ML20132B611
ML20132B611 | |
Person / Time | |
---|---|
Issue date: | 08/17/1983 |
From: | Dircks W NRC OFFICE OF THE EXECUTIVE DIRECTOR FOR OPERATIONS (EDO) |
To: | |
Shared Package | |
ML20132B617 | List: |
References | |
FOIA-85-236 SECY-83-072B, SECY-83-72B, NUDOCS 8308300004 | |
Download: ML20132B611 (2) | |
Text
r -
- Q '
August 17, 1983 SECY-83-72B For: The Commissioners From: William J. Dircks Executive Director for Operations
Subject:
RESULTS OF OPERATOR LICENSING EXAMINATIONS FOR SECOND QUARTER FY 1983
Purpose:
To infonn the Commissioners of examination and licensing activities for Reactor Operators and Senior Reactor
, Operators for January 1,1983 through March 31, 1983.
Discussion: The enclosed table reports licensing action results, including issuances, denials or withdrawals and pass / fail rate for each NRC licensing examination component.
The total number of licensing actions processed in the second quarter FY 1983 was approximately the same as for the first quarter FY 1983, (SECY 83-72A). The pass / fail rate remained consistent during the period. Most of the failures continue to occur on the written portion of the examination.
As a result of the regionalization effort, we expect the examination processing time to be reduced and the data input into the Operator Licensing Tracking Systen to be
- maintained on a current basis. Therefore, we plan to include in the next report the results by region from the third and fourth quarters of FY 1983. The report will also include results of the requalification examinations, which commenced in May 1983. Subsequent reports will include results from the preceding quarter.
(
William J. Dircks Executive Director for Operations
Enclosure:
Operator Licensing Tracking System Quarterly Status Report 2nd Quarter FY 1983
Contact:
DISTRIBUTION:
D. Beckham, x24868 Commissioners OGC OPE s ACRS SECY Y (
R-1236315 OPERATOR LICENSING TRACKING SYSTEM DATE: 08/11/83 ACTIVITY STATUS REPORT 01/01/83 THROUGH 03/31/83 .i g WRITTEM ORAL SIMULATOR TOTAL SPASS # FAIL OPASS 8 FAIL ePASS OFAIL TAKEN INITIAL - RO 75 / 18 83 / 7 40 / 1 93 80.6% / 19.4% 92.2% / 7.8% 97.6% / 2.4%
SRO 25 / 8 30 / 2 17 / 5 33 75.8% / 24.2% 93.8% / 6.2% 77.3% / 22.7%
REAPPLICATIONS - RO 6 / 4 1 / 1 1 / 0 10 60.0% / 40.0% 50.0% / 50.0% 100.0% / 0.0%
SRO 9 / 0 2 / 0 1 / 0 11 100.0% / 0.0% 100.0% / 0.0% 100.0% / 0.0%
UPGRADE - SRO 23 / 2 22 / 1 0 / 1 26 92.0% / 8.C% 95.7% / 4.3% 0.0% /100.0%
TOTAL - RO 81 / 22 84 / 8 41 / 1 103 78.6% / 21.4% 91.3% / 8.7% 97.6% / 2.4%
SRO 57 / 10 54 / 3 18 / 6 70 85.1% / 14.9% 94.7% / 5.3% 75.0% / 25.0%
8 ISSUED SDENIED SWITNDRAWM IMITIAL - RO - 76 27 5 SRO - 26 2 1 INST CERT - 5 2 0 LTD SRO - 0 0 0 REAPPLICATIONS -
RO - 9 3 0 SRO - 14 1 0 INST CERT . 0 1 0 LTD SRO - 0 0 0 UPGRADE - SRO - 41 9 5 TOTAL - RO - 85 30 5 SRO - 81 12 6 INST CERT - 5 3 0 LTD SRO - 0 0 0 RENEWAL - RO - 15 0 1 SRO - 44 0 2 INST CERT - 0 0 0 LTD SRO - 0 0 0