B16094, Forwards Monthly Operating Rept for Millstone Nuclear Power Station,Unit 2 for Nov 1996 & Revised Repts for Mar-Oct 1996

From kanterella
(Redirected from ML20132C181)
Jump to navigation Jump to search
Forwards Monthly Operating Rept for Millstone Nuclear Power Station,Unit 2 for Nov 1996 & Revised Repts for Mar-Oct 1996
ML20132C181
Person / Time
Site: Millstone 
Issue date: 12/16/1996
From: Price A
NORTHEAST NUCLEAR ENERGY CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML20132C184 List:
References
B16094, NUDOCS 9612180197
Download: ML20132C181 (2)


Text

y-Northeast 7 wen su-1, anun, cm,037 Ut!!ities System uns,.a usitie. suvic, comp.oy P.O. Box 270 Ilartford, CT 06141-0270 (860) 66' 5000 DEC I 6 1996 Docket No. 50-336 B16094 U.S. Nuclear Regulatory Commission Attention: DocumentControlDesk Washington, DC 20555 Millstone Nuclear Power Station, Unit No. 2 Facility Operating License No. DPR-65 Monthly Operatina Report in meccidsace with the reporting requirements of Technical Specification Section 6.9.1.7 for Millstone Unit No. 2, enclosed is the monthly operating report for the month of November i

1996.

i Millstone Unit No. 2 has recently chosen to redefine the nature of its continued shutdown, due to the fact that the Unit is classified as a Category 3 facility which requires NRC approval to restart. Also, the NRC has issued a Confirmatory Order requiring implementation of an independent Corrective Action verification Program, and has issued an Order requiring a third-party review of the Employee Concerns Program at Millstone Station. Millstone Unit No. 2 has chosen March 7,1996 as the date when the present outage became a forced outage. This was the date that Millstone Unit No. 2 received a request for information pursuant to 10CFR50.54(f).m This redefinition has affected the cumulative totals for forced shutdown rates in the Millstone Unit No. 2 reports dating back to March 1995. Previous reports have been revised to reflect this change in definition of the continued shutdowns and have been provided as in attachment to this letter.

j Very truly yours, L

NORTHEAST NUCLEAR ENERGY COMPANY M

A Pri piirector-Unit Operations 1.O0008 Millston Unit No.2 NRC letter to R. E. Busch, dated March 7,1996.

9612190197 961216 PDR ADOCK 05000336 R

PDR u

-.~.

U.S. Nuclear Regulatory Commission B16094\\Page 2 cc-H. J. Miller, Region i Administrator D. G. Mcdonald, Jr., NRC Project Manager, Millstone Unit No. 2 D. Beaulieu, Acting Senior Pesident inspector, Millstone Unit No. 2 Dr. W. D. Travers, Director, Special Projects i