OPERATING DATA REPORT (REVISED DATA)
UNIT NAME Millstone Unit 2 DATE 12/10/96 4
COMPLETED BY S. Doboe TELEPHONE (860)447 1791 EXT 4678 OPERATING STATUS 1.
Docket Number 50-336 Notes:
2.
Reporting Period August 1996 (revised)
"' Revised data. Redefined 3.
Utility Contact S.Doboe outage to forced outage.
4.
Licensed Thermal Power (MWt):
2700
- Cumulative weighted j
J 5.
Nameplate Rating (Gross MWe):
909 averages. Unit operated at l
6.
Design Electrical Rating (Not MWe):
870 2560 MWTH prior to its uprate 1
7.
Maximum Dependable Capacity (Gross MWel:
901.63 to current 2700 MWTH power level i
8.
Maximum Dependable Capacity (Net MWe):
870.63 9.
If Changes Occur in Capacity Ratings (items Number 4 Through 8) Since Last Report, i
Give Reasons:
N/A "3
- 10. Power Level To Which Restricted, if any (Net MWe):
0 "I
l
- 11. Reasons For Restrictions, if Any:
NRC Category lil Facility; NRC Confirmatory Order requiring j
implementation of an independent t.orrective action verification program received 8/14/96; NRC letter requiring design basis verification response pursuant to 10CFR50.54(fl.
j This Month Yr. To-Date Cumulative a
1
- 13. Hours in Reporting Period 744.0 5855.0 181319.0 i
- 13. Number Of Hours Reactor Was Critical 0.0 1223.6 121911.7
- 14. Reactor Reserve Shutdown Hours 0.0 0.0 2205.5 4
- 15. Hours Generator On-Line 0.0 1222.1 116611.9..
l
- 16. Unit Reserve Shutdown Hours 0.0 0.0 468.2 2
- 17. Gross Thormal Energy Generated (MWH) 0.0 3240377.0-300862506.4
- 18. Gross Electrical Energy Generated (MWH) 0.0 1085422.5 98709460.0 l
- 19. Net Electrical Energy Generated (MWH)
-2202.0 1030379.6 94649825.7 l
- 20. Unit Service Factor 0.0 20.9 64.3
- 31. Unit Availability Factor 0.0 20.9 64.6
- 23. Unit Capacity Factor (Using MDC Net!
O.0 20.2
'
- 61.0 l
- 33. Unit Capacity Factor (Using DER Net)
U$U 20.2
- 60.1
- 24. Unit Forced Outage Rate 100.0
- 78.3
"' 17.6
- 25. Shutdowns Scheduled Over Next 6 Months (Type, Date, and Duration of Each):
Shutdown at the time of this report
- 26. If Unit Shutdown At End Of Report Period, Estimated Date of Startup:
To be determined
- 27. Units In Test Status (Prior to Commercial Operation):
Forecast Achieved INITIAL CRITICALITY N/A N/A INITIAL ELECTRICITY N/A N/A COMMERCIAL OPERATION N/A N/A 4
9612180235 961216 PDR ADOCK 05000336 R
PDR s
UNIT SHUTDOWNS AND POWER REDUCTIONS (REVISED DATA)
DOCKET NO. 50-336 3
UNIT NAME Millstone Unit 2 DATE 12/10/96 COMPLETED BY S. Doboe TELEPHONE (860) 447-1791 EXT 4678 i
REPORT MONTH: Auaust 1996 (revised) 2 No.
Date Type' Duration Reason Method of Ucense System Component Cause & Corrective (Hours)
Shutting Event Code' Code' Action to f
Down Reactor' Report #
Prevent Recurrence
'96-04 03/07/96 S/F 744 B/D 4
N/A N/A N/A Scheduled: Continued mid cycle surveillance testing from previous month.
Forced: Continued from previous month. NRC Category til facility: NRC Confirmatory Order requiring independent corrective action verification: NRC l
order requiring design basis verification for response to f
NRC pursuant to 10CRF50.54(f).
i i
e
'F: Forced Reason
' Method
S: Scheduled A - Equipment Failure (Explain) 1 - Manual
" Recommended Practices B - Maintenance or Test 2 - Manual Scram for System identification in C - Refueling 3 - Automatic Scram Nuclear Power Plants and l
D - Regulatory Restriction 4 - Continued from Previous Month Related Facilities" i
E - Operator Training & License Examination 5 - Power Reduction (Duration = 0)
F - Administrative 6 - Other (Explain)
'IEEE Standard 803A-1983, G - Operational Error (Explain)
" Recommended Practices 1
H - Other (Explain) for Unique identification in Power Plants and Related Facilities - Component
- Revised data: Redefined outage beginning 3/7/96 to forced outage Function Identifiers" l