|
---|
Category:OPERATOR TRAINING/REQUALIFICATION PROGRAM
MONTHYEARML20133N3661985-07-15015 July 1985 Rev 3 to TDP.8, Trainee Evaluation for Placement or Change of Status ML20133N3361985-01-0909 January 1985 Rev 2 to TDP.2, Training Div Goals & Objectives ML20133N3971985-01-0707 January 1985 Rev 1 to TDP.12, Schedules & Scheduling ML20133N3731985-01-0707 January 1985 Rev 2 to TDP.9, Use & Control of Training Facilities & Equipment ML20133N3641985-01-0707 January 1985 Rev 1 to TDP.7, Training Div Record Keeping ML20133N3571985-01-0707 January 1985 Rev 2 to TDP.6, Evaluation & Rev of Training Programs ML20133N3521985-01-0707 January 1985 Rev 2 to TDP.5, Development & Implementation of Training Programs & Matls ML20133N3371985-01-0707 January 1985 Rev 2 to TDP.3, Training Div Organization ML20133N3261985-01-0707 January 1985 Rev 1 to TDP.1, Training Div Procedures ML20133N3441985-01-0404 January 1985 Rev 2 to TDP.4, Development & Evaluation of Training Div Staff ML20133N3861983-04-12012 April 1983 TDP.11, Recognizing Need for Training ML20133N3761983-04-12012 April 1983 TDP.10, Contracted Training 1985-07-15
[Table view] Category:TEXT-SAFETY REPORT
MONTHYEARML20211H7921999-08-13013 August 1999 Safety Evaluation Supporting Amend 126 to License DPR-54 ML20195D1901999-05-0606 May 1999 Annual Rept ML20195H8571998-12-31031 December 1998 1998 Annual Rept for Smud. with ML20155D4801998-10-27027 October 1998 Amend 3 to Rancho Seco DSAR, Representing Updated Licensing Basis for Operation of Permanently Shutdown & Defueled Rancho Seco Nuclear Facility During Permanently Defueled Mode ML20248C4301998-05-0606 May 1998 Annual Rept, Covering Period 970507-980506 ML20249A7831997-12-31031 December 1997 1997 Smud Annual Rept ML20198G8271997-08-22022 August 1997 Safety Evaluation Supporting Amend 125 to License DPR-54 ML20217D3271997-07-30030 July 1997 Update of 1995 Decommissioning Evaluation for Rancho Seco Nuclear Generating Station ML20140A6371997-05-0606 May 1997 Annual Rept, Covering Period 960507-970506 ML20140G4481997-05-0101 May 1997 Part 21 Rept Re Potential Defect in Component of Dsrv & Dsr Enterprise Standby Diesel Generator Sys.Recommends That Springs Be Inspected on Periodic Basis,Such as During Refueling Outages ML20137W8151997-03-20020 March 1997 Amend 1 to Post Shutdown Decommissioning Activities Rept ML20141J2711996-12-31031 December 1996 Smud 1996 Annual Rept ML20138L1231996-11-13013 November 1996 Smud Rancho Seco Incremental Decommissioning Action Plan, Rev 0,961113 ML20129E7151996-10-14014 October 1996 Defueled SAR for Rancho Seco ML20059H6821994-01-17017 January 1994 Revised Rancho Seco Quality Manual ML20058K3841993-12-0909 December 1993 Part 21 Rept Re Potential Defect in Component of Dsrv & Dsr Enterprise Standby DG Sys,Regarding Potential Problem W/ Subcover Assembled Atop Power Head ML20056E5171993-08-31031 August 1993 Technical Review Rept, Tardy Licensee Actions ML20059K1981993-05-0606 May 1993 Annual Rept, Covering Period from 920501- 930506,consisting of Shutdown Statistics,Narrative Summary of Shutdown Experience & Tabulations of Facility Changes, Tests & Experiments,Per 10CFR50.59(b) ML20128C9641993-02-0202 February 1993 Informs Commission of Status of Open Issues & Progress of Specified Facilities Toward Decommissioning ML20127H2301993-01-15015 January 1993 Part 21 Rept Re Potential Defeat in Component of Dsrv & Dsr Enterprise Standby DG Sys.Starting Air Distributor Housing Assemblies Installed as Replacement Parts at Listed Sites ML20126B0421992-12-17017 December 1992 Final Part 21 Rept Re Potential Problem W/Steel Cylinder Heads.Initially Reported on 921125.Caused by Inadequate Cast Wall Thickness at 3/4-inch-10 Bolt Hole.Stud at Location Indicated on Encl Sketch Should Be Removed ML20125C7161992-12-0707 December 1992 Part 21 Rept Re Possibility for Malfunction of Declutching Mechanisms in SMB/SB-000 & SMB/SB/SBD-00 Actuators. Malfunction Only Occurs During Seismic Event.Balanced Levers May Be Purchased from Vendor.List of Affected Utils Encl ML20127P5861992-11-23023 November 1992 Followup to 921005 Part 21 Rept Re Potential Defect in SB/SBD-1 Housing Cover Screws.Procedure Re Replacement of SBD-1 Spring Cover Bolts Encl.All Fasteners Should Be Loosened & Removed.List of Affected Utils Encl ML20126E6771992-08-0303 August 1992 Rev 7 to Rancho Seco Quality Manual NL-90-451, Monthly Operating Rept for Oct 1990 for Rancho Seco Nuclear Generating Station1990-10-31031 October 1990 Monthly Operating Rept for Oct 1990 for Rancho Seco Nuclear Generating Station ML17348B5061990-10-0909 October 1990 Part 21 Rept Re Zener Diode VR2 on Power Supply Board 9 1682 00 106 Possibly Being Installed Backwards ML20059G9621990-09-10010 September 1990 Safety Evaluation Supporting Amend 115 to License DPR-54 NL-90-443, Monthly Operating Rept for Aug 1990 for Rancho Seco1990-08-31031 August 1990 Monthly Operating Rept for Aug 1990 for Rancho Seco ML20217A5711990-08-28028 August 1990 Final Engineering Rept,Assessment of Spent Fuel Pool Liner Leakage NL-90-439, Monthly Operating Rept for Jul 1990 for Rancho Seco Nuclear Generating Station1990-07-31031 July 1990 Monthly Operating Rept for Jul 1990 for Rancho Seco Nuclear Generating Station ML20055F8591990-07-16016 July 1990 Special Rept 90-11:on 900613,06,25,18,21 & 28,fire Barriers Breached More than 7 Days & Not Made Operable in 14 Days. Corrective Actions:Operability of Fire Detectors Verified on One Side of Breached Barriers NL-90-423, Monthly Operating Rept for June 1990 for Rancho Seco Nuclear Generating Station1990-06-30030 June 1990 Monthly Operating Rept for June 1990 for Rancho Seco Nuclear Generating Station ML20055C6291990-05-21021 May 1990 Special Rept 90-08:on 900419,fire Pump Batteries Inoperable When Surveillance Procedure SP.206 Not Performed by Due Date.Caused by Test Frequency Incorrectly Changed from Weekly to Monthly.Surveillance Schedule Revised ML20055C6301990-05-21021 May 1990 Special Rept 90-09:on 900424,25,30,31 & 0502,fire Barriers Inoperable for More than 7 Days,Per Tech Spec 3.14.6.2 Requirement.Hourly Fire Watches Established & Penetrations & Doors Returned to Operable Status ML20058B6521990-05-0404 May 1990 Rev 0 to ERPT-M0216, Property Loss Study for Rancho Seco Nuclear Generating Station in Long Term Defueled Mode ML20248E0121989-09-13013 September 1989 Supplemental Part 21 Rept Re Potential Problem W/Six Specific Engine Control Devices in Air Start,Lube Oil, Jacket Water & Crankcase Sys.Initially Reported on 890429. California Controls Co Will Redesign Valve Seating NL-89-634, Monthly Operating Rept for Aug 1989 for Rancho Seco Nuclear Generating Station1989-08-31031 August 1989 Monthly Operating Rept for Aug 1989 for Rancho Seco Nuclear Generating Station NL-89-598, Monthly Operating Rept for Jul 1989 for Rancho Seco Nuclear Generating Station1989-07-31031 July 1989 Monthly Operating Rept for Jul 1989 for Rancho Seco Nuclear Generating Station ML20247B3611989-07-17017 July 1989 Safety Evaluation Supporting Amend 112 to License DPR-54 NL-89-556, Monthly Operating Rept for June 1989 for Rancho Seco Nuclear Station1989-06-30030 June 1989 Monthly Operating Rept for June 1989 for Rancho Seco Nuclear Station ML20245E1161989-06-20020 June 1989 Safety Evaluation Supporting Amend 111 to License DPR-54 ML20245B6651989-06-15015 June 1989 Part 21 Rept 150 Re Potential Defect in Component of Dsr Standby Diesel Generator.Cause of Failure Determined to Be Combination of Insufficient Lubrication to Bushings.Listed Course of Action Recommended at Next Scheduled Engine Maint ML20245A1991989-06-0909 June 1989 Safety Evaluation Supporting Amend 110 to License DPR-54 ML20248B9361989-06-0505 June 1989 Safety Evaluation Supporting Amend 107 to License DPR-54 ML20248B6321989-06-0505 June 1989 Safety Evaluation Supporting Amend 108 to License DPR-54 ML20248B9621989-06-0505 June 1989 Safety Evaluation Supporting Amend 109 to License DPR-54 NL-89-517, Monthly Operating Rept for May 1989 for Rancho Seco Nuclear Generating Station1989-05-31031 May 1989 Monthly Operating Rept for May 1989 for Rancho Seco Nuclear Generating Station ML20247P1761989-05-30030 May 1989 Safety Evaluation Accepting Generic Ltr 83-28,Item 4.5.2 Re on-line Testing of Reactor Trip Sys ML20247N7491989-05-30030 May 1989 Special Rept 89-13:on 890328-29,specific Activity of Primary Sys Exceeded Limits in Administrative Procedure & Chemistry Control Commitment.Possibly Caused by Power Reduction.Isotopic Analysis Continued ML20247K7261989-05-23023 May 1989 Safety Evaluation Supporting Amend 105 to License DPR-54 1999-08-13
[Table view] |
Text
- - - -- - - -
~
NOT A 07-15-85 l
CONTROLLED Rav. 3 ,
' WP0387P COPY a-0018, i
O TDP.8 TRAINEE EVALUATION FOR PLACEMENT OR CHANGE OF STATUS .
1.0 PURPOSE To. provide for evaluation of personnel to determine if trainees meet i
program pre-requisites, to allow for advanced placement of trainees into training programs, provide for special training or retraining when necessary and trainee removal from a training program.
2.0 REFERENCES
.1 NUCLEAR OPERATIONS TRAINING PROGRAM (AP.700)
.2 Criteria, INPO 82-011 3.0 PROCEDUME
.1 Trainee evaluation shall be conducted to determine any of the following:
.1 If trainee meets training program pre-requisites.
.1 Trainee evaluation is not required for programs which have SMUD hiring criteria as the only entry criteria.
1
.2 I4 vel of placement into a program.
.3 If special training or retraining is required.
.4 That a traince should be removed from a program.
.2 Trainee evaluation for placement.into a training program sha11 occur prior to any trainee entering a training program at a level other than the entry level.
! .3 Trainee evaluations,shall be conducted by at least the Cognizant Nuclear Training Supervisor, as directed by the Nuclear Training Superintendent, and the trainee's Division Superintendent (by agreement between Nuclear Training Superintendent and the Division Superintendent, the Division Superintendent can assign a designated representative).
850Bif0 p PDR V, Rev.3 i
i .
TDP.8-1 . _ _ . . . _ . . _ _ . _ . _ _. _ - _ _
, PROCEDURE (Continued) 3.3 .1 Evaluation may include pre-testing such as:
.1 Established test or quizzes.
D .2 Tailored tests or quizzes. . .
.3 Oral quizzes.
.4 Review board.
I 1 3> .2 Reactor Operator and Senior Reactor Operator candidates will be 4
required to pass a course exas with a score greater than or equal 4 to 80% prior to being exempted from any training course.
- 3. Evaluation should include documentation of education, job history, I experience, etc.
i
.1 Documentation of previous training and/or experience may be 4-used in conjunction with or in lieu of pre-testing.
J
.4 Evaluation results and recomendations shall be recorded on i
Enclosure 2. All evaluation materials shall be attached to 4
Enclosure 2 and retained in the individual's training record and in
, the training division's master file in accordance with TRAINING
- DIVISION'S RECORD KEEPING (TDP.7)
.5 The evaluation process shall include a trainee consultation.
- 1. Trainee consultations shall also occur when:
i .
- 1 Requested by trainee.
4
- .2 Requested by the instructor
.3 Requested by trainee's supervisor.
, .4 Directed by the Nuclear Training Superintendent.
.5 Trainee's performance does not meet program standards.
l .2 Results and recommendations of trainee consultations shall be recorded on Enclosure 1 and retained in the individual's l training record and in the division master files in accordance )
with TRAINING DIVISION RECORD KEEPING (TDP.7).
.3 Requests or recommendations for a change in trainee status shall result in a trainee evaluation in accordance with this procedure.
4.0 ENCLOSURES .
l .1 Trainee Consultation
. 2- Trainee Evaluation Form i
TDP.8-2
Paga 2 of 2 ENCLOSURE 4.1
'0 . .4 Trainee Evaluation required.
YES NO .
.5 .
Trainee Signature Date
.6 Instructor / Training Supervisor Date Action required:
, O 4
Division Superintendent advised Yes No Plant Superintendent advised
, Yes No Nuclear Training Superintendent Date i-Forward this enclosure to the Training Division Master Files when i completed. A g of this consultation shall be provided to the trainee. 1 O
TDP.8-3
Pegs 1 of 2 l ENCLOSURE 4.2
~
180 O TRAINEE EVALUATION FORE i
)
1 Name of Trainee Division Group !
l
.2 Evaluator (Training Division) Evaluator (Div./ Group)
.3 Program Name and Number 4 List documentation used in evaluation.
.5 List method (s) of evaluation. Attach additional evaluation materials as applicable.
O
.6 Based on trainee evaluation, the following recommendation for placement is made:
Evaluator (Training Division) Evaluator (Div./ Group)
Date o A.,. t TDP.8-4
Pags 2 of 2 ENCLOSURE 4.2 O .7 Trainee consultation conducted in accordance with TRAINEE EVALUATION FOR PLACEMENT OR CHANGE IN STATUS (TDP.8).
Nuclear Training Superintendent Date i 1
8 Placement decision.
Division Superintendent advised Yes No Plant Superintendent advised Nuclear Training Superintendent Date Forward this enclosurc to the Training Division Master Files when completed.
i )
END O
TDP.8-5
. _ _ _ . .. . - - - _