OPERATING DATA REPORT (REVISED DATA)
UNIT NAME Millstone Unit 2 DATE 12/10/96 COMPLETED BY S. Doboe TELEPHONE (860)447-1791 i
EXT 4678 l
OPERATING STATUS 1.
Docket Number 50-336 Notes:
2.
Reporting Period October 1996 (revised)
- Revised data. Redefined 3.
Utility Contact S.Doboe outage to forced outage.
4.
Licensed Thermal Power (MWt):
2700
- Cumulative weighted 5.
Nameplate Rating (Gross MWe):
909 averages. Unit operated at 6.
Design Electrical Rating (Net MWe):
870 2560 MWTH prior to its uprate 7.
Maximum Dependable Capacity (Gross MWe):
901.63 to current 2700 MWTH power level l
8.
Maximum Dependable Capacity (Net MWe):
870.63 1
9.
If Changes Occur in Capacity Ratings (Items Number 4 Through 8) Since Last Report, Give Reasons:
N/A
- 10. Power Level To Which Restricted, If any (Net MWe):
0
- 11. Reasons For Restrictions, if Any:
NRC Category lil Facility; NRC Confirmatory Order requiring implementatio of an independent corrective action verification program; NRC order requiring a third party review of the employee concerns program at Millstone Station received 10/29/96; design basi.s verif.ication re_spons_e pursuant t') 10CFR50.54(fl.
This Month Yr.-To-Date Cumulative
- 12. Hours in Reporting Period 745.0 7320.0 182784.0
- 13. Number Of Hours Reactor Was Critical 0.0 1223.6 121911.7
- 14. Reactor Reserve Shutdown Hours 0.0 0.0 2205.5
- 15. Hours Generator On-Line 0.0 1222.1 116611.9
- 16. Unit Reserve Shutdown Hours 0.0 0.0 468.2
- 17. Gross Thermal Energy Generated (MWH) 0.0 3240377.0 300862506.4
- 18. Gross Electrical Energy Generated (MWH) 0.0 1085422.5 98709460.0
- 19. Net Electrical Energy Generated (MWH) 2243.6 1026147.0 94645593.1
- 20. Unit Service Factor 0.0 16.7 63.8
- 21. Unit Availability Factor 0.0 16.7 64.1
< 23
- 22. Unit Capacity Factor (Using MDC Net) 0.0 16.1 60.5
- 23. Unit Capacity Factor (Using DER Net) 0.0 16.1 59.6
- 24. Unit Forced Outage Rate 100.0 m 82.8 18.5
- 25. Shutdowns Scheduled Over Next 6 Months (Type, Date, and Duration of Each):
Shutdown at the time of this report
- 26. If Unit Shutdown At End Of Report Period, Estimeted Date of Startup:
To be determined
- 27. Units in Test Status (Prior to Commercial Operation):
Forecast Achloved INITIAL CRITICALITY
_. N/A _
N/A INrilAL ELECTRICITY N/A N/A COMMERCIAL OPERATION N/A N/A 9612180247 961216 PDR ADOCK 05000336 R
PDR A
um
OPERATING DATA REPORT (REVISED DATA)
UNIT NAME Millstone Unit 2 j
DATE 12/10/96 COMPLETED BY S.Doboe TELEPHONE (860)447 1791 EXT 4678 OPERATING STATUS 1.
Docket Number 50-336 Notes:
- 2. ' Reporting Period October 1996 (revised)
"' Revised data. Redefined 3.
Utility Contact S. Doboe outage to forced outage.
4.
Licensed Thermal Power (MWt):
2700
- Cumulative weighted 5.
Nameplate Rating (Gross MWe):
909 averages. Unit operated at 6.
Design Electrical Rating (Net MWe):
870 2560 MWTH prior to its uprate 7.
Maximum Dependable Capacity (Gross MWe):
901.63 to current 2700 MWTH power level 8.
Maximum Dependable Capacity (Net MWe):
870.63 9.
If Chances Occur in Capacity Ratings (ltems Number 4 Through 8) Since Last Report, Give Reasons:
N/A
- 10. Power Level 1o Which Restricted, if any (Net MWe):
~
_O'
- 11. Reasons For Restrictions, if Any:
NRC Category ill Facility; NRC Confirmatory Order requiring implementation of an independent corrective action verification program; NRC order requiring a third-party review of the employee concerns program at Millstone 2; design basis verification response pursuant to 10CFR50.54(f).
This Month Yr.-To-Date Cumulative
- 12. Hours in Reporting Period 745.0 7320.0 182784.0
- 13. Number Of Hours Reactor Was Critical 0.0 1223.6 121911.7
- 14. Reactor Reserve Shutdown Hours 0.0 0.0 2205.5
- 15. Hours Generator On-Line 0.0 1222.1 116611.9
- 16. Unit Reserve Shutdown Hours 0.0 0.0 468.2
- 17. Gross Thermal Energy Generated (MWH) 0.0 3240377.0 300862506.4 i
- 18. Gross Electrical Energy Generated (MWH) 0.0 1085422.5 98709460.0
- 19. Net Electrical Energy Generated (MWH)
-2243.6 1026147.0 94645593.1
- 20. Unit Service Factor 0.0 16.7 63.8
- 21. Unit Availability Factor 0.0 16.7 64.1
- 22. Unit Capacity Factor (Using MDC Net) 0.0 16.1'
- 60.5
- 23. Unit Capacity Factor (Using DER Net) 0.0 16.1
- 59.6
- 24. Unit Forced Outage Rate 100.0
- 82.8 m 18.5
- 25. Shutdowns Scheduled Over Next 6 Months (Type, Date, and Duration of Each):
Shutdown at the time of this report
- 26. If Unit Shutdown At End Of Report Period, Estimated Date of Startup:
' ~io be determined l
- 27. Units in Test Status (Prior to Commercial Operation):
Forecast Achieved INITIAL CRITICALITY N/A N/A INITIAL ELECTRICITY N/A N/A COMMERCIAL OPERATION N/A N/A i
4
~
UNIT SHUTDOWNS AND POWER REDUCTIONS (REVISED DATA)
DOCKET NO. 50-336 UNIT NAME Millstone Unit 2 DATE 12/10/96 COMPLETED BY S. Doboe TELEPHONE (860) 447-1791 EXT 4678 REPORT MONTH: October 1996 (revisedl 2
No.
Date Type' Duration Reason Method of License System Component Cause & Corrective 5
(Hours)
Shutting Event Code' Code Action to a
Down Reactor Report #
Prevent Recurrence
'96-04 03/07/96 S/F 745 B/D 4
N/A N/A N/A Scheduled: Continued mid cycle surveillance testing from previous month.
Forced: Continued from previous month. NRC Category 111 facility; NRC Confirmatory Order requiring independent corrective action verification; NRC order requiring third party review of Millstone Station employee concerns program; design basis verification for response to NRC pursuant to 10CRF50.54(f).
'F: Forced Reason
' Method
S: Scheduled A - Equipment Failure (Explain) 1 - Manual
" Recommended Practices B - Maintenance or Test 2 - Manual Scram for System identification in C - Refueling 3 - Automatic Scram Nuclear Power Plants and D - Regulatory Restriction 4 - Continued from Previous Month Related Facilities" E - Operator Training & License Examination 5 - Power Reduction (Duration = 0)
F - Administrative 6 - Other (Explain) 5lEEE Standard 803A-1983, G - Operational Error (Explain)
" Recommended Practices H - Other (Explain) for Unique identificatior. in Power Plants and Related Facilities - Component
- Revised data: Redefined outage beginning 3/7/96 to forced outage Function Identifiers"