MONTHYEARML20217P7111999-10-26026 October 1999 Informs That Licensee 990330 Response to GL 97-06 Provides Reasonable Assurance That Condition of Licensee Steam Generator Internals Is in Compliance with Current Licensing Bases for Plant ML20217K3571999-10-21021 October 1999 Discusses Use of SONGS as Generic Safety Issue 191 Ref Plant.Future Requests for Info & Addl Coordination Activities Be Handled Through D Evans of Organization.With Diskette ML20217K8541999-10-21021 October 1999 Forwards Revised Pages to ERDS Data Point Library,Per Requirements of 10CFR50,App E,Section VI.3.a.Described Unit 2 & 3 Changes for 2/3R7813 Were Completed on 990924 ML20217L9491999-10-21021 October 1999 Forwards SONGS Emergency Response Telephone Directory, for Oct-Dec 1999 ML20217J8631999-10-15015 October 1999 Forwards Insp Repts 50-361/99-12 & 50-362/99-12 on 990808- 0918.One Violation Identified Involving Inoperability of Emergency Diesel Generator in Excess of Allowed Outage Time ML20217E3221999-10-13013 October 1999 Forwards MORs for Sept 1999 for Songs,Units 2 & 3.No Challenges Were Noted to Psvs for Either Units 2 or 3 ML20217E7671999-10-12012 October 1999 Forwards Rev 62 to NRC Approved Aug 1983, Physical Security Plan,Songs,Units 1,2 & 3, IAW 10CFR50.54(p).Changes,as Described in Encls 1 & 2,do Not Reduce Effectiveness of Plan.Encl Withheld,Per 10CFR73.21 ML20217B5981999-10-0606 October 1999 Informs That Staff Concluded That All Requested Info for GL 98-01, Year 2000 Readiness in Us Nuclear Power Plants, Provided for San Onofre Nuclear Generating Station,Units 2 & 3 ML20216H8741999-09-29029 September 1999 Provides Requested Written Response to GL 99-02, Lab Testing of Nuclear-Grade Activated Charcoal. Lab Testing of Charcoal Adsorber Samples for Creacus & Pacu Satisfies Listed Requirements ML20216H8541999-09-29029 September 1999 Submits Encl Request for Relief from ASME Code,Section III Requirements in 10CFR50.55(a)(3) to Use Mechanical Nozzle Seal Assembly as Alternate ASME Code Replacement at SONGS, Units 2 & 3 for Period of Operation Beginning with Cycle 11 ML20216J2631999-09-28028 September 1999 Forwards Copy of Final Accident Sequence Precursor (ASP) Analysis of Operational Event at Songs,Unit 2,reported in LER 361/98-003 ML20212H4461999-09-28028 September 1999 Forwards Suppl Info,As Discussed with NRC During 990812 Telcon,To Support Risk Informed Inservice Testing & GL 96-05, Periodic Verification of Design-Basis Capability of Safety-Related Movs ML20212G5611999-09-24024 September 1999 Informs NRC That SCE Remains Committed to Performing Eddy Current Examinations of 100% of Reactor Vessel Head Penetrations at Songs,Unit 3.Exams Will Not Be Performed During Cycle 11 RFO 05000361/LER-1999-005, Forwards 30-day follow-up LER 99-005-00,describing Loss of Physical Train Separation in Control Room.Any Actions Listed Intended to Ensure Continued Compliance with Existing Commitments1999-09-23023 September 1999 Forwards 30-day follow-up LER 99-005-00,describing Loss of Physical Train Separation in Control Room.Any Actions Listed Intended to Ensure Continued Compliance with Existing Commitments ML20212D9921999-09-16016 September 1999 Informs That on 990818,NRC Staff Completed Midcycle PPR of San Onofre.Nrc Plan to Conduct Core Insps & One Safety Issues Evaluation of MOVs at Facility Over Next 7 Months. Details of Insp Plan Through March 2000 Encl ML20212A4061999-09-14014 September 1999 Forwards Revised Pages to ERDS Data Point Library.Described Unit 2 Changes for 2R7817 & 2R7828 Were Completed on 990818 & Unit 3 Change for 3R7828 Was Completed on 990903 ML20216E6031999-09-10010 September 1999 Provides Response to NRC Administrative Ltr 99-03, Preparation & Scheduling of Operator Licensing Exams, Dtd 990820.Schedule Shown on Attachment 1, Operator Licensing Exam Data, Provides Util Best Estimate Through Cy 2003 ML20217B9011999-09-10010 September 1999 Responds to Which Addressed Concerns Re Y2K Issue & Stockpiling of Potassium Iodide (Ki) Tablets by Informing That San Onofre Nuclear Station Already Completed All Work Required to Be Ready for Y2K Transition ML20211K4191999-09-0303 September 1999 Final Response to FOIA Request for Documents.Documents Listed in App a Being Withheld in Part (Ref FOIA Exemptions 5 & 7) ML20211N0261999-09-0303 September 1999 Forwards Exemption from Certain Requirements of 10CFR50.44 & 10CFR50,app A,General Design Criterion 41 in Response to Util Request of 980910,as Supplemented 990719 & SER 05000206/LER-1999-001, Forwards LER 99-001-00 for Occurrence Re Unattended Security Weapon Inside Protected Area.Single Rept for Unit 1 Is Being Submitted,Iaw NUREG-1022,Rev 1,since Condition Involves Shared Sys & Is Applicable to Units 1,2 & 31999-08-31031 August 1999 Forwards LER 99-001-00 for Occurrence Re Unattended Security Weapon Inside Protected Area.Single Rept for Unit 1 Is Being Submitted,Iaw NUREG-1022,Rev 1,since Condition Involves Shared Sys & Is Applicable to Units 1,2 & 3 ML20211H3321999-08-30030 August 1999 Discusses 1999 Emergency Preparedness Exercise Extent of Play & Objectives.Based on Review,Nrc Has Determined That Exercise Extent of Play & Objectives Are Appropriate to Meet Emergency Plan Requirements ML20211J7151999-08-27027 August 1999 Forwards Insp Repts 50-361/99-09 & 50-362/99-09 on 990627- 0807.Two Violations Being Treated as non-cited Violations ML20211H8561999-08-23023 August 1999 Forwards SE Accepting Licensee 970625 Requests for Relief RR-E-2-03 - RR-E-2-04 from Exam Requirements of Applicable ASME Code,Section Xi,For First Containment ISI Interval ML20211J5821999-08-23023 August 1999 Corrected Copy of ,Changing Application Date from 970625 to 990625.Ltr Forwarded SE Accepting Licensee 990625 Requests for Relief RR-E-2-03 - RR-E-2-08 from Exam Requirements of Applicable ASME Code,Section XI as Listed ML20210V4271999-08-16016 August 1999 Forwards Proprietary Certified Renewal Applications for SROs a Harkness,R Grabo & T Vogt & RO D Carter,Submitted on Facsimile Form NRC-398 & Certified NRC Form 396.Encls Withheld ML20210R6681999-08-13013 August 1999 Forwards Response to NRC RAI Re SCE License Amend Applications 173 & 159 for Songs,Units 2 & 3,proposed Change Number 485,which Requests Addition of SR to TS 3.3.9, CR Isolation Signal ML20211A9501999-08-12012 August 1999 Discusses 990720-21 Workshop Conducted in Region IV Ofc,Re Exchange of Info in Area of Use of Risk Insights in Regulatory Activities.List of Attendees,Summary of Topic & Issues,Agenda & Copies of Handouts Encl ML20210Q6451999-08-12012 August 1999 Forwards Monthly Operating Repts for July 1999 for SONGS, Units 2 & 3,per TS 5.7.1.4.There Were No Challenges to Pressurizer Safety Valves for Either Units ML20210P5711999-08-11011 August 1999 Forwards Amend Application Number 189 for License NPF-10 & Amend Application Number 174 to License NPF-15,replacing Analytical Limits Currently Specified as Acceptance Criteria with Allowable Values,Per Encl Calculation E4C-098 ML20210P4681999-08-11011 August 1999 Forwards COLR for Cycle 10 for Songs,Units 2 & 3,IAW TS Section 5.7.1.5.d, Colr. Changes to COLR Parameters Have Been Conducted IAW Approved COLR Methodologies & All Applicable Limits of Safety Analysis Were Met ML20210P6221999-08-10010 August 1999 Forwards Replacement Pages for Attachments E & F of Amend Application Numbers 168 & 154 for Songs,Units 2 & 3.Pages Are Provided to Correct Errors to Pagination & Headings in 970618 Submittal ML20210N9721999-08-10010 August 1999 Responds to Appeal of FOIA Request for Documents Re Osre Issue.No Osre Visit Scheduled for Sept 1996 at Plant,Per 990722 Telcon.V Dricks,In Ofc of Public Affairs Should Be Contacted Re Osre Issue ML20210N0901999-08-0909 August 1999 Informs That 990312 Application Requested Amends to Licenses DPR-13,NPF-10 & NPF-15,respectively,being Treated as Withdrawn.Proposed Change Would Have Modified Facility TSs Pertaining to SONGS Physical Security Plan ML20210N5051999-08-0909 August 1999 Forwards Cycle 10 Update to TS Bases,Which Have Been Revised Between 980101-990630,per 10CFR50.71(e) 05000361/LER-1999-004, Forwards LER 99-004-00 Re Automatic Tgis Actuation.Event Affected Units 2 & 3 Equally Because Tgis Is Shared Sys. Single Rept Is Being Provided for Unit 2 IAW NUREG-1022, Rev 1.No New Commitments Are Contained in Encl1999-08-0606 August 1999 Forwards LER 99-004-00 Re Automatic Tgis Actuation.Event Affected Units 2 & 3 Equally Because Tgis Is Shared Sys. Single Rept Is Being Provided for Unit 2 IAW NUREG-1022, Rev 1.No New Commitments Are Contained in Encl ML20210L2311999-08-0505 August 1999 Forwards ISI Summary Rept,Including Owners Repts of Repairs & Replacements,For Songs,Unit 3.Rept Covers 970916 Through 990509,date Unit 3 Returned to Service Following Cycle 10 Refueling Outage ML20210L1461999-08-0303 August 1999 Informs That NRC Plans to Administer Gfes of Written Operator Licensing Exam on 991006.Requests Submittal of Ltr Identifying Individuals Taking Exam,Personnel Allowed Access to Exams & Mailing Address for Exams ML20216D9671999-07-29029 July 1999 Provides Response to RAI to Support Proposed TS Change 460 Re Containment Isolation Valve Completion Time for SONGS, Units 2 & 3.Rev 3 to Abnormal Operating Instruction SO23-13-14, Reactor Coolant Leak, Encl ML20210C1821999-07-22022 July 1999 Forwards Rept Providing Results of Insp of Eggcrate Tube Supports Done on Secondary Side of Sgs,Using Remote Controlled Visual Equipment ML20210B2451999-07-21021 July 1999 Forwards Response to NRC 990615 RAI Re GL 95-07, Pressure Locking & Thermal Bldg of SR Power-Operated Gate Valves, for Songs,Units 2 & 3 ML20210B9891999-07-20020 July 1999 Ack Receipt of Transmitting Plant Emergency Plan Implementing Procedure SO123-VIII-1, Recognition & Classification of Emergencies ML20209J5241999-07-19019 July 1999 Provides Clarification of Util Intentions Re Disposition of Systems for Which Exemption & TS Changes Were Requested in Licensee .Deferment of Action Re Hydrogen Monitors,Encl ML20210N2881999-07-19019 July 1999 Forwards Rev 61 to Physical Security Plan,Rev 21 to Safeguards Contingency Plan & Rev 20 to Security Force Training & Qualification Plan,Per 10CFR50.54(p),for Plant. Screening Criteria Forms Encl.Plans Withheld ML20210A2911999-07-19019 July 1999 Submits Withdrawal Request Submitted by Ltr Dtd 990312, Requesting NRC Approval of Revs to Physical Security Plan & Safeguards Contingency Plan Tactical Response Plan ML20209G3421999-07-15015 July 1999 Forwards Table of 16 Affected Tube Locations in SG E089, Discovered During Cycle 10 Outage Insp,Which Were Probably Not Examined by Bobbin During Cycle Outage Insp ML20209D8051999-07-12012 July 1999 Discusses Licensee Response to RAI Re GL 92-01,Rev 1,Suppl 1, Rc Structural Integrity, Issue on 950519 to Plant. NRC Revised Info in Reactor Vessel Integrity Database & Is Releasing It as Rvid Version 2 ML20209F5681999-07-0909 July 1999 Forwards Insp Repts 50-361/99-08 & 50-362/99-08 on 990516- 0626.One Violation Identified & Being Treated as Noncited Violation,Consistent with App C of Enforcement Policy ML20209C1571999-07-0202 July 1999 Forwards Response to NRC RAI Re SCE Submittal Dtd 980710,re GL 96-06, Assurance of Equipment Operability & Containment Integrity During Design-Basis Accident Conditions ML20196K6721999-07-0202 July 1999 Discusses 990628 Meeting Conducted in Region IV Office Re Status of San Onofre Nuclear Generating Station Emergency Preparedness Program.List of Attendees & Licensee Presentation Encl 1999-09-03
[Table view] Category:INCOMING CORRESPONDENCE
MONTHYEARML20217L9491999-10-21021 October 1999 Forwards SONGS Emergency Response Telephone Directory, for Oct-Dec 1999 ML20217K3571999-10-21021 October 1999 Discusses Use of SONGS as Generic Safety Issue 191 Ref Plant.Future Requests for Info & Addl Coordination Activities Be Handled Through D Evans of Organization.With Diskette ML20217K8541999-10-21021 October 1999 Forwards Revised Pages to ERDS Data Point Library,Per Requirements of 10CFR50,App E,Section VI.3.a.Described Unit 2 & 3 Changes for 2/3R7813 Were Completed on 990924 ML20217E3221999-10-13013 October 1999 Forwards MORs for Sept 1999 for Songs,Units 2 & 3.No Challenges Were Noted to Psvs for Either Units 2 or 3 ML20217E7671999-10-12012 October 1999 Forwards Rev 62 to NRC Approved Aug 1983, Physical Security Plan,Songs,Units 1,2 & 3, IAW 10CFR50.54(p).Changes,as Described in Encls 1 & 2,do Not Reduce Effectiveness of Plan.Encl Withheld,Per 10CFR73.21 ML20216H8741999-09-29029 September 1999 Provides Requested Written Response to GL 99-02, Lab Testing of Nuclear-Grade Activated Charcoal. Lab Testing of Charcoal Adsorber Samples for Creacus & Pacu Satisfies Listed Requirements ML20216H8541999-09-29029 September 1999 Submits Encl Request for Relief from ASME Code,Section III Requirements in 10CFR50.55(a)(3) to Use Mechanical Nozzle Seal Assembly as Alternate ASME Code Replacement at SONGS, Units 2 & 3 for Period of Operation Beginning with Cycle 11 ML20212H4461999-09-28028 September 1999 Forwards Suppl Info,As Discussed with NRC During 990812 Telcon,To Support Risk Informed Inservice Testing & GL 96-05, Periodic Verification of Design-Basis Capability of Safety-Related Movs ML20212G5611999-09-24024 September 1999 Informs NRC That SCE Remains Committed to Performing Eddy Current Examinations of 100% of Reactor Vessel Head Penetrations at Songs,Unit 3.Exams Will Not Be Performed During Cycle 11 RFO 05000361/LER-1999-005, Forwards 30-day follow-up LER 99-005-00,describing Loss of Physical Train Separation in Control Room.Any Actions Listed Intended to Ensure Continued Compliance with Existing Commitments1999-09-23023 September 1999 Forwards 30-day follow-up LER 99-005-00,describing Loss of Physical Train Separation in Control Room.Any Actions Listed Intended to Ensure Continued Compliance with Existing Commitments ML20212A4061999-09-14014 September 1999 Forwards Revised Pages to ERDS Data Point Library.Described Unit 2 Changes for 2R7817 & 2R7828 Were Completed on 990818 & Unit 3 Change for 3R7828 Was Completed on 990903 ML20216E6031999-09-10010 September 1999 Provides Response to NRC Administrative Ltr 99-03, Preparation & Scheduling of Operator Licensing Exams, Dtd 990820.Schedule Shown on Attachment 1, Operator Licensing Exam Data, Provides Util Best Estimate Through Cy 2003 05000206/LER-1999-001, Forwards LER 99-001-00 for Occurrence Re Unattended Security Weapon Inside Protected Area.Single Rept for Unit 1 Is Being Submitted,Iaw NUREG-1022,Rev 1,since Condition Involves Shared Sys & Is Applicable to Units 1,2 & 31999-08-31031 August 1999 Forwards LER 99-001-00 for Occurrence Re Unattended Security Weapon Inside Protected Area.Single Rept for Unit 1 Is Being Submitted,Iaw NUREG-1022,Rev 1,since Condition Involves Shared Sys & Is Applicable to Units 1,2 & 3 ML20210V4271999-08-16016 August 1999 Forwards Proprietary Certified Renewal Applications for SROs a Harkness,R Grabo & T Vogt & RO D Carter,Submitted on Facsimile Form NRC-398 & Certified NRC Form 396.Encls Withheld ML20210R6681999-08-13013 August 1999 Forwards Response to NRC RAI Re SCE License Amend Applications 173 & 159 for Songs,Units 2 & 3,proposed Change Number 485,which Requests Addition of SR to TS 3.3.9, CR Isolation Signal ML20210Q6451999-08-12012 August 1999 Forwards Monthly Operating Repts for July 1999 for SONGS, Units 2 & 3,per TS 5.7.1.4.There Were No Challenges to Pressurizer Safety Valves for Either Units ML20210P5711999-08-11011 August 1999 Forwards Amend Application Number 189 for License NPF-10 & Amend Application Number 174 to License NPF-15,replacing Analytical Limits Currently Specified as Acceptance Criteria with Allowable Values,Per Encl Calculation E4C-098 ML20210P4681999-08-11011 August 1999 Forwards COLR for Cycle 10 for Songs,Units 2 & 3,IAW TS Section 5.7.1.5.d, Colr. Changes to COLR Parameters Have Been Conducted IAW Approved COLR Methodologies & All Applicable Limits of Safety Analysis Were Met ML20210P6221999-08-10010 August 1999 Forwards Replacement Pages for Attachments E & F of Amend Application Numbers 168 & 154 for Songs,Units 2 & 3.Pages Are Provided to Correct Errors to Pagination & Headings in 970618 Submittal ML20210N5051999-08-0909 August 1999 Forwards Cycle 10 Update to TS Bases,Which Have Been Revised Between 980101-990630,per 10CFR50.71(e) 05000361/LER-1999-004, Forwards LER 99-004-00 Re Automatic Tgis Actuation.Event Affected Units 2 & 3 Equally Because Tgis Is Shared Sys. Single Rept Is Being Provided for Unit 2 IAW NUREG-1022, Rev 1.No New Commitments Are Contained in Encl1999-08-0606 August 1999 Forwards LER 99-004-00 Re Automatic Tgis Actuation.Event Affected Units 2 & 3 Equally Because Tgis Is Shared Sys. Single Rept Is Being Provided for Unit 2 IAW NUREG-1022, Rev 1.No New Commitments Are Contained in Encl ML20210L2311999-08-0505 August 1999 Forwards ISI Summary Rept,Including Owners Repts of Repairs & Replacements,For Songs,Unit 3.Rept Covers 970916 Through 990509,date Unit 3 Returned to Service Following Cycle 10 Refueling Outage ML20216D9671999-07-29029 July 1999 Provides Response to RAI to Support Proposed TS Change 460 Re Containment Isolation Valve Completion Time for SONGS, Units 2 & 3.Rev 3 to Abnormal Operating Instruction SO23-13-14, Reactor Coolant Leak, Encl ML20210C1821999-07-22022 July 1999 Forwards Rept Providing Results of Insp of Eggcrate Tube Supports Done on Secondary Side of Sgs,Using Remote Controlled Visual Equipment ML20210B2451999-07-21021 July 1999 Forwards Response to NRC 990615 RAI Re GL 95-07, Pressure Locking & Thermal Bldg of SR Power-Operated Gate Valves, for Songs,Units 2 & 3 ML20210A2911999-07-19019 July 1999 Submits Withdrawal Request Submitted by Ltr Dtd 990312, Requesting NRC Approval of Revs to Physical Security Plan & Safeguards Contingency Plan Tactical Response Plan ML20210N2881999-07-19019 July 1999 Forwards Rev 61 to Physical Security Plan,Rev 21 to Safeguards Contingency Plan & Rev 20 to Security Force Training & Qualification Plan,Per 10CFR50.54(p),for Plant. Screening Criteria Forms Encl.Plans Withheld ML20209J5241999-07-19019 July 1999 Provides Clarification of Util Intentions Re Disposition of Systems for Which Exemption & TS Changes Were Requested in Licensee .Deferment of Action Re Hydrogen Monitors,Encl ML20209G3421999-07-15015 July 1999 Forwards Table of 16 Affected Tube Locations in SG E089, Discovered During Cycle 10 Outage Insp,Which Were Probably Not Examined by Bobbin During Cycle Outage Insp ML20209C1571999-07-0202 July 1999 Forwards Response to NRC RAI Re SCE Submittal Dtd 980710,re GL 96-06, Assurance of Equipment Operability & Containment Integrity During Design-Basis Accident Conditions ML20210N9871999-07-0101 July 1999 Appeals Denial of Documents Re Sept 1996 Osre for San Onofre Nuclear Generating Station.Requests Copies of Sept 1996 Osre Rept & Any More Recent Osre Repts ML20209B3571999-06-28028 June 1999 Submits Response to GL 98-01,Suppl 1 Y2K Readiness of Computer Sys at Nuclear Power Plants. GL 98-01 Requested Response on Status of Facility Y2K Readiness by 990701. Disclosure Encl ML20209B4831999-06-25025 June 1999 Requests NRC Approval of Six Relief Requests from ASME Code Requirement for Containment ISI Exams.Six Relief Requests, Provided as Enclosures 1-6,are as Listed ML20196A9801999-06-17017 June 1999 Responds to NRC 990420 RAI Re Proposed risk-informed Inservice Testing & GL 96-05 Programs at Songs,Units 2 & 3. Revised Pages to risk-informed Inservice Testing Program, Encl ML20195G8091999-06-14014 June 1999 Forwards Response to RAI Made During 990511 Telcon Re LARs 184 & 170 for SONGS Units 2 & 3.Amend Applications Proposed Restriction on Operation with Channel of RAS or Efas in Tripped Condition ML20195K4201999-06-11011 June 1999 Forwards LERs 99-003-00 & 99-004-00 Re Manual Esfas (Reactor Trips) Due to Problems with Main Feedwater Control.Two Events Are Being Reported Separately Because Actual Causes Are Considered Different & Independent of Each Other ML20195H1561999-06-10010 June 1999 Forwards MORs for May 1999 for Songs,Units 2 & 3.There Were No Challenges to Pressurizer Safety Valves for Either Unit 2 & 3 ML20195E4981999-06-0808 June 1999 Forwards Application for Amends 188 & 173 to Licenses NPF-10 & NPF-15 for SONGS Units 2 & 3,respectively.Amends Would Revise TS 3.5.2,3.1.9,3.7.1 & 5.1.7.5 Re Small Break LOCA Charging Flow & Main Steam Safety Valve Setpoints ML20196L3191999-05-24024 May 1999 Forwards ISI Summary Rept,Including Owners Repts of Repairs & Replacements for Songs,Unit 2.Rept Covers Period of 970916-990226 ML20207A3831999-05-24024 May 1999 Responds to NRC 990326 RAI on DG Srs.Proposed to Add Listed Sentence to TS Bases for SRs 3.8.1.7,3.8.1.12 & 3.8.1.15,as Result of Discussion with NRC During 990427 Telcon ML20211K4261999-05-18018 May 1999 FOIA Request for Documents Re San Onofre OI Repts 4-98-041, 4-98-043 & 4-98-045 ML20206S7161999-05-17017 May 1999 Forwards MORs for Apr 1999 for Songs,Units 2 & 3.There Were No Challenges to Pressurizer Safety Valves for Either Unit 2 or 3 ML20206N4711999-05-13013 May 1999 Provides Info Requested by NRC Re Reduced Pressurizer Water Vol Change Amends Application 172 & 158 for Songs,Units 2 & 3,respectively.Proposed Change Will Reduce Pressurizer Water Level Required for Operability ML20206M7791999-05-13013 May 1999 Informs NRC of Changes Being Made to Emergency Response Data Sys (ERDS) at SONGS Unit 3.Revised Page to ERDS Data Point Library Is Provided in Encl ML20206K6891999-05-11011 May 1999 Forwards Approved Amends to NPDES Permits CA0108073,Order 94-49 & CA0108181,Order 94-50 & State Water Resources Board Resolution ML20206M0681999-05-10010 May 1999 Submits Correction to Info Contained in Licensee to NRC Re Proposed TS Change Number NPF-10/15-475.Stated Info Was Incorrect in That Overtime Provisions Were Not Contained in TR at Time of Was Submitted ML20206H0451999-05-0404 May 1999 Forwards Annual Financial Repts for Listed Licensees of Songs,Units 1,2 & 3.Each Rept Includes Appropriate Certified Financial Statement Required by 10CFR50.71(b) ML20206H1931999-05-0303 May 1999 Forwards 1998 Annual Rept, for SONGS Units 2 & 3 & PVNGS Units 1,2 & 3.SCEs Form 10K Annual Rept to Securites & Exchange Commission for Fiscal Yr Ending 981231,encl ML20206C5151999-04-29029 April 1999 Forwards 1998 Radiological Environ Operating Rept for Songs,Units 1,2 & 3. Annual Radiological Environ Operating Rept Covers Operation of Songs,Units 1,2 & 3 During CY98 & Includes Summaries Interpretations & Analysis of Trends ML20206E5851999-04-29029 April 1999 Forwards Annual Radioactive Effluent Release Rept for 1998 for SONGS Units 1,2 & 3. Also Encl Are Rev 13 to Unit 1 ODCM & Rev 31 to Units 2 & 3 Odcm 1999-09-29
[Table view] |
Text
.- - - . . .. . . - - ... - -.- - ~- -.. . - . . . . . .. .-
From PAUL BLANCH <PMBLANCH61x.netcom.com>
, To s , WND2. WNP3 ( j a z ) , TWD1. TWP4 (gan) , WND2 . WNP4 ( j x13 ) , KPD1. . .
Dates.
1/30/97 12:58pm subjects songs i f
Dear concerned whistleblower..
1Please respond to me or.to the NRC if'you care.
Paul ,
t l
+
! UNITED STATES )
- NUCLEAR REGULATORY' COMMISSION 1
- REGION IV 611.RYAN PLAZA DRIVE,. SUITE 400 ,
- ARLINGTON, TEXAS 76011-8064 l
4 January 22, 1 997' 4
4 d
Paul M. Blanch-1 35 Hyde Road West Hartford, CT 0611 7 '
s
Dear Mr. Blanch:
}
l
Reference:
' Allegation No. RIV-96-A-01:26A l .This is in reference to Ms. Jean Lee's May 16, 1996, letter which
~
acknowledged receipt of,your electronic mail regarding spent fuel j
-activities at San Onofre Nuclear Generating Station.-(SONGS) Unit !
. 1. Additionally, the letter advised you'that Region IV had :
' oversight. responsibilityLfor SONGS, and that Region IV would be !
~
conducting' appropriate review or inspection follow-up and that you would be advised when Region IV had completed its review.
During our' inspection and reYlew of your concerns we considered the SCE findings. Our inspection was completed and our findings are summarized in the Resolution of Concerns, enclosed with this letter. Your concerns are underlined and NRC findings are in bold text. Additionally, enclosed i'or your reference and
'information is a copy of NRC Inspection Report 50-206/96-06 that documents our inspection at the SONGS Unit i facility.
Although you may find that the'NRC'was not able to fully substantiate your concerns, this does not necessarily mean that we find the-facts as you stated them to be untrue. It means only that we were unable to obtain objective evidence to corroborate your statements through interviews, document rVith) }D 9703130385 970306 PDR ORG NRRA
l reviews, and/or direct observation.
We believe that our' actions in this matter have been responsive to your concerns. We take our safety responsibilities to the public very seriously and will continue to do so within the bounds of our lawful authority. Unless NRC receives additional information that suggests our conclusions should be altered, Region IV plans no further action on this matter except as noted for our review of the NOB-LOCK membrane issue.
Sincerely, Russell Wise Senior Allegations Coordinator
Enclosures:
As stated cc w/ enclosures:
Allegation file RESOLUTION OF CONCERNS
Reference:
Allegation No. RIV-96-A-0126A 1 . The SONGS Unit 1 Spent Fuel Pool has numerous spent assemblies with broken pins, degradation of all of the spent fuel assemblies continues uninterrupted as there is no approved means to ship the assemblies off site.
Section 4 of NRC Inspection Report 50-206/96-06 documents the NRC review of spent fuel pool activities and the inspection concluded that SONGS Unit 1 was in compliance with all limitations and requirements established in the Permanently Defueled Technical Specifications.
Southern California Edison's review concluded and reported on August 1 6, 1 996, that presently, there are a few known failed fuel pins located in the SONGS Unit 1 spent fuel pool (SFP).
However, a routine analysis of the SFP water indicates that there has been no further degradation of the fuel cladding while it has been stored in the SFP. There are no known loose fuel pellets on the floor of SFP. In the mid 1980's, a visual inspection of the SFP floor was performed which confirmed the absence of loose fuel pellets.
Your reference that a concerned individual discussed this concern with his management but was dissatisfied with the response, and the concerned individual's immediate manager engaged in l intimidating conversations with the concerned individual was not reviewed.
_ _ _ . _ . _ _ . _ _ _ _ _ _ _ _ . _ _ . _ . _ . = _ _ _ - - _ . . - _ _ _ _ _ _ _ . _
NRC reviews all concerns of harassment and intimidation (H&I).
However, the identity of the individual who was the subject of HEI is required before NRC can conduct an investigation to determine if H&I occurred.
2.
There have been numerous leaks of radioactive water from the stainless steel-liner of the SONGS 1 SFP. Although the pool employs a leak = detection / collection system, it is known that failure of operating personnel to monitor this system has-resulted in radioactive ' contamination of a 480 volt room structure wall near the pool and local contamination of soil near the pool (boric acid crystals have been found in outside soil surface areas near the Pool). The exact extent of contamination is unknown and it is possible that an underground t radioactive Plume may be migrating away from the pool to the
! beach- , underground water'supplias, etc. ,
In October 1994, the NRC conducted a team inspection to review the potential forcleaks from the dTP and to determine SCE's ability'to detect such leaks. The inspection determined that there have been leaks from the SFP liner at various times and the leakage was the source of' contamination of the 480 volt room wall. No evidence was found that- boric acid crystals were identified on outside soil surface. areas near the pool.
~
RIV-96-A-0126A The potential impact of' soil contamination resulting from SFP j leaks was also considered. Based on our review of the j i information obtained by SCE during our 1994 inspection, we l understand that water has been leaking into the SFP monitor '
well. (The term " monitor well" can be misleading because the SFP monitor is a leak detection system designed to catch and prevent any leaks from contaminating the outdoor soil,-and is not a groundwater monitor well.) There were not indications of leaks to the soil around the. buildings, but this cannot be verified !
because no groundwater monitor wells exist in the area.
However, we have found that SCE has provided reasonable assurance that SFP leakage is not currently contaminating the soil around the buildings for the following reasons. SCE has taken steps to maintain the water level in the monitor well l below the groundwater table. As a result, the hydrostatic head of the groundwater would tend to result in groundwater leaking into the monitor rather than the slightly contaminated water leaking out of the monitor. This is consistent with j information contained in the March 10, 1995, submittal which l ' documents the water in the SFP monitor well has about half of i the tritium activity as the SFP, indicating that= it is some l combination of groundwater in-leakage and leakage from the SFP.
, To prevent leakage of spent fuel pool water into the ground and i ultimately into the beach and underground water reserves, a i waterproof membrane 40 mils thick, known as Amercoat Corporation l l iNOB-LOCKi was placed under the SFP bottom slab and on the pool l
< 1
. . , . . , , . - . , + , , - -
walls below grade.
( The membrane was not installed above elevation 1 21-01. The membrane and installation were'in accordance with Specification-l 'BSO-2576 which cannot be found in the SONGS documentation' There has been no system, testing: done for the membrane.known The environmental membrane hasqualification been in service
- for approximately 30' years, has likely experienced degradation.
- Its exact condition is unknown.
i The SCE review determined that there are no local water supplies-in the immediate vicinity of the site. Water is l
imported from the Tri-Cities Water District and the Camp Pendleton groundwater supply is upstream from SONGS.
Groundwater has a seaward gradient which indicates' the water flow-is toward the ocean.' Therefore, a radioactive plume from L SONGS could not move towards any local water supplies.
SCE has concluded that although the condition of the waterproof )
membrate is not empirically known, engineering judgment ;
considers the membrane to be intact. It is unlikely that the 1 membrane has deteriorated.because of its underground conditions. I Membranes do not generally deteriorate unless they are subjected I to sunlight exposure and dry-wet cycles.
NRC will verify with the licensee that there are no other uses intended for'the membrane that are not stated in the FSAR, 1
RIV-96-A-0126A but.may be a part of the plant's licensing basis. We will provide you the results'of our inquiry at a future date.
Since the pool stainless steel liner has experienced corrosion resulting in leakage, it is inevitable that the stainless steel fuel cladding will also degrade with time greatly increasing the probability of transport of fuel = fleas to the pool water and the environment.' The corrosion could weaken the cladding to the point that massive disintegration of fuel-pin- structure would occur in a major seismic event. This would contaminate the pool extensively resulting in a major cleanup: effort and possible offsite effects. In the worst cases, both the fuel and pool structure .would' experience' failure in an earthquake resulting in unacceptable offsite doses to the public.
SCE has reported that eight commercial nuclear power plants have used, or are using, stainless steel-clad uranium dioxide fuel.
Those reactors include four boiling-water. reactors and four pressurized-water reactors. Investigations of commercial spent fuel performance indicate that there was no evidence of stainless steel cladding degradation during fuel pool storage.
J SFP chemistry-is closely' tracked to ensure that water quality is l
i i
i l
maintained. As long as the strict chemical limits are maintained, degradation of the fuel cladding is not expected.
(See Section 4 of NRC Inspection Report 50-206/96-06).
I j
.Section 9.1.2 of the Updated Final Safety Analysis Report for San Onofre Nuclear Generating Station Unit i documents that the spent fuel pool racks which hold the' spent fuel are designed to withstand a seismic event.
l l
Paul M. Blanch j Energy Consultant l 135 Hyde Rd.
West Hartford CT 06117 Tel: 860-236-0326 Fax: 860-232-9350 l
l l
l l
l