Category:CORRESPONDENCE-LETTERS
MONTHYEARML20217D5211999-09-30030 September 1999 Informs That Remediating 3D Monicore Sys at Pbaps,Units 2 & 3 & 3D Monicore/Plant Monitoring Sys at Lgs,Unit 2 Has Been Completed Ahead of Schedule ML20216J3981999-09-29029 September 1999 Submits Comments for Lgs,Unit 1 & Pbaps,Units 2 & 3 Rvid,Rev 2,based on Review as Requested in GL 92-01,rev 1,suppl 1, Reactor Vessel Structural Integrity ML20212J6561999-09-29029 September 1999 Informs of Completion of mid-cycle PPR of Limerick Generating Station on 990913.Identified No Areas in Which Licensee Performance Warranted Addl Insp Beyond Core Insp Program.Historical Listing of Plant Issues Encl ML20212H6401999-09-24024 September 1999 Forwards Revised Epips,Including Rev 11 to ERP-101 & Rev 18 to ERP-800.Copy of Computer Generated Rept Index Identifying Latest Revs of LGS Erps,Encl ML20212E7941999-09-22022 September 1999 Requests Authorization for Listed Licensed Operators to Temporarily Suspend Participation in Licensed Operator Requalification Program at LGS ML20212E8081999-09-22022 September 1999 Provides Notification That Listed Operators Have Been Permanently Reassigned to Duties That Do Not Require Maintaining Licensed Operator Status,Per 10CFR50.74 ML20212F5481999-09-20020 September 1999 Forwards Response to NRC Administrative Ltr 99-03, Preparation & Scheduling of Operator Licensing, for Pbaps,Units 2 & 3 & Lgs,Units 1 & 2 ML20212F8991999-09-17017 September 1999 Provides Written Confirmation That Thermo-Lag 330-1 Fire Barrier Corrective Actions at Lgs,Units 1 & 2 Have Been Completed 05000353/LER-1999-010, Forwards LER 99-010-00,re Manual Actuation of Esf.Main CR Ventilation Sys Was Placed in Chlorine Isolation Mode Due to Rept of Faint Odor of Chlorine in Unit 2 Reactor Encl1999-09-16016 September 1999 Forwards LER 99-010-00,re Manual Actuation of Esf.Main CR Ventilation Sys Was Placed in Chlorine Isolation Mode Due to Rept of Faint Odor of Chlorine in Unit 2 Reactor Encl ML20216F7821999-09-16016 September 1999 Forwards Insp Repts 50-352/99-05 & 50-353/99-05 on 990713-0816.One Violation Noted & Being Treated as NCV, Consistent with App C of Enforcement Policy.Violation Re Inoperability of Automatic Depression Sys During Maint ML20212A8751999-09-13013 September 1999 Forwards Safety Evaluation of First & Second 10-year Interval Inservice Insp Plan Request for Relief ML20211N5061999-09-0909 September 1999 Forwards TSs Bases Pages B 3/4 10-2 & B 3/4 2-4 for LGS, Units 1 & 2,being Issued to Assure Distribution of Revised Bases Pages to All Holders of TSs ML20212A0091999-09-0909 September 1999 Provides Notification That Licenses SOP-11172 & SOP-11321, for SO Muntzenberger & Rh Wright,Respectively,Are No Longer Necessary as Result of Permanent Reassignment ML20211P8571999-09-0808 September 1999 Forwards Reactor Operator Retake Exams 50-352/99-303OL & 50-353/99-303OL Conducted on 990812 ML20211P3891999-09-0303 September 1999 Informs That During 990902 Telcon Between J Williams & B Tracy,Arrangements Were Made for NRC to Inspect Licensed Operator Requalification Program at Plant.Insp Planned for Wk of 991018 05000352/LER-1999-009, Forwards LER 99-009-00,providing 30-day Written follow-up Rept Re Performance of Maint That Affected Safeguard Sys for Which Compensatory Measures Had Not Been Employed1999-09-0101 September 1999 Forwards LER 99-009-00,providing 30-day Written follow-up Rept Re Performance of Maint That Affected Safeguard Sys for Which Compensatory Measures Had Not Been Employed ML20211H2571999-08-26026 August 1999 Informs of Individual Exam Result on Initial Retake Exam on 990812.One Individual Was Administered Exam & Passed ML20211E9191999-08-24024 August 1999 Forwards fitness-for-duty Program Performance Data for Jan-June 1999 for PBAPS & LGS IAW 10CFR26.71(d).Data Includes Listed Info ML20211E9731999-08-23023 August 1999 Forwards LGS Unit 2 Summary Rept for 970228 to 990525 Periodic ISI Rept Number 5, Per TS SRs 4.0.5 & 10CFR50.55a(g) ML20211D6761999-08-20020 August 1999 Forwards non-proprietary Revised Emergency Response Procedures (Erps),Including Rev 29 to ERP-110, Emergency Notification & Rev 17 to ERP-800, Maint Team & Proprietary App ERP-110-1.App Withheld Per 10CFR2.790(a)(6) ML20210T4271999-08-13013 August 1999 Informs That NRC Revised Info in Rvid & Releasing Rvid Version 2 as Result of Review of 980830 Responses to GL 92-01 Rev 1,GL 92-01 Rev 1 Suppl 1 & Suppl Rai.Tacs MA1197 & MA1198 Closed ML20210U2211999-08-10010 August 1999 Forwards Insp Repts 50-352/99-04 & 50-353/99-04 on 990525-0712.One Violation Occurred & Being Treated as NCV, Consistent with App C of Enforcement Policy.Violation Re Late Performance of off-gas Grab Sample Surveillance 05000353/LER-1999-005, Forwards LER 99-005-00,re Actuation of Primary Containment & Reactor Vessel Isolation Control Sys,Esf.Fuse Failed Due to Mechanical Failure of Cold Solder Joint1999-08-10010 August 1999 Forwards LER 99-005-00,re Actuation of Primary Containment & Reactor Vessel Isolation Control Sys,Esf.Fuse Failed Due to Mechanical Failure of Cold Solder Joint ML20211B7881999-08-10010 August 1999 Transmits Summary of Two Meetings with Risk-Informed TS Task Force in Rockville,Md on 990514 & 0714 ML20210M7571999-08-0404 August 1999 Forwards Response to Requesting Addl Info Re Status of Decommissioning Funding for Lgs,Pbaps & Sngs. Attachment Provides Restatement of Questions Followed by Response ML20210P4191999-08-0404 August 1999 Forwards Initial Exam Repts 50-352/99-302 & 50-353/99-302 on 990702-04 (Administration) & 990715-22 (Grading).Six of Limited SRO Applicants Passed All Portion of Exam NUREG-1092, Informs J Armstrong of Individual Exam Results for Applicants on Initial Exam Conducted on 990702 & 990712-14 at Facility.All Six Individuals Who Were Administered Exam, Passed Exam.Without Encls1999-08-0303 August 1999 Informs J Armstrong of Individual Exam Results for Applicants on Initial Exam Conducted on 990702 & 990712-14 at Facility.All Six Individuals Who Were Administered Exam, Passed Exam.Without Encls ML20210L2011999-07-28028 July 1999 Forwards Final Personal Qualification Statement (NRC Form 398) for Reactor Operator License Candidate LB Mchugh ML20211F2641999-07-27027 July 1999 Forwards Three Copies of Rev 12 to LGS Physical Security Plan, Rev 4 to LGS Training & Qualification Plan & Rev 2 to LGS Safeguards Contingency Plan. Without Encls 05000352/LER-1999-008, Forwards LER 99-008-00 Re 990623 Failure of Plant HPCI Sys to Start Due to Failure of HPCI Turbine,Hydraulic Actuator1999-07-23023 July 1999 Forwards LER 99-008-00 Re 990623 Failure of Plant HPCI Sys to Start Due to Failure of HPCI Turbine,Hydraulic Actuator 05000353/LER-1999-004, Forwards LER 99-004-00 Re 990701 Discovery of Pressure Setpoint Drift of Thirteen Mss SRV Due to Corrosion Induced Bonding within SRVs1999-07-23023 July 1999 Forwards LER 99-004-00 Re 990701 Discovery of Pressure Setpoint Drift of Thirteen Mss SRV Due to Corrosion Induced Bonding within SRVs ML20210E6211999-07-22022 July 1999 Submits Rev to non-limiting Licensing Basis LOCA Peak Clad Temps (Pcts) for Limerick Generating Station (Lgs),Units 1 & 2 & Pbaps,Units 2 & 3 ML20216D3081999-07-19019 July 1999 Requests Renewal of OLs for Listed Individuals,Iaw 10CFR55.57.NRC Forms 398 & 396,encl for Applicants.Without Encl ML20216D8041999-07-19019 July 1999 Submits Summary of Final PECO Nuclear Actions Taken to Resolve Scram Solenoid Pilot Valve Issues Identified in Info Notice 96-007 05000352/LER-1999-006, Forwards LER 99-006-00 Re 990614 Discovery That Grab Sample of Plant Offgas Sys Was Not Obtained within Time Limit Required by TS 3.3.7.12,Action 110 Due to Personnel Error1999-07-12012 July 1999 Forwards LER 99-006-00 Re 990614 Discovery That Grab Sample of Plant Offgas Sys Was Not Obtained within Time Limit Required by TS 3.3.7.12,Action 110 Due to Personnel Error ML20209F6341999-07-0909 July 1999 Submits Supplemental Response to GL 94-03, Intergranular Stress Corrosion Cracking of Core Shrouds in Bwrs, for Unit 2.Rev 0 to 1H61R & GE-NE-B13-02010-33NP Repts & Revised Pages to Summary Rept Previously Submitted,Encl ML20209G9121999-07-0909 July 1999 Informs That Ja Hutton Has Been Appointed Director,Licensing for PECO Nuclear,Effective 990715.Previous Correspondence Addressed to Gd Edwards Should Now Be Sent to Ja Hutton ML20209C9041999-07-0808 July 1999 Forwards Monthly Operating Repts for June 1999 for Limerick Generating Station,Units 1 & 2 & Revised Monthly Repts for May 1999 ML20210B4441999-07-0808 July 1999 Forwards Preliminary NRC Form 398 & NRC Form 396 for Reactor Operator for License Candidate LB Mchugh.Candidate Failed Category B Portion of Operating Exam Given at LGS During Week of 990315.Tentative re-exam Has Been Scheduled 990812 05000353/LER-1999-003, Forwards LER 99-003-00,re Bypass of RW Cleanup Leak Detection Sys Isolation Function on Three Separate Occasions.Bypass of Safety Function Was Caused by Inadequate Review & Approval of Change to Procedure1999-07-0707 July 1999 Forwards LER 99-003-00,re Bypass of RW Cleanup Leak Detection Sys Isolation Function on Three Separate Occasions.Bypass of Safety Function Was Caused by Inadequate Review & Approval of Change to Procedure ML20209D8821999-07-0707 July 1999 Submits Estimate of Number of Licensing Actions Expected to Be Submitted in Years 2000 & 2001,as Requested by Administrative Ltr 99-02.Renewal Applications for PBAPS, Units 2 & 3,will Be Submitted in Second Half of 2001 ML20209D2671999-07-0202 July 1999 Responds to NRC 990322 & 0420 RAI Re GL 96-05, Periodic Verification of Design-Basis Capability of Safety-Related Motor-Operated Valves ML20196J6301999-07-0101 July 1999 Requests Addl Info Re Status of Decommissioning Funding for Limerick Generating Station,Units 1 & 2,Peach Bottom Atomic Power Station,Units 1,2 & 3 & Salem Nuclear Generating Station,Units 1 & 2 05000352/LER-1999-004, Forwards LER 99-004-00,re Inoperability of Automatic Depressurization Sys Portion of Eccs.Condition Resulted from Incomplete Impact Review of Isolating Portion of ADS Nitrogen Backup Supply on Operability of ECCS Sys1999-07-0101 July 1999 Forwards LER 99-004-00,re Inoperability of Automatic Depressurization Sys Portion of Eccs.Condition Resulted from Incomplete Impact Review of Isolating Portion of ADS Nitrogen Backup Supply on Operability of ECCS Sys ML20209B7001999-06-30030 June 1999 Responds to GL 98-01,Suppl 1, Y2K Readiness of Computer Sys at Nuclear Power Plants ML20212J5401999-06-28028 June 1999 Discusses Completion of Licensing Action for NRC Bulletin 96-003, Potential Plugging of ECC Suction Strainers by Debris in Bwrs. Bulletin Closed for Unit 2 by NRC ML20207H8271999-06-24024 June 1999 Informs NRC That Util Has Completed Core Shroud Insps for LGS Unit 2.Proprietary Rept GE-NE-B13-02010-33P & non-proprietary Rev 0 to 1H61R,encl.Proprietary Rept Withheld,Per 10CFR2.790(a)(4) ML20196G7041999-06-24024 June 1999 Forwards Insp Repts 50-352/99-03 & 50-353/99-03 on 990413- 0524.No Violations Noted.Nrc Concluded That Licensee Staff Continued to Operate Both Units Safely ML20196A5641999-06-15015 June 1999 Provides Info Re Util Use of Four Previously Irradiated LGS, Unit 1,GE11 Assemblies in Unit 2 Cycle 6.Encl 990518 GE Ltr Provides Objective of Lead Use Assemblies Program & Outlines Kinds of Measurements That Will Be Made on Assemblies ML20195J6831999-06-11011 June 1999 Provides Proprietary Objectives for Lgs,Units 1 & 2,1999 Emergency Preparedness Exercise Scheduled to Be Conducted on 990914.Licensee Identifies Which Individuals Should Receive Copies of Info.Proprietary Info Withheld 1999-09-09
[Table view] Category:OUTGOING CORRESPONDENCE
MONTHYEARML20212J6561999-09-29029 September 1999 Informs of Completion of mid-cycle PPR of Limerick Generating Station on 990913.Identified No Areas in Which Licensee Performance Warranted Addl Insp Beyond Core Insp Program.Historical Listing of Plant Issues Encl ML20216F7821999-09-16016 September 1999 Forwards Insp Repts 50-352/99-05 & 50-353/99-05 on 990713-0816.One Violation Noted & Being Treated as NCV, Consistent with App C of Enforcement Policy.Violation Re Inoperability of Automatic Depression Sys During Maint ML20212A8751999-09-13013 September 1999 Forwards Safety Evaluation of First & Second 10-year Interval Inservice Insp Plan Request for Relief ML20211N5061999-09-0909 September 1999 Forwards TSs Bases Pages B 3/4 10-2 & B 3/4 2-4 for LGS, Units 1 & 2,being Issued to Assure Distribution of Revised Bases Pages to All Holders of TSs ML20211P8571999-09-0808 September 1999 Forwards Reactor Operator Retake Exams 50-352/99-303OL & 50-353/99-303OL Conducted on 990812 ML20211P3891999-09-0303 September 1999 Informs That During 990902 Telcon Between J Williams & B Tracy,Arrangements Were Made for NRC to Inspect Licensed Operator Requalification Program at Plant.Insp Planned for Wk of 991018 ML20211H2571999-08-26026 August 1999 Informs of Individual Exam Result on Initial Retake Exam on 990812.One Individual Was Administered Exam & Passed ML20210T4271999-08-13013 August 1999 Informs That NRC Revised Info in Rvid & Releasing Rvid Version 2 as Result of Review of 980830 Responses to GL 92-01 Rev 1,GL 92-01 Rev 1 Suppl 1 & Suppl Rai.Tacs MA1197 & MA1198 Closed ML20211B7881999-08-10010 August 1999 Transmits Summary of Two Meetings with Risk-Informed TS Task Force in Rockville,Md on 990514 & 0714 ML20210U2211999-08-10010 August 1999 Forwards Insp Repts 50-352/99-04 & 50-353/99-04 on 990525-0712.One Violation Occurred & Being Treated as NCV, Consistent with App C of Enforcement Policy.Violation Re Late Performance of off-gas Grab Sample Surveillance ML20210P4191999-08-0404 August 1999 Forwards Initial Exam Repts 50-352/99-302 & 50-353/99-302 on 990702-04 (Administration) & 990715-22 (Grading).Six of Limited SRO Applicants Passed All Portion of Exam NUREG-1092, Informs J Armstrong of Individual Exam Results for Applicants on Initial Exam Conducted on 990702 & 990712-14 at Facility.All Six Individuals Who Were Administered Exam, Passed Exam.Without Encls1999-08-0303 August 1999 Informs J Armstrong of Individual Exam Results for Applicants on Initial Exam Conducted on 990702 & 990712-14 at Facility.All Six Individuals Who Were Administered Exam, Passed Exam.Without Encls ML20196J6301999-07-0101 July 1999 Requests Addl Info Re Status of Decommissioning Funding for Limerick Generating Station,Units 1 & 2,Peach Bottom Atomic Power Station,Units 1,2 & 3 & Salem Nuclear Generating Station,Units 1 & 2 ML20212J5401999-06-28028 June 1999 Discusses Completion of Licensing Action for NRC Bulletin 96-003, Potential Plugging of ECC Suction Strainers by Debris in Bwrs. Bulletin Closed for Unit 2 by NRC ML20196G7041999-06-24024 June 1999 Forwards Insp Repts 50-352/99-03 & 50-353/99-03 on 990413- 0524.No Violations Noted.Nrc Concluded That Licensee Staff Continued to Operate Both Units Safely ML20206Q5871999-05-14014 May 1999 Advises That Info Contained in ,Which Submitted Revised Procedures for Plant EP Response Procedures Will Be Withheld from Public Disclosure,Per 10CFR2.790(a)(6) ML20206R3031999-05-11011 May 1999 Informs That on 990407,NRC Administered GFE Section of Written Operator Licensing Exam to Employees of Facility. Forwards Copies of Both Forms of Exam,Including Answer Keys & Grading Results of Facility ML20206N1111999-05-0707 May 1999 Forwards Insp Repts 50-352/99-02 & 50-353/99-02 on 990302-0412.Three Violations of NRC Requirements Occurred & Being Treated as non-cited Violations,Consistent with App C of Enforcement Policy ML20206H2651999-05-0606 May 1999 Informs That on 990112 Licensee Submitted to NRC Core Shroud Insp Plan for Plant,Unit 2,in Response to GL 94-03, Intergranular Stress Corrosion Cracking of Core Shrouds in Boiling Water Reactors ML20206G5131999-05-0303 May 1999 Approves Change of Completion Date for Implementation of Thermo-Lag Fire Barrier Corrective Actions at Plant from End of April 1999 Limerick Unit 2 RFO to 990930 ML20206H8301999-04-30030 April 1999 Forwards Exam Repts 50-352/99-301 & 50-353/99-301 on 990312-19 (Administration) & 22-26 (Grading).Four of Five RO Applicants & Three of Four SRO Applicants Passed All Portions of Exams ML20206E6951999-04-30030 April 1999 Advises That Plant,Unit 2 Cycle 6 Safety Limit Mcpr, ,contained in PECO Energy Co 990311 Application & 990204 Affidavit Will Be Withheld from Public Disclosure,Per 10CFR2.790 ML20206F4221999-04-27027 April 1999 Informs of Individual Exam Results for Applicants on Initial Exam Conducted on 990312 & 990315-19 at Facility.Completed ES-501-2,power Plant Licensing Exam Results Summary & Summary of Overall Exam Results Encl.Without Encl ML20205N2291999-04-0909 April 1999 Discusses Limerick Generating Station Plant Performance Review Conducted for Period April 1998 Through 990115 & Informs of NRC Planned Insp Effort Resulting from Review. Historial Listing of Plant Issues,Encl IR 05000352/19980091999-03-30030 March 1999 Ack Receipt of Informing NRC of Steps Taken to Correct Violations Noted in Insp Repts 50-352/98-09 & 50-353/98-09 Issued on 990106.Actions Will Be Examined During Future Insp of Licensed Program ML20205C2711999-03-26026 March 1999 Forwards Insp Repts 50-352/99-01 & 50-353/99-01 on 990112-0301.One Violation Noted & Being Treated as Non-Cited Violation.Staff Conduct of Activities During Insp Generally Characterized by Safe & Conservative Decision Making ML20205G7651999-03-22022 March 1999 Forwards RAI Re GL 96-05, Periodic Verification of Design-Basis Capability of Safety-Related Movs, for Plant, Units 1 & 2.Response Requested within 90 Days of Receipt of Ltr ML20204G9721999-03-11011 March 1999 Informs of Completion of Review of Changes Proposed by PECO Energy Co to Lgs,Units 1 & 2,EALs.Proposed EALs Incorporate Guidance in NUMARC/NESP-007,Rev 2.Forwards Safety Evaluation Supporting Proposed Changes ML20204H8171999-03-10010 March 1999 Discusses Request That NEDC-32645P, Limerick Generating Station,Units 1 & 2,SRV Setpoint Tolerance Relaxation Licensing Rept, Rev 2,dtd Dec 1998,be Withheld from Public Disclosure.Determined Info Proprietary & Will Be Withheld ML20207J0611999-03-0808 March 1999 Provides Authorization to Administer Initial Written Exams to Listed Applicants on 990312.NRC Region I Operator Licensing Staff Will Administer Operating Tests on 990315-19 at Limerick Generating Station ML20203G6721999-02-17017 February 1999 Second Partial Response to FOIA Request for Documents. Records in App D Encl & Being Made Available in Pdr.App E Records Being Withheld in Part (Ref FOIA Exemption 5) & App F Records Completely Withheld (Ref FOIA Exemptions 6 & 7) ML20203B9001999-02-0808 February 1999 First Partial Response to FOIA Request for Documents. Forwards Documents Listed in App a Already Available in PDR, Documents in App B Released in Entirety & Documents in App C Being Withheld in Part (Ref Exemption 6) ML20202J0261999-02-0303 February 1999 Informs of Completion of Licensing Action for NRC Bulletin 96-03, Potential Plugging of Emergency Core Cooling Suction Strainers by Debris in Boiling-Water Reactors ML20203A6111999-01-22022 January 1999 Confirms 990115 Conversation Between Mj Williams & P Orphanos Re Arrangements Made for Administration of Licensing Exam at Limerrick Generating Station & Peach Bottom Atomic Power Station During Week of 990705 ML20199F9251999-01-11011 January 1999 Ack Receipt of Informing NRC of Steps Taken to Correct Violations Noted in Insp Repts 50-352/98-05 & 50-353/98-05 ML20199C6501999-01-0606 January 1999 Forwards Insp Repts 50-352/98-09 & 50-353/98-09 on 981018- 1130 & Notice of Violation.Violation of Concern Because Technicians Exercised Poor Judgement & Deviated from Procedure in Attempt to Resolve Problem Without Mgt ML20198H4951998-12-18018 December 1998 Forwards Results of Audit of Licensee Year 2000 Program for Limerick Generating Station,Units 1 & 2 ML20198A3721998-12-10010 December 1998 Forwards Safety Evaluation Re Licensee Response to GL 95-07, Pressure Locking & Thermal Binding of Safety-Related Power-Operated Gate Valves ML20198B1751998-12-0808 December 1998 Advises of Planned Insp Effort Resulting from Limerick mid-year Insp Resource Planning Meeting Held on 981110. Historical Listing of Plant Issues & Details of Insp Plan for Next Six Months Encl IR 05000352/19980081998-11-23023 November 1998 Discusses licensee-identified Issue Involving Potential for Bypass of Suppression Pool as Documented in Insp Repts 50-352/98-08 & 50-353/98-08.NOV Will Not Be Issued & Civil Penalty Will Not Be Proposed ML20196C3311998-11-23023 November 1998 Forwards Insp Repts 50-352/98-08 & 50-353/98-08 on 980901-1017.No Violation Identified.Security Program Insp Identified That Security Program Effectively Protects Public Health & Safety ML20195D1491998-11-13013 November 1998 Forwards RAI Re on-going Review of IPEEE Submittal Dtd 951014.Understands That Licensee Will Inform NRC in Writing, by 981130,on How Question Re Effects of New Probable Max Precipitation at Plant,Units 2 & 3 Will Be Addressed IR 05000352/19980061998-10-15015 October 1998 Ack Receipt of Informing NRC of Steps Taken to Correct Violations Noted in Insp Repts 50-352/98-06 & 50-353/98-06 on 980826.Finds C/As for Violation Involving Failure to Select Performance Measures to Be Acceptable ML20154F8191998-10-0101 October 1998 Forwards Notice of Withdrawal of 960503 & Suppl Application for Amend to Fols.Amend Would Have Modified Facility TSs Pertaining to Rev to Frequency of Testing Stand Gas Treatment Sys & Reactor Encl Recirculation Sys ML20154A3461998-09-25025 September 1998 Forwards Insp Repts 50-352/98-07 & 50-353/98-07 on 980707-0831.No Violations Noted.Weaknesses Noted with Reactor Engineering Support to Rod Pattern Adjustment ML20153G4291998-09-24024 September 1998 Forwards Request for Addl Info Re Licensee Revised Emergency Action Level Guidelines for Limerick Generating Station, Units 1 & 2 & Peach Bottom Atomic Power Station,Units 2 & 3. Response Requested within 30 Days of Receipt of Ltr ML20153D0151998-09-21021 September 1998 Informs of Completion of Licensing Action for GL 92-08, Thermo-Lag 330-1 Fire Barriers, for Plant, Units 1 & 2 ML20151X2421998-09-11011 September 1998 Ack Receipt of Informing NRC of Steps Taken to Correct Violations Noted in Insp Repts 50-352/98-04 & 50-353/98-04 on 980805 ML20151W9601998-09-10010 September 1998 Informs That as Part of NRC PRA Implementation Plan, Commission Has Assigned Two Senior Reactor Analysts (Sras) to Each Regional Ofc.T Shedlosky & J Trapp Were Selected as SRAs for Region I ML20237D5421998-08-26026 August 1998 Ack Receipt of & Fee for $55,000 in Payment for Civil Penalty Proposed by NRC in .C/As Will Be Examined During Future Insps 1999-09-09
[Table view] |
Text
-._- ..
,
1- :
"
!'
, *; f nouq fi._ g UNITED STATES
- { g NUCLEAR REGULATORY COMMISSION
,
% REGloN I '
,
j i[E . 475 ALLENDALE ROAD KING oF PRUSSIA, PENNSYLVANIA 19406 1415
- ,e I October 17, 1996 EA 96-209 i
- Mr. D. M. Smith, President I i PECO Nuclear ,
{ Nuclear Group Headquarters !
- Correspondence Control Desk Post Office Box 195
'
Wayne, Pennsylvania 19087-0195 SUBJECT: NOTICE OF VIOLATION
'
(NRC Inspection Report Nos. 50 352/96-04; 50-353/96-04)
Dear Mr. Smith:
This letter refers to the NRC inspection conducted from May 7 through July 1,1996, at your Limerick Generating Station facility. The findings of the inspection were discussed with your staff during an exit meeting on July 3,1996. During the inspection, the inspectors reviewed the circumstances surrounding the substantial accumulation of debris on the Unit i "A" RHR pump suppression pool suction strainer which had been identified by your staff after an inadvertent actuation of a Unit 1 safety relief valve (SRV) that had opened and caused the reactor coolant system to depressurize on September 11,1995. Approximately 30 minutes after the event, an RHR pump, which had been operating in the suppression pool cooling mode of operation, ;
showed signs of cavitation. Subsequent underwater inspection indicated that the cavitation was caused by a collection of fibrous material and corrosion products on the pump's suction strainers.
Based on a review of the event and its associated causes, a violation of NRC requirements was identified involving the failure to establish adequate controls for excluding foreign material from the Unit 1 suppression pool. The violation was described in the NRC inspection report sent to you with our letter, dated Juiy 30,1996. In that letter, you were informed that this apparent violation was being considered for escalated enforcement and that a predecisional enforcement conference may not be necesdary in order for the NRC to make an enforcement decision. In your response, dated August 29,1996, you agreed that a conference was not needed and you described your corrective actions in that response.
The violation, which is also set forth in the enclosed Notice of Violation, involved the failure to comply with 10 CFR Part 50, Appendix B, Criterion V, " Instruction, Procedures, and Drawings,"
which requires that activities affecting quality shall be prescribed by documented instructions, g1 procedures or drawings of a type appropriate to the circumstances. Prior to the SRV actuation \
- '
on September 11,1995, you had not established an effective instruction for a foreign materials exclusion (FME) program to ensure that the suppression pool did not contain materials which could clog the ECCS suction strainers. Specifically, the FME procedure for the suppression pool did not contain adequate cleanliness acceptance criteria, and did not p -
instructions on how to assess the effects of items dropped into the suppression pool. As a result, after the SRV opened on September 11,1995, the A RHR pump was considered
~
9610250097 961017 PDR ADOCK 05000352 0 PDR m
. _ - . -. . .. . - . . - . - - . - - . - ..
_
..
_ _ _ . _ _ _ _ _ _ . _ _ . . __ _ . _ _ _ __ . - - _ _ _ _ _ . _ _ _
_.7._
'
!
!' PECO En:rgy 2 l
t inoperable due to the accumulation of debris on its suppression pool suction strainers.
.
Therefore, this violation has been categorized at Severity Level ill in accordance with the i " General Statement of Policy and Procedure for NRC Enforcement Actions," (Enforcement i Policy), NUREG-1600.
<
During your follow-up of the event, you noted that there was debris on the B RHR strainer, but to a lesser extent, and that the remaining ECCS suction strainers were essentially clean. You attributed the substantial accumulation of debris on the A RHR strainer to the significant period of time the pump had been operated in the suppression pool cooling mode of operation, compared to a much lower run time in that mode for the B RHR pump. You also concluded that the remaining ECCS strainers were essentially clean since they were operated infrequently.
Notwithstanding your contentions, the A RHR pump was significantly degraded, and the RHR system could have been inoperable or in a degraded condition for an extended period because of such debris. In addition, debris on the A suction strainer may have been due to the fact that the majority of the blowdown occurred in the vicinity of this strainer, and not due to the length of time the A system operated.
In either case, the NRC is concemed that PECO Energy was unaware that debris had accumulated in the Unit 1 suppression pool water or the suction strainers due to the inadequate Foreign Material Exclusion (FME) program and plant housekeeping programs and procedures.
Although debris was found in the Unit 2 suppression pool by your staff in February 1995, and Unit 2 was cleaned following that discovery, you were not proactive in aggressively pursuing at that time whether a similar condition existed at Unit 1. In fact, you did not perform inspection of the Unit 1 suppression pool during two maintenance outages that followed the Unit 2 suppression pool cleaning to determine if foreign material existed in the Unit 1 suppression pool.
These findings demonstrate the importance of management taking appropriate action to assure that (1) the Foreign Material Exclusion Program is appropriately implemented, and (2) your staff is proactive in evaluating adverse conditions identified at one unit to ensure degraded conditions do not exist at the other unit. It may have been fortuitous that only a limited amount of debris had collected on the other ECCS suction strainers at Unit 1. Additional debris, or lifting of other SRVs, may have rendered other systems inoperable.
In accordance with the Enforcement Policy, a base civil penalty in the amount of $50,000 is considered for a Severity Level ill violation. Because your facility has not been the subject of l escalated enforcement actions within the last 2 years, the NRC considered whether credit was warranted for Corrective Action in accordance with the civil penalty assessment process in Section VI.B.2 of the Enforcement Policy. Credit is warranted because your corrective actions were both prompt and comprehensive. Your corrective actions included, but were not limited to, >
the following: (1) cleaning the Unit 1 suppression pool; (2) testing of RHR pumps and declaring them operab;e prior to start-up; (3) implementing a program to monitor the differential pressure of the Suppression Pool suction strainers; (4) initiating FME accountability tracking during unit outages for Suppression Pool and Primary Containment; (5) sampling and trending suppression i pool water for fibrous content on a monthly basis; and, (6) providing training to planner supervisors and lead technicians on the importance of FME controls for work in the drywell and suppression pool.
.
~
PECO Energy 3 Therefore, to encourage prompt and comprehensive correction of violations, and in recognition of the absence of previous escalated enforcement action, I have been authorized, after consultation with the Director, Office of Enforcement, not to propose a civil penalty in this case.
However, it is important that you clearly understand that any future performance problems, especially involving missed opportunities to aggressively pursue a condition adverse to quality, could result in more significant enforcement action and civil penalties, a
The NRC has concluded that the reason for the violation, the corrective actions taken and planned to correct the violation and prevent recurrence, and the date when full compliance was achieved, are already adequately addressed on the docket in LER 95-008, and your letters dated October 6,1995, November 16,1995, March 1,1996, June 10,1996, and August 29,1996.
Therefore, you are not required to respond to this letter unless the description therein does not accurately reflect your corrective actions or your position. In that case, or if you choose to provide additionalinformation, you should follow the instructions specified in the enclosed Notice.
In accordance with 10 CFR 2.790 of the NRC's " Rules of Practice," a copy of this letter, and its enclosure will be placed in the NRC Public Document Room (PDR).
Sincerely,
// !
H ert J. Miller Regional Administrator Docket Nos. 50-352, 50-353 License Nos. NPF-39, NPF-85 l Enclosure: Notice of Violation l
l
_., ._ _ . _ _ - _ .. _ _ _ . _ . _ . - . . . _ _ _ _ _ _ . - _ _ - _ _ _ _ _ . _ _ _ - _. _ _ _ - _ . . _ _ _
. -
a
.
PECO Enirgy 4
.
.' cc w/ encl:
G. Hunger, Jr., Chairman, Nuclear Review Board and Director - Licensing W. MacFarland, Vice President - L!merick Generating Station
~
J. Kantner, Regulatory Engineer - Limerick Generating Station !
Secretary, Nuclear Committee of the Board !
4 Commonwealth of Pennsylvania i
i
,
i I
$
i b
l
,
i I
4 i
f i
!
i
!
4
$
I ,
.
,
i
.
I i
a
,
d
1
'
,
1
,
-- ,
..e-f u .
PECO Energy DISTRIBUTION:
PUBLIC SECY CA JTaylor, EDO j JMilhoan, DEDR
!
JLieberman, OE ,
>
HMiller, RI
~ FDavis, OGC WRussell, NRR
) RZimmerman, NRR l Enforcement Coordinators Rl, Ril, Rlli, RIV
'
i 1
'
.
BBeecher, GPNPA ;
l GCaputo, Ol DBangart, OSP HBell, OlG ,
,
EJordan, AEOD l
-
OE:Chron l OE:EA i
- DCS I
'
NUDOCS i I DScrenci, PAO (2) l I Nuclear Safety Information Center (NSIC)
i
- i j
A
- !
l j
I l
250003 1 l
l l
J