Partial Response to FOIA Request for Documents Re Performance Appraisal Team Insp Starting Wk of 850301 & Info on Fire Protection Deficiencies.Forwards Documents Listed on App A.Documents Also Available in PDR
ML20133Q279
Person / Time
Site: San Onofre  Southern California Edison icon.png
Issue date: 07/17/1985
From: Felton J
NRC OFFICE OF ADMINISTRATION (ADM)
To: Bell N
NUCLEAR INFORMATION & RESOURCE SERVICE
Shared Package
ML20132C709 List:
References
FOIA-85-425 NUDOCS 8508150086
Download: ML20133Q279 (3)


Text

_ . .

s f

p"%

.g#o UNITED STATES k, cyQ e

e NUCLEAR REGULATORY COMMISSION .)

g a WASHINGTON, D. C. 20555 o  ?

$+..../

R 17 585 Ms. Nina Bell Assistant Director Nuclear Information and Resource Service 1346 Connecticut Avenue, NW, 4th Floor IN RESPONSE REFER Washington, DC 20036 TO F01A-85-425

Dear Ms. Bell:

J This is in partial response to your letter dated June 13, 1985, in which you requested, pursuant to the Freedom of Information Act (FOIA), all documents regarding a Perfonnance Appraisal Team inspection conducted at the San Onofre Nuclear Generating Station (SONGS) starting the week of March 1,1985, and fire protection deficiencies at SONGS.

The documents listed on the enclosed Appendix A are being placed in the NRC Public Document Room (PDR) in PDR file F01A-85-425 under your name.

The NRC has not completed the search for and review of documents sub,iect to your request. We will respond as soon as those actions are completed.

Sincerely

^

f M. Felton, Director Division of Rules and Records Office of Administration 4

Enclosure:

As stated o &

I 0 50M l 1 09 pon

- - . . - , _ _ - . - _ _ .- _ _... ~ ~~-_,- . . - ,

I i

f.

Re: F01A-85-425 APPENDIX

1. Undated NRC Inspection of San Onofre Units 1, 2 & 3 (22 pages)
2. 05/25/82 Auxiliary Feedwater Flow Test (Operator Surveillance Test)

(5 pages)

3. 03/02/84 Auxiliary Feedwater Flow Test (Operator Surveillance Test)

(3 pages)

4. 09/21/84 Issuance of Amed #25 to Facility Operating License NPF-10... l (1 page)
5. 10/01/84 Docket 50-361 & 50-362 50 2 & 3 - Copies of Amend Application No. 28 (4 pages)
6. 12/01/84 Generating Station Log - Unit 3 (3 pages) 7, 12/01/84 Operator Surveillance Test (3 pages)
8. 12/18/84 Maintenace Data Record Fom - Refueling Interval 8attery Service Test (2 pages) 9.

I 01/09/85 SDCS Flow Path Alignment - Rev 4 Attachment 4 (5 pages)

[

10. 01/14/85 Procedure Modification Permit - Operating Instruction...

(7 pages)

{

11. 02/07/85 Swing HPSI Pump P-018 Alignment-0perating Instruction (4 pages)
12. 02/12/85 HPSI Pump P-017 Alignment-0perating Instruction 5023-3-2.7 (4 pages)
13. 02/12/85 Mode 4 Pre-HeatChecklist-Unit 2-OperatingInstruction(6pages) ,
14. 02/12/85 Procedure Modification Permit-0perating Instruction (9 pages)
15. 02/13/85 Plant Operations and Surveillance Program Inspection by IE Personnel (1 page) i
16. 02/15/85 Plant Operations and Surveillance Program Inspection by IE Personnel (1page)

I 1

i i

Re: F0lA-85-425 f

APPENDIX  ;

(Continued) i

17. 02/15/85 SCE Corrective Action Request (CAR) 5023-P-739 Incomplete CPC Addressable Constants Change Log Sheets S.O. Units 2 & 3 (5 pages)
18. 02/15/85 Procedure Modification Pennit - Rev 2 att. 4 (8 pages)
19. 02/15/85 High Pressure Safety Injection System Flowpath Valve Alignment Unit 2 (10 pages)
20. 02/15/85 High Pressure Safety injection System Electrical Line-up -

Unit 2 (8 pages)

21. 02/17/85 Containment Spray System - Electrical Alignment-Unit 2 (3 pages)
22. 03/06/85 Potential items of Noncompliance Discussed on 3/5/85-S.O. Units

, 2 & 3 (4 pages)

23. 03/07/85 Maintenance Section Error Investigation (3 pages)
24. 04/02/85 50-361/30-Day Report-LER 83-149-5.0. Unit 2 (3 pages)
25. 04/10/85 NRC Inspection of San Onofre Units 1, 2, and 3 (19 pages) 1
26. 04/23/85 Open Items /Open and Closed Tasks (7 pages)
27. 04/29/85 Inspection by IE Personnel - San Onofre (6 pages)
28. 04/29/85 San Onofre Inspection - Potential Enforcement Findings (8 pages) '
29. 04/30/85 Inspection Report # 50-206/85-12, Finding Concerning Containment Integrated Leak Rate Test at San Onofre Unit 1 (5pages)