05000458/LER-1985-004, :on 850906,discovered That APRM Weekly Reactor Protection Sys Tests for Channels B,D,E,G & H Unsatisfactory Per Requirements for Setdown Neutron Trip.Caused by Exclusion of Steps to Verify Half Scram

From kanterella
(Redirected from ML20138A563)
Jump to navigation Jump to search
:on 850906,discovered That APRM Weekly Reactor Protection Sys Tests for Channels B,D,E,G & H Unsatisfactory Per Requirements for Setdown Neutron Trip.Caused by Exclusion of Steps to Verify Half Scram
ML20138A563
Person / Time
Site: River Bend Entergy icon.png
Issue date: 09/30/1985
From: Cutchin J
GULF STATES UTILITIES CO.
To:
Shared Package
ML20138A454 List:
References
LER-85-004, LER-85-4, NUDOCS 8510080588
Download: ML20138A563 (2)


LER-1985-004, on 850906,discovered That APRM Weekly Reactor Protection Sys Tests for Channels B,D,E,G & H Unsatisfactory Per Requirements for Setdown Neutron Trip.Caused by Exclusion of Steps to Verify Half Scram
Event date:
Report date:
4581985004R00 - NRC Website

text

.

3 NEC,

3 4 U s huCLE AS KEGutATOav Comme 8646oss 4,cao.:o oue o siio..

LICENSEE EVENT REPORT (LER) l

,actLivv manas its

]

occuar =vmeenis

,aarim River Rond 9tatinn 0 [ 5 l 0 l 0 j o l 3 l q [q 1 lOFl n),

I Tif LS tel APRnf 9ttrvn i l l n nen Tottino avant pais ins tanaevaseanici ascont ca re in ofwan,acilitess a=volvso ist MONTH oav ytan vtan 8 8,G,*g (a 4 go,3 gegy, oa, vgam

.aci6et,aawee oocatimousen ta s

0151010101 I l 01 9 0 16 8

5 8E O I014 010 019 31 0 8I5 0 1 5 toioiog [ t rais aa, cat is sveuerreo evneu4=v to v a neov.asus=re o, is e,a 3 <c3..

.,, e

nie "008 *'

q ao 4e:<=>

a sosi.e eo n n:H nowen so enee.in He so w.His se 73=usit.:

r,sise tion 0l 010 m acei.HiHei 73 tie.i LtviL

.\\

M acts.HgHei so Sei.Hsi x

so

  • 4.nsie o.rw e a t.s, a, = 4.,.,

e... r,nec e 30 73i.H2HG e0 F36.t(2HvisaHAl Jf4A>

M tosiellt Hese oO F3ieH3Has 30 738.H2Hs'uHel N edS'.H1H.

ed.734s H2HHet a0 731.ai2H.)

LICt4SE8 Comf act,om TMis LER 112) awa it LE,**ONE Noweta aaaa coce

_ Joe Cutchin, Tech Staff 510 ft 31416 [ 81615 l 11 co u n. t,.......c

~.=1,anu.. o se.ie... r,0..., n >>

l

"' *% ', " C'

"$y"l,aaga

cause

sysrtw cowso%t%t wa=

ac.

p a

e,yg, cou,og,,,

mege I

I l i I I l l

l 1 !

I I I l

I I I l l i I

l I l l 1 I su,.u...,at..

.,...ecr.o.

oo~1-o.,

u...s.c.

q ves a,,.

ua,rcuo st e-.ssion oA rts p no a.or ac,a -,s.,

,.%..,,-,.,o.,

On 9-11-85 at 2330, with the unit subcritical, it was discovered that the Average Power Range 5fonitor (APRSI) weekly Reactor Protection System (RPS) functional tests (Channels B, D, E, G,11) did not satisfy the requirements for the setdown s

i neutron trip. During this time, core alterations had been performed with less than the minimum number of APR>f channels.

i l

The Shif t Supervisor declared the above mentioned APR5fs inoperable.

1 l

The required APR31 weekly RPS functional tests were completed, and core alterations j

resumed.

1 i

j B510000500 850930yB PDR ADOCK O S

..e,.>

le 43)

4

'%KC pere 3e64

~""

U S NUCLE AR REGULaf 047 COMU@04 LICENSEE EVENT REPORT (LER) TEXT CONTINUATION

+

a>*aovio ove%o m oic.

E n'imt $ 8 3t #4 8&CILif y haut lit D0Ca t t NUMete fit ten %gween its P4GG 131 "R:.r. '

"T,7:

River Bend Station 0 [5 [ 0 l 0 l 0 l.1 l 5 l 8 Sl5 0 l 0l4 0 l0 0 l2 0F g ly

~~

sw, -.===..,

._vco nu,,on When the APRM weekly RPS functional tests were performed on 9-3-85 (Channel F) and 9-6-85 (Channels B, D, E, G,11), steps not required in Mode 5 were not performed to reduce unnecessary testing. On 9-11-85 the procedure results were reviewed by the Technical Staff System Engineer. During this review it was found that the Mode 5 test requirements for the setdown neutron trip were not satisfied. Normally when this trip is checked a half scram is verified, however, in this case the steps to verify the half scram were left out.

The Shift Supervisor concurred with the finding and declared the above APRMs inoperable. Since 9-6-85 core alterations had been performed with less than the minimum number of APRM channels.

As a result the limiting conditions for operation for Technical Specification 3/4.3.1 were not satisfied.

The requirements of Section 3.0.4 were also not satisfied.

No core alterations were being performed when this was discovered.

The procedures were then performed with all the steps required for Mode 5.

Core alterations resumed when the required APRM weekly functional tests were completed.