e OPERATING DATA REPORT 3
j (REVISED DATA)
UNIT NAME Millstone Unit 2 a
DATE 12/10/96 j
COMPLETED 8Y S. Doboe TELEPHONE (860) 447-1791 l
EXT 4678 i
OPERATING STATUS 1.
Docket Number 50-336 Notes:
2.
Reporting Period May 1996 (revised)
(" Revised data. Redefined j
f 3.
Utility Contact S. Doboe outage to forced outage.
l 4.
Licensed Thermal Power (MWt):
2700
'2' Cumulative weighted 5.
Nameplate Rating (Gross MWe):
909 averages. Unit operated at 6.
Design Electrical Rating (Net MWe):
870 2560 MWTH prior to its uprate 7.
Maximum Dependable Capacity (Gross MWe):
901.63 to current 2700 MWTH power level 8.
Maximum Dependable Capacity (Net MWe):
870.63 9.
If Changes Occur in Capacity Ratings (Items Number 4 Through 8) Since Last Report, l
Give Reasons:
N/A-10 Power Level To Which Restricted, if any (Net MWe):
'" 0 "I
- 11. Reasons For Restrictions, If Any:
NRC letter requiring design basis verification response pursuant to 10CFR50.54(fl.
This Month Yr.-To-Date Cumulative
- 12. Hours in Reporting Period
_744.,0 3647.0 179111.0
- 13. Number Of Hours Reactor Was Critical Of 1223.6 121911.7
- 14. Reactor Reserve Shutdown Hours -
0.0 0.0 2205.5 I
- 15. Hours Generator On-Line 0.0 1222.1 116611.9 l
- 16. Unit Reserve Shutdown Hours 0.0 0.0 468.2
- 17. Gross Thermal Energy Generated (MWH) 0.0 3240377.0 300862506.4
- 18. Gross Electrical Energy Generated (MWH) 0.0 1085422.5 98709460.0
- 19. Net Electrical Energy Generated (MWH)
-2376.0 1036791.9
-94656238.0
- 20. Unit Service Factor 0.0 33.5 65.1 1
- 21. Unit Availability Factor 0.0 33.5 65.4 22.' Unit Capacity Factor (Using MDC Net) 0.0 32.7
- 61.7 23 Unit Capacity Factor (Using DER Net) 0.0 32.7
- 60.9
- 24. Unit Forced Outage Rate
'" 100.0
'" 64.2
'" 16.3
- 25. Shutdowns Scheduled Over Next 6 Months (Type, Date, and Duration of Each):
1 Shutdown at the time of this report
- 26. If Unit Shutdown At End Of Report Period, Estimated Date of Startup:
To be determined
- 27. Units in Test Status (Prior to Commercial Operation):
Forecast Achieved INITIAL CRITICALITY
- N/A N/A INITIAL ELECTRICITY N/A N/A COMMERCIAL OPERATION N/A N/A 9612180222 961216 PDR ADOCK 05000336' R
UNIT SHUTDOWNS AND POWER REDUCTIONS (REVISED DATA)
DOCKET NO. 50-336 UNIT NAME Millstone Unit 2 DATE 12/10/96 COMPLETED BY S. Doboe TELEPHONE (8601 447-1791 EXT 4678 REPORT MONTH: May 1996 (revised) 2 No.
Date Type' Duration Reason Method of License System Component Cause & Corrective (Hours)
Shutting Evem Code' Code' Action to Down Reactor' Report #
Prevent Recurrence
'96-04 03/07/96 S/F 744 B/D 4
N/A N/A N/A Scheduled: Continued mid cycle surveillance testing from previous month.
Forced: Continued from previous month. NRC order requiring design basis verification for response to NRC pursuant to 10CRF50.54(f).
'F: Forced Reason
' Method lEEE Standard 805-1984 S: Scheduled A - Equipment Failure (Explain) 1 - Manual
" Recommended Practices B - Maintenance or Test 2 - Manual Scram for System identification in C - Refueling 3 - Automatic Scram Nuclear Power Plants and D - Regulatory Restriction 4 - Continued from Previous Month Related Facilities" E - Operator Training & License Examination 5 - Power Reduction (Duration = 0)
F - Administrative 6 - Other (Explain) 5'EEE Standard 803A-1983, G - Operational Error (Expir.in)
" Recommended Practices H - Other (Explain) for Unique identification in Power Plants and Related Facilities - Component
' Revised data: Redefined outage beginning 3/7/96 to forced outage Function Identifiers"
-