Other: AECM-81-281, Responds to NRC Providing Addl Guidance for NUREG-0737,Item I.G.1 Re Training During Low Power Testing, as Applied to BWR-OL Applicants.Simulated Loss of Ac Power Test Program Will Be Submitted for NRC Approval, AECM-86-0042, Forwards Station Blackout Evaluati Ept..., for Approval.Rept Provides Justification for Not Performing Simulated Station Blackout Test,Per TMI Item I.G.1.Test Not Recommended Per Generic Ltr 83-24.Fee Paid, ML20003E750, ML20137P712, ML20199L109, ML20203D679, ML20203J963, ML20207G520, ML20212P470, ML20215L243
|
MONTHYEARML20003E7501981-04-0707 April 1981 Responds to NRC Providing Addl Guidance Re NUREG-0737,Item I.G.1.Addl Safety Analyses & Waivers of Certain Tech Specs Would Be Required Re Training During Low Power Testing.Encl Program Completes Response Project stage: Other AECM-81-281, Responds to NRC Providing Addl Guidance for NUREG-0737,Item I.G.1 Re Training During Low Power Testing, as Applied to BWR-OL Applicants.Simulated Loss of Ac Power Test Program Will Be Submitted for NRC Approval1981-08-18018 August 1981 Responds to NRC Providing Addl Guidance for NUREG-0737,Item I.G.1 Re Training During Low Power Testing, as Applied to BWR-OL Applicants.Simulated Loss of Ac Power Test Program Will Be Submitted for NRC Approval Project stage: Other ML20137P6931986-01-29029 January 1986 Application for Amend to License NPF-29,revising Tech Specs to Reflect Design Changes in Progress to Complete Installation of Drywell Chilling Water Sys Project stage: Request ML20137P7121986-01-29029 January 1986 Proposed Tech Spec Changes to Reflect Design Change in Progress to Complete Installation of Drywell Chilling Water Sys Project stage: Other AECM-86-0023, Forwards Application for Amend to License NPF-29,revising Tech Specs to Reflect Design Change in Progress to Complete Installation of Drywell Chilling Water Sys.Fee Paid1986-01-29029 January 1986 Forwards Application for Amend to License NPF-29,revising Tech Specs to Reflect Design Change in Progress to Complete Installation of Drywell Chilling Water Sys.Fee Paid Project stage: Request AECM-86-0042, Forwards Station Blackout Evaluati Ept..., for Approval.Rept Provides Justification for Not Performing Simulated Station Blackout Test,Per TMI Item I.G.1.Test Not Recommended Per Generic Ltr 83-24.Fee Paid1986-04-0303 April 1986 Forwards Station Blackout Evaluati Ept..., for Approval.Rept Provides Justification for Not Performing Simulated Station Blackout Test,Per TMI Item I.G.1.Test Not Recommended Per Generic Ltr 83-24.Fee Paid Project stage: Other ML20199L1091986-04-0303 April 1986 Station Blackout Evaluation Rept,Grand Gulf Nuclear Station Project stage: Other ML20203D6791986-04-14014 April 1986 Proposed Tech Specs Re Design Changes to Scram Discharge Vol & post-LOCA Vacuum Breakers Project stage: Other ML20199E9111986-06-13013 June 1986 Proposed Changes to Tech Specs 3.5.1 & 4.5.1,revising Automatic Depressurization sys-related Air Sys Per Prior Commitments to Add Extrapolated Pressure Decay Test & Instrument Quality Test Project stage: Request AECM-86-0188, Application for Amend to License NPF-29,revising Tech Spec 4.5.1 to Change Automatic Depressurization sys-related Air Sys,Per Prior Commitments to Add Extrapolated Pressure Decay Test & Instrument Air Quality Test.Fee Paid1986-06-13013 June 1986 Application for Amend to License NPF-29,revising Tech Spec 4.5.1 to Change Automatic Depressurization sys-related Air Sys,Per Prior Commitments to Add Extrapolated Pressure Decay Test & Instrument Air Quality Test.Fee Paid Project stage: Request AECM-86-0225, Application for Amend to License NPF-29,combining Drywell Vacuum Relief Requirements for post-LOCA & Combustible Gas Purge Sys Into One Tech Spec.Fee Paid1986-07-16016 July 1986 Application for Amend to License NPF-29,combining Drywell Vacuum Relief Requirements for post-LOCA & Combustible Gas Purge Sys Into One Tech Spec.Fee Paid Project stage: Request ML20207G5201986-07-16016 July 1986 Proposed Tech Specs Combining Drywell Vacuum Relief Requirements w/post-LOCA & Combustible Gas Purge Sys Into One Tech Spec Project stage: Other AECM-86-0198, Application for Amend to License NPF-29,modifying License Condition 2.C.(33)(b) to Allow Use of Alternate Training & Testing to Satisfy NUREG-0694,Item I.G.1 Requirement to Conduct Simulated Loss of Power Test.Fee Paid1986-07-25025 July 1986 Application for Amend to License NPF-29,modifying License Condition 2.C.(33)(b) to Allow Use of Alternate Training & Testing to Satisfy NUREG-0694,Item I.G.1 Requirement to Conduct Simulated Loss of Power Test.Fee Paid Project stage: Request ML20203J9631986-07-25025 July 1986 Proposed Tech Spec,Modifying License Condition 2.C.(33)(b) to Allow Use of Alternate Training to Satisfy NUREG-0694,TMI Action Plan Item I.G.1 Requirement to Conduct Simulated Loss of Power Test Project stage: Other AECM-86-0243, Application for Amend to License NPF-29,modifying License Condition 2.C(33)(b) Requiring Util to Conduct Simulated Loss of Onsite & Offsite Alternating Current Power Test1986-08-11011 August 1986 Application for Amend to License NPF-29,modifying License Condition 2.C(33)(b) Requiring Util to Conduct Simulated Loss of Onsite & Offsite Alternating Current Power Test Project stage: Request ML20212P4641986-08-26026 August 1986 Revised Application for Amend to License NPF-29,allowing Entry Into Operational Conditions 1 & 2 W/O Performing Surveillance Requirement 4.1.3.1.4.a for Scram Discharge Vol Vents Provided Test Performed at Least Every 18 Months Project stage: Request ML20212P4701986-08-26026 August 1986 Proposed Tech Specs Allowing Entry Into Operational Conditions 1 & 2 W/O Performing Surveillance Requirement 4.1.3.1.4.a for Scram Discharge Vol Vents Provided Test Performed at Least Every 18 Months Project stage: Other AECM-86-0238, Forwards Revised Application for Amend to License NPF-29, Allowing Entry Into Operational Conditions 1 & 2 W/O Performing Surveillance Requirement 4.1.3.1.4.a Provided Test Performed at Least Every 18 Months1986-08-26026 August 1986 Forwards Revised Application for Amend to License NPF-29, Allowing Entry Into Operational Conditions 1 & 2 W/O Performing Surveillance Requirement 4.1.3.1.4.a Provided Test Performed at Least Every 18 Months Project stage: Request ML20215L2431986-10-17017 October 1986 Amend 21 to License NPF-29,revising Tech Specs Re Names & Designation of Certain Plant Svc Water Valves,Record Retention Specs & Control Rod Scram Discharge Vol Project stage: Other ML20215L2481986-10-17017 October 1986 Safety Evaluation Supporting Amend 21 to License NPF-29 Project stage: Approval ML20056A7491990-08-0707 August 1990 Forwards Safety Evaluation Accepting Licensee Fire Barrier Penetration Seal Program & Commitment to Complete 100% Review of All Tech Spec Fire Penetration Seals by 911231 Project stage: Approval 1986-04-03
[Table View] |
Text
j ]
MISSISSIPPI POWER & LIGHT COMPANY Helping Build Mississippi EdhhihhlMdB P. O. B O X 16 4 0, J A C K S O N, MI S SIS SIP PI 39215-1640 January 29, 1986 O. D. KING 5 LEY, J R.
UICE PRI$1DE NT - NUCLE AR OPE R ATIONS U. S. Nuclear Regulatory Commission Office of Nuclear Reactor Regulation Washington, D. C.
20555 Attention:
Mr. Harold R. Denton, Director
Dear Mr. Denton:
SUBJECT:
Grand Gulf Nuclear Station Unit 1 Docket No. 50-416 License No. NPF-29 File:
0260/15180/L-860.0 Proposed Amendment to the Operating License (PCOL-86/01)
AECM-86/0023 Mississippi Power and Light (MP6L) Company is submitting by this letter proposed changes to the Grano Gulf Technical Specifications and Facility Operating License NPF-29.
Two of the proposed changes are required by Operating License Conditions to be implemented prior to startup from the first refueling outage (2.C.(15), Scram Discharge Volume, and 2.C.(35), Post LOCA Vacuum Breaker Position Indicators). The proposed change to the liigh Pressure Core Spray System Actuation Instrumentation is required by Technical Specification Tables 3.3.3-1 and 4.3.3.1-1 to be resolved prior to restart from the first refueling outage. Of the three remaining changes, one is the result of a design change to correct the system designator for certain drywell chilled water valves and the other two changes are purely administrative in nature.
The design changes associated with changes proposed in this letter are scheduled for implementation not later than startup following the first refueling outage. As previously provided to MP6L on several Technical Specification changes involving design changen to the plant, the NRC is requested to issue the amendments with an open effective date and require that MP&L notify the NRC within 30 days of the ef fective date of impicmentation of the technical specification changes.
In accordance with the provisions of 10 CFR 50.30, three (3) signed origintls and forty (40) copies of the requested amendment are enclosed. The attachment provides the complete technical justification and discussion to support the requested amendment. This amendment has been reviewed and accepted by the Plant Safety Review Committee (PSRC) and the Safety Review Committee (SRC).
PDR ADOCK 0000 16 g/
j ffg,3 G602050295 0601W 0
p
,, g ((
P Member Middle South Utilities System J14AECM86012102 - 1
4 AECM-86/0023 Page 2 Based on the guidelines presented in 10 CFR 50.92, it is the opinion of MP&L that this proposed amendment involves no significant hazards considerations.
In accordance with the requirements of 10 CFR 170.21, we have determined that the application fee is $150. A remittance of $150 is attached to this letter.
Yours pru)ly,
/
///
ODK:dmm Attachments: CGNS PCOL-86/01
/
cc:
Mr. T. H. Cloninger (w/a)
Mr. R. B. McGehee (w/a)
Mr. N. S. Reynolds (w/a)
Mr. H. L. Thomas (w/o)
Mr. R. C. Butcher (w/a)
Mr. James M. Taylor, Director (w/a)
Office of Inspection & Enforcement U. S. Nuclear Regulatory Commission Washington, D. C.
20555 Dr. J. Nelson Grace, Regional Administrator (w/a)
U. S. Nuclear Regulatory Commission Region II 101 Marietta St., N. W., Suite 2900 Atlanta, Georgia 30323 Dr. Alton B. Cobb (w/a)
State Health Officer State Board of Health Box 1700 Jackson, Mississippi 39205 i
J14AECM86012102 - 2