05000295/LER-1997-005, Forwards LER 97-005-00 IAW 10CFR50.73(a)(2)(i)(B).Actions Listed

From kanterella
(Redirected from ML20137E975)
Jump to navigation Jump to search
Forwards LER 97-005-00 IAW 10CFR50.73(a)(2)(i)(B).Actions Listed
ML20137E975
Person / Time
Site: Zion File:ZionSolutions icon.png
Issue date: 03/24/1997
From: Starkey R
COMMONWEALTH EDISON CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML20137E978 List:
References
NUDOCS 9703280347
Download: ML20137E975 (2)


LER-1997-005, Forwards LER 97-005-00 IAW 10CFR50.73(a)(2)(i)(B).Actions Listed
Event date:
Report date:
Reporting criterion: 10 CFR 50.73(a)(2)(1)
2951997005R00 - NRC Website

text

O>mmonwct.lth life.on Cnmp.m)

O

/ ion Generating Station l01 Shiloh IL>ulclard xmn. iuornrr

'lclHl* N UMi March 24, 1997 i

U.S. Nuclear Regulatory Commission i

Document Control Desk l

Washington, DC 20555 1

The enclosed Licensee Event Report number 97-005 Docket No. 50-295/DPR-39 from Zion Generating Station is being transmitted to you in accordance with the 10CFR50.73(a)(2)(1)(B), which requires a thirty-day written report when any operation or condition occurs that is prohibited by the plant's Technical Specifications.

The following corrective actions have been developed to prevent recurrence:

1.

Immediate Actions Both Units have been placed in cold shutdown with the reactor coolant systems at atmospheric pressure.

Operations is reviewing proposed evolutions to ensure they are 3roperly planned and executed.

31 ant evolutions are being limited to minimize distractions and to ensure proper focus on the task at hand.

Designated evolutions are being monitored by an assigned Senior e

i Manager.

The SE, the US, and the NSO involved were removed from licensed activities, The Qualified Nuclear Engineers (ONE) involved have been removed e

from independent reactivity management duties.

An Independent Investigation was initiated.

l Sen'

. n nd 9703280347 970324 PDR ADOCK 05000295 S

PDR I

l l Rill $5ll%%.Illl@I l

2LER\\97005 ler(9)

.\\ t mcom Gimpan)-

i 2.

Long Term Actions Long term actions will be supplied in a Su)plemental re) ort to this LER.

The corrective actions will 3e based on t1e results of the ongoing Corporate Investigation.

Very truly yours.

R. Starkey Station Manager Zion Generating Station RS/jz

Enclosure:

Licensee Event Report cc:

NRC Region III Administrator NRC Resident Inspector IDNS Resident Inspector INP0 Record Center 1

Illinois Department of Nuclear Safety i

2LER\\97005.ler(10)