Category:CONTRACTED REPORT - RTA
MONTHYEARML20247N5421998-05-11011 May 1998 Technical Evaluation Rept on Pump & Valve Inservice Testing Program:Peach Bottom Atomic Power Station,Units 2 & 3 ML20094C7411995-08-0404 August 1995 Individual Plant Exam Insight Support Rept for NUREG-1150 Plants L-95-037, Evaluation of Peach Bottom Atomic Power Station Units 2 & 3 Odcm,Rev 51995-07-31031 July 1995 Evaluation of Peach Bottom Atomic Power Station Units 2 & 3 Odcm,Rev 5 ML20070N3361994-03-31031 March 1994 Release of Radionuclides and Chelating Agents from CEMENT- Solidified Decontamination LOW-LEVEL Radioactive Waste Collected from the Peach Bottom Atomic Power Station Unit 3 ML20057E5061993-09-30030 September 1993 Severe Accident Source Term Characteristics for Selected Peach Bottom Sequences Predicted by the Melcor Code ML20058F9621993-08-31031 August 1993 Evaluation of Util Response to Suppl 1 to NRC Bulletin 90-01:Limerick-1/2 & Peach Bottom-2/3, Technical Evaluation Rept ML20028H6071990-12-31031 December 1990 Evaluation of Severe Accident Risks: Peach Bottom,Unit 2. Main Report ML20066C2721990-12-31031 December 1990 Analysis of Core Damage Frequency: Peach Bottom,Unit 2 External Events ML20028H6051990-12-31031 December 1990 Evaluation of Severe Accident Risks: Peach Bottom,Unit 2. Appendices ML20065Q3081990-11-30030 November 1990 Technical Evaluation Rept,Pump & Valve Inservice Testing Program,Peach Bottom Atomic Power Station Units 2 & 3 ML20247N6471989-08-31031 August 1989 Analysis of Core Damage Frequency: Peach Bottom, Unit 2, Internal Events Appendices ML20247M6631989-08-31031 August 1989 Analysis of Core Damage Frequency: Peach Bottom, Unit 2, Internal Events ML20206B1581988-10-31031 October 1988 Technical Evaluation:Peco Topical Rept PECO-RMS-004 `Methods for Performing BWR Sys Transient Analysis,Peach Bottom Atomic Power Station,Units 2 & 3.' ML20245D7911988-09-30030 September 1988 Dcrdr Onsite Meeting Rept for Philadephia Electric Co Peach Bottom Atomic Power Stations,Unit 2 & 3 ML20245D6681988-09-14014 September 1988 Dcrdr Preimplementation Audit Rept for Philadelphia Electric Co Peach Bottom Station,Units 2 & 3 ML20235V1521987-08-31031 August 1987 Technical Evaluation Rept,Reactor Trip Sys Reliability Conformance to Item 4.5.2 of Generic Ltr 83-28,Peach Bottom 2 & 3,Perry 1 & 2,Pilgrim 1,Quad Cities 1 & 2,River Bend 1, Shoreham,Susquehanna 1 & 2,Vermont Yankee & WNP-2 ML20237J1411987-08-17017 August 1987 Facility Sys Analysis Support, Progress Rept 23 for 870713 -0807 ML20236P5111987-07-31031 July 1987 Technical Evaluation Rept Fibwr & Tcppeco Computer Programs, Final Informal Rept ML20214U0401987-06-0909 June 1987 App D & Suppl a to App D, Evaluation of Licensee-Reported Revs to Offsite Dose Calculation Manual, Technical Evaluation Rept ML20234B6291987-05-31031 May 1987 Evaluation of Severe Accident Risks and the Potential for Risk Reduction:Peach Bottom,Unit 2.Appendices.Draft for Comment ML20234B5941987-04-30030 April 1987 Evaluation of Severe Accident Risks and the Potential for Risk Reduction:Peach Bottom,Unit 2.Main Report.Draft for Comment ML20214R3971987-03-31031 March 1987 Conformance to Generic Ltr 83-28,Item 2.2.1, 'Equipment Classification (All Other Safety-Related Components),' Peach Bottom 2 & 3, Informal Rept ML20206A2881987-02-28028 February 1987 Containment Venting Analysis for the Peach Bottom Atomic Power Station ML20212J9201986-10-31031 October 1986 Analysis of Core Damage Frequency from Internal Events:Peach Bottom Unit 2 ML20245A4481986-09-30030 September 1986 Revised Draft Conformance to Generic Ltr 83-28 Item 2.1 (Part 1) Equipment Classification Hope Creek,Peach Bottom 2 & 3,Perry 1 & 2 & Pilgrim 1 ML20206G8211986-05-12012 May 1986 Preliminary Draft Containment Event Analysis for Postulated Severe Accidents at Peach Bottom Atomic Power Station, for Review.Related Documentation Encl ML20140C2491986-01-0202 January 1986 Request for Info:Evaluation of Exemption Requests from 10CFR50.48 & 10CFR50,App R,Peach Bottom Atomic Power Stations,Units 2 & 3 ML20151P4161985-12-17017 December 1985 Dcrdr Validation Walkthrough Audit Results for Peach Bottom Atomic Power Station,Units 2 & 3 ML20141F6271985-09-30030 September 1985 Technical Evaluation Rept,Second Interval Inservice Insp Program,Peach Bottom Units 2 & 3 ML20128D8381985-05-15015 May 1985 Draft Review of Licensee & Applicant Responses to Generic Ltr 83-28,Item 1.2, 'Post-Trip Review:Data & Info Capabilities,' for Peach Bottom Atomic Power Station,Units 2 & 3, Technical Evaluation Rept ML20129A2411985-05-0101 May 1985 Addendum a to Technical Evaluation Rept,First-Interval Inservice Insp Program ML20126L1481985-03-31031 March 1985 Conformance to Reg Guide 1.97,Peach Bottom Atomic Power Station,Units 2 & 3 ML20115H1531985-03-22022 March 1985 Detailed Control Room Design Review In-Progress Audit Rept for Peach Bottom Atomic Power Station,Units 2 & 3 ML20106A6791984-09-12012 September 1984 Masonry Wall Design,Peach Bottom Atomic Power Station Units 2 & 3, Technical Evaluation Rept ML20106A6831984-08-31031 August 1984 Evaluation of Applicability of Nonlinear Analysis Techniques to Reinforced Masonry Walls in Nuclear Power Plants ML20106C4031984-07-31031 July 1984 Draft Vol II, Radionuclide Release Under Specific LWR Accident Conditions,Bwr,Mark I Design ML20126E6541984-07-31031 July 1984 Draft Containment Event Analysis & Estimation of Source Term Frequencies,App to NUREG-0956 ML20115D3441984-01-0404 January 1984 Data Collection & Evaluation of Proposed Spds,Peach Bottom Units 2 & 3 ML20076H3611983-08-31031 August 1983 Control of Heavy Loads (C-10),Philadelphia Electric Co, Peach Bottom Atomic Power Station,Units 2 & 3, Technical Evaluation Rept ML20080E3311983-08-18018 August 1983 Proposed Tech Spec Changes for Inservice Surveillance of Safety-Related Hydraulics & Mechanical Snubbers at Peach Bottom Atomic Power Station,Units 2 & 3, Technical Evaluation Rept ML20093J2831983-06-30030 June 1983 Technical Evaluation of Integrity of Peach Bottom,Units 2 & 3 Reactor Coolant Boundary Piping Sys ML20071N2041983-05-17017 May 1983 Control of Heavy Loads,Peach Bottom Atomic Power Station, Units 2 & 3, Draft Technical Evaluation Rept ML20072S3191983-03-11011 March 1983 Rev 1 to Proposed Design Mods & Tech Spec Changes on Grid Voltage Degradation for Peach Bottom Atomic Power Station, Units 2 & 3, Technical Evaluation Rept ML20126E9941982-12-0707 December 1982 Containment Leak Rate Testing Investigations, Monthly Progress Rept for Nov 1982 ML20079G8831982-11-24024 November 1982 ECCS Repts (F-47):TMI Action Plan Requirements,Peach Bottom Atomic Power Station,Units 2 & 3, Technical Evaluation Rept ML20079L0551982-10-31031 October 1982 Containment Purging & Venting During Normal Operation of Peach Bottom Atomic Power Station,Units 2 & 3, Draft Technical Evaluation Rept ML20076C7731982-09-10010 September 1982 Inservice Insp Program, Technical Evaluation Rept ML20071L3801982-08-26026 August 1982 Improvements in Training & Requalification Programs as Required by TMI Action Items I.A.2.1 & II.B.4 for Peach Bottom Atomic Power Station, Technical Evaluation Rept ML20058H6581982-07-31031 July 1982 Socioeconomic Impacts of Nuclear Generating Stations:Peach Bottom Case Study.Docket Nos. 50-277 and 50-278. (Philadelphia Electric Company) ML20054M1531982-07-0101 July 1982 Adequacy of Station Electric Distribution Sys Voltages for Peach Bottom Atomic Power Station,Units 2 & 3, Technical Evaluation Rept 1998-05-11
[Table view] Category:QUICK LOOK
MONTHYEARML20247N5421998-05-11011 May 1998 Technical Evaluation Rept on Pump & Valve Inservice Testing Program:Peach Bottom Atomic Power Station,Units 2 & 3 ML20094C7411995-08-0404 August 1995 Individual Plant Exam Insight Support Rept for NUREG-1150 Plants L-95-037, Evaluation of Peach Bottom Atomic Power Station Units 2 & 3 Odcm,Rev 51995-07-31031 July 1995 Evaluation of Peach Bottom Atomic Power Station Units 2 & 3 Odcm,Rev 5 ML20070N3361994-03-31031 March 1994 Release of Radionuclides and Chelating Agents from CEMENT- Solidified Decontamination LOW-LEVEL Radioactive Waste Collected from the Peach Bottom Atomic Power Station Unit 3 ML20057E5061993-09-30030 September 1993 Severe Accident Source Term Characteristics for Selected Peach Bottom Sequences Predicted by the Melcor Code ML20058F9621993-08-31031 August 1993 Evaluation of Util Response to Suppl 1 to NRC Bulletin 90-01:Limerick-1/2 & Peach Bottom-2/3, Technical Evaluation Rept ML20028H6071990-12-31031 December 1990 Evaluation of Severe Accident Risks: Peach Bottom,Unit 2. Main Report ML20066C2721990-12-31031 December 1990 Analysis of Core Damage Frequency: Peach Bottom,Unit 2 External Events ML20028H6051990-12-31031 December 1990 Evaluation of Severe Accident Risks: Peach Bottom,Unit 2. Appendices ML20065Q3081990-11-30030 November 1990 Technical Evaluation Rept,Pump & Valve Inservice Testing Program,Peach Bottom Atomic Power Station Units 2 & 3 ML20247N6471989-08-31031 August 1989 Analysis of Core Damage Frequency: Peach Bottom, Unit 2, Internal Events Appendices ML20247M6631989-08-31031 August 1989 Analysis of Core Damage Frequency: Peach Bottom, Unit 2, Internal Events ML20206B1581988-10-31031 October 1988 Technical Evaluation:Peco Topical Rept PECO-RMS-004 `Methods for Performing BWR Sys Transient Analysis,Peach Bottom Atomic Power Station,Units 2 & 3.' ML20245D7911988-09-30030 September 1988 Dcrdr Onsite Meeting Rept for Philadephia Electric Co Peach Bottom Atomic Power Stations,Unit 2 & 3 ML20245D6681988-09-14014 September 1988 Dcrdr Preimplementation Audit Rept for Philadelphia Electric Co Peach Bottom Station,Units 2 & 3 ML20235V1521987-08-31031 August 1987 Technical Evaluation Rept,Reactor Trip Sys Reliability Conformance to Item 4.5.2 of Generic Ltr 83-28,Peach Bottom 2 & 3,Perry 1 & 2,Pilgrim 1,Quad Cities 1 & 2,River Bend 1, Shoreham,Susquehanna 1 & 2,Vermont Yankee & WNP-2 ML20237J1411987-08-17017 August 1987 Facility Sys Analysis Support, Progress Rept 23 for 870713 -0807 ML20236P5111987-07-31031 July 1987 Technical Evaluation Rept Fibwr & Tcppeco Computer Programs, Final Informal Rept ML20214U0401987-06-0909 June 1987 App D & Suppl a to App D, Evaluation of Licensee-Reported Revs to Offsite Dose Calculation Manual, Technical Evaluation Rept ML20234B6291987-05-31031 May 1987 Evaluation of Severe Accident Risks and the Potential for Risk Reduction:Peach Bottom,Unit 2.Appendices.Draft for Comment ML20234B5941987-04-30030 April 1987 Evaluation of Severe Accident Risks and the Potential for Risk Reduction:Peach Bottom,Unit 2.Main Report.Draft for Comment ML20214R3971987-03-31031 March 1987 Conformance to Generic Ltr 83-28,Item 2.2.1, 'Equipment Classification (All Other Safety-Related Components),' Peach Bottom 2 & 3, Informal Rept ML20206A2881987-02-28028 February 1987 Containment Venting Analysis for the Peach Bottom Atomic Power Station ML20212J9201986-10-31031 October 1986 Analysis of Core Damage Frequency from Internal Events:Peach Bottom Unit 2 ML20245A4481986-09-30030 September 1986 Revised Draft Conformance to Generic Ltr 83-28 Item 2.1 (Part 1) Equipment Classification Hope Creek,Peach Bottom 2 & 3,Perry 1 & 2 & Pilgrim 1 ML20206G8211986-05-12012 May 1986 Preliminary Draft Containment Event Analysis for Postulated Severe Accidents at Peach Bottom Atomic Power Station, for Review.Related Documentation Encl ML20140C2491986-01-0202 January 1986 Request for Info:Evaluation of Exemption Requests from 10CFR50.48 & 10CFR50,App R,Peach Bottom Atomic Power Stations,Units 2 & 3 ML20151P4161985-12-17017 December 1985 Dcrdr Validation Walkthrough Audit Results for Peach Bottom Atomic Power Station,Units 2 & 3 ML20141F6271985-09-30030 September 1985 Technical Evaluation Rept,Second Interval Inservice Insp Program,Peach Bottom Units 2 & 3 ML20128D8381985-05-15015 May 1985 Draft Review of Licensee & Applicant Responses to Generic Ltr 83-28,Item 1.2, 'Post-Trip Review:Data & Info Capabilities,' for Peach Bottom Atomic Power Station,Units 2 & 3, Technical Evaluation Rept ML20129A2411985-05-0101 May 1985 Addendum a to Technical Evaluation Rept,First-Interval Inservice Insp Program ML20126L1481985-03-31031 March 1985 Conformance to Reg Guide 1.97,Peach Bottom Atomic Power Station,Units 2 & 3 ML20115H1531985-03-22022 March 1985 Detailed Control Room Design Review In-Progress Audit Rept for Peach Bottom Atomic Power Station,Units 2 & 3 ML20106A6791984-09-12012 September 1984 Masonry Wall Design,Peach Bottom Atomic Power Station Units 2 & 3, Technical Evaluation Rept ML20106A6831984-08-31031 August 1984 Evaluation of Applicability of Nonlinear Analysis Techniques to Reinforced Masonry Walls in Nuclear Power Plants ML20106C4031984-07-31031 July 1984 Draft Vol II, Radionuclide Release Under Specific LWR Accident Conditions,Bwr,Mark I Design ML20126E6541984-07-31031 July 1984 Draft Containment Event Analysis & Estimation of Source Term Frequencies,App to NUREG-0956 ML20115D3441984-01-0404 January 1984 Data Collection & Evaluation of Proposed Spds,Peach Bottom Units 2 & 3 ML20076H3611983-08-31031 August 1983 Control of Heavy Loads (C-10),Philadelphia Electric Co, Peach Bottom Atomic Power Station,Units 2 & 3, Technical Evaluation Rept ML20080E3311983-08-18018 August 1983 Proposed Tech Spec Changes for Inservice Surveillance of Safety-Related Hydraulics & Mechanical Snubbers at Peach Bottom Atomic Power Station,Units 2 & 3, Technical Evaluation Rept ML20093J2831983-06-30030 June 1983 Technical Evaluation of Integrity of Peach Bottom,Units 2 & 3 Reactor Coolant Boundary Piping Sys ML20071N2041983-05-17017 May 1983 Control of Heavy Loads,Peach Bottom Atomic Power Station, Units 2 & 3, Draft Technical Evaluation Rept ML20072S3191983-03-11011 March 1983 Rev 1 to Proposed Design Mods & Tech Spec Changes on Grid Voltage Degradation for Peach Bottom Atomic Power Station, Units 2 & 3, Technical Evaluation Rept ML20126E9941982-12-0707 December 1982 Containment Leak Rate Testing Investigations, Monthly Progress Rept for Nov 1982 ML20079G8831982-11-24024 November 1982 ECCS Repts (F-47):TMI Action Plan Requirements,Peach Bottom Atomic Power Station,Units 2 & 3, Technical Evaluation Rept ML20079L0551982-10-31031 October 1982 Containment Purging & Venting During Normal Operation of Peach Bottom Atomic Power Station,Units 2 & 3, Draft Technical Evaluation Rept ML20076C7731982-09-10010 September 1982 Inservice Insp Program, Technical Evaluation Rept ML20071L3801982-08-26026 August 1982 Improvements in Training & Requalification Programs as Required by TMI Action Items I.A.2.1 & II.B.4 for Peach Bottom Atomic Power Station, Technical Evaluation Rept ML20058H6581982-07-31031 July 1982 Socioeconomic Impacts of Nuclear Generating Stations:Peach Bottom Case Study.Docket Nos. 50-277 and 50-278. (Philadelphia Electric Company) ML20054M1531982-07-0101 July 1982 Adequacy of Station Electric Distribution Sys Voltages for Peach Bottom Atomic Power Station,Units 2 & 3, Technical Evaluation Rept 1998-05-11
[Table view] Category:ETC. (PERIODIC
MONTHYEARML20247N5421998-05-11011 May 1998 Technical Evaluation Rept on Pump & Valve Inservice Testing Program:Peach Bottom Atomic Power Station,Units 2 & 3 ML20094C7411995-08-0404 August 1995 Individual Plant Exam Insight Support Rept for NUREG-1150 Plants L-95-037, Evaluation of Peach Bottom Atomic Power Station Units 2 & 3 Odcm,Rev 51995-07-31031 July 1995 Evaluation of Peach Bottom Atomic Power Station Units 2 & 3 Odcm,Rev 5 ML20070N3361994-03-31031 March 1994 Release of Radionuclides and Chelating Agents from CEMENT- Solidified Decontamination LOW-LEVEL Radioactive Waste Collected from the Peach Bottom Atomic Power Station Unit 3 ML20057E5061993-09-30030 September 1993 Severe Accident Source Term Characteristics for Selected Peach Bottom Sequences Predicted by the Melcor Code ML20058F9621993-08-31031 August 1993 Evaluation of Util Response to Suppl 1 to NRC Bulletin 90-01:Limerick-1/2 & Peach Bottom-2/3, Technical Evaluation Rept ML20028H6071990-12-31031 December 1990 Evaluation of Severe Accident Risks: Peach Bottom,Unit 2. Main Report ML20066C2721990-12-31031 December 1990 Analysis of Core Damage Frequency: Peach Bottom,Unit 2 External Events ML20028H6051990-12-31031 December 1990 Evaluation of Severe Accident Risks: Peach Bottom,Unit 2. Appendices ML20065Q3081990-11-30030 November 1990 Technical Evaluation Rept,Pump & Valve Inservice Testing Program,Peach Bottom Atomic Power Station Units 2 & 3 ML20247N6471989-08-31031 August 1989 Analysis of Core Damage Frequency: Peach Bottom, Unit 2, Internal Events Appendices ML20247M6631989-08-31031 August 1989 Analysis of Core Damage Frequency: Peach Bottom, Unit 2, Internal Events ML20206B1581988-10-31031 October 1988 Technical Evaluation:Peco Topical Rept PECO-RMS-004 `Methods for Performing BWR Sys Transient Analysis,Peach Bottom Atomic Power Station,Units 2 & 3.' ML20245D7911988-09-30030 September 1988 Dcrdr Onsite Meeting Rept for Philadephia Electric Co Peach Bottom Atomic Power Stations,Unit 2 & 3 ML20245D6681988-09-14014 September 1988 Dcrdr Preimplementation Audit Rept for Philadelphia Electric Co Peach Bottom Station,Units 2 & 3 ML20235V1521987-08-31031 August 1987 Technical Evaluation Rept,Reactor Trip Sys Reliability Conformance to Item 4.5.2 of Generic Ltr 83-28,Peach Bottom 2 & 3,Perry 1 & 2,Pilgrim 1,Quad Cities 1 & 2,River Bend 1, Shoreham,Susquehanna 1 & 2,Vermont Yankee & WNP-2 ML20237J1411987-08-17017 August 1987 Facility Sys Analysis Support, Progress Rept 23 for 870713 -0807 ML20236P5111987-07-31031 July 1987 Technical Evaluation Rept Fibwr & Tcppeco Computer Programs, Final Informal Rept ML20214U0401987-06-0909 June 1987 App D & Suppl a to App D, Evaluation of Licensee-Reported Revs to Offsite Dose Calculation Manual, Technical Evaluation Rept ML20234B6291987-05-31031 May 1987 Evaluation of Severe Accident Risks and the Potential for Risk Reduction:Peach Bottom,Unit 2.Appendices.Draft for Comment ML20234B5941987-04-30030 April 1987 Evaluation of Severe Accident Risks and the Potential for Risk Reduction:Peach Bottom,Unit 2.Main Report.Draft for Comment ML20214R3971987-03-31031 March 1987 Conformance to Generic Ltr 83-28,Item 2.2.1, 'Equipment Classification (All Other Safety-Related Components),' Peach Bottom 2 & 3, Informal Rept ML20206A2881987-02-28028 February 1987 Containment Venting Analysis for the Peach Bottom Atomic Power Station ML20212J9201986-10-31031 October 1986 Analysis of Core Damage Frequency from Internal Events:Peach Bottom Unit 2 ML20245A4481986-09-30030 September 1986 Revised Draft Conformance to Generic Ltr 83-28 Item 2.1 (Part 1) Equipment Classification Hope Creek,Peach Bottom 2 & 3,Perry 1 & 2 & Pilgrim 1 ML20206G8211986-05-12012 May 1986 Preliminary Draft Containment Event Analysis for Postulated Severe Accidents at Peach Bottom Atomic Power Station, for Review.Related Documentation Encl ML20140C2491986-01-0202 January 1986 Request for Info:Evaluation of Exemption Requests from 10CFR50.48 & 10CFR50,App R,Peach Bottom Atomic Power Stations,Units 2 & 3 ML20151P4161985-12-17017 December 1985 Dcrdr Validation Walkthrough Audit Results for Peach Bottom Atomic Power Station,Units 2 & 3 ML20141F6271985-09-30030 September 1985 Technical Evaluation Rept,Second Interval Inservice Insp Program,Peach Bottom Units 2 & 3 ML20128D8381985-05-15015 May 1985 Draft Review of Licensee & Applicant Responses to Generic Ltr 83-28,Item 1.2, 'Post-Trip Review:Data & Info Capabilities,' for Peach Bottom Atomic Power Station,Units 2 & 3, Technical Evaluation Rept ML20129A2411985-05-0101 May 1985 Addendum a to Technical Evaluation Rept,First-Interval Inservice Insp Program ML20126L1481985-03-31031 March 1985 Conformance to Reg Guide 1.97,Peach Bottom Atomic Power Station,Units 2 & 3 ML20115H1531985-03-22022 March 1985 Detailed Control Room Design Review In-Progress Audit Rept for Peach Bottom Atomic Power Station,Units 2 & 3 ML20106A6791984-09-12012 September 1984 Masonry Wall Design,Peach Bottom Atomic Power Station Units 2 & 3, Technical Evaluation Rept ML20106A6831984-08-31031 August 1984 Evaluation of Applicability of Nonlinear Analysis Techniques to Reinforced Masonry Walls in Nuclear Power Plants ML20106C4031984-07-31031 July 1984 Draft Vol II, Radionuclide Release Under Specific LWR Accident Conditions,Bwr,Mark I Design ML20126E6541984-07-31031 July 1984 Draft Containment Event Analysis & Estimation of Source Term Frequencies,App to NUREG-0956 ML20115D3441984-01-0404 January 1984 Data Collection & Evaluation of Proposed Spds,Peach Bottom Units 2 & 3 ML20076H3611983-08-31031 August 1983 Control of Heavy Loads (C-10),Philadelphia Electric Co, Peach Bottom Atomic Power Station,Units 2 & 3, Technical Evaluation Rept ML20080E3311983-08-18018 August 1983 Proposed Tech Spec Changes for Inservice Surveillance of Safety-Related Hydraulics & Mechanical Snubbers at Peach Bottom Atomic Power Station,Units 2 & 3, Technical Evaluation Rept ML20093J2831983-06-30030 June 1983 Technical Evaluation of Integrity of Peach Bottom,Units 2 & 3 Reactor Coolant Boundary Piping Sys ML20071N2041983-05-17017 May 1983 Control of Heavy Loads,Peach Bottom Atomic Power Station, Units 2 & 3, Draft Technical Evaluation Rept ML20072S3191983-03-11011 March 1983 Rev 1 to Proposed Design Mods & Tech Spec Changes on Grid Voltage Degradation for Peach Bottom Atomic Power Station, Units 2 & 3, Technical Evaluation Rept ML20126E9941982-12-0707 December 1982 Containment Leak Rate Testing Investigations, Monthly Progress Rept for Nov 1982 ML20079G8831982-11-24024 November 1982 ECCS Repts (F-47):TMI Action Plan Requirements,Peach Bottom Atomic Power Station,Units 2 & 3, Technical Evaluation Rept ML20079L0551982-10-31031 October 1982 Containment Purging & Venting During Normal Operation of Peach Bottom Atomic Power Station,Units 2 & 3, Draft Technical Evaluation Rept ML20076C7731982-09-10010 September 1982 Inservice Insp Program, Technical Evaluation Rept ML20071L3801982-08-26026 August 1982 Improvements in Training & Requalification Programs as Required by TMI Action Items I.A.2.1 & II.B.4 for Peach Bottom Atomic Power Station, Technical Evaluation Rept ML20058H6581982-07-31031 July 1982 Socioeconomic Impacts of Nuclear Generating Stations:Peach Bottom Case Study.Docket Nos. 50-277 and 50-278. (Philadelphia Electric Company) ML20054M1531982-07-0101 July 1982 Adequacy of Station Electric Distribution Sys Voltages for Peach Bottom Atomic Power Station,Units 2 & 3, Technical Evaluation Rept 1998-05-11
[Table view] Category:TEXT-PROCUREMENT & CONTRACTS
MONTHYEARML20247N5421998-05-11011 May 1998 Technical Evaluation Rept on Pump & Valve Inservice Testing Program:Peach Bottom Atomic Power Station,Units 2 & 3 ML20094C7411995-08-0404 August 1995 Individual Plant Exam Insight Support Rept for NUREG-1150 Plants L-95-037, Evaluation of Peach Bottom Atomic Power Station Units 2 & 3 Odcm,Rev 51995-07-31031 July 1995 Evaluation of Peach Bottom Atomic Power Station Units 2 & 3 Odcm,Rev 5 ML20070N3361994-03-31031 March 1994 Release of Radionuclides and Chelating Agents from CEMENT- Solidified Decontamination LOW-LEVEL Radioactive Waste Collected from the Peach Bottom Atomic Power Station Unit 3 ML20057E5061993-09-30030 September 1993 Severe Accident Source Term Characteristics for Selected Peach Bottom Sequences Predicted by the Melcor Code ML20058F9621993-08-31031 August 1993 Evaluation of Util Response to Suppl 1 to NRC Bulletin 90-01:Limerick-1/2 & Peach Bottom-2/3, Technical Evaluation Rept ML20028H6071990-12-31031 December 1990 Evaluation of Severe Accident Risks: Peach Bottom,Unit 2. Main Report ML20066C2721990-12-31031 December 1990 Analysis of Core Damage Frequency: Peach Bottom,Unit 2 External Events ML20028H6051990-12-31031 December 1990 Evaluation of Severe Accident Risks: Peach Bottom,Unit 2. Appendices ML20065Q3081990-11-30030 November 1990 Technical Evaluation Rept,Pump & Valve Inservice Testing Program,Peach Bottom Atomic Power Station Units 2 & 3 ML20247N6471989-08-31031 August 1989 Analysis of Core Damage Frequency: Peach Bottom, Unit 2, Internal Events Appendices ML20247M6631989-08-31031 August 1989 Analysis of Core Damage Frequency: Peach Bottom, Unit 2, Internal Events ML20206B1581988-10-31031 October 1988 Technical Evaluation:Peco Topical Rept PECO-RMS-004 `Methods for Performing BWR Sys Transient Analysis,Peach Bottom Atomic Power Station,Units 2 & 3.' ML20245D7911988-09-30030 September 1988 Dcrdr Onsite Meeting Rept for Philadephia Electric Co Peach Bottom Atomic Power Stations,Unit 2 & 3 ML20245D6681988-09-14014 September 1988 Dcrdr Preimplementation Audit Rept for Philadelphia Electric Co Peach Bottom Station,Units 2 & 3 ML20235V1521987-08-31031 August 1987 Technical Evaluation Rept,Reactor Trip Sys Reliability Conformance to Item 4.5.2 of Generic Ltr 83-28,Peach Bottom 2 & 3,Perry 1 & 2,Pilgrim 1,Quad Cities 1 & 2,River Bend 1, Shoreham,Susquehanna 1 & 2,Vermont Yankee & WNP-2 ML20237J1411987-08-17017 August 1987 Facility Sys Analysis Support, Progress Rept 23 for 870713 -0807 ML20236P5111987-07-31031 July 1987 Technical Evaluation Rept Fibwr & Tcppeco Computer Programs, Final Informal Rept ML20214U0401987-06-0909 June 1987 App D & Suppl a to App D, Evaluation of Licensee-Reported Revs to Offsite Dose Calculation Manual, Technical Evaluation Rept ML20234B6291987-05-31031 May 1987 Evaluation of Severe Accident Risks and the Potential for Risk Reduction:Peach Bottom,Unit 2.Appendices.Draft for Comment ML20234B5941987-04-30030 April 1987 Evaluation of Severe Accident Risks and the Potential for Risk Reduction:Peach Bottom,Unit 2.Main Report.Draft for Comment ML20214R3971987-03-31031 March 1987 Conformance to Generic Ltr 83-28,Item 2.2.1, 'Equipment Classification (All Other Safety-Related Components),' Peach Bottom 2 & 3, Informal Rept ML20206A2881987-02-28028 February 1987 Containment Venting Analysis for the Peach Bottom Atomic Power Station ML20212J9201986-10-31031 October 1986 Analysis of Core Damage Frequency from Internal Events:Peach Bottom Unit 2 ML20245A4481986-09-30030 September 1986 Revised Draft Conformance to Generic Ltr 83-28 Item 2.1 (Part 1) Equipment Classification Hope Creek,Peach Bottom 2 & 3,Perry 1 & 2 & Pilgrim 1 ML20206G8211986-05-12012 May 1986 Preliminary Draft Containment Event Analysis for Postulated Severe Accidents at Peach Bottom Atomic Power Station, for Review.Related Documentation Encl ML20140C2491986-01-0202 January 1986 Request for Info:Evaluation of Exemption Requests from 10CFR50.48 & 10CFR50,App R,Peach Bottom Atomic Power Stations,Units 2 & 3 ML20151P4161985-12-17017 December 1985 Dcrdr Validation Walkthrough Audit Results for Peach Bottom Atomic Power Station,Units 2 & 3 ML20141F6271985-09-30030 September 1985 Technical Evaluation Rept,Second Interval Inservice Insp Program,Peach Bottom Units 2 & 3 ML20128D8381985-05-15015 May 1985 Draft Review of Licensee & Applicant Responses to Generic Ltr 83-28,Item 1.2, 'Post-Trip Review:Data & Info Capabilities,' for Peach Bottom Atomic Power Station,Units 2 & 3, Technical Evaluation Rept ML20129A2411985-05-0101 May 1985 Addendum a to Technical Evaluation Rept,First-Interval Inservice Insp Program ML20126L1481985-03-31031 March 1985 Conformance to Reg Guide 1.97,Peach Bottom Atomic Power Station,Units 2 & 3 ML20115H1531985-03-22022 March 1985 Detailed Control Room Design Review In-Progress Audit Rept for Peach Bottom Atomic Power Station,Units 2 & 3 ML20106A6791984-09-12012 September 1984 Masonry Wall Design,Peach Bottom Atomic Power Station Units 2 & 3, Technical Evaluation Rept ML20106A6831984-08-31031 August 1984 Evaluation of Applicability of Nonlinear Analysis Techniques to Reinforced Masonry Walls in Nuclear Power Plants ML20106C4031984-07-31031 July 1984 Draft Vol II, Radionuclide Release Under Specific LWR Accident Conditions,Bwr,Mark I Design ML20126E6541984-07-31031 July 1984 Draft Containment Event Analysis & Estimation of Source Term Frequencies,App to NUREG-0956 ML20115D3441984-01-0404 January 1984 Data Collection & Evaluation of Proposed Spds,Peach Bottom Units 2 & 3 ML20076H3611983-08-31031 August 1983 Control of Heavy Loads (C-10),Philadelphia Electric Co, Peach Bottom Atomic Power Station,Units 2 & 3, Technical Evaluation Rept ML20080E3311983-08-18018 August 1983 Proposed Tech Spec Changes for Inservice Surveillance of Safety-Related Hydraulics & Mechanical Snubbers at Peach Bottom Atomic Power Station,Units 2 & 3, Technical Evaluation Rept ML20093J2831983-06-30030 June 1983 Technical Evaluation of Integrity of Peach Bottom,Units 2 & 3 Reactor Coolant Boundary Piping Sys ML20071N2041983-05-17017 May 1983 Control of Heavy Loads,Peach Bottom Atomic Power Station, Units 2 & 3, Draft Technical Evaluation Rept ML20072S3191983-03-11011 March 1983 Rev 1 to Proposed Design Mods & Tech Spec Changes on Grid Voltage Degradation for Peach Bottom Atomic Power Station, Units 2 & 3, Technical Evaluation Rept ML20126E9941982-12-0707 December 1982 Containment Leak Rate Testing Investigations, Monthly Progress Rept for Nov 1982 ML20079G8831982-11-24024 November 1982 ECCS Repts (F-47):TMI Action Plan Requirements,Peach Bottom Atomic Power Station,Units 2 & 3, Technical Evaluation Rept ML20079L0551982-10-31031 October 1982 Containment Purging & Venting During Normal Operation of Peach Bottom Atomic Power Station,Units 2 & 3, Draft Technical Evaluation Rept ML20076C7731982-09-10010 September 1982 Inservice Insp Program, Technical Evaluation Rept ML20071L3801982-08-26026 August 1982 Improvements in Training & Requalification Programs as Required by TMI Action Items I.A.2.1 & II.B.4 for Peach Bottom Atomic Power Station, Technical Evaluation Rept ML20058H6581982-07-31031 July 1982 Socioeconomic Impacts of Nuclear Generating Stations:Peach Bottom Case Study.Docket Nos. 50-277 and 50-278. (Philadelphia Electric Company) ML20054M1531982-07-0101 July 1982 Adequacy of Station Electric Distribution Sys Voltages for Peach Bottom Atomic Power Station,Units 2 & 3, Technical Evaluation Rept 1998-05-11
[Table view] |
Text
._ _
, l Addendum A to SAI Report
, No. 186-028-14 9 .
PEACH BOTTOM ATOMIC POWER STATION UNITS 2 AND 3
.)
ADDENDIN A TO TECHNICAL EVALUATION REPORT FIRST-INTERVAL INSERVICE INSPECTION PROGRAM a
3 Submitted to . .
U.S. Nuclear Regulatory Commission
, Contract No. NRC-03-83-096 3
Submitted by Science Applications International Corporatio'n Idaho Falls, Idaho 83402 May 1,1985
') .
e 8'.4to$44sifxy b
CONTENTS 3
I N TR ODUCT I ON . . . . . . . . . . . . . . . . . . . . . . . . . . 1 Relief Request, Internal Surfaces of Pumps, Category B-L-2, Item 85.7 ................... 2 as Relief Request, Internal Surfaces of Valves, Category B-M-2, Item B6.7 ................... S Relief Request, Pressure Test Hold Time ............ 8 a
Relief Request, Class 2 Emergency Core Cooling System (ECCS) Components and Piping Previously Exempt Under IWC-1220( c ) . . . . . . . . . . . . . . . . . . . . 10
.)
REFERENCES . . . . . . . . . . . . . . . . . . . . . . . . . . . 12
)
4
_f .
ADDENDUM TO TECHNICAL EVALUATION REPORT INSERVICE INSPECTION PROGRAM O Peach Bottom, Units 2 and 3 INTRODUCTION
) Science Applications International Corporation (SAIC) submitted a Technical Evaluation Report (TER) on the Inservice Inspection (ISI) program for Units 2 and 3 of Peach Bottom for the first inspection interyal to the U.S. Nuclear Regulatory Commission (NRC) on August 27, 1982.8 On May 2,1983, the NRC issued its formal Safety Evaluation Report.2 whfe5 included SAIC's TER,as an appendix. For Peach Dottoa. L.;t 2, the ISI program and relief requests evaluated in these reports covered the last 80 months of the first inspection interval, from November 5, 1977, to July 5,1984. For Unit 3, they covered the last 80 months of the interval from April 23, 1978, to December 12, 1984. On December 27, 1983, Philadelphia Elecjric Company submitted a new request for relief for the first interval, which the NRC granted on June 1, 1984.4 The ISI program for the gecond interval, including relief requests, was submitted June 28, 1984.3 On October 29, 1984, the NRC requested additional information to complete its review of the relief requegts.6 The information wgs furnished in letters dated December 21, 1984,'
January 31, 1985,o and February 1, 1985.9 In the December 21, 1984,
) letter, pursuant to the terms of 10 CFR 50.55a (g)(5)(iv), Philadelphia Electric Company submitted three requests not previously submitted for relief from the 1974 Edition of Section XI of the American Society of Mechanical Engineers Boiler and Pressure Vessel Code (the Code) with Addenda through the Summer of 1975, which was applicable to the first inspection interval. The letter of Fe
) relief request for the first interval.gruary 1,1985, These submitted four new a fourth relief requests are evaluated in this addendum to the originally issued Technical Evaluation Report. All but one relief request pertain only to Unit 3.
Relig{ requests for the second interval are being evaluated in a separate TER.' . .
3
(
l l
l l ) -
l l
1
. Relief Request, Internal Surfaces of Pumps, Category B-L-2, Item B5.7 (Unit 3 Only)
O Code Requirement A visual examination of pump internal pressure boundary surfaces shall be performed on one pump in each of the group of pumps performing similar functions in the system during each inspection interval. The examinations J may be performed at or near the end of the inspection interval.
Code Relief Request Relief is requested from the visual examination of the internal surfaces of the reactor recirculation pump at the pressure boundary.
Proposed Alternative Examination As an alternative inspection, a UT wall thickness surveillance program
) to verify structural integrity shall be incorporated into the upgraded ISI program to be performed at or near the beginning of the next 120-month interval .
The following testing shall continue to be implemented on the recir-culation pumps to assure structural integrity:
- 1. Hydrostatic pressure tests and leak tests performed periodically.
- 2. External visual inspections performed during seal maintenance.
- 3. Continuous vibration monitoring.
- 4. Continuous drywell leakage monitoring.
- 5. Visual inspection of internal surfaces upon pump disassembly for maintenance. ' '
O Licensee's Basis for Raguesting Reli_ef The disassembly of a recirculation pump during the current 120-month interval for the sole purpose of visually inspecting its internal surfaces would result in unnecessary personnel exposure, potential hazards, generation of excessively high amounts of radioactive waste and would be in conflict with the concept, "as low as reasonably achievable." There has been no maintenance required on these pumps during the first ten-year in-terval which would have accommodated visual inspection. As a result of an extensive outage currently in progress on Peach Botto.n Unit 2 for replace-ment of pr,imary system piping, identical pumps were disassembled and
)
2
.. . .. ~ .--
inspected. During this inspection, no reportable indications were dis-covered. Thus, it is appropriate to postpone inspection of the Unit 3 pump taib t i.he hond 120-munth ISI intervai.
O ,
Evaluation In its Safety Evaluation Report,(2) the NRC made relief on reactor J coolant pumps contingent on maintenance being performed during the first 10-year interval. The licensee has disassembled and examined Unit 2 pumps but not Unit 3 pumps. Thus, the licensee is asking for relief at this time for Unit 3 pumps, lhe visual examination is to determine whether unanticipated severe degradation of the casing is occurring due to phenomena such as erosion, corrosion, or cracking. However, examinations of Unit 2 pumps and pumps at other plants have not shown any significant degradation of casings. -
The disassembly of the reactor recirculation pumps to the degree neces-
)
sary to inspect the internal pressure-retaining surfaces is a major effort, involving large personnel exposures and the generation of large amounts of radioactive waste. In view of the effort required to disassemble a pump, the information returned from visual examination of its internal surfaces would be marginal.
The licensee has committed to an ultrasonic surveillance program and visual examination if a pump is disassembled for maintenance. Meanwhile,
. pressure and flow are monitored during pump performance tests to assess y -
performance, b~
The proposed ultrasonic surveillance program has not been required of other licensees and, therefore, should be an option rather than a condition
) of relief. The proposed alternative examination, performance tests, and normal visual examination during system pressure tests are reasonable sub-stitutes for the Code-required examination. T 3 Conclusions and Recommendations Based upon the above evaluation, it is concluded that for the pumps discussed above, the Code requirements are impractical. It is further concluded that the alternative examinations discussed will provide neces-sary added assurance of structural reliability. Therefore, the following are recommended:
(1) Relief should be granted from the Code-required visual examinations for the first inspection interval.
3 3
(2) The licensee should perform the Code examinations upon any re-cirrulation pumps disassembled fo* maintenance or any ette purp:
C) during the second interval as proposed.
( 3) The proposed ultrasonic surveillance of the pump casings should be at the licensee's option.
} Reference Reference 7.
O I
)
3 4
yw - - w
- Relief Request, Internal Surfaces of Valves, Category _ B-M-2, Item B6.7 (Unit 3 Only)
Code Requirement Visual inspection of the internal pressure boundary surfaces, on valves g, exceeding 4-in, nominal pipe size shall be performed.
One valve in each group of valves of the same constructional design, e.g., globe, gate, or check valve, manufacturing method and manufacturer that performs similar functions in the system shall be examined during each inspection interval.
The examinations may be performed at or near the end of the inspection -
interval . ,
) Code Relief Request Relief is requested from the visual examination of the internal surfaces at the pressure boundary of the Class 1 valves exceeding 4-in. diameter nominal pipe size.
?
Proposed Alternative Examination As an alternative inspection, a UT wall thickness surveillance program to verify structural integrity shall be incorporated into the upgraded ISI 3 program.
The following testing shall continue to be implemented on the subject valves to assure structural integrity:
- 1. Hydrostatic pressure testing and leak tests performed periodically.
3
- 2. Continuous drywell leakage monitoring.
- 3. Visual inspection of internal surfaces upon valve disassembly for maintenance.
Licensee's Basis for Requesting Relief In order to carry out these inspections, it would be necessary to disassemble these valves during the remainder of the current 120-month
) interval. Thus, it would be impractical due to time limitation, potential safety hazards, and excessive radiation and contamination exposures. Also, 5
a large scope of preliminary work which must be performed (i.e., off-loading fuel elements, draining the reactor vessel, plugging the jet pump risord Consequently, n. woulo be more appropriate to coordinate these inspections Q with other activities that would require a similar configuration of the NSSS to minimize decontamination and radiation exposures.
We request that relief be granted under the first interval ISI program and commit to the inspection of the subject valves upon valve disassembly for maintenance during the next 120-month interval. There has been no J maintenance required on these valves during the first ten-year interval which would have permitted visual inspection to be performed. As with the request for relief from examination of the reactor recirculation pump internals, access to identical valves became available and the visual inspection was performed nn the Unit ? valves. During that inspection ne flaws requiring repair were discovered. Thus, there exists a high degree of confidence that inspection of the Unit 3 valves can be appropriately .
postponed until the second 120-month ISI interval.
Evaluation
)
In its Safety Evaluation Report,(2) the NRC made relief for valves con-tingent on maintenance being performed during the first 10-year interval.
The licensee has disassembled and examined Unit 2 valves but not Unit 3 valves. Thus, the licensee is seeking relief at this time for Unit 3 valves.
) The disassembly of large valves to the degree necessary to inspect the internal pressure-retaining surfaces (bodies) is a major effort in terms of exposure of personnel. The licensee has also inspected the Unit 2 valves during this interval and found no flaws. To disassemble Unit 3 valves solely to perform a visual examination of the internal body during this interval is impractical.
The licensee has committed to an ultrasonic surveillance program and visual examination of any valve disassembled for other reasons. The pro-posed ultrasonic surveillance program has not been required of other ,
licensees and, therefore, should be an option rather than a ' condition of relief. The proposed alternative visual examinations and normal visual C examination during system pressure tests are reasonable substitutes for the Code-requirad examivtions.
Conclusions and Recommendations Based upon the above evaluation, it is concluded that for the valves discussed above, the Code requirements are impractical. It is further concluded that the alternative visual examinations discussed will provide necessary added assurance of structural reliability. Therefore, the following.are recommended:
6
l
)
(1) Pelief rhnold be granted fram pcrform!nt the Code requi-c.'
examinations on valves during the first interval.
3 .
(2) The licensee should perform the Code examination on Unit 3 valves disassembled for maintenance or any other purpose during the second interval as proposed.
(3) The proposed ultrasonic surveillance of valve bodies should be
- at the licensee's option.
Reference .
Reference 7. .
J
)
7
Relief Request, Pressure Test Hold Time O Code Requirement IWA-5210(a) of the 1974 Edition, Summer 1975 Addenda, states that the test pressure and temperature shall be maintained for at least four hours prior to the performance of the examinations.
e Code Relief Request ,
Relief is requested from pressure-testing hold time requireuents of the Code.
.a Proposed Alternative Examination The HPCI and RCIC system hydrostatic pressure test will be performed at 3 a discharge pressure of 1,403 psig with a hold time of ten minutes in accor-dance with IWC-5000 with inspection per IWA-5000 as specified in Section XI of the 1980 Edition of the ASME Code.
The insulated portion of these systems will be hydrostatically tested
) using a hydrostatic test pump maintaining the test pressure at 1,403 psig far four hours in accordance with IWC-5000 with inspection per IWA-5000 as specified in Section XI of the 1980 Edition of the ASME Code.
) Licensee's Basis for Requesting Relief To perform the system hydrostatic pressure test to the 1974 Code requirements, it would be necessary to run the HPCI turbine-driven booster pump / main pump combination or RCIC turbine-driven pump for a. minimum of .
four hours before performing the required inspection in accordance with IWA-5000. During the four-hour run time, the system hydrostatic test pressure would be held at 1007, of the nominal system operating pressure of 1,200 psig.
Except for approximately 20 feet of pipe in each system in the outboard main steam isolation valve (MSIV) room, the HPCI and RCIC pump discharge piping is uninsulated. The 1974 Edition of the Code did not recognize that a four-hour hold time for hydrostatic testing of uninsulated pipe is not required. However, the 1980 Edition of Section XI of the ASME Code recog-nizes that a four-hour hold time for uninsulated pipe is not required and that a hold time of ten minutes is sufficient for uninsulated piping systems.
However, the 1980 Edition of the Code requires the system hydenstatic
) pressure test to be 1.10 times the system design pressure for the HPCI and RCIC systems.
8
These systems are designed to inject water into the vessel at a pressure equivalent to the highest pressure achieved in the reactor vessel durin? an operational transient which requires HPCI or RCIC system operation. This 5 pressure is,1,275 psig which can result from an MSIV closure with a high flux scram. Therefore, the system hydrostatic test pressure required, in accor-dance with IWC-5222(a) of the 1980 Edition of the Code, would be 1,403 psig.
Complying with the 1974 version of this Code would necessitate signiff-cantly longer test runs resulting in unnecessary wear and tear on the HPCI d and RCIC pumps and on the Residual Heat Removal system pumps which must operate in the torus water cooling mode for at least the same period of ti me. The requested relief would therefore obviate the need for more than 16 hours1.851852e-4 days <br />0.00444 hours <br />2.645503e-5 weeks <br />6.088e-6 months <br /> of aggregate ECCS equipment operation per unit.
Evaluation .
The 1980 Edition of Section XI has been referenced in 10 CFR 50.55a and -
inservice examinations may meet the requirements of this edition in lieu of those from previous editions with the following provisions:
J (a) Commission approval is required to update to the more recent edition (pursuant to 10 CFR 50.55a(g)(4)(iv);
(b) Any requirement of the more recent edition which is related to the one(s) under consideration must also be met.
)
The IWA-5213 found in the 1980 Edition has been included in the Code since the Winter 1977 Addenda. Thus, the Code has recognized for many year,s-that a four-hour hold time for uninsulated pipe is not required and that a g, hold time of ten minutes is sufficient. It is appropriate for the ifcensee to update to the newer Code version. IWA-5213 refers to types of tests and to pressure and temperature conditions that are defined in other paragraphs of Subsubarticle IWA-5210. The entire subsubarticle needs to be adopted to comply with requirements of (b) above.
T Conclusions and Recommendations Pursuant to 10 CFR SC.55a(g)(4)(iv), approval should be granted to update from the requirements of Paragraph IWA-5210 of the 1974 Edition, Summer 1975 Addenda to the requirements of Subsubarticle IWA-5210 in the 1980 Edition. This approval would permit the licensee to carry out its proposed alternative examination.
Reference 3
Reference 9.
9
Relief Request, Class 2 Emergency Core Cooling System (ECCS) Components
.an,d_ P,1, ping,Previousl_y, Exemgt Under IWC ,1220(c) (Unit 3 Only)
S Code Requirements The following components may be exempted from the examination require-ments of IWC-2520:
- (c) components that perform an emergency core cooling function, provided the control of the chemistry (to minimize corrosive effects) of the contained fluid is verified by periodic sampling and test.
Code Relief Reg est Schedule relief under the first ten-year IS! program for inspection of ECCS components and piping in accordance with IWC-1220(c).
2 Proposed Alternative Examination We are proposing a schedule to complete inspections on Class 2 ECCS components and piping previously exempted under Article IWC-1220(c) of
) Section XI of the ASME Code. Since five refueling outages have been com-pleted during the current 120-month ISI interval for Unit 3. Philadelphia Electric Company proposes to examine a minimum one-sixth of the total number of subject components and pipe welds required for examination during the current interval during the next refueling outage. This is based on six inspection periods per 120-month interval. This plan would carry through 3 into the next 120-month ISI interval to ensure that all ECCS component inspections are completed during that interval.
A similar relief request for Peach Bottom Unit 2 was for. warded to the .
NRC, S. L. Daltroff, PECo, letter to J. F. Stolz, USNRC, December 27, 1983, and found to be acceptable in the NRC response from G. W. Rivenback, USNRC, to E. G. Bauer, Jr., PECo, letter da ted June 1,1984.
Licensee's Basis for Requesting Relief There is not sufficient time remaining in the current ISI interval to complete the inspection of the subject components and piping, particularly portions of the RHR, Core Spray, and HPCI systems. The following work must be performed prior to the actual required examinations.
- 1. An examination plan must be developed which includes the physical
) identification of all pipe welds and components.
10
- 2. Erection of a significant amount of scaffolding.
- 3. Upure gairang access tu Lhe piping, the weld crowris r equire ugnt-O ficant rework, since the weld configurations are not conducive to Ultrasonic Testing.
By letter dated May 2,1983, J. F. Stolz, USNRC, to E. G. Bauer, Jr.,
PECo, transmitting the Safety Evaluation Report for the first ten-year program, the NRC staff concluded that these examinations ghould be included J and denied the relief request for the current interval.t 2s At the time of receipt of this letter, Peach Bottom Unit 3 was undergoing inspections of primary system piping in accordance with IE Bulletin 83-02 and there was not sufficient time to develop the inspection plan for ECCS components necessary to satisfy Code requirements.
Evaluation ,
By letter dated June 1,1984, the NRC approved a similar schedule request for Unit 2. As expressed in that letter, however, the NRC clearly 3 expects that a sample examination of ECCS components be undertaken during the remaining outage. The licensee's proposed examination of a minimum of one-sixth of the required welds during the final refueling outage for Unit 3 (which is the same proposal accepted for Unit 2) meets these expectations.
Because of the amount of work required before the examinations could be performed, it would be difficult to perfonn all required examinations before
_6 the end of the interval. Thus, the carryover of these examinations into the second interval would be acceptable.
Conclusions and Recommendations Based on the above evaluation, it is concluded that for the ECCS components and piping discussed above, the schedule requirements associated with the Code requirements are finpractical. It is further concluded that
- the examination discussed above will provide the necessary assurance of structural reliability. Therefore, the following is recommended:
(1) Relief should be granted from the schedule requirements associated with the required examination of ECCS components and piping previ-ously considered by the licensee exempt under *WC-1220(c) provided that the licensee performs at least one-sixth of the Code-required examinations during the final refueling outage of the first interval for Unit 3.
Re ference
~
) Reference 7. ,
i 11
e d
REFERENCES c) 1. SAIC, Technical Evaluation Report, Peach Bottom Atomic Power Station, Units Z and 3, Inservice Inspection Program, 5AI Report No. 185-025-14, August 27, 1982.
- 2. Letter, J. F. Stolz (4RC) to E. G. Bauer (PECo), May 2,1983; transmits g the attached SER on first interval program.
- 3. Letter, S. L. Daltroff (PEco) to J. F. Stolz (NRC), December 27, 1983; relief request on schedule to examine Unit 2 ECCS components and piping.
- 4. Letter, G. W. Rivenback (NRC) to E. G. Bauer, Jr. (PECo), June 1,1984; -
9 rants schedule relief on examination of Unit 2 ECCS co.nponents and ,,
piping.
) 5. I.etter, S. L. Daltroff (PECo) to J. F. Stolz (NRC), June 28, 1984; transmits the attached second interval program for both units.
- 6. Letter, J. F. Stolz (NRC) to E. G. Bauer (PEco), October 29, 1984; request for additional information.
3
- 7. Letter, S. L. Daltroff (PECo) to J. F. Stolz (NRC), December 21, 1934; partial response to request for information.
) 8. Letter, S. L. Daltroff (PECo) to J. F. Stolz (NRC), January 31, 1985; renaining response to request for information.
- 9. Letter, S. L.Daltroff (PEco) to J. F. Stolz (NRC), February 1,1985; .
additional first interval relief requested.
3 ort, Second Interval Inservice Inspection
- 10. Progea SAIC,n,Technical Evaluation
~ ~
PeRh ~ Bottom Xt iiiiic' Rep /5ErTtatM,~ OnTts T ant 37 Repoit TU.
- ~
5AIC-84/1557, April 19,1985.
~
')
12
__ _ _ _ _ . . _ _ . . . . _ . . . . . . . . - - - -