ML20137X020
ML20137X020 | |
Person / Time | |
---|---|
Site: | Comanche Peak |
Issue date: | 12/05/1985 |
From: | Wade D TEXAS UTILITIES ELECTRIC CO. (TU ELECTRIC) |
To: | NRC |
Shared Package | |
ML20137W974 | List: |
References | |
AFF-851205, OL, OL-2, NUDOCS 8512100398 | |
Download: ML20137X020 (2) | |
Similar Documents at Comanche Peak | |
---|---|
Category:AFFIDAVITS
MONTHYEARML20073B6951994-09-19019 September 1994
[Table view]Affidavit of Cl Terry Authorizing Signing & Filing W/Nrc OL Amend Request 94-016 ML20073B6731994-09-19019 September 1994 Affidavit of Cl Terry Re License Amend Request 94-015 ML20128D6111993-01-26026 January 1993 Joint Affidavit of I Barnes & Ft Grubelich Re Borg-Warner Check Valves.* Discusses Issues Re Borg-Warner Check Valves Raised by Cfur & Adequacy of Actions Taken by TU Electric ML20127L9661993-01-26026 January 1993 Affidavit of Rl Pettis Re Borg-Warner Check Valves.* Statement of Prof Qualifications & Certificate of Svc Encl ML20127L9321993-01-26026 January 1993 Affidavit of Re Architzel Re Thermo-Lag Installation at Testing for Unit 2.* Statement of Prof Qualifications Encl ML20086Q3931991-12-26026 December 1991 Affidavit of Case President J Ellis.* Affidavit of Case President J Ellis Re Motion for Leave to File Response to Portions of Motion of R Micky & Dow to Reopen Record. W/Certificate of Svc ML20154G7841988-09-0909 September 1988 Affidavit of Jj Macktal Re Oppressive Terms of Settlement Agreement for Addl Safety Concerns.Related Info Encl ML20207E6061988-08-12012 August 1988 Affidavit of B Brink.* Discusses Concern Re Operation of Plant.W/Supporting Documentation & Certificate of Svc ML20207E5941988-08-0505 August 1988 Affidavit of K Mccook.* Discusses Concerns Re Operations of Plant.Unexecuted Affidavit of P Reznikoff Encl ML19325D6431988-07-12012 July 1988 Affidavit of B Brink.* Expresses Concern That Operation of Plant Will Cause Loss of Health to Author & Family & Safety Problems at Plant Will Jeopardize Life & Property ML19325D6461988-07-12012 July 1988 Affidavit of L Burnam.* Expresses Concern That Operation of Plant Will Cause Loss of Health to Author & Family & Safety Problems at Plant Will Jeopardize Life & Property.W/ Certificate of Svc ML19325D6401988-07-12012 July 1988 Affidavit of P Reznikoff.* Expresses Concern Re Danger to Health & Safety Posed by Normal Operations of Plant & by Possible Accidents ML20197E3011988-05-23023 May 1988 Affidavit of JW Muffett.* Encl Review Issues Lists (Rils) on Pipe Stress & Pipe Supports Document That All Issues Closed by Cygna.Job Responsibilities of JW Muffett Stated. W/O Rils.W/Certificate of Svc ML20154E5391988-05-13013 May 1988 Affidavit of Ha Levin.* Related Documentation Encl ML20154E5281988-05-0606 May 1988 Affidavit of RP Klause.* Discusses Design Validation & for Large & Small Bore Piping Supports at Plant During Preparation of Project Status Repts.Author Statement of Training & Experience Encl ML20196B0751988-02-0101 February 1988 Affidavit of Rd Pollard Re Environ Qualification of RG-59 Coaxial Cable ML20236X2501987-12-0202 December 1987 Affidavit of Dn Chapman.* Discusses Mgt Analysis Co Audit Rept ML20236E0481987-10-23023 October 1987 Affidavit of Bp Garde in Support of Motion for Reconsideration.* ML20236E7501987-07-23023 July 1987 Affidavit of Jt Merritt.* Affidavit Discusses Mgt Analysis Co Audit Repts.Related Correspondence ML20236E7411987-07-22022 July 1987 Affidavit of JB George.* Affidavit Discusses Mgt Analysis Co Audit Repts.Related Correspondence ML20236E7551987-07-22022 July 1987 Affidavit of Eg Gibson.* Affidavit Discusses Mgt Analysis Co Audit Rept.Related Correspondence ML20211D0591987-02-11011 February 1987 Affidavit of Eh Johnson.* Responds to Statements in Case Motion Re Trend Analyses or Trend Repts.Trend Analyses & Repts Incorporated Into SALP Repts in 1980.Certificate of Svc Encl ML20212E8631986-12-26026 December 1986 Affidavit of Case Witness J Doyle Re Case 861230 Partial Response to Applicants 861201 Response to Board Concerns.* Certificate of Svc Encl ML20211J4721986-11-0101 November 1986 Affidavit of J Doyle Re Scope of Cygna Role.Supporting Documentation Encl ML20211J4141986-10-28028 October 1986 Affidavit of DC Garlington Re Irregularities in Plant Const or Operations Noticed During Site Visits.Emergency Lights Not Aimed & Locked & Trash in Diesel Room Noted in Monitoring Repts.W/Certificate of Svc ML20211J3551986-10-0303 October 1986 Affidavit of MD Nozette Re Events Concerning Participation as co-owner of Plant Between Nov 1984 & Feb 1985.Discusses Util Failure to Answer Questions Posed in Re Participation in Project ML20214L6911986-08-18018 August 1986 Affidavit of Tg Tyler Supporting Applicant Response to a Palmer Affidavit Re Case 860731 Response to Applicant 860716 Motion for Protective Order & Motion to Compel.W/ Certificate of Svc ML20214M4271986-08-0505 August 1986 Joint Affidavit of D Lurie & E Marinos Clarifying 860404 Joint Affidavit on Statistical Inferences from Comanche Peak Review Team Sampling ML20207F7741986-07-16016 July 1986 Affidavit of Le Powell Re Discovery in CP Extension Proceeding.W/Certificate of Svc ML20207E3071986-07-16016 July 1986 Affidavit of Le Powell on 860716 Re Estimate of Time & Effort Required to Prepare Responses to Questions 4-7 of M Gregory Set One Discovery Requests.Related Correspondence ML20197C1301986-05-0606 May 1986 Affidavit of M Walsh,Advising That Statistical Sampling Being Performed & Proposed for Facility Inappropriate. Applicant Reliance on Statistical Sample Will Not Identify Problems W/Pipe Supports.Certificate of Svc Encl ML20197C1051986-04-26026 April 1986 Affidavit of J Doyle,Addressing Applicability of Statistical Sampling to Facility ML20155A6851986-04-0404 April 1986 Joint Affidavit of D Lurie & E Marinos Re Board Concerns on Statistical Inferences from Comanche Peak Review Team Sampling.Certificate of Svc Encl ML20138B1711986-03-13013 March 1986 Affidavit of SD Mckay Re Likelihood of Reactor Coolant Pump Restart Due to Operator Error W/No Occurrence of Inadequate Cooling Event.Prof Qualifications & Certificate of Svc Encl ML20138B1431986-03-12012 March 1986 Affidavit of B Mann Re Treatment of Operator Error in Licensing Process & Likelihood of Reactor Coolant Pump Restart During Inadequate Core Cooling Event.Prof Qualifications Encl ML20138B1071986-03-12012 March 1986 Affidavit of CE Mccracken Re Core Flow Blockage Due to Fine Paint Particles ML20215E7171986-01-27027 January 1986 Partially Withheld Affidavit Re Allegations Concerning Drug Use & Distribution ML20138P5551985-12-14014 December 1985 Affidavit of Jj Doyle in Response to Applicant Changes to 1984 Motions for Summary Disposition ML20137X1831985-12-0505 December 1985 Affidavit of R Mcgrane Re Knowledge of Mgt Analysis Corp Rept & Issues Raised by Rept.Author Admits Only Recent Awareness of Rept.Related Correspondence ML20137X0201985-12-0505 December 1985 Affidavit of Dh Wade Re Knowledge of Mgt Analysis Corp Rept & Issues Raised by Rept.Author Admits No Knowledge of Rept Prior to May or June 1985.Related Correspondence ML20137W9971985-12-0404 December 1985 Affidavit of Nh Williams Re Knowledge of Mgt Analysis Corp Rept & Issues Raised by Rept.Author Admits No Knowledge of Rept Prior to 850625.Related Correspondence ML20137X2101985-12-0303 December 1985 Affidavit of R Siever Re Knowledge of Mgt Analysis Corp Rept & Issues Raised by Rept.Author Admits Awareness of Audit & Rept Preparation Through General Onsite Conversation in 1985.Related Correspondence ML20137X1611985-12-0202 December 1985 Affidavit of P Chang Re Knowledge of Mgt Analysis Corp Rept & Issues Raised by Rept.Author Admits No Knowledge of Rept Prior to mid-1985.Related Correspondence ML20137X1291985-12-0202 December 1985 Affidavit of G Krishnan Re Knowledge of Mgt Analysis Corp Rept & Issues Raised by Rept.Author Admits General Awareness of Discovery Process Re 1980 Licensing Proceedings.Related Correspondence ML20137X0881985-12-0202 December 1985 Affidavit of Rc Iotti Re Knowledge of Mgt Analysis Corp Rept & Issues Raised by Rept.Author Admits No Knowledge Apart from News Publicity & ASLB Documents in mid-1985.Related Correspondence ML20137X0601985-12-0202 December 1985 Affidavit of Jc Finneran Re Knowledge of Mgt Analysis Corp Rept & Issues Raised by Rept.Author Admits No Knowledge Apart from News Publicity & General Onsite Conversations Earlier in 1985.Related Correspondence ML20205H4071985-11-12012 November 1985 Affidavit of Rc Iotti & Jc Finneran Re Corrections & Clarifications to Affidavits Supporting Motions for Summary Disposition of Pipe Support Design Allegations. Supporting Documentation Encl.Related Correspondence ML20205H3501985-11-12012 November 1985 Affidavit of Rc Iotti & Jc Finneran in Response to ASLB Request for Info Re Variation of Field Configurations of Pipe Supports Utilizing clinched-down U-bolts.Related Correspondence ML20133F8161985-09-0909 September 1985 Affidavit of CE Mccracken Providing Further Explanation of Background of Sser 9,App L,Per ASLB 850918 Memorandum ML20133F8221985-09-0909 September 1985 Affidavit of Aw Serkiz Providing Explanation Re Sser 9, App L,Per ASLB 850918 Memorandum.Certificate of Svc Encl 1994-09-19 Category:CORRESPONDENCE-LETTERS MONTHYEARTXX-9924, Forwards Responses to Questions by NRC Re Application for Amends to Licenses NPF-87 & NPF-89,by Incorporating Changes Increasing RWST low-level Setpoint from Greater than But Equal to 40% to Greater than But Equal to 45% of Span1999-10-22022 October 1999
[Table view]Forwards Responses to Questions by NRC Re Application for Amends to Licenses NPF-87 & NPF-89,by Incorporating Changes Increasing RWST low-level Setpoint from Greater than But Equal to 40% to Greater than But Equal to 45% of Span ML20217M5711999-10-20020 October 1999 Forwards Insp Repts 50-445/99-15 & 50-446/99-15 on 990822- 1002.Two Severity Level IV Violations of NRC Requirements Identified & Being Treated as non-cited Violations Consistent with App C of Enforcement Policy TXX-9923, Forwards Monthly Operating Repts for Sept 1999 for CPSES, Units 1 & 2,per Plant TS 5.6.4.No Failures of Challenges to PORVs of SV for Units Occurred1999-10-15015 October 1999 Forwards Monthly Operating Repts for Sept 1999 for CPSES, Units 1 & 2,per Plant TS 5.6.4.No Failures of Challenges to PORVs of SV for Units Occurred ML20217E7951999-10-12012 October 1999 Forwards COLR for Unit 1,Cycle 8,per TS 5.6.5 ML20212L2891999-10-0101 October 1999 Discusses Closeout of GL 97-06, Degradation of Steam Generator Internals. Purpose of GL Was to Obtain Info That Would Enable NRC to Verify That Condition of Licensee SG Internals Comply with Current Licensing Bases TXX-9922, Forwards Revised COLR, for Cycle 5 for Unit 21999-10-0101 October 1999 Forwards Revised COLR, for Cycle 5 for Unit 2 ML20216J5571999-10-0101 October 1999 Provides Final Response to GL 98-01,suppl 1, Y2K Readiness of Computer Sys at Npps ML20212G0721999-09-24024 September 1999 Forwards Rev 4 to Augmented Inservice Insp Plan for CPSES, Unit 1. Future Changes & Revs to Unit 1 Augmented Inservice Insp Plan Will Be Available on Site ML20212H0461999-09-24024 September 1999 Forwards Rev 6 to CPSES Glen Rose,Tx ASME Section XI ISI Program Plan for 1st Interval on 990820 ML20212F7481999-09-24024 September 1999 Forwards SER Authorizing Relief from Exam Requirement of 1986 Edition ASME Code,Section XI Pursuant to 10CFR50.55a(a)(3)(ii) for Relief Request A-3 & 10CFR50.55a(g)(6)(i) for Relief Requests B15,16,17 & C-4 ML20212F1041999-09-23023 September 1999 Requests That NRC Be Informed of Any Changes in Scope of Y2K System Deficiencies Listed or Util Projected Completion Schedule for Comanche Peak Steam Electric Station,Units 1 & 2 ML20212E6661999-09-21021 September 1999 Advises That Info Contained in Application & Affidavit, (CAW-99-1342) Re WCAP-15009,Rev 0, Comache Peak Unit 1 Evaluation for Tube Vibration Induced Fatigue, Will Be Withheld from Public Disclosure ML20212D9111999-09-16016 September 1999 Informs That on 990818,NRC Completed Midcycle PPR of CPSES & Did Not Identify Any Areas in Which Performance Warranted Insp Beyond Core Insp Program.Core Insp Plan at Facility Over Next 7 Months.Insp Plan Through March 2000 Encl ML20212A7601999-09-14014 September 1999 Forwards Insp Repts 50-445/99-14 & 50-446/99-14 on 990707-0821.Four Violations Occurred & Being Treated as Ncvs.Conduct of Activities Was Generally Characterized by safety-conscious Operations & Sound Radiological Controls TXX-9921, Suppls 981221 LAR 98-010 to Licenses NPF-87 & NPF-89, Clarfying Conditions of Use Re Analytical Methods Used to Determine Core Operating Limits,Per Telcon with NRC1999-09-10010 September 1999 Suppls 981221 LAR 98-010 to Licenses NPF-87 & NPF-89, Clarfying Conditions of Use Re Analytical Methods Used to Determine Core Operating Limits,Per Telcon with NRC ML20211P3761999-09-0707 September 1999 Ack Receipt of Ltr Dtd 990615,transmitting Rev 30 to Physical Security Plan,Per 10CFR50.54(p).No NRC Approval Is Required ML20211L9871999-09-0303 September 1999 Forwards Rev 31 to Technical Requirements Manual. All Changes Applicable to Plants Have Been Reviewed Under Util 10CFR50.59 Process & Found Not to Include Any USQs TXX-9915, Responds to 990701 & 0825 RAI Telcons Re Spent Fuel Pool Temp,Per LAR 98-008,which Requested Increase in Spent Fuel Storage capacity.Marked-up Page 4-1 of CPSES Fuel Storage Licensing Rept, Encl1999-09-0303 September 1999 Responds to 990701 & 0825 RAI Telcons Re Spent Fuel Pool Temp,Per LAR 98-008,which Requested Increase in Spent Fuel Storage capacity.Marked-up Page 4-1 of CPSES Fuel Storage Licensing Rept, Encl ML20211K2231999-08-31031 August 1999 Forwards Txu Electric Comments of Rvid,Version 2 ML20211J3801999-08-27027 August 1999 Forwards Corrected TS Page 3.8-26 to Amend 66 to Licenses NPF-87 & NPF-89,respectively.Footnote on TS Page 3.8-26 Incorrectly Deleted ML20211G7301999-08-26026 August 1999 Forwards Revs 29 & 30 to CPSES Technical Requirements Manual (Trm). Attachments 1 & 2 Contain Description of Changes for Revs 29 & 30 Respectively ML20211G1081999-08-26026 August 1999 Responds to NRR Staff RAI Re Util Mar 1999 Submittal for NRC Review & Approval of Changes to CPSES Emergency Classification Procedure ML20211G3441999-08-25025 August 1999 Forwards Response to NRC RAI on LAR 98-010 for Cpses,Units 1 & 2.Communication Contains No New Licensing Commitments Re Cpses,Units 1 & 2 ML20211B2861999-08-18018 August 1999 Forwards Insp Repts 50-445/99-13 & 50-446/99-13 on 990720- 23.No Violations Noted.Insp Included Implementation of Licensee Emergency Plan & Procedures During Util Biennial Emergency Preparedness Exercise ML20211C4661999-08-18018 August 1999 Discusses Proprietary Info Re Thermo-Lag.NRC Treated Bisco Test Rept 748-105 as Proprietary & Withheld It from Public Disclosure,Iaw 10CFR2.790 ML20210U3981999-08-17017 August 1999 Forwards Monthly Operating Repts for July 1999 for CPSES, Units 1 & 2,per TS 6.9.1.5.No Failures or Challenges to PORVs or SVs for Plant Occurred ML20211C0991999-08-17017 August 1999 Forwards Rev 3 to ASME Section XI ISI Program Plan,Unit 2 - 1st Interval, Replacing Rev 2 in Entirety ML20211C4571999-08-16016 August 1999 Forwards Omitted Subj Page of Contractor TER TXX-9919, Forwards Relief Request A-3,Rev 1 to Unit 1 ISI Program,Per Conversations Between NRC & Txu Electric on 9908021999-08-16016 August 1999 Forwards Relief Request A-3,Rev 1 to Unit 1 ISI Program,Per Conversations Between NRC & Txu Electric on 990802 ML20210R6561999-08-13013 August 1999 Forwards Response to NRR 990805 Telcon RAI Re License Amend Request 98-010,to Increase Power for Operation of CPSES Unit 2 to 3445 Mwth & Incorporating Addl Changes Into Units 1 & 2 TS ML20211A9501999-08-12012 August 1999 Discusses 990720-21 Workshop Conducted in Region IV Ofc,Re Exchange of Info in Area of Use of Risk Insights in Regulatory Activities.List of Attendees,Summary of Topic & Issues,Agenda & Copies of Handouts Encl ML20210S6411999-08-12012 August 1999 Informs That Wg Guldemond,License SOP-43780,is No Longer Performing Licensed Duties.Discontinuation of License Is Requested ML20210R2221999-08-12012 August 1999 Forwards Insp Repts 50-445/99-10 & 50-446/99-10 on 990510-0628.Violations Noted & Being Treated as Ncvs, Consistent with App C of Enforcement Policy ML20210N1101999-08-0404 August 1999 Provides Supplemental Info to Util 990623 License Amend Request 99-005 Re Bypassing DG Trips.Info Replaces Info Contained in Subject Submittal in Attachment 2,Section II, Description of TS Change Request ML20210L1461999-08-0303 August 1999 Informs That NRC Plans to Administer Gfes of Written Operator Licensing Exam on 991006.Requests Submittal of Ltr Identifying Individuals Taking Exam,Personnel Allowed Access to Exams & Mailing Address for Exams ML20210J2301999-08-0202 August 1999 Forwards Amend 96 to CPSES Ufsar.Replacement of FSAR Figures with Plant Process Flow Diagrams Meets Intent & Requirements of NRC Reg Guide 1.70,Rev 2 ML20210J6071999-08-0202 August 1999 Forwards line-by-line Descriptions of Changes in Amend 96 to CPSES UFSAR Transmitted by Util Ltr TXX-99166,dtd 990802. Replacment of FSAR Figures with Plant Process Flow Diagrams Meets Intent & Requirements of NRC Reg Guide 1.70,rev 2 TXX-9916, Notifies NRC That CPSES Units 1 & 2,improved TS Implemented on 9907271999-08-0202 August 1999 Notifies NRC That CPSES Units 1 & 2,improved TS Implemented on 990727 TXX-9918, Forwards CPSES 10CFR50.59 Evaluation Summary Rept 0008,for 970802-990201 & CPSES Commitment Matl Change Evaluation Rept 0003,for 970802-9906301999-08-0202 August 1999 Forwards CPSES 10CFR50.59 Evaluation Summary Rept 0008,for 970802-990201 & CPSES Commitment Matl Change Evaluation Rept 0003,for 970802-990630 ML20210K2321999-07-29029 July 1999 Forwards Insp Repts 50-445/99-12 & 50-446/99-12 on 990530-0710.No Violations Noted ML20210G5861999-07-29029 July 1999 Forwards fitness-for-duty Program Performance Data for Six Month Period of Jan-June 1999 ML20210J0121999-07-27027 July 1999 Forwards Summary of Methodology for Determination of NDE Measurement Uncertainty,In Response to Recent Discussions with NRC Re LAR 98-006 Concerning Rev to SG Tube Plugging Criteria TXX-9917, Provides Info Re Augmented Inservice Insp Plan,Which Requires Periodic Insp of Rv Head & Internals Lifting Devices at CPSES1999-07-26026 July 1999 Provides Info Re Augmented Inservice Insp Plan,Which Requires Periodic Insp of Rv Head & Internals Lifting Devices at CPSES ML20210F3121999-07-26026 July 1999 Responds to GL 99-02, Laboratory Testing of Nuclear-Grade Activated Charcoal, ML20210D8231999-07-23023 July 1999 Forwards Safety Evaluation of Relief Requests Re Use of 1998 Edition of Subsections IWE & Iwl of ASME Code for Containment Insp ML20210D3211999-07-21021 July 1999 Provides List of Estimates of Licensing Actions,In Response to Administrative Ltr 99-02,dtd 990603 ML20210C2931999-07-21021 July 1999 Supplements 880323 Response to NRC Bulletin 88-02, Rapidly Propagating...Sg Tubes, Non-proprietary WCAP-15010 & Proprietary Rev 0 to WCAP-15009, CP Unit 1 Evaluation for Tube Vibration... Encl.Proprietary Rept Withheld ML20209H0111999-07-16016 July 1999 Forwards Relief Request C-4 to CPSES Unit 2 ISI Program for Approval ML20210C3331999-07-16016 July 1999 Forwards Exam Repts 50-445/99-301 & 50-446/99-301 on 990618- 24.Exam Included Evaluation of Six Applicants for Senior Operator Licenses ML20209H2551999-07-16016 July 1999 Forwards ISI Summary Rept for Fourth Refueling Outage of CPSES Unit 2 & Containment ISI Summary Rept for Fourth Refueling Outage of CPSES Unit 2,per ASME Boiler & Pressure Vessel Code,Section Xi,Paragraph IWA-6230 1999-09-07 Category:INCOMING CORRESPONDENCE MONTHYEARTXX-9924, Forwards Responses to Questions by NRC Re Application for Amends to Licenses NPF-87 & NPF-89,by Incorporating Changes Increasing RWST low-level Setpoint from Greater than But Equal to 40% to Greater than But Equal to 45% of Span1999-10-22022 October 1999
[Table view]Forwards Responses to Questions by NRC Re Application for Amends to Licenses NPF-87 & NPF-89,by Incorporating Changes Increasing RWST low-level Setpoint from Greater than But Equal to 40% to Greater than But Equal to 45% of Span TXX-9923, Forwards Monthly Operating Repts for Sept 1999 for CPSES, Units 1 & 2,per Plant TS 5.6.4.No Failures of Challenges to PORVs of SV for Units Occurred1999-10-15015 October 1999 Forwards Monthly Operating Repts for Sept 1999 for CPSES, Units 1 & 2,per Plant TS 5.6.4.No Failures of Challenges to PORVs of SV for Units Occurred ML20217E7951999-10-12012 October 1999 Forwards COLR for Unit 1,Cycle 8,per TS 5.6.5 ML20216J5571999-10-0101 October 1999 Provides Final Response to GL 98-01,suppl 1, Y2K Readiness of Computer Sys at Npps TXX-9922, Forwards Revised COLR, for Cycle 5 for Unit 21999-10-0101 October 1999 Forwards Revised COLR, for Cycle 5 for Unit 2 ML20212G0721999-09-24024 September 1999 Forwards Rev 4 to Augmented Inservice Insp Plan for CPSES, Unit 1. Future Changes & Revs to Unit 1 Augmented Inservice Insp Plan Will Be Available on Site ML20212H0461999-09-24024 September 1999 Forwards Rev 6 to CPSES Glen Rose,Tx ASME Section XI ISI Program Plan for 1st Interval on 990820 TXX-9921, Suppls 981221 LAR 98-010 to Licenses NPF-87 & NPF-89, Clarfying Conditions of Use Re Analytical Methods Used to Determine Core Operating Limits,Per Telcon with NRC1999-09-10010 September 1999 Suppls 981221 LAR 98-010 to Licenses NPF-87 & NPF-89, Clarfying Conditions of Use Re Analytical Methods Used to Determine Core Operating Limits,Per Telcon with NRC ML20211L9871999-09-0303 September 1999 Forwards Rev 31 to Technical Requirements Manual. All Changes Applicable to Plants Have Been Reviewed Under Util 10CFR50.59 Process & Found Not to Include Any USQs TXX-9915, Responds to 990701 & 0825 RAI Telcons Re Spent Fuel Pool Temp,Per LAR 98-008,which Requested Increase in Spent Fuel Storage capacity.Marked-up Page 4-1 of CPSES Fuel Storage Licensing Rept, Encl1999-09-0303 September 1999 Responds to 990701 & 0825 RAI Telcons Re Spent Fuel Pool Temp,Per LAR 98-008,which Requested Increase in Spent Fuel Storage capacity.Marked-up Page 4-1 of CPSES Fuel Storage Licensing Rept, Encl ML20211K2231999-08-31031 August 1999 Forwards Txu Electric Comments of Rvid,Version 2 ML20211G1081999-08-26026 August 1999 Responds to NRR Staff RAI Re Util Mar 1999 Submittal for NRC Review & Approval of Changes to CPSES Emergency Classification Procedure ML20211G7301999-08-26026 August 1999 Forwards Revs 29 & 30 to CPSES Technical Requirements Manual (Trm). Attachments 1 & 2 Contain Description of Changes for Revs 29 & 30 Respectively ML20211G3441999-08-25025 August 1999 Forwards Response to NRC RAI on LAR 98-010 for Cpses,Units 1 & 2.Communication Contains No New Licensing Commitments Re Cpses,Units 1 & 2 ML20210U3981999-08-17017 August 1999 Forwards Monthly Operating Repts for July 1999 for CPSES, Units 1 & 2,per TS 6.9.1.5.No Failures or Challenges to PORVs or SVs for Plant Occurred ML20211C0991999-08-17017 August 1999 Forwards Rev 3 to ASME Section XI ISI Program Plan,Unit 2 - 1st Interval, Replacing Rev 2 in Entirety TXX-9919, Forwards Relief Request A-3,Rev 1 to Unit 1 ISI Program,Per Conversations Between NRC & Txu Electric on 9908021999-08-16016 August 1999 Forwards Relief Request A-3,Rev 1 to Unit 1 ISI Program,Per Conversations Between NRC & Txu Electric on 990802 ML20210R6561999-08-13013 August 1999 Forwards Response to NRR 990805 Telcon RAI Re License Amend Request 98-010,to Increase Power for Operation of CPSES Unit 2 to 3445 Mwth & Incorporating Addl Changes Into Units 1 & 2 TS ML20210S6411999-08-12012 August 1999 Informs That Wg Guldemond,License SOP-43780,is No Longer Performing Licensed Duties.Discontinuation of License Is Requested ML20210N1101999-08-0404 August 1999 Provides Supplemental Info to Util 990623 License Amend Request 99-005 Re Bypassing DG Trips.Info Replaces Info Contained in Subject Submittal in Attachment 2,Section II, Description of TS Change Request TXX-9918, Forwards CPSES 10CFR50.59 Evaluation Summary Rept 0008,for 970802-990201 & CPSES Commitment Matl Change Evaluation Rept 0003,for 970802-9906301999-08-0202 August 1999 Forwards CPSES 10CFR50.59 Evaluation Summary Rept 0008,for 970802-990201 & CPSES Commitment Matl Change Evaluation Rept 0003,for 970802-990630 ML20210J2301999-08-0202 August 1999 Forwards Amend 96 to CPSES Ufsar.Replacement of FSAR Figures with Plant Process Flow Diagrams Meets Intent & Requirements of NRC Reg Guide 1.70,Rev 2 ML20210J6071999-08-0202 August 1999 Forwards line-by-line Descriptions of Changes in Amend 96 to CPSES UFSAR Transmitted by Util Ltr TXX-99166,dtd 990802. Replacment of FSAR Figures with Plant Process Flow Diagrams Meets Intent & Requirements of NRC Reg Guide 1.70,rev 2 TXX-9916, Notifies NRC That CPSES Units 1 & 2,improved TS Implemented on 9907271999-08-0202 August 1999 Notifies NRC That CPSES Units 1 & 2,improved TS Implemented on 990727 ML20210G5861999-07-29029 July 1999 Forwards fitness-for-duty Program Performance Data for Six Month Period of Jan-June 1999 ML20210J0121999-07-27027 July 1999 Forwards Summary of Methodology for Determination of NDE Measurement Uncertainty,In Response to Recent Discussions with NRC Re LAR 98-006 Concerning Rev to SG Tube Plugging Criteria TXX-9917, Provides Info Re Augmented Inservice Insp Plan,Which Requires Periodic Insp of Rv Head & Internals Lifting Devices at CPSES1999-07-26026 July 1999 Provides Info Re Augmented Inservice Insp Plan,Which Requires Periodic Insp of Rv Head & Internals Lifting Devices at CPSES ML20210F3121999-07-26026 July 1999 Responds to GL 99-02, Laboratory Testing of Nuclear-Grade Activated Charcoal, ML20210C2931999-07-21021 July 1999 Supplements 880323 Response to NRC Bulletin 88-02, Rapidly Propagating...Sg Tubes, Non-proprietary WCAP-15010 & Proprietary Rev 0 to WCAP-15009, CP Unit 1 Evaluation for Tube Vibration... Encl.Proprietary Rept Withheld ML20210D3211999-07-21021 July 1999 Provides List of Estimates of Licensing Actions,In Response to Administrative Ltr 99-02,dtd 990603 ML20209H2551999-07-16016 July 1999 Forwards ISI Summary Rept for Fourth Refueling Outage of CPSES Unit 2 & Containment ISI Summary Rept for Fourth Refueling Outage of CPSES Unit 2,per ASME Boiler & Pressure Vessel Code,Section Xi,Paragraph IWA-6230 ML20209H0111999-07-16016 July 1999 Forwards Relief Request C-4 to CPSES Unit 2 ISI Program for Approval ML20209G0721999-07-13013 July 1999 Forwards Monthly Operating Repts for June 1999 for CPSES, Units 1 & 2,per TS 6.9.1.5.No Failures or Challenges to PORVs of SV Occurred During Reporting Period ML20209F0681999-07-0909 July 1999 Informs That Effective 990514,TU Electric Formally Changed Name to Txu Electric.Change All Refs of TU Electric to Txu Electric on Correspondence Distribution Lists ML20209E0421999-07-0909 July 1999 Forwards Response to NRC Request for Addl Info on LAR 98-010.Attachment 1 Is Affidavit for Info Supporting LAR 98-010 ML20209B6021999-06-30030 June 1999 Submits Second Response to NRC GL 98-01,Suppl 1, Y2K Readiness of Computer Sys at Npps. Readiness Disclosure for Reporting Status of Facility Y2K Readiness Encl ML20195J6981999-06-15015 June 1999 Provides Addl Info Related to Open Issue,Discussed in 990610 Conference Call with D Jaffe Re ISI Program Relief Request L-1 Submitted by Util on 980220 ML20196A4921999-06-15015 June 1999 Forwards Rev 30 to Physical Security Plan.Rev Withheld,Per 10CFR73.21 ML20195J0491999-06-14014 June 1999 Submits Response to RAI Re Implementation of 1.0 Volt Repair Criteria ML20195J0651999-06-14014 June 1999 Submits Response to RAI Re GL 95-07, Pressure Locking & Thermal Binding of Safety Related Power Operated Gate Valves 05000445/LER-1999-001, Forwards LER 99-001-00, Some Electrical Contacts for RCS Pressure Relief Valves Were Not Included in Surveillance Testing Procedures. New Licensing Commitments Identified in Attachment 11999-06-0808 June 1999 Forwards LER 99-001-00, Some Electrical Contacts for RCS Pressure Relief Valves Were Not Included in Surveillance Testing Procedures. New Licensing Commitments Identified in Attachment 1 ML20195F0091999-06-0808 June 1999 Forwards Response to RAI Re Units 1 & 2 ISI Program for Relief Requests E-1 & L-1.Communication Contains No New Licensing Basis Commitments Re Cpses,Units 1 & 2 ML20207E1921999-05-28028 May 1999 Submits Updated Request for NRC Staff to Review & Approve Certain Changes to CPSES Emergency Plan Submitted in 981015 & s Prior to Changes Being Implemented at CPSES ML20207E1711999-05-28028 May 1999 Supplements 990526 LAR 99-004 as TU Electric Believes Extingency Exists in That Proposed Amend Was Result of NOED Granted to Prevent Shudown of CPSES Unit 1 ML20207D9841999-05-26026 May 1999 Requests That NRC Exercise Enforcement Discretion to Allow Cpses,Unit 1 to Remain in Mode 1,power Operation,Without Having Performed Svc Test,Per SR 4.8.2.1d on Unit 1 Battery BT1ED2 ML20195B6351999-05-25025 May 1999 Submits Response to RAI Re GL 95-07, Pressure Locking & Thermal Binding of Safety Related Power Operated Gate Valves TXX-9912, Forwards Txu Electric (Formerly TU Electric) CPSES Emergency Preparedness Exercise Scenario Manual for 990721-22,Graded Exercise1999-05-21021 May 1999 Forwards Txu Electric (Formerly TU Electric) CPSES Emergency Preparedness Exercise Scenario Manual for 990721-22,Graded Exercise ML20206U1981999-05-20020 May 1999 Forwards Form 10K Annual Rept,Per 10CFR50.71(b). Communication Contains No New Licensing Basis Commitments Re Cpses,Units 1 & 2 ML20196L1931999-05-20020 May 1999 Forwards MOR for Apr 1999 for Cpses,Units 1 & 2.During Reporting Period There Have Been No Failures or Challenges to Power Operated Relief Valves or Safety Valves TXX-9911, Forwards non-proprietary & Proprietary Responses to RAI Re LAR 98-010 by Incorporating Attached Changes Into CPSES Unit 2 OL NPF-89 & CPSES Units 1,OL NPF-87 & 2 TS to Increase Licensed Power.W & Caldon Proprietary Responses Withheld1999-05-14014 May 1999 Forwards non-proprietary & Proprietary Responses to RAI Re LAR 98-010 by Incorporating Attached Changes Into CPSES Unit 2 OL NPF-89 & CPSES Units 1,OL NPF-87 & 2 TS to Increase Licensed Power.W & Caldon Proprietary Responses Withheld 1999-09-03 Category:LEGAL TRANSCRIPTS & ORDERS & PLEADINGS MONTHYEARML20196G4021999-06-18018 June 1999
[Table view]Comment on FRN Re Rev of NRC Enforcement Policy NUREG-1600, Rev 1 & Amend of 10CFR55.49.Concurs with Need to Provide Examples That May Be Used as Guidance in Determining Appropriate Severity Level for Violations as Listed ML20206H1881999-05-0606 May 1999 Exemption from Requirements of 10CFR50,App K Re ECCS Evaluation Models. Commission Grants Licensee Exemption ML20206M5111999-04-30030 April 1999 Comment Supporting Draft RG DG-1083 Re Content of UFSAR IAW 10CFR50.71(e). Recommends That Listed Approach Be Adopted for Changes to Documents Incorporated by Ref CY-99-007, Comment Supporting Proposed Changes to Improve Insp & Assessment Processes for Overseeing Commercial Nuclear Industry That Were Published in Fr on 990122 & in SECY-99-0071999-02-22022 February 1999 Comment Supporting Proposed Changes to Improve Insp & Assessment Processes for Overseeing Commercial Nuclear Industry That Were Published in Fr on 990122 & in SECY-99-007 TXX-9825, Comment Endorsing NEI Comments on Proposed Rulemaking to 10CFR50.65, Requirements for Monitoring Effectiveness at Npps1998-12-14014 December 1998 Comment Endorsing NEI Comments on Proposed Rulemaking to 10CFR50.65, Requirements for Monitoring Effectiveness at Npps ML20154C4101998-09-30030 September 1998 Comment Re Proposed Rule 10CFR50 Re Reporting Requirements for Nuclear Power Reactors.Comanche Peak Electric Station Endorses NEI Comment Ltr & Agrees with NEI Recommendations & Rationale ML20216E1051998-04-0707 April 1998 Comment Supporting Draft RG DG-1029 Titled Guidelines for Evaluating Electromagnetic & Radio-Frequency Interference in Safety-related Instrumentation & Control Sys ML20217H3611998-03-26026 March 1998 Comment Opposing Draft GL 97-XX, Lab Testing of Nuclear Grade Charcoal, Issued on 980225.Advises That There Will Be Addl Implementation Costs ML20198Q4851998-01-16016 January 1998 Comment Opposing PRM 50-63A by P Crane That Requests NRC Amend Regulations Re Emergency Planning to Require Consideration of Sheltering,Evacuation & Prophylactic Use of Potassium Iodide for General Public ML20211A4871997-09-12012 September 1997 Changes Submittal Date of Response to NRC RAI Re Proposed CPSES risk-informed Inservice Testing Program & Comments on NRC Draft PRA Documents ML20149L0311997-07-21021 July 1997 Comment on Draft Guides DG-1048,DG-1049 & DG-1050.Error Identified in Last Line of DG-1050,item 1.3 of Section Value/Impact Statement.Rev 30 Should Be Rev 11 ML20140A4871997-05-27027 May 1997 Comment Opposing Proposed Rule Re Safety Conscious Work Environ.Util Agrees W/Nuclear Energy Inst Comment Ltr ML20133G5411996-12-0505 December 1996 Transcript of 961205 Meeting in Arlington,Tx Re Comanche Peak Thermo-Lag Fire Barriers. Pp 1-111 ML20135B7881996-11-29029 November 1996 Order Approving Corporate Restructuring of TU to Facilitate Acquistion of Enserch Corp ML20128M8011996-10-0303 October 1996 Comment Opposing Proposed NRC Generic Communication, Primary Water Stress Corrosion Cracking of Control Rod Drive Mechanism & Other Vessel Head Penetrations ML20097D7321996-02-0909 February 1996 Comment Opposing Petition for Rulemaking PRM-50-63 Re CPSES Request for Amend to Its Regulations Dealing W/Emergency Planning to Include Requirement That Emergency Planning Protective Actions for General Public Include Listed Info ML20094Q6421995-11-28028 November 1995 Comment Supporting Petition for RM PRM-50-62 Re Amend to Regulation Re QAPs Permitting NPP Licensees to Change Quality Program Described in SAR W/O NRC Prior Approval If Changes Do Not Potentially Degrade Safety or Change TSs ML20094H4801995-11-0808 November 1995 Comment Supporting Nuclear Energy Inst Comments on Proposed Rules 10CFR60,72,73 & 75 Re Safeguards for Spent Nuclear Fuel or high-level Radwaste ML20091M6441995-08-25025 August 1995 Comment Opposing Proposed Rule Re Review of Revised NRC SALP Program.Believes That NRC Should Reconsider Need for Ipap or SALP in Light of Redundancy ML20086M7921995-07-0707 July 1995 Comment Supporting Proposed GL Process for Changes to Security Plan Without Prior NRC Approval ML20084A0181995-05-19019 May 1995 Comment Suporting Proposed Rule 10CFR50 Re Containment Leakage Testing.Supports NEI Comments ML20077M7311994-12-30030 December 1994 Comments Opposing Proposed Rule 10CFR50 Re Shutdown & Low Power Operations for Nuclear Power Reactors ML20077L8711994-12-22022 December 1994 Comment Supporting Proposed Rule 10CFR50,55 & 73 Re Reduction of Reporting Requirements Imposed on NRC Licensees ML20073B6731994-09-19019 September 1994 Affidavit of Cl Terry Re License Amend Request 94-015 ML20073B6951994-09-19019 September 1994 Affidavit of Cl Terry Authorizing Signing & Filing W/Nrc OL Amend Request 94-016 ML20058E0561993-11-10010 November 1993 Comment on Proposed Rule Re Staff Meetings Open to Public. Believes That NRC Has Done Well in Commitment to Provide Public W/Fullest Practical Access to Its Activities ML20056G3351993-08-27027 August 1993 Comment Opposing Proposed Rule 10CFR2 Re Review of 10CFR2.206 Process ML20045D8321993-06-11011 June 1993 Comment Supporting Proposed Rules 10CFR50 & 54, FSAR Update Submittals. ML20044F3271993-05-21021 May 1993 Comments on Draft NRC Insp Procedure 38703, Commercial Grade Procurement Insp, Fr Vol 58,Number 52.NRC Should Use EPRI Definitions for Critical Characteristics ML20056C0831993-03-19019 March 1993 Texas Utils Electric Co Response to Petitioners Motion to Stay Issuance of Full Power License.* Licensee Urges NRC to Reject Petitioners Motion & to Deny Petitioners Appeal of 921215 Order.Motion Should Be Denied.W/Certificate of Svc ML20056C1881993-03-17017 March 1993 Order.* Directs Util to Respond to Motion by COB 930319 & NRC to Respond by COB 930322.W/Certificate of Svc.Served on 930317 ML20128D9651993-02-0303 February 1993 Memorandum & Order.* Stay Request Filed by Petitioners Denied.W/Certificate of Svc.Served on 930203 ML20128F6221993-02-0303 February 1993 Transcript of 930203 Affirmation/Discussion & Vote Public Meeting in Rockville,Md.Pp 1-2.Related Info Encl ML20128D3391993-02-0202 February 1993 Emergency Motion to Stay Issuance of low-power Ol.* Petitioners Specific Requests Listed.W/Certificate of Svc ML20128D4651993-02-0202 February 1993 Texas Utils Electric Co Response to Emergency Motion to Stay Issuance of low-power Ol.* Petitioner Request Should Be Denied Based on Failure to Meet Heavy Burden Imposed on Party.W/Certificate of Svc ML20128D3461993-01-29029 January 1993 NRC Staff Notification of Issuance of OL for Facility.* Low Power License May Be Issued by 930201.W/Certificate of Svc ML20128D6321993-01-29029 January 1993 Memorandum & Order.* Denies Citizens for Fair Util Regulation for Fr Notice Hearing on Proposed Issuance of OL for Facility.W/Certificate of Svc.Served on 930129 ML20127L9321993-01-26026 January 1993 Affidavit of Re Architzel Re Thermo-Lag Installation at Testing for Unit 2.* Statement of Prof Qualifications Encl ML20128D6111993-01-26026 January 1993 Joint Affidavit of I Barnes & Ft Grubelich Re Borg-Warner Check Valves.* Discusses Issues Re Borg-Warner Check Valves Raised by Cfur & Adequacy of Actions Taken by TU Electric ML20127L9181993-01-26026 January 1993 NRC Staff Reply to Cfur Request for Publication of Proposed Action Re Licensing of Unit 2.* Cfur Request That Notice Re Licensing of Unit 2 Be Published Permitting Parties to Request Hearings Should Be Denied ML20127L9661993-01-26026 January 1993 Affidavit of Rl Pettis Re Borg-Warner Check Valves.* Statement of Prof Qualifications & Certificate of Svc Encl ML20127L9091993-01-25025 January 1993 Tx Util Electric Response to Citizens for Fair Util Regulation Request of 930113.* Request Fails to Raise Worthy Issue & Should Be Denied.W/Certificate of Svc ML20127L8891993-01-21021 January 1993 Order.* License Should File Response to Citizens for Fair Util Regulation Ltr Requesting That Commission Issue Fr Notice Providing for Opportunity for Hearing Re Issuance of OL by 930125.W/Certificate of Svc.Served on 930122 ML20127G9191993-01-19019 January 1993 Order.* Grants Petitioners Extension of Time Until 930122 to File Brief.Replies to Petitioners Brief Shall Be Filed on or Before 930208.W/Certificate of Svc.Served on 930119 ML20127G9441993-01-19019 January 1993 TU Electric Brief in Opposition to Petitioners Appeal of ASLB Memorandum & Order.* Requests That Petitioners Appeal Be Denied & Licensing Board 921215 Memorandum & Order Be Affirmed.W/Certificate of Svc ML20127G8041993-01-15015 January 1993 NRC Staff Response to Appeal of Licensing Board Decision Denying Petition for Leave to Intervene & Request for Hearing Filed by Bi & Di Orr.* Board 921215 Decision Should Be Upheld.Certificate of Svc Encl ML20127G7451993-01-14014 January 1993 NRC Staff Response to Motion of Petitioners RM Dow & SL Dow, (Disposable Workers of Comanche Peak Steam Electric Station),For Leave to File Out of Time & Request for Extension of Time to File Brief.* W/Certificate of Svc ML20127G7941993-01-12012 January 1993 Opposition of TU Electric to Motion for Leave to File Out of Time & Request for Extension of Time to File Brief by SL Dow (Disposable Workers of Comanche Peak Steam Electric Station) & RM Dow.* W/Certificate of Svc ML20127A5931993-01-0808 January 1993 Brief in Support of Petitioner Notice of Appeal.Aslb Erred by Not Admitting Petitioner Contention & Action Should Be Reversed.W/Certificate of Svc ML20127A6371993-01-0707 January 1993 Notice of Appeal.* Appeal Submitted Due to 921215 Memo Denying Petitioner Motion for Rehearing & Petition for Intervention & Request for Hearings.Proceedings Were Terminated by Aslb.W/Certificate of Svc 1999-06-18 Category:STATE/LOCAL GOVERNMENT TO NRC MONTHYEARML20011E8521989-01-11011 January 1989
[Table view]Forwards Examiner Rept & Proposed Order Re Application of Cap Rock Electric Cooperative,Inc for Authority to Change Rates.Open Meeting Scheduled for 890207 in Austin,Tx to Consider Case ML20237J4231987-07-21021 July 1987 Forwards State of Tx Boiler Law,Rules & Regulations & Rule 65.102 That Applies to Responsibilities at Plant,Per 870714 Meeting ML20137X0201985-12-0505 December 1985 Affidavit of Dh Wade Re Knowledge of Mgt Analysis Corp Rept & Issues Raised by Rept.Author Admits No Knowledge of Rept Prior to May or June 1985.Related Correspondence ML20137E9721985-07-11011 July 1985 Discusses Interim Environ Surveillance Program Under Cooperative Agreement NRC-31-83-671.Proposed State Program Will Be Implemented by End of 1985 ML20100A9281984-11-27027 November 1984 Forwards Affidavit & Transcript of 830819 Investigative Interview of Gf Clancy Re QA Problems.Svc List Encl.Related Correspondence ML20098G4701984-10-0202 October 1984 Requests Guidance as to Obligations Under Protective Order as Set Forth in ASLB 840921 in Camera Hearing.Related Correspondence ML20091K3351983-12-0505 December 1983 Objects to Nuclear Waste Storage in County.Objection Should Be Registered in Official Proceedings During Forthcoming Hearings ML20077F9311983-07-27027 July 1983 Corrects Error on Page 8,717 of Transcript of 830720 Telcon Re Stipulation.Stipulation Must Reflect That Witnesses Indicated No Discouragement of Reporting Nonconforming Conditions ML20077A5181983-07-12012 July 1983 Expresses Shock & Amazement Re ASLB Comments in Recent Hearings in Fort Worth,Tx.Population Numbers within 10-mile Zone Around Plant Should Have No Effect on Adequacy of Emergency Plan ML20071E4751983-02-21021 February 1983 Suggests That Performance of Siren Early Warning Sys Totally Unacceptable.Sirens Cannot Be Heard by Many Citizens ML20066C2711982-10-0505 October 1982 Forwards Public Version of State of Tx Response to FEMA Comments Re State Portion of Offsite Radiological Emergency Mgt Plans & Change 1 to State of Tx Emergency Mgt Plan. State of Tx to FEMA Encl ML20063J3851982-08-12012 August 1982 Demands No OL Be Issued or Radioactive Matl Transported to Site Prior to Installation of Emergency Alerting Sys in County.Sys Should Be Fully Operational Before OL Issued. Certificate of Svc Encl ML20052E4501982-05-0505 May 1982 Requests Documentation Needed for State Historic Preservation Officer to Make Determination of Eligibility of May House ML19277B0391982-02-26026 February 1982 Advises That Not Responding to Ltrs Is Lack of Courtesy & May Be Reason Why NRC Is Not Receiving Greater Support. Suggests Attitude & Expensive Public Relations People Be Investigated ML20009G5021981-07-30030 July 1981 Forwards Budget & Planning Ofc Review Comments on Des ML20009A8191981-07-0303 July 1981 Comments by Tx Historical Commission on Des.Sufficient Info Not Contained in Des to Allow Review of Cultural Resources. Requests Repts Re Cultural Resources,Including Archeological Investigations Mentioned on 810421 ML20005A6611981-06-24024 June 1981 Requests That EIS Section 4.3.6.2 Re Recreational Uses,Be Altered to Contain Only Absolute & True Facts.Objects to Incorrect Data Contained in Statement ML19343B6681980-09-26026 September 1980 Forwards Executed Stipulation Re License Conditions ML19309F7891980-04-0303 April 1980 Forwards Public Utils Board of City of Brownsville,Tx 800403 Opposition for Extension of Procedural Dates.Requests Early Prehearing Conference to Resolve Critical Issues Unless Motion Is Denied ML19305B4251979-12-11011 December 1979 Urges Commission to Immediately Begin Considering Applications for New Licenses.Delay in Licensing Will Place Economic Burden on Tx Ratepayers ML19209B1141979-09-0505 September 1979 Submits Aug 1979 Discovery Rept.City of Austin Has Neither Initiated Nor Received Any Discovery Requests.Certificate of Svc Encl ML19249D5161979-08-0808 August 1979 Advises of Termination of Active Participation in Proceeding Due to 790824 Transfer to San Francisco Field Ofc,Antitrust Div ML19249D9241979-08-0202 August 1979 Notifies That City of Austin,Tx Has Neither Initiated Nor Received Any Discovery Requests During Jul 1979.Certificate of Svc Encl ML19207A4751979-07-0202 July 1979 Notifies That City of Austin,Tx Has Not Initiated Nor Received Any Discovery Requests During June 1979. Certificate of Svc Encl ML19248C9231979-05-0808 May 1979 Submits Discovery Rept for Apr 1979.No Discoveries Initiated or Received ML19274E6241979-03-0101 March 1979 Notifies of Objection to Motion to Compel Fuller Answers & Production by Doj.Interrogatories from City of Brownsville, Tx Received.Offer Made to Both Parties to Inspect Austin'S Files.Certificate of Svc Encl ML19282B1391979-02-0606 February 1979 Answered DOJ Discovery Request in Jan 1979 & Received Interrogatories.Answers Due W/Documents (Ref Encl Agreement).Certificate of Svc Encl 1989-01-11 |
Text
. .
AFFIDAVIT OF DAVID H. WADE THE STATE OF TEXAS :
COUNTY OF DALLAS :
BEFORE ME, the undersigned authority, a Notary Public in and for Dallas County, Texas, on this day personally appeared DAVID H. WADE, who by me being duly sworn upon his oath depose,s and says:
My name is David H. Wade. I am presently employed by Texas Utilities Generating Company as a Mechanical Engineering Discipline Supervisor in Opera-tions Support Engineering in Dallas, Texas. I reside at 5225 Ponderosa Way, Dallas, Texas 75227. My telephone numbers are 214/979-8371 and 214/388-1315. In 1978, I was an Engineering Supervisor at the Comanche Peak Steam Electric Station near Glen Rose, Texas. In 1980, I was a Mechanical Engineering Discipline Supervisor at Comanche Peak. On December 31,1984,'I was an Administrative Assistant to the Project General Manager at Comanche Peak.
I was not interviewed by Management Analysis Company (MAC) in 1978 in connection with any quality assurance review of Comanche Peak. I did not attend any initial interview regarding the MAC Report nor did I attend pre- or post-audit meetings. I did not participate in any internal management discussions regarding the report and was not aware that there was a report that should have been provided to CASE on discovery. I first learned that MAC had issued a report relating to the QA program at Comanche Peak when I read about it in the newspaper in May or June of 1985. I do not have a copy of the report, have never had a copy of the report, and have not read the report.
b f: ) i u>d//J2 DAVID H. WADE y
B512100398 851206 PDR ADOCK 05000445 -
G PDR, y
SUBSCRIBED AND SWORN To before me by the said DAVID H. WADE on this, the b TM day of December,1985.
l ~~
Nothry P@ic in and for Dallas County, Texas My Commission Expires:
9 - \ -H l
l
~
9 l