Notice of Violation from Insp on 850509
ML20133E887
Person / Time
Site: Catawba Duke Energy icon.png
Issue date: 07/12/1985
From:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To:
Shared Package
ML20133E873 List:
References
50-413-85-20, NUDOCS 8508080053
Download: ML20133E887 (1)


Text

.

ENCLOSURE 1 NOTICE OF VIOLATION Duke Power Company Docket No. 50-413 Catawba 1 License No. NPF-35 The following violations were identified during an inspection conducted on May 9, 1985. The Severity Levels were assigned in accordance with the NRC Enforcement Policy (10 CFR Part 2, Appendix C).

10 CFR 50 Appendix B, Criterion V, as implemented by Section 17.2.5 of the accepted QA Program, requires that activities associated with nuclear safety related structures, systems and components be accomplished in accordance with procedures appropriate to the activities being performed.

Station Directive 3.11.1, Housekeeping and Cleanliness Levels In Safety Related Areas, Revision 9, requires all dirt and debris be removed from a Cleanliness Level IV Area.

Contrary to the above, on May 9,1985, all dirt and debris including flam-mable material was not removed from a Level IV Area (Diesel Generator Room 18).

This is a Severity Level IV violation (Supplement I).

Pursuant to 10 CFR 2.201, you are required to submit to this office within 30 days of the date of this Notice, a written statement or explanation in reply, including:

(1) admission or denial of the alleged violations; (2) the reasons for the violations if admitted; (3) the corrective steps which have been taken and the results achieved; (4) corrective steps which will be taken to avoid further violations; and (5) the date when full compliance will be achieved.

Security or safeguards information should be submitted as an enclosure to facilitate withholding it from public disclosure as required by 10 CFR 2.790(d) or 10 CFR 73.21.

Date:

8508080053 850712 PDR ADOCK 05000413 G