WASHINGTON D.C. 20555-0001 August 3, 1993 Docket Nos. 50-335 and 50-389 MEMORANDUM TO:
FILE FROM:
Jan A. Norris, Sr. Project Manager Project Directorate II-2 Division of Reactor Projects - I/II Officie of Nuclear Reactor Regulation
SUBJECT:
FLORIDA POWER & LIGHT (FPL) - ST. LUCIE UNITS 1 AND 2 GENERIC LETTER 90-06, GENERIC ISSUES 70 AND 94 -
(TAC NOS. M77382, M77383, M77457, AND M77458)
As a result of a telephone conversation to clarify the licensee's submittals relating to the subject matter, FPL, on July 21, 1993, submitted by facsimile the enclosed clarifying information.
0
)-
h&,
J n A. Norris, Sr. Project Manager Pr ect Directorate 11-2 Division of Reactor Projects - 1/II Office of Nuclear Reactor Regulation
Enclosure:
As Stated NRC FRE CBETE C0F1 hg(e (c_f3 o3I? v3 3 L v/o s/ y d
Augu:;t 3, %.,
Docket hos. 50-335 and 50-389 MEM0PANDUM T0:
FILE FROM:
Jan A. Norris, Sr. Project Manager Project Directorate 11-2 Division of Reactor Projects - I/II Officie of Nuclear Reactor Regulation
SUBJECT:
FLORIDA POWER & LIGHT (FPL) - ST. LUCIE UNITS 1 AND 2 GENERIC LETTER 90-06, GENERIC ISSUES 70 AND 94 -
(TAC NOS. M77382, M77383, M77457, AND M77458)
As a result of a telephone conversation to clarify the licensee's submittals relating to the subject matter, FPL, on July 21, 1993, submitted by facsimile the enclosed clarifying information.
(Original Signed By)
Jan A. Norris, Sr. Project Manager Project Directorate 11-2 Division of Reactor Projects - I/II Office of Nuclear Reactor Regulation
Enclosure:
As Stated Distribution M W' PDII-2 Reading H. Berkow E. Tana J. Norris office LA:PDII-2 PM:M-2 D:PDJJ-2 N
ETana f(f JNoNik HB'eh DATE 07/J9/93 k3 93 d/)/93
/
0FFICIAL RECORD COPY - DOCUMENT NAME: C:\\ AUTOS \\WPDOCS\\NOANNA\\M77382.GL E E EE E
Ju. 21. '93 02:29PM FPL ST LUCIE ADt1 P.2 BACKGROUND
}
On May 12,1993, during a telephone conference call to discuss the review of GL 9006 for St Lucie, the NRC reviewer, Lambros Luis, requested FPL compare the PSL to a Non PORV CB l
P ant.
1 i
Lambros stated his position was that he felt PSL met the same safety enadivinna as the CB plants i
without PORVs (i.e., Waterfbrd & San Ono6e) because we had the saflety related charging and
.n,m y spray. PFL was asked to discuss how our system compared to Waterfbrd in response to the most limidag accident for the PORVs. This was the Less of al1 Foodwasst with a loss i
of offsite power. Could PSL respond to this event without the use of feed and bleed. PPL restated its position that we did not consider bleed & feed an issue and that feed & blood was l
planned to be resolved by the PRA and GL 88-20. Iambros stated that thejustification for this l
issue relied on the inclusion of feed & bleed in the regulatory analysis, i
FPL stated we were not familiar with the Waterford systems and the auxiliary feed water l
system, but did explain the PSL anvillary feedwater system and the redundancy built into the PSL APW system. FPL stated that our system was probably very similar to Waterford.
4 i
FPL sated we would look at a comparison of the PSL systems to systems in units almilar to l
Waterfbrd including HPSI, murillary spray, charging, and mur1Hary feedwater systems.
l The scope of the information provided was discussed with 1Ambros Luis and is similar to the information used for comparison in Table 3.2-1 of CEN 239 Supplement 2.
PPL prepared the attachments based on the review of the following documents:
3 1.
NUREG 1044 " Evaluation of the Need for a Rapid Doj w 00n Capability fbr l
Combusdon Engineering Plants," dated August 1984.
{
2.
Combustion hgla==dng, CEN 239, "Depressurization and Decay Heat Removal Response to NRC Questions," dated June 1983.
\\
I 3.
Combustion Engineering, CEN 239 Supplement 2, "Probabilistic Risk Assessment of the l
Effect of PORVs on Depressurizadon and Decay Heat Removal, Waterford Steam 1
Electric Station Unit 3," dated June 1983.
i 1
4.
Waterford 3 Probabilistic Risk Assessment for Generic letter 88-20.
5.
Combustion heta== ing, CENPD-263-P, "ATWS early Verification, Response to NRC Isteer of February 15, 1979, for Combustion Engineering NSSSs, dated November 1979.
Jti 21 '93 02:29PM FPL LUCIE ADM p,3 io m
! Ilj i l li ll1 l:j, l! ili l
i
$s i l
l li gi p!
3 I lil
!,! I 1p llili1l5 e sii ji Ill ll I ll l lI llllilijl!!!l!I il l i
i !Q l1llllllllll!_
I ii i !'? 1
_II_l!
l l l__
l.
- ,;ni l
Al i li ll l, l I,! E!g!
E i
ii 1, i
i e l,il ii
- l
!r ll!! il !I i i i i i i
l
.ll !
I!!! !
! ! !__l_
m;w
(( !Y l
!f l
g l ll l l g
e
=
l a
i t-i
- i 1,
e s
g g i
g Id l
l ll l 1 1 l
a i
.__