1 N

Docket No. 50-336 B16094 4

.I l

e i

1 i

3, f

i Millstone Nuclear Power Station, Unit No. 2 f

Facility Operating License No. DPR-65 l

Monthly Operating Report-November i

a i

i i

i December 1996 9612180204 961216 PDR ADOCK 05000336 R

PDR

l OPERATING DATA REPORT l

l l

UNIT NAME Millstone Unit 2 DATE 12/10/96 COMPLETED 8Y S. Doboe l

TELEPHONE (860)447 1791 EXT 4678 OPERATING STATUS 1.

Docket Number 50-336 l

2.

Reporting Period November 1996 Notes: Items 22 and 23 l

3.

Utility Contact S.Doboe cumulative are weighted l

4.

Licensed Thermal Power (MWt):

2700 averages. Unit operated at 5.

Nameplate Rating (Gross MWe):

909 2560 MWTH prior to its 6.

Design Electrical Rating (Net MWe):

870 uprating to its current 7.

Maximum Dependable Capacity (Gross MWe):

901.63 2700 MWTH power level.

8.

Maximum Dependable Capacity (Net MWe):

870.63 l

9.

If Changes Occur in Capacity Ratings (Items Number 4 Through 8) Since Last Report, i

l Give Reasons:

l N/A l

l

10. Power Level To Which Restricted, if any (Net MWe):

0

11. Reasons For Restrictions, if Any:

NRC Category lil Facility; NRC Confirmatory _ Order requiring implementation of an independent corrective action verification program; NRC order requiring a third-party review i

of the employee concerns program at Millstone Station; design basis verification response pur_suant_to 10CFR50.54(fl.

This Month Yr.-To-Date Cumulative r

12. Hours in Reporting Period 720.0 8040.0 183504.0
13. Number Of Hours Reactor Was Critical 0.0 1223.6 121911.7 l
14. Reactor Reserve Shutdown Hours 0.0 0.0 2205.5 t
15. Hours Generator On-Line 0.0 1222.1 116611.9 i
16. Unit Reserve Shutdown Hours 0.0 0.0 468.2
17. Gross Thermal Energy Generated (MWH) 0.0 3240377.0 300862500.4 l
18. Gross Electrical Energy Generated (MWH) 0.0 1085422.5 98709460.0
19. Net Electrical Energy Generated (MWH)

-2243.7 1023903.3 94643349.4

20. Unit Service Factor 0.0 15.2 63.5
21. Unit Availability Factor 0.0 15.2 63.8 l
32. Unit Capacity Factor (Using MDC Net) 0.0 14.6 60.2 l
23. Unit Capacity Factor (Using DER Net) 0.0 14.6 59.4 l
24. Unit Forced Outage Rate 100.0 84.3 18.9 l
35. Shutdowns Scheduled Over Next 6 Months (Type, Date, and Duration of Each):

Shutdown at the time of this report

26. If Unit Shutcown At End Of Report Period, Estimated Date of Startup:

To be determined

27. Units in Test Status (Prior to Commercial Operation):

[

Forecast Achieved j

N/A N/A INITIAL CRITICALITY l

INITIAL ELECTRICITY N/A N/A COMMERCIAL OPERATION N/A N/A a

I

l AVERAGE DAILY UNIT POWER LEVEL 1

DOCKET NO. 50-336 UNIT Millstone Unit 2 DATE 12/10/96 COMPLETED BY S. Doboe TELEPHONE (8601 447-1791 l

EXT 4678 i

MONTH: NOVEMBER DAY AVG. DAILY POWER LEVEL DAY AVG. DAILY POWER LEVEL (MWe-Net)

(MWe-Net) 1 0

17 0

1 2

0 18 0

3 0

19 0

4 0

20 0

l 5

0 21 0

6 0

22 0

7 0

23 0

8 0

24 0

9 0

25 0

l 10 0

26 0

l l

l 11 0

27 0

j 12 0

28 0

13 0

29 0

14 0

30 0

15 0

31 l

16 0

i i

1

\\

INSTRUCTIONS 3

l I

On this format, list the average daily unit power levelin MWe-Net for each j

day in the reporting month. Compute to the nearest whole megawatt.

i l

l l

l l

UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO. 50-336 UNIT NAME Millstone Unit 2 DATE 12/10/96 COMPLETED BY S. Doboe TELEPHONE (860) 447-1791.

EXT 4678 REPORT MONTH: November 1996 No.

Date Type' Duration Reason #

Method of License System Component Cause & Corrective (Hours)

Shutting Event Code' Code' Action to Down Reactor

  • Report #

Prevent Recurrence 96-04 03/07/96 S/F 720 B/D 4

N/A N/A N/A Scheduled: Continued mid cycle surveillance testing from previous month.

Forced: Continued from previous month. NRC Category ill facility; NRC Confirmatory Order requiring independent corrective action verification; NRC order requiring third party review of Millstone Station employee concerns program; design basis verification for response to NRC pursuant to 10CRF50.54(f).

'F: Forced Reason

' Method

'IEEE Standard 805-1984, S: Scheduled A - Equipment Failure (Explain) 1 - Manual

" Recommended Practices 8 - Maintenance or Test 2 - Manual Scram for System identification in C - Refueling 3 - Automatic Scram Nuclear Power Plants and D - Regulatory Restriction 4 - Continued from Previous Month Related Facilities" E - Operator Training & License Examination 5 - Power Reduction (Duration = 0)

F - Administrative 6 - Other (Explain)

'lEEE Standard 803A-1983, G - Operational Error (Explain)

  • Recommended Practices H - Other (Explain) for Unique identification in Power Plants and Related Facilities - Component Function Identifiers"

REFUELING INFORMATION REQUEST 1.

Name of the facility:

Millstone Unit 2 i

2.

Scheduled date for next refueling outage: To Be Determined 3.

Scheduled date for restart following refueling: To Be Determined 4.

Will refueling or resumption of operation thereafter require a technical specification change or other license amendment?

To Be Determined 5.

Scheduled date(s) for submitting licensing action and supporting information:

To Be Determined 6.

Important licensing considerations associated with refueling, e.g., new or l

different fuel design or supplier, unreviewed design or performance analysis methods, significant changes in fuel design, new operating procedures:

To Be Determined 7.

The number of fuel assemblies (a) in the core and (b) in the spent fuel storage pool:

In Core:

(a) 217 In Spent Fuel Pool: (b) 868 l

l NOTE: These numbers reoresent the total Fuel Assemblies and Consolidated l

Fuel Storaae Boxes (3 total containina the fuel rods from 6 fuel l

assemblies) in these two (2) Item Control Areas.

l 8.

The present licensed spent fuel pool storage capacity and the size of any l

increase in licensed storage capacity that has been requested or is planned, in l

number of fuel assemblies:

Present storace capacity: 1306 storaae locations 9.

The projected date of the last refueling that can be discharged to the spent j

fuel pool assuming present license capacity:

2000, Soent Fuel Pool Full, Core offload caoacity is reached.

2004, Core Full, Soent Fuel Pool Full.

1 l

1 Docket No. 50-336 B16094 2

i Millstone Nuclear Power Station, Unit No. 2 Facility Operating License No. DPR-65 Revised Monthly Operating Report i

t i

t l

l December 1996