l OPERATING DATA REPORT i
(REVISED DATA) t-UNIT NAME Millstone Unit 2 DATE 12/10/96 4
COMPLETED BY S.Doboe TELEPHONE (860)447 1791 i
EXT 4678 OPERATING STATUS 4
4 1.
Docket Number 50 336 Notes:
2.
Reporting Period September 1996 (revised)
Revieed data. Redefined "8
3.
Utility Contact S.Doboe outage to forced outage.
4.
Licensed Thermal Power (MWt):
2700
- Cumulative weighted i
5.
Nameplate Rating (Gross MWe):
909 averages. Unit operated at
,j
,6.
Design Electrical Rating (Not MWe):
870 2560 MWTH prior to its uprate j
7.
Maximum Dependable Capacity (Gross MWe):
901.63 to current 2700 MWTH power level 8.
Maximum Dependable Capacity (Net MWe):
870.63 g.
9.
If Changes Occur in Capacity Ratings (Items Number 4 Through 8) Since Last Report, Give Reasons:
N/A 1
- 10. Power Level To Which Restricted, if any (Net MWe):
7" O
- 11. Reasons For Restrictions, if Any:
'" NRC Category lli Facility; NRC Order requiring implementation of an independent corrective action verification program: NRC letter requiring design basis verification _
-t response pursuant to 10CFR50.54(f).
This Month Yr. To-Date Cumulative
- 12. Hours in Reporting Period 720.0 6575.0 182039.0
- 13. Number Of Hours Reactor Was Critical 0.0 1223.6 121911.7 -i
- 14. Reactor Reserve Shutdown Hours 0.0 0.0 2205.5 f
- 15. Hours Generator On-Line 0.0 1222.1 116611.9
- 16. Unit Reserve Shutdown Hours 0.0 0.0 468.2
- 17. Gross Thermal Energy Generated (MWH) 0.0 3240377.0 300862506.4
- 18. Gross Electrical Energy Generated (MWH) 0.0 1085422.5 98709460.0
- 19. Net Electrical Energy Generated (MWH)
-1989.0 1028390.6 94647836.7
- 20. Unit Service Factor 0.0 18.6 64.1
- 21. Unit Availability Factor 0.0 18.6 64.3
- 22. Unit Capacity Factor (Using MDC Net) 0.0 18.0
60.7 (26
- 23. Unit Capacity Factor (Using DER Net) 0.0 18.0 59.9
- 24. Unit Forced Outage Rate
"' 100.0
"' 80.7
'" 18.0
- 25. Shutdowns Scheduled Over Next 6 Months (Type, Date, and Duration of Each):
Shutdown at the time of this report
- 26. If Unit Shutdown At End Of Report Period, Estimated Date of StarEp:
~~~To be determined
^
- 27. Units in Test Status (Prior to Commercial Operation):
Forecast Achieved INITIAL CRITICALITY N/A N/A INITIAL ELECTRICITY
'J/A N/A COMMERCIAL OPERATION
.."A N/A 9612180241 961216 -
PDR ADOCK 05000336'.
R PM
t UNIT SHUTDOWNS AND POWER REDUCTIONS (REVISED DATA)
I DOCKET NO. 50-336 UNIT NAME Millstone Unit 2 DATE 12/10/96 COMPLETED BY S. Doboe I
TELEPHONE (8601 447-1791 EXT 4678 REPORT MONTH: Seotember 1996 (revised)
No.
Date Type' Duration.
Reason' Method of License System Component Cause & Corrective (Hours)
Shutting Event Code' Code' Action to Down Reactor' Report #
Prevent Recurrence
'96-04 03/07/96 S/F 720 B/D 4
N/A N/A N/A Scheduled: Continued mid cycle surveillance testing from previous month.
Forced: Continued from previous month. NRC l
Category til facility; NRC t
Confirmatory Order requiring independent corrective action verification; NRC i
order requiring design basis verification for response to NRC pursuant to 10CRF50.54(fl.
I L
'F: Forced
' Reason Method
S: Scheduled A - Equipment Failure (Explain) 1 - Manual
" Recommended Practices B - Maintenance or Test 2 - Manual Scram for System identification in C - Refueling 3 - Automatic Scram Nuclear Power Plants and D - Regulatory Restriction 4 - Continued from Previous Month Related Facilities" E - Operator Training & License Examination 5 - Power Reduction (Duration = 0)
F - Administrative 6 - Other (Explain)
'lEEE Standard 803A-1983, G - Operational Error (Explain)
" Recommended Practices l
H - Other (Explain) for Unique identification in Power Plants and Related l
Facilities - Component
- Revised data: % defined outage beginning 3/7/96 to forced outage Function identifiers"
- -