1 N
Docket No. 50-336 B16094 4
.I l
e i
1 i
3, f
i Millstone Nuclear Power Station, Unit No. 2 f
Facility Operating License No. DPR-65 l
Monthly Operating Report-November i
a i
i i
i December 1996 9612180204 961216 PDR ADOCK 05000336 R
l OPERATING DATA REPORT l
l l
UNIT NAME Millstone Unit 2 DATE 12/10/96 COMPLETED 8Y S. Doboe l
TELEPHONE (860)447 1791 EXT 4678 OPERATING STATUS 1.
Docket Number 50-336 l
2.
Reporting Period November 1996 Notes: Items 22 and 23 l
3.
Utility Contact S.Doboe cumulative are weighted l
4.
Licensed Thermal Power (MWt):
2700 averages. Unit operated at 5.
Nameplate Rating (Gross MWe):
909 2560 MWTH prior to its 6.
Design Electrical Rating (Net MWe):
870 uprating to its current 7.
Maximum Dependable Capacity (Gross MWe):
901.63 2700 MWTH power level.
8.
Maximum Dependable Capacity (Net MWe):
870.63 l
9.
If Changes Occur in Capacity Ratings (Items Number 4 Through 8) Since Last Report, i
l Give Reasons:
l N/A l
l
- 10. Power Level To Which Restricted, if any (Net MWe):
0
- 11. Reasons For Restrictions, if Any:
NRC Category lil Facility; NRC Confirmatory _ Order requiring implementation of an independent corrective action verification program; NRC order requiring a third-party review i
of the employee concerns program at Millstone Station; design basis verification response pur_suant_to 10CFR50.54(fl.
This Month Yr.-To-Date Cumulative r
- 12. Hours in Reporting Period 720.0 8040.0 183504.0
- 13. Number Of Hours Reactor Was Critical 0.0 1223.6 121911.7 l
- 14. Reactor Reserve Shutdown Hours 0.0 0.0 2205.5 t
- 15. Hours Generator On-Line 0.0 1222.1 116611.9 i
- 16. Unit Reserve Shutdown Hours 0.0 0.0 468.2
- 17. Gross Thermal Energy Generated (MWH) 0.0 3240377.0 300862500.4 l
- 18. Gross Electrical Energy Generated (MWH) 0.0 1085422.5 98709460.0
- 19. Net Electrical Energy Generated (MWH)
-2243.7 1023903.3 94643349.4
- 20. Unit Service Factor 0.0 15.2 63.5
- 21. Unit Availability Factor 0.0 15.2 63.8 l
- 32. Unit Capacity Factor (Using MDC Net) 0.0 14.6 60.2 l
- 23. Unit Capacity Factor (Using DER Net) 0.0 14.6 59.4 l
- 24. Unit Forced Outage Rate 100.0 84.3 18.9 l
- 35. Shutdowns Scheduled Over Next 6 Months (Type, Date, and Duration of Each):
Shutdown at the time of this report
- 26. If Unit Shutcown At End Of Report Period, Estimated Date of Startup:
To be determined
- 27. Units in Test Status (Prior to Commercial Operation):
[
Forecast Achieved j
N/A N/A INITIAL CRITICALITY l
INITIAL ELECTRICITY N/A N/A COMMERCIAL OPERATION N/A N/A a
I
l AVERAGE DAILY UNIT POWER LEVEL 1
DOCKET NO. 50-336 UNIT Millstone Unit 2 DATE 12/10/96 COMPLETED BY S. Doboe TELEPHONE (8601 447-1791 l
EXT 4678 i
MONTH: NOVEMBER DAY AVG. DAILY POWER LEVEL DAY AVG. DAILY POWER LEVEL (MWe-Net)
(MWe-Net) 1 0
17 0
1 2
0 18 0
3 0
19 0
4 0
20 0
l 5
0 21 0
6 0
22 0
7 0
23 0
8 0
24 0
9 0
25 0
l 10 0
26 0
l l
l 11 0
27 0
j 12 0
28 0
13 0
29 0
14 0
30 0
15 0
31 l
16 0
i i
1
\\
INSTRUCTIONS 3
l I
On this format, list the average daily unit power levelin MWe-Net for each j
day in the reporting month. Compute to the nearest whole megawatt.
i l
l l
l l
UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO. 50-336 UNIT NAME Millstone Unit 2 DATE 12/10/96 COMPLETED BY S. Doboe TELEPHONE (860) 447-1791.
EXT 4678 REPORT MONTH: November 1996 No.
Date Type' Duration Reason #
Method of License System Component Cause & Corrective (Hours)
Shutting Event Code' Code' Action to Down Reactor
- Report #
Prevent Recurrence 96-04 03/07/96 S/F 720 B/D 4
N/A N/A N/A Scheduled: Continued mid cycle surveillance testing from previous month.
Forced: Continued from previous month. NRC Category ill facility; NRC Confirmatory Order requiring independent corrective action verification; NRC order requiring third party review of Millstone Station employee concerns program; design basis verification for response to NRC pursuant to 10CRF50.54(f).
'F: Forced Reason
' Method
'IEEE Standard 805-1984, S: Scheduled A - Equipment Failure (Explain) 1 - Manual
" Recommended Practices 8 - Maintenance or Test 2 - Manual Scram for System identification in C - Refueling 3 - Automatic Scram Nuclear Power Plants and D - Regulatory Restriction 4 - Continued from Previous Month Related Facilities" E - Operator Training & License Examination 5 - Power Reduction (Duration = 0)
F - Administrative 6 - Other (Explain)
'lEEE Standard 803A-1983, G - Operational Error (Explain)
- Recommended Practices H - Other (Explain) for Unique identification in Power Plants and Related Facilities - Component Function Identifiers"
REFUELING INFORMATION REQUEST 1.
Name of the facility:
Millstone Unit 2 i
2.
Scheduled date for next refueling outage: To Be Determined 3.
Scheduled date for restart following refueling: To Be Determined 4.
Will refueling or resumption of operation thereafter require a technical specification change or other license amendment?
To Be Determined 5.
Scheduled date(s) for submitting licensing action and supporting information:
To Be Determined 6.
Important licensing considerations associated with refueling, e.g., new or l
different fuel design or supplier, unreviewed design or performance analysis methods, significant changes in fuel design, new operating procedures:
To Be Determined 7.
The number of fuel assemblies (a) in the core and (b) in the spent fuel storage pool:
In Core:
(a) 217 In Spent Fuel Pool: (b) 868 l
l NOTE: These numbers reoresent the total Fuel Assemblies and Consolidated l
Fuel Storaae Boxes (3 total containina the fuel rods from 6 fuel l
assemblies) in these two (2) Item Control Areas.
l 8.
The present licensed spent fuel pool storage capacity and the size of any l
increase in licensed storage capacity that has been requested or is planned, in l
number of fuel assemblies:
Present storace capacity: 1306 storaae locations 9.
The projected date of the last refueling that can be discharged to the spent j
fuel pool assuming present license capacity:
2000, Soent Fuel Pool Full, Core offload caoacity is reached.
2004, Core Full, Soent Fuel Pool Full.
1 l
1 Docket No. 50-336 B16094 2
i Millstone Nuclear Power Station, Unit No. 2 Facility Operating License No. DPR-65 Revised Monthly Operating Report i
t i
t l
l December 1996