpreted and applied GDC 17 in the manner attributed to it by the Intervenors (Id., at 8). El j In sum, the evidence proffered by the Intervenors simply does not 1
support the inference they seek to draw, concerning the Staff's alleged i

j construction of GDC 17. The Appeal Board summed up the matter as follows:

i . . . [E]ven had the table reflected that the emer-l gency generators associated with all of the listed

reactors possessed large capacity / power demand margins,

{ there still scarcely would have been room to infer

, that such margins were provided in obedience to a j staff mandate, rooted in GDC 17. For utilities and i their contractors do many things in the construction

~~~13/ The Intervenors' assertions that the Appeal Board incorrectly inter-i preted their proffered table (Petition, at 7-8), even if true, are

irrelevant. Regardless of whether the smallest capacity / power demand margin reflected in the table is 3% or 7%, the table simply
fails to establish that the Staff has interpreted GDC 17 to require i a " substantial margin". Further, the Intervenors have inadequately addressed the fact that other plants have a margin lower than that
possessed by the Shoreham EDGs (see ALAB-624, slip op, at 9). .

H / The Intervenors complain that the Appeal Board improperly relied upon a " post-hearing" statement by the Staff which "is not in evidence and was not subject to cross-examination" (Petition, at 6-7). Contrary to Intervenors' suggestion, however, this matter l was addressed before the Licensing Board. Thus, Staff witnesses l had testified that the design load, as defined in IEEE 387-1977,

does not include loads attributable to operator error. See Tr.

j 27,796-97, 28,174 (Knox); Tr. 28,277-81 (Berlinger, Hodges);

j see ;enerally, PID, 21 NRC at 1698-1700 (Findings L L-33).

1 Tiiacdition, Staff witnesses had testified that there may be, and j probably are, operating plants where addition of loads induced by operator error would result in exceeding the ratings of the EDGs at those plants. Tr.28,200(Hodges, Knox). The Intervenors'

assertions in this regard must be rejected, i

I

4 and operation of nuclear power reactors that are not 9n direct response to a staff-imposed requirement.

The short of the matter is that the table, and accordingly the testimony of the witnesses founded thereon, were of so little probative value on the ,

question of the staff's interpretation and application of GDC 17 that the Licensing Board was fully justified in excluding them from the record.

The Appeal Board's conclusions with respect to this matter are clearly

! correct, and do not present an "important question" for Consnission review.

B. The Single Failure Criterion. .

The Intervenors' second complaint concerns the Appeal Board's detennination that the Shoreham EDGs are adequate under the single failure criterion of GDC 17. E The Intervenors claim the Appeal Board ruled as follows:

[E]ven if the Shoreham EDGs are of insufficient capacity and capability to meet the requirements of GDC 17 because of inadequate Maximum Pennitted Loads, they would nevertheless be accepted because even if 4

one EDG were lost, the other two would be sufficient to perfonn the necessary safety functions.

(Petition, at 9, citing ALAB-824, slip op, at 12). In effect, the Intervenors contend that the Appeal Board waived the first requirement i of GDC 17, and they assert that this is "an erroneous and dangerous interpretation of GDC 17 and the single failure criterion" (Id.).

The Intervenors incorrectly characterize the Appeal Board's ruling.

Contrary to their assertion, the Appeal Board found that the Shoreham EDGs are adequate under both of the standards set forth in GDC 17.

15/ This matter was addressed by the Appeal Board in its sua sponte review, and was never appealed by the Intervenors although it had been directly addressed by the Licensing Board (PID, 21 NRC at 1698-99 (Finding L-32).

First,thgLicensingBoardfoundthatthedesignbasisloadneednot include additional loads attributable to operator error, and that the Shoreham EDGs possess sufficient capacity and capability to accommodate the MESL as required by GDC 17 without requiring any additional margin; this determination was affirmed by the Appeal Board (see ALAB-824, slip op. at 12-14). Secondly, the Appeal Board found that the single failure i criterion of GDC 17 was met, in that any two of the EDGs must and do

" meet the power demand should the worst case event be accompanied or followed by a loss of the third generator (either because of operator error or otherwise)" (Id., at 12). The Intervenors incorrectly assert that ALAB-824 " eviscerates" GDC 17 (Petition, at 10), and they fail to present an "important question" that warrants Commission review of that decision.

CONCLUSION For the reasons set forth above, the Staff submits that the Intervenors' Petition for review of ALAB-824 should be denied.

Respectfully submitted Sherwin E. Turk Deputy Assistant Chief Hearing Counsel Dated at Bethesda, Maryland this 26th day of December, 1985

a i

E UNITED STATES OF AMERICA D%r-NUCLEAR REGULATORY COMMISSION 05 OEC27 P1:5g BFORE THE COMMISSION .A D j.,

In the Matter of d,dg ,

LONG ISLAND LIGHTING COMPANY ) Docket No. 50-322-1

) (OL)

(Shoreham Nuclear Power Station, )

Unit 1) )

CERTIFICATE OF SERVICE I hereby certify that copies of "NRC STAFF'S ANSWER TO ' PETITION FOR REVIEW 0F APPEAL BOARD DECISION' FILED BY SUFFOLK COUNTY AND THE STATE 0F NEW YORK" in the above-captioned proceeding have been served on the following by deposit in the United States mail, first class or, as indicated by an asterisk, through deposit in the Nuclear Regulatory Commission's internal mail system, this 26th day of December, 1985.

Lawrence Brenner, Esq.* Fabian G. Palomino, Esq.

Administrative Judge Special Counsel to the Governo.

Atomic Safety and Licensing Board Executive Chamber U.S. Nuclear Regulatory Comission State Capitol Washington, D.C. 20555 Albany, NY 12224 Dr. George A. Ferguson W. Taylor Reveley IT:, Esq.

Administrative Judge Hunton & Williams School of Engineering 707 East Main Street Howard University Richmond, VA 23212 2300 - 6th Street, N.W.

Washington, D.C. 20059 Dr. Peter A. Morris

  • Administrative Judge Jonathan D. Feinberg, Esq. Atomic Safety and Licensing Board New York State Department of U.S. Nuclear Regulatory Comission Public Service Washington, DC 20555 Three Empire State Plaza Albany, NY 12223 Stephen B. Latham, Esq.

John F. Shea, III, Esq. Herbert H. Brown, Esq.

Twomey, Latham & Shea Lawrence Coe Lanpher, Esq.

Attorneys at Law Karla J. Letsche, Esq.

P.O. Box 398 Kirkpatrick & Lockhart 33 West Second Street 1900 M Street, N.W.

Riverhead, NY 11901 8th Floor Washington, DC 20036

Atomic Safety and Licensing Board PJhe1* Docketing and Service Section*

U.S. Nuclear Regulatory Connission Office of the Secretary Washington, DC 20555 U.S. Nuclear Regulatory Comnission Atomic Safety and Licensing Appeal Board Panel

  • James B. Dougherty, Esq.

U.S. Nuclear Regulatory Commission 3045 Porter Street, NW Washington, DC 20555 Washington, DC 20008 Peter S. Everett, Esq.

Hunton & Williams Gerald C. Crotty, Esq. 2000 Pennsylvania Avenue, NW Ben Wiles, Esq. Washington, DC 20036 Counsel to the Governor Executive Chamber Robert Abrams, Esq.

State Capitol Attorney General of the State Albany, NY 12224 of New York Attn: Peter Bienstock, Esq.

Department of Law State of New York Two World Trade Center Room 46-14 New York, NY 10047 Edward M. Barrett, Esq. MHB Technical Associates General Counsel 1723 Hamilton Avenue Long Island Lighting Company Suite K 250 Old County Road San Jose, CA 95125 .

Mineola, NY 11501 Hon. Peter Cohalan Mr. Jay Dunkleberger Suffolk County Executive New York State Energy Office County Executive / Legislative Bldg. Agency Building 2 Hauppauge, NY 11788 Empire State Plaza Albany, New York 12223 Ms. Nora Predes Chris Nolin Shoreham Opponents Coalition New York State Assembly 195 East Main Street Energy Committee Smithtown, NY 11787 626 Legislative Office Building Albany, New York 12248 Partin Bradley Ashare, Esq.

Suffolk County Attorney H. Lee Dennison Building Veteran's Memorial Highway Hauppauge, NY 11788

/

) (m u-,: LI &

Sherwin E. Turk

._