OPERATING DATA REPORT (REVISED DATA)

UNIT NAME Millstone Unit 2 DATE 12/10/96 4

COMPLETED BY S. Doboe TELEPHONE (860)447 1791 EXT 4678 OPERATING STATUS 1.

Docket Number 50-336 Notes:

2.

Reporting Period August 1996 (revised)

"' Revised data. Redefined 3.

Utility Contact S.Doboe outage to forced outage.

4.

Licensed Thermal Power (MWt):

2700

  • Cumulative weighted j

J 5.

Nameplate Rating (Gross MWe):

909 averages. Unit operated at l

6.

Design Electrical Rating (Not MWe):

870 2560 MWTH prior to its uprate 1

7.

Maximum Dependable Capacity (Gross MWel:

901.63 to current 2700 MWTH power level i

8.

Maximum Dependable Capacity (Net MWe):

870.63 9.

If Changes Occur in Capacity Ratings (items Number 4 Through 8) Since Last Report, i

Give Reasons:

N/A "3

10. Power Level To Which Restricted, if any (Net MWe):

0 "I

l

11. Reasons For Restrictions, if Any:

NRC Category lil Facility; NRC Confirmatory Order requiring j

implementation of an independent t.orrective action verification program received 8/14/96; NRC letter requiring design basis verification response pursuant to 10CFR50.54(fl.

j This Month Yr. To-Date Cumulative a

1

13. Hours in Reporting Period 744.0 5855.0 181319.0 i
13. Number Of Hours Reactor Was Critical 0.0 1223.6 121911.7
14. Reactor Reserve Shutdown Hours 0.0 0.0 2205.5 4
15. Hours Generator On-Line 0.0 1222.1 116611.9..

l

16. Unit Reserve Shutdown Hours 0.0 0.0 468.2 2
17. Gross Thormal Energy Generated (MWH) 0.0 3240377.0-300862506.4
18. Gross Electrical Energy Generated (MWH) 0.0 1085422.5 98709460.0 l
19. Net Electrical Energy Generated (MWH)

-2202.0 1030379.6 94649825.7 l

20. Unit Service Factor 0.0 20.9 64.3
31. Unit Availability Factor 0.0 20.9 64.6
23. Unit Capacity Factor (Using MDC Net!

O.0 20.2

'

  • 61.0 l
33. Unit Capacity Factor (Using DER Net)

U$U 20.2

  • 60.1
24. Unit Forced Outage Rate 100.0
  • 78.3

"' 17.6

25. Shutdowns Scheduled Over Next 6 Months (Type, Date, and Duration of Each):

Shutdown at the time of this report

26. If Unit Shutdown At End Of Report Period, Estimated Date of Startup:

To be determined

27. Units In Test Status (Prior to Commercial Operation):

Forecast Achieved INITIAL CRITICALITY N/A N/A INITIAL ELECTRICITY N/A N/A COMMERCIAL OPERATION N/A N/A 4

9612180235 961216 PDR ADOCK 05000336 R

PDR s

UNIT SHUTDOWNS AND POWER REDUCTIONS (REVISED DATA)

DOCKET NO. 50-336 3

UNIT NAME Millstone Unit 2 DATE 12/10/96 COMPLETED BY S. Doboe TELEPHONE (860) 447-1791 EXT 4678 i

REPORT MONTH: Auaust 1996 (revised) 2 No.

Date Type' Duration Reason Method of Ucense System Component Cause & Corrective (Hours)

Shutting Event Code' Code' Action to f

Down Reactor' Report #

Prevent Recurrence

'96-04 03/07/96 S/F 744 B/D 4

N/A N/A N/A Scheduled: Continued mid cycle surveillance testing from previous month.

Forced: Continued from previous month. NRC Category til facility: NRC Confirmatory Order requiring independent corrective action verification: NRC l

order requiring design basis verification for response to f

NRC pursuant to 10CRF50.54(f).

i i

e

'F: Forced Reason

' Method

'IEEE Standard 805-1984, 2

S: Scheduled A - Equipment Failure (Explain) 1 - Manual

" Recommended Practices B - Maintenance or Test 2 - Manual Scram for System identification in C - Refueling 3 - Automatic Scram Nuclear Power Plants and l

D - Regulatory Restriction 4 - Continued from Previous Month Related Facilities" i

E - Operator Training & License Examination 5 - Power Reduction (Duration = 0)

F - Administrative 6 - Other (Explain)

'IEEE Standard 803A-1983, G - Operational Error (Explain)

" Recommended Practices 1

H - Other (Explain) for Unique identification in Power Plants and Related Facilities - Component

  • Revised data: Redefined outage beginning 3/7/96 to forced outage Function Identifiers" l