Advises That Safeguards Regulatory Effectiveness Review Will Be Conducted During Wk of 860324-28.Util Requested to Provide Drawing List for Vital Area Analysis by 851001
ML20135F095
Person / Time
Site: Oyster Creek
Issue date: 09/13/1985
From: Martin T
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Fiedler P
GENERAL PUBLIC UTILITIES CORP.
References
NUDOCS 8509170152
Download: ML20135F095 (4)


Text

.

i SEP 131985 Docket No: 50-219 GPU Nuclear Corporation '

ATTN: Mr. P. B. Fiedler Vice President and Director P. O. Box 388 Forked River, New Jersey 08731 Gentlemen:

Subject:

Safeguards Regulatory Effectiveness Review at the Oyster Creek Nuclear Power Station The NRC's Office of Nuclear Material Safety and Safeguards (NMSS) is in the process of conducting a Regulatory Effectiveness Review (RER) at operating nuclear power plants. The Oyster Creek Power Station is scheduled for such a review during the week of March 24-28, 1986.

The purposes of the RER are to evaluate the overall effectiveness of the safeguards program and to determine whether existing safeguards regulations yield the level of protection intended by NRC. The RER supports the NRC's quality assurance program for safeguards, as it applies to both the Oyster Creek security systems and the NRC's regulations. The RER will complement but will be independent of the licensing and inspection functions. Specific details regarding the conduct of the RER, including identification of the team members, will be provided to you at a later date.

So that NMSS can prepare for the RER at the Oyster Creek Nuclear Power Station, you are requested to provide the information identified on the enclosed list directly to Mr. _ Robert Dube, Chief, Safeguards Evaluation Section, of that office by October 1, 1985. If you have any questions regarding this request, please contact R. R. Keimig of my staff at (215) 337-5255.

The response directed by this letter is not subject to the clearance procedures of the Office of Management and Budget as required by the Paperwork Reduction Act of 1980, PL 96-511.

Your cooperation with us in this matter is appreciated.

Sincerely, original signed by:

$A F Thomas T. Martin, Director Division M Radiation Safety and Safeguards

Enclosure:

As stated 0FFICIAL RECORD COPY

- g.Ol[%

i 3

o GPU Nuclear Corporation 2 SEP 131985 1

cc:-(w/ encl)

M. Laggart, BWR Licensing Manager Licensing Manager, Oyster Creek PublicDocumentRoom(PDR)

- Local Public Document Room (LPDR)

Nuclear Safety Information Center-(NSIC)

NRC Resident Inspector

State of New Jersey bcc:.(w/ encl)

RegionIDocketRoom(withconcurrences)

Section Chief, DRP Robert Dube, NMSS-4 l

4 4

I i

i 4

4 d

dh
DRSS ith

' RI /SS soyner.

Ke ig -

1

lRSS : R DRSS M refn 9/(/85 9/ /85 9 8 /85 9//3/85

, 0FFICIAL RECORD COPY 4

Y 6

4 4

r- og

(

,1 ENCLOSURE OYSTER CREEK DRAWING LIST FOR VITAL AREA ANALYSIS

1. Equipment Layout Drawings 2050-3 General Arrangement Turbine Building-Basement Floor Plan 2051-4 General Arrangement Turbine Building-Mezzanine F1oor Plan 2052-3 General Arrangement TurbineBuilding-Operating Floor Plan 2060-4 General Arrangement Reactor Building Plans 2061-4 General Arrangement Reactor Building Plans 2062-2 General Arrangement Reactor Building Plans
2. Piping and Instrument Diagrams 148F262 Emergency Condenser System 148F444 Cleanup Demineralizer System 148F711 Reactor Shutdown Cooling System 148F740 Containment Spray System 237E487 Control Rod Drive Hydraulic System 237E726 Dry Well and Suppression System 237E798 Reactor and Recire. Loop 885D781 Core Spray System 2002 Flow Diagram - Main, Extraction and Aux. Steam System -

Turbine and Reactor Buildings 2004-2 Flow Diagram - Condensate and Demineralized Water Tansfer System s

3. Electrical One Line Diagrams

-3002 Auxiliary One Line Diagram - Sheet-1 3004 Auxi.lary One Line Diagram - Sheet 3 3013 Vital One Line Diagram 2028 D.C. One Line Diagram 3033-1A D.C. One Line Diagram - Battery C

O 4-

,. , 1 Oyster Creek Nuclear Plan Drawing List i' Page 2

4. Miscellaneous Drawings 2001-5 Mechanical Symbols and Abbreviations 4510-3 First and Second Floor Plans - Office Building
  • Figure I-4-1 Plot Plan (FSAR Figure No.) '
    • Diesel Generator Building Layout
  • Need equivalent engineering drawing for the FSAR Figure number listed above.

I **This " drawing" was a sketch made by Oyster Creek personnel during the vital area analysis visit. We need to obtain an equivalent engineering drawing.

i N

k 6

i i

I J

4

- . . . . . -- - , , , . . . , - , , _ _ . - . . - , - . . .- . ~ . . , . - . . - . . ,, .