Category:CONTRACTED REPORT - RTA
MONTHYEARML20247N5421998-05-11011 May 1998 Technical Evaluation Rept on Pump & Valve Inservice Testing Program:Peach Bottom Atomic Power Station,Units 2 & 3 ML20094C7411995-08-0404 August 1995 Individual Plant Exam Insight Support Rept for NUREG-1150 Plants L-95-037, Evaluation of Peach Bottom Atomic Power Station Units 2 & 3 Odcm,Rev 51995-07-31031 July 1995 Evaluation of Peach Bottom Atomic Power Station Units 2 & 3 Odcm,Rev 5 ML20070N3361994-03-31031 March 1994 Release of Radionuclides and Chelating Agents from CEMENT- Solidified Decontamination LOW-LEVEL Radioactive Waste Collected from the Peach Bottom Atomic Power Station Unit 3 ML20057E5061993-09-30030 September 1993 Severe Accident Source Term Characteristics for Selected Peach Bottom Sequences Predicted by the Melcor Code ML20058F9621993-08-31031 August 1993 Evaluation of Util Response to Suppl 1 to NRC Bulletin 90-01:Limerick-1/2 & Peach Bottom-2/3, Technical Evaluation Rept ML20028H6071990-12-31031 December 1990 Evaluation of Severe Accident Risks: Peach Bottom,Unit 2. Main Report ML20066C2721990-12-31031 December 1990 Analysis of Core Damage Frequency: Peach Bottom,Unit 2 External Events ML20028H6051990-12-31031 December 1990 Evaluation of Severe Accident Risks: Peach Bottom,Unit 2. Appendices ML20065Q3081990-11-30030 November 1990 Technical Evaluation Rept,Pump & Valve Inservice Testing Program,Peach Bottom Atomic Power Station Units 2 & 3 ML20247N6471989-08-31031 August 1989 Analysis of Core Damage Frequency: Peach Bottom, Unit 2, Internal Events Appendices ML20247M6631989-08-31031 August 1989 Analysis of Core Damage Frequency: Peach Bottom, Unit 2, Internal Events ML20206B1581988-10-31031 October 1988 Technical Evaluation:Peco Topical Rept PECO-RMS-004 `Methods for Performing BWR Sys Transient Analysis,Peach Bottom Atomic Power Station,Units 2 & 3.' ML20245D7911988-09-30030 September 1988 Dcrdr Onsite Meeting Rept for Philadephia Electric Co Peach Bottom Atomic Power Stations,Unit 2 & 3 ML20245D6681988-09-14014 September 1988 Dcrdr Preimplementation Audit Rept for Philadelphia Electric Co Peach Bottom Station,Units 2 & 3 ML20235V1521987-08-31031 August 1987 Technical Evaluation Rept,Reactor Trip Sys Reliability Conformance to Item 4.5.2 of Generic Ltr 83-28,Peach Bottom 2 & 3,Perry 1 & 2,Pilgrim 1,Quad Cities 1 & 2,River Bend 1, Shoreham,Susquehanna 1 & 2,Vermont Yankee & WNP-2 ML20237J1411987-08-17017 August 1987 Facility Sys Analysis Support, Progress Rept 23 for 870713 -0807 ML20236P5111987-07-31031 July 1987 Technical Evaluation Rept Fibwr & Tcppeco Computer Programs, Final Informal Rept ML20214U0401987-06-0909 June 1987 App D & Suppl a to App D, Evaluation of Licensee-Reported Revs to Offsite Dose Calculation Manual, Technical Evaluation Rept ML20234B6291987-05-31031 May 1987 Evaluation of Severe Accident Risks and the Potential for Risk Reduction:Peach Bottom,Unit 2.Appendices.Draft for Comment ML20234B5941987-04-30030 April 1987 Evaluation of Severe Accident Risks and the Potential for Risk Reduction:Peach Bottom,Unit 2.Main Report.Draft for Comment ML20214R3971987-03-31031 March 1987 Conformance to Generic Ltr 83-28,Item 2.2.1, 'Equipment Classification (All Other Safety-Related Components),' Peach Bottom 2 & 3, Informal Rept ML20206A2881987-02-28028 February 1987 Containment Venting Analysis for the Peach Bottom Atomic Power Station ML20212J9201986-10-31031 October 1986 Analysis of Core Damage Frequency from Internal Events:Peach Bottom Unit 2 ML20245A4481986-09-30030 September 1986 Revised Draft Conformance to Generic Ltr 83-28 Item 2.1 (Part 1) Equipment Classification Hope Creek,Peach Bottom 2 & 3,Perry 1 & 2 & Pilgrim 1 ML20206G8211986-05-12012 May 1986 Preliminary Draft Containment Event Analysis for Postulated Severe Accidents at Peach Bottom Atomic Power Station, for Review.Related Documentation Encl ML20140C2491986-01-0202 January 1986 Request for Info:Evaluation of Exemption Requests from 10CFR50.48 & 10CFR50,App R,Peach Bottom Atomic Power Stations,Units 2 & 3 ML20151P4161985-12-17017 December 1985 Dcrdr Validation Walkthrough Audit Results for Peach Bottom Atomic Power Station,Units 2 & 3 ML20141F6271985-09-30030 September 1985 Technical Evaluation Rept,Second Interval Inservice Insp Program,Peach Bottom Units 2 & 3 ML20128D8381985-05-15015 May 1985 Draft Review of Licensee & Applicant Responses to Generic Ltr 83-28,Item 1.2, 'Post-Trip Review:Data & Info Capabilities,' for Peach Bottom Atomic Power Station,Units 2 & 3, Technical Evaluation Rept ML20129A2411985-05-0101 May 1985 Addendum a to Technical Evaluation Rept,First-Interval Inservice Insp Program ML20126L1481985-03-31031 March 1985 Conformance to Reg Guide 1.97,Peach Bottom Atomic Power Station,Units 2 & 3 ML20115H1531985-03-22022 March 1985 Detailed Control Room Design Review In-Progress Audit Rept for Peach Bottom Atomic Power Station,Units 2 & 3 ML20106A6791984-09-12012 September 1984 Masonry Wall Design,Peach Bottom Atomic Power Station Units 2 & 3, Technical Evaluation Rept ML20106A6831984-08-31031 August 1984 Evaluation of Applicability of Nonlinear Analysis Techniques to Reinforced Masonry Walls in Nuclear Power Plants ML20106C4031984-07-31031 July 1984 Draft Vol II, Radionuclide Release Under Specific LWR Accident Conditions,Bwr,Mark I Design ML20126E6541984-07-31031 July 1984 Draft Containment Event Analysis & Estimation of Source Term Frequencies,App to NUREG-0956 ML20115D3441984-01-0404 January 1984 Data Collection & Evaluation of Proposed Spds,Peach Bottom Units 2 & 3 ML20076H3611983-08-31031 August 1983 Control of Heavy Loads (C-10),Philadelphia Electric Co, Peach Bottom Atomic Power Station,Units 2 & 3, Technical Evaluation Rept ML20080E3311983-08-18018 August 1983 Proposed Tech Spec Changes for Inservice Surveillance of Safety-Related Hydraulics & Mechanical Snubbers at Peach Bottom Atomic Power Station,Units 2 & 3, Technical Evaluation Rept ML20093J2831983-06-30030 June 1983 Technical Evaluation of Integrity of Peach Bottom,Units 2 & 3 Reactor Coolant Boundary Piping Sys ML20071N2041983-05-17017 May 1983 Control of Heavy Loads,Peach Bottom Atomic Power Station, Units 2 & 3, Draft Technical Evaluation Rept ML20072S3191983-03-11011 March 1983 Rev 1 to Proposed Design Mods & Tech Spec Changes on Grid Voltage Degradation for Peach Bottom Atomic Power Station, Units 2 & 3, Technical Evaluation Rept ML20126E9941982-12-0707 December 1982 Containment Leak Rate Testing Investigations, Monthly Progress Rept for Nov 1982 ML20079G8831982-11-24024 November 1982 ECCS Repts (F-47):TMI Action Plan Requirements,Peach Bottom Atomic Power Station,Units 2 & 3, Technical Evaluation Rept ML20079L0551982-10-31031 October 1982 Containment Purging & Venting During Normal Operation of Peach Bottom Atomic Power Station,Units 2 & 3, Draft Technical Evaluation Rept ML20076C7731982-09-10010 September 1982 Inservice Insp Program, Technical Evaluation Rept ML20071L3801982-08-26026 August 1982 Improvements in Training & Requalification Programs as Required by TMI Action Items I.A.2.1 & II.B.4 for Peach Bottom Atomic Power Station, Technical Evaluation Rept ML20058H6581982-07-31031 July 1982 Socioeconomic Impacts of Nuclear Generating Stations:Peach Bottom Case Study.Docket Nos. 50-277 and 50-278. (Philadelphia Electric Company) ML20054M1531982-07-0101 July 1982 Adequacy of Station Electric Distribution Sys Voltages for Peach Bottom Atomic Power Station,Units 2 & 3, Technical Evaluation Rept 1998-05-11
[Table view] Category:QUICK LOOK
MONTHYEARML20247N5421998-05-11011 May 1998 Technical Evaluation Rept on Pump & Valve Inservice Testing Program:Peach Bottom Atomic Power Station,Units 2 & 3 ML20094C7411995-08-0404 August 1995 Individual Plant Exam Insight Support Rept for NUREG-1150 Plants L-95-037, Evaluation of Peach Bottom Atomic Power Station Units 2 & 3 Odcm,Rev 51995-07-31031 July 1995 Evaluation of Peach Bottom Atomic Power Station Units 2 & 3 Odcm,Rev 5 ML20070N3361994-03-31031 March 1994 Release of Radionuclides and Chelating Agents from CEMENT- Solidified Decontamination LOW-LEVEL Radioactive Waste Collected from the Peach Bottom Atomic Power Station Unit 3 ML20057E5061993-09-30030 September 1993 Severe Accident Source Term Characteristics for Selected Peach Bottom Sequences Predicted by the Melcor Code ML20058F9621993-08-31031 August 1993 Evaluation of Util Response to Suppl 1 to NRC Bulletin 90-01:Limerick-1/2 & Peach Bottom-2/3, Technical Evaluation Rept ML20028H6071990-12-31031 December 1990 Evaluation of Severe Accident Risks: Peach Bottom,Unit 2. Main Report ML20066C2721990-12-31031 December 1990 Analysis of Core Damage Frequency: Peach Bottom,Unit 2 External Events ML20028H6051990-12-31031 December 1990 Evaluation of Severe Accident Risks: Peach Bottom,Unit 2. Appendices ML20065Q3081990-11-30030 November 1990 Technical Evaluation Rept,Pump & Valve Inservice Testing Program,Peach Bottom Atomic Power Station Units 2 & 3 ML20247N6471989-08-31031 August 1989 Analysis of Core Damage Frequency: Peach Bottom, Unit 2, Internal Events Appendices ML20247M6631989-08-31031 August 1989 Analysis of Core Damage Frequency: Peach Bottom, Unit 2, Internal Events ML20206B1581988-10-31031 October 1988 Technical Evaluation:Peco Topical Rept PECO-RMS-004 `Methods for Performing BWR Sys Transient Analysis,Peach Bottom Atomic Power Station,Units 2 & 3.' ML20245D7911988-09-30030 September 1988 Dcrdr Onsite Meeting Rept for Philadephia Electric Co Peach Bottom Atomic Power Stations,Unit 2 & 3 ML20245D6681988-09-14014 September 1988 Dcrdr Preimplementation Audit Rept for Philadelphia Electric Co Peach Bottom Station,Units 2 & 3 ML20235V1521987-08-31031 August 1987 Technical Evaluation Rept,Reactor Trip Sys Reliability Conformance to Item 4.5.2 of Generic Ltr 83-28,Peach Bottom 2 & 3,Perry 1 & 2,Pilgrim 1,Quad Cities 1 & 2,River Bend 1, Shoreham,Susquehanna 1 & 2,Vermont Yankee & WNP-2 ML20237J1411987-08-17017 August 1987 Facility Sys Analysis Support, Progress Rept 23 for 870713 -0807 ML20236P5111987-07-31031 July 1987 Technical Evaluation Rept Fibwr & Tcppeco Computer Programs, Final Informal Rept ML20214U0401987-06-0909 June 1987 App D & Suppl a to App D, Evaluation of Licensee-Reported Revs to Offsite Dose Calculation Manual, Technical Evaluation Rept ML20234B6291987-05-31031 May 1987 Evaluation of Severe Accident Risks and the Potential for Risk Reduction:Peach Bottom,Unit 2.Appendices.Draft for Comment ML20234B5941987-04-30030 April 1987 Evaluation of Severe Accident Risks and the Potential for Risk Reduction:Peach Bottom,Unit 2.Main Report.Draft for Comment ML20214R3971987-03-31031 March 1987 Conformance to Generic Ltr 83-28,Item 2.2.1, 'Equipment Classification (All Other Safety-Related Components),' Peach Bottom 2 & 3, Informal Rept ML20206A2881987-02-28028 February 1987 Containment Venting Analysis for the Peach Bottom Atomic Power Station ML20212J9201986-10-31031 October 1986 Analysis of Core Damage Frequency from Internal Events:Peach Bottom Unit 2 ML20245A4481986-09-30030 September 1986 Revised Draft Conformance to Generic Ltr 83-28 Item 2.1 (Part 1) Equipment Classification Hope Creek,Peach Bottom 2 & 3,Perry 1 & 2 & Pilgrim 1 ML20206G8211986-05-12012 May 1986 Preliminary Draft Containment Event Analysis for Postulated Severe Accidents at Peach Bottom Atomic Power Station, for Review.Related Documentation Encl ML20140C2491986-01-0202 January 1986 Request for Info:Evaluation of Exemption Requests from 10CFR50.48 & 10CFR50,App R,Peach Bottom Atomic Power Stations,Units 2 & 3 ML20151P4161985-12-17017 December 1985 Dcrdr Validation Walkthrough Audit Results for Peach Bottom Atomic Power Station,Units 2 & 3 ML20141F6271985-09-30030 September 1985 Technical Evaluation Rept,Second Interval Inservice Insp Program,Peach Bottom Units 2 & 3 ML20128D8381985-05-15015 May 1985 Draft Review of Licensee & Applicant Responses to Generic Ltr 83-28,Item 1.2, 'Post-Trip Review:Data & Info Capabilities,' for Peach Bottom Atomic Power Station,Units 2 & 3, Technical Evaluation Rept ML20129A2411985-05-0101 May 1985 Addendum a to Technical Evaluation Rept,First-Interval Inservice Insp Program ML20126L1481985-03-31031 March 1985 Conformance to Reg Guide 1.97,Peach Bottom Atomic Power Station,Units 2 & 3 ML20115H1531985-03-22022 March 1985 Detailed Control Room Design Review In-Progress Audit Rept for Peach Bottom Atomic Power Station,Units 2 & 3 ML20106A6791984-09-12012 September 1984 Masonry Wall Design,Peach Bottom Atomic Power Station Units 2 & 3, Technical Evaluation Rept ML20106A6831984-08-31031 August 1984 Evaluation of Applicability of Nonlinear Analysis Techniques to Reinforced Masonry Walls in Nuclear Power Plants ML20106C4031984-07-31031 July 1984 Draft Vol II, Radionuclide Release Under Specific LWR Accident Conditions,Bwr,Mark I Design ML20126E6541984-07-31031 July 1984 Draft Containment Event Analysis & Estimation of Source Term Frequencies,App to NUREG-0956 ML20115D3441984-01-0404 January 1984 Data Collection & Evaluation of Proposed Spds,Peach Bottom Units 2 & 3 ML20076H3611983-08-31031 August 1983 Control of Heavy Loads (C-10),Philadelphia Electric Co, Peach Bottom Atomic Power Station,Units 2 & 3, Technical Evaluation Rept ML20080E3311983-08-18018 August 1983 Proposed Tech Spec Changes for Inservice Surveillance of Safety-Related Hydraulics & Mechanical Snubbers at Peach Bottom Atomic Power Station,Units 2 & 3, Technical Evaluation Rept ML20093J2831983-06-30030 June 1983 Technical Evaluation of Integrity of Peach Bottom,Units 2 & 3 Reactor Coolant Boundary Piping Sys ML20071N2041983-05-17017 May 1983 Control of Heavy Loads,Peach Bottom Atomic Power Station, Units 2 & 3, Draft Technical Evaluation Rept ML20072S3191983-03-11011 March 1983 Rev 1 to Proposed Design Mods & Tech Spec Changes on Grid Voltage Degradation for Peach Bottom Atomic Power Station, Units 2 & 3, Technical Evaluation Rept ML20126E9941982-12-0707 December 1982 Containment Leak Rate Testing Investigations, Monthly Progress Rept for Nov 1982 ML20079G8831982-11-24024 November 1982 ECCS Repts (F-47):TMI Action Plan Requirements,Peach Bottom Atomic Power Station,Units 2 & 3, Technical Evaluation Rept ML20079L0551982-10-31031 October 1982 Containment Purging & Venting During Normal Operation of Peach Bottom Atomic Power Station,Units 2 & 3, Draft Technical Evaluation Rept ML20076C7731982-09-10010 September 1982 Inservice Insp Program, Technical Evaluation Rept ML20071L3801982-08-26026 August 1982 Improvements in Training & Requalification Programs as Required by TMI Action Items I.A.2.1 & II.B.4 for Peach Bottom Atomic Power Station, Technical Evaluation Rept ML20058H6581982-07-31031 July 1982 Socioeconomic Impacts of Nuclear Generating Stations:Peach Bottom Case Study.Docket Nos. 50-277 and 50-278. (Philadelphia Electric Company) ML20054M1531982-07-0101 July 1982 Adequacy of Station Electric Distribution Sys Voltages for Peach Bottom Atomic Power Station,Units 2 & 3, Technical Evaluation Rept 1998-05-11
[Table view] Category:ETC. (PERIODIC
MONTHYEARML20247N5421998-05-11011 May 1998 Technical Evaluation Rept on Pump & Valve Inservice Testing Program:Peach Bottom Atomic Power Station,Units 2 & 3 ML20094C7411995-08-0404 August 1995 Individual Plant Exam Insight Support Rept for NUREG-1150 Plants L-95-037, Evaluation of Peach Bottom Atomic Power Station Units 2 & 3 Odcm,Rev 51995-07-31031 July 1995 Evaluation of Peach Bottom Atomic Power Station Units 2 & 3 Odcm,Rev 5 ML20070N3361994-03-31031 March 1994 Release of Radionuclides and Chelating Agents from CEMENT- Solidified Decontamination LOW-LEVEL Radioactive Waste Collected from the Peach Bottom Atomic Power Station Unit 3 ML20057E5061993-09-30030 September 1993 Severe Accident Source Term Characteristics for Selected Peach Bottom Sequences Predicted by the Melcor Code ML20058F9621993-08-31031 August 1993 Evaluation of Util Response to Suppl 1 to NRC Bulletin 90-01:Limerick-1/2 & Peach Bottom-2/3, Technical Evaluation Rept ML20028H6071990-12-31031 December 1990 Evaluation of Severe Accident Risks: Peach Bottom,Unit 2. Main Report ML20066C2721990-12-31031 December 1990 Analysis of Core Damage Frequency: Peach Bottom,Unit 2 External Events ML20028H6051990-12-31031 December 1990 Evaluation of Severe Accident Risks: Peach Bottom,Unit 2. Appendices ML20065Q3081990-11-30030 November 1990 Technical Evaluation Rept,Pump & Valve Inservice Testing Program,Peach Bottom Atomic Power Station Units 2 & 3 ML20247N6471989-08-31031 August 1989 Analysis of Core Damage Frequency: Peach Bottom, Unit 2, Internal Events Appendices ML20247M6631989-08-31031 August 1989 Analysis of Core Damage Frequency: Peach Bottom, Unit 2, Internal Events ML20206B1581988-10-31031 October 1988 Technical Evaluation:Peco Topical Rept PECO-RMS-004 `Methods for Performing BWR Sys Transient Analysis,Peach Bottom Atomic Power Station,Units 2 & 3.' ML20245D7911988-09-30030 September 1988 Dcrdr Onsite Meeting Rept for Philadephia Electric Co Peach Bottom Atomic Power Stations,Unit 2 & 3 ML20245D6681988-09-14014 September 1988 Dcrdr Preimplementation Audit Rept for Philadelphia Electric Co Peach Bottom Station,Units 2 & 3 ML20235V1521987-08-31031 August 1987 Technical Evaluation Rept,Reactor Trip Sys Reliability Conformance to Item 4.5.2 of Generic Ltr 83-28,Peach Bottom 2 & 3,Perry 1 & 2,Pilgrim 1,Quad Cities 1 & 2,River Bend 1, Shoreham,Susquehanna 1 & 2,Vermont Yankee & WNP-2 ML20237J1411987-08-17017 August 1987 Facility Sys Analysis Support, Progress Rept 23 for 870713 -0807 ML20236P5111987-07-31031 July 1987 Technical Evaluation Rept Fibwr & Tcppeco Computer Programs, Final Informal Rept ML20214U0401987-06-0909 June 1987 App D & Suppl a to App D, Evaluation of Licensee-Reported Revs to Offsite Dose Calculation Manual, Technical Evaluation Rept ML20234B6291987-05-31031 May 1987 Evaluation of Severe Accident Risks and the Potential for Risk Reduction:Peach Bottom,Unit 2.Appendices.Draft for Comment ML20234B5941987-04-30030 April 1987 Evaluation of Severe Accident Risks and the Potential for Risk Reduction:Peach Bottom,Unit 2.Main Report.Draft for Comment ML20214R3971987-03-31031 March 1987 Conformance to Generic Ltr 83-28,Item 2.2.1, 'Equipment Classification (All Other Safety-Related Components),' Peach Bottom 2 & 3, Informal Rept ML20206A2881987-02-28028 February 1987 Containment Venting Analysis for the Peach Bottom Atomic Power Station ML20212J9201986-10-31031 October 1986 Analysis of Core Damage Frequency from Internal Events:Peach Bottom Unit 2 ML20245A4481986-09-30030 September 1986 Revised Draft Conformance to Generic Ltr 83-28 Item 2.1 (Part 1) Equipment Classification Hope Creek,Peach Bottom 2 & 3,Perry 1 & 2 & Pilgrim 1 ML20206G8211986-05-12012 May 1986 Preliminary Draft Containment Event Analysis for Postulated Severe Accidents at Peach Bottom Atomic Power Station, for Review.Related Documentation Encl ML20140C2491986-01-0202 January 1986 Request for Info:Evaluation of Exemption Requests from 10CFR50.48 & 10CFR50,App R,Peach Bottom Atomic Power Stations,Units 2 & 3 ML20151P4161985-12-17017 December 1985 Dcrdr Validation Walkthrough Audit Results for Peach Bottom Atomic Power Station,Units 2 & 3 ML20141F6271985-09-30030 September 1985 Technical Evaluation Rept,Second Interval Inservice Insp Program,Peach Bottom Units 2 & 3 ML20128D8381985-05-15015 May 1985 Draft Review of Licensee & Applicant Responses to Generic Ltr 83-28,Item 1.2, 'Post-Trip Review:Data & Info Capabilities,' for Peach Bottom Atomic Power Station,Units 2 & 3, Technical Evaluation Rept ML20129A2411985-05-0101 May 1985 Addendum a to Technical Evaluation Rept,First-Interval Inservice Insp Program ML20126L1481985-03-31031 March 1985 Conformance to Reg Guide 1.97,Peach Bottom Atomic Power Station,Units 2 & 3 ML20115H1531985-03-22022 March 1985 Detailed Control Room Design Review In-Progress Audit Rept for Peach Bottom Atomic Power Station,Units 2 & 3 ML20106A6791984-09-12012 September 1984 Masonry Wall Design,Peach Bottom Atomic Power Station Units 2 & 3, Technical Evaluation Rept ML20106A6831984-08-31031 August 1984 Evaluation of Applicability of Nonlinear Analysis Techniques to Reinforced Masonry Walls in Nuclear Power Plants ML20106C4031984-07-31031 July 1984 Draft Vol II, Radionuclide Release Under Specific LWR Accident Conditions,Bwr,Mark I Design ML20126E6541984-07-31031 July 1984 Draft Containment Event Analysis & Estimation of Source Term Frequencies,App to NUREG-0956 ML20115D3441984-01-0404 January 1984 Data Collection & Evaluation of Proposed Spds,Peach Bottom Units 2 & 3 ML20076H3611983-08-31031 August 1983 Control of Heavy Loads (C-10),Philadelphia Electric Co, Peach Bottom Atomic Power Station,Units 2 & 3, Technical Evaluation Rept ML20080E3311983-08-18018 August 1983 Proposed Tech Spec Changes for Inservice Surveillance of Safety-Related Hydraulics & Mechanical Snubbers at Peach Bottom Atomic Power Station,Units 2 & 3, Technical Evaluation Rept ML20093J2831983-06-30030 June 1983 Technical Evaluation of Integrity of Peach Bottom,Units 2 & 3 Reactor Coolant Boundary Piping Sys ML20071N2041983-05-17017 May 1983 Control of Heavy Loads,Peach Bottom Atomic Power Station, Units 2 & 3, Draft Technical Evaluation Rept ML20072S3191983-03-11011 March 1983 Rev 1 to Proposed Design Mods & Tech Spec Changes on Grid Voltage Degradation for Peach Bottom Atomic Power Station, Units 2 & 3, Technical Evaluation Rept ML20126E9941982-12-0707 December 1982 Containment Leak Rate Testing Investigations, Monthly Progress Rept for Nov 1982 ML20079G8831982-11-24024 November 1982 ECCS Repts (F-47):TMI Action Plan Requirements,Peach Bottom Atomic Power Station,Units 2 & 3, Technical Evaluation Rept ML20079L0551982-10-31031 October 1982 Containment Purging & Venting During Normal Operation of Peach Bottom Atomic Power Station,Units 2 & 3, Draft Technical Evaluation Rept ML20076C7731982-09-10010 September 1982 Inservice Insp Program, Technical Evaluation Rept ML20071L3801982-08-26026 August 1982 Improvements in Training & Requalification Programs as Required by TMI Action Items I.A.2.1 & II.B.4 for Peach Bottom Atomic Power Station, Technical Evaluation Rept ML20058H6581982-07-31031 July 1982 Socioeconomic Impacts of Nuclear Generating Stations:Peach Bottom Case Study.Docket Nos. 50-277 and 50-278. (Philadelphia Electric Company) ML20054M1531982-07-0101 July 1982 Adequacy of Station Electric Distribution Sys Voltages for Peach Bottom Atomic Power Station,Units 2 & 3, Technical Evaluation Rept 1998-05-11
[Table view] Category:TEXT-PROCUREMENT & CONTRACTS
MONTHYEARML20247N5421998-05-11011 May 1998 Technical Evaluation Rept on Pump & Valve Inservice Testing Program:Peach Bottom Atomic Power Station,Units 2 & 3 ML20094C7411995-08-0404 August 1995 Individual Plant Exam Insight Support Rept for NUREG-1150 Plants L-95-037, Evaluation of Peach Bottom Atomic Power Station Units 2 & 3 Odcm,Rev 51995-07-31031 July 1995 Evaluation of Peach Bottom Atomic Power Station Units 2 & 3 Odcm,Rev 5 ML20070N3361994-03-31031 March 1994 Release of Radionuclides and Chelating Agents from CEMENT- Solidified Decontamination LOW-LEVEL Radioactive Waste Collected from the Peach Bottom Atomic Power Station Unit 3 ML20057E5061993-09-30030 September 1993 Severe Accident Source Term Characteristics for Selected Peach Bottom Sequences Predicted by the Melcor Code ML20058F9621993-08-31031 August 1993 Evaluation of Util Response to Suppl 1 to NRC Bulletin 90-01:Limerick-1/2 & Peach Bottom-2/3, Technical Evaluation Rept ML20028H6071990-12-31031 December 1990 Evaluation of Severe Accident Risks: Peach Bottom,Unit 2. Main Report ML20066C2721990-12-31031 December 1990 Analysis of Core Damage Frequency: Peach Bottom,Unit 2 External Events ML20028H6051990-12-31031 December 1990 Evaluation of Severe Accident Risks: Peach Bottom,Unit 2. Appendices ML20065Q3081990-11-30030 November 1990 Technical Evaluation Rept,Pump & Valve Inservice Testing Program,Peach Bottom Atomic Power Station Units 2 & 3 ML20247N6471989-08-31031 August 1989 Analysis of Core Damage Frequency: Peach Bottom, Unit 2, Internal Events Appendices ML20247M6631989-08-31031 August 1989 Analysis of Core Damage Frequency: Peach Bottom, Unit 2, Internal Events ML20206B1581988-10-31031 October 1988 Technical Evaluation:Peco Topical Rept PECO-RMS-004 `Methods for Performing BWR Sys Transient Analysis,Peach Bottom Atomic Power Station,Units 2 & 3.' ML20245D7911988-09-30030 September 1988 Dcrdr Onsite Meeting Rept for Philadephia Electric Co Peach Bottom Atomic Power Stations,Unit 2 & 3 ML20245D6681988-09-14014 September 1988 Dcrdr Preimplementation Audit Rept for Philadelphia Electric Co Peach Bottom Station,Units 2 & 3 ML20235V1521987-08-31031 August 1987 Technical Evaluation Rept,Reactor Trip Sys Reliability Conformance to Item 4.5.2 of Generic Ltr 83-28,Peach Bottom 2 & 3,Perry 1 & 2,Pilgrim 1,Quad Cities 1 & 2,River Bend 1, Shoreham,Susquehanna 1 & 2,Vermont Yankee & WNP-2 ML20237J1411987-08-17017 August 1987 Facility Sys Analysis Support, Progress Rept 23 for 870713 -0807 ML20236P5111987-07-31031 July 1987 Technical Evaluation Rept Fibwr & Tcppeco Computer Programs, Final Informal Rept ML20214U0401987-06-0909 June 1987 App D & Suppl a to App D, Evaluation of Licensee-Reported Revs to Offsite Dose Calculation Manual, Technical Evaluation Rept ML20234B6291987-05-31031 May 1987 Evaluation of Severe Accident Risks and the Potential for Risk Reduction:Peach Bottom,Unit 2.Appendices.Draft for Comment ML20234B5941987-04-30030 April 1987 Evaluation of Severe Accident Risks and the Potential for Risk Reduction:Peach Bottom,Unit 2.Main Report.Draft for Comment ML20214R3971987-03-31031 March 1987 Conformance to Generic Ltr 83-28,Item 2.2.1, 'Equipment Classification (All Other Safety-Related Components),' Peach Bottom 2 & 3, Informal Rept ML20206A2881987-02-28028 February 1987 Containment Venting Analysis for the Peach Bottom Atomic Power Station ML20212J9201986-10-31031 October 1986 Analysis of Core Damage Frequency from Internal Events:Peach Bottom Unit 2 ML20245A4481986-09-30030 September 1986 Revised Draft Conformance to Generic Ltr 83-28 Item 2.1 (Part 1) Equipment Classification Hope Creek,Peach Bottom 2 & 3,Perry 1 & 2 & Pilgrim 1 ML20206G8211986-05-12012 May 1986 Preliminary Draft Containment Event Analysis for Postulated Severe Accidents at Peach Bottom Atomic Power Station, for Review.Related Documentation Encl ML20140C2491986-01-0202 January 1986 Request for Info:Evaluation of Exemption Requests from 10CFR50.48 & 10CFR50,App R,Peach Bottom Atomic Power Stations,Units 2 & 3 ML20151P4161985-12-17017 December 1985 Dcrdr Validation Walkthrough Audit Results for Peach Bottom Atomic Power Station,Units 2 & 3 ML20141F6271985-09-30030 September 1985 Technical Evaluation Rept,Second Interval Inservice Insp Program,Peach Bottom Units 2 & 3 ML20128D8381985-05-15015 May 1985 Draft Review of Licensee & Applicant Responses to Generic Ltr 83-28,Item 1.2, 'Post-Trip Review:Data & Info Capabilities,' for Peach Bottom Atomic Power Station,Units 2 & 3, Technical Evaluation Rept ML20129A2411985-05-0101 May 1985 Addendum a to Technical Evaluation Rept,First-Interval Inservice Insp Program ML20126L1481985-03-31031 March 1985 Conformance to Reg Guide 1.97,Peach Bottom Atomic Power Station,Units 2 & 3 ML20115H1531985-03-22022 March 1985 Detailed Control Room Design Review In-Progress Audit Rept for Peach Bottom Atomic Power Station,Units 2 & 3 ML20106A6791984-09-12012 September 1984 Masonry Wall Design,Peach Bottom Atomic Power Station Units 2 & 3, Technical Evaluation Rept ML20106A6831984-08-31031 August 1984 Evaluation of Applicability of Nonlinear Analysis Techniques to Reinforced Masonry Walls in Nuclear Power Plants ML20106C4031984-07-31031 July 1984 Draft Vol II, Radionuclide Release Under Specific LWR Accident Conditions,Bwr,Mark I Design ML20126E6541984-07-31031 July 1984 Draft Containment Event Analysis & Estimation of Source Term Frequencies,App to NUREG-0956 ML20115D3441984-01-0404 January 1984 Data Collection & Evaluation of Proposed Spds,Peach Bottom Units 2 & 3 ML20076H3611983-08-31031 August 1983 Control of Heavy Loads (C-10),Philadelphia Electric Co, Peach Bottom Atomic Power Station,Units 2 & 3, Technical Evaluation Rept ML20080E3311983-08-18018 August 1983 Proposed Tech Spec Changes for Inservice Surveillance of Safety-Related Hydraulics & Mechanical Snubbers at Peach Bottom Atomic Power Station,Units 2 & 3, Technical Evaluation Rept ML20093J2831983-06-30030 June 1983 Technical Evaluation of Integrity of Peach Bottom,Units 2 & 3 Reactor Coolant Boundary Piping Sys ML20071N2041983-05-17017 May 1983 Control of Heavy Loads,Peach Bottom Atomic Power Station, Units 2 & 3, Draft Technical Evaluation Rept ML20072S3191983-03-11011 March 1983 Rev 1 to Proposed Design Mods & Tech Spec Changes on Grid Voltage Degradation for Peach Bottom Atomic Power Station, Units 2 & 3, Technical Evaluation Rept ML20126E9941982-12-0707 December 1982 Containment Leak Rate Testing Investigations, Monthly Progress Rept for Nov 1982 ML20079G8831982-11-24024 November 1982 ECCS Repts (F-47):TMI Action Plan Requirements,Peach Bottom Atomic Power Station,Units 2 & 3, Technical Evaluation Rept ML20079L0551982-10-31031 October 1982 Containment Purging & Venting During Normal Operation of Peach Bottom Atomic Power Station,Units 2 & 3, Draft Technical Evaluation Rept ML20076C7731982-09-10010 September 1982 Inservice Insp Program, Technical Evaluation Rept ML20071L3801982-08-26026 August 1982 Improvements in Training & Requalification Programs as Required by TMI Action Items I.A.2.1 & II.B.4 for Peach Bottom Atomic Power Station, Technical Evaluation Rept ML20058H6581982-07-31031 July 1982 Socioeconomic Impacts of Nuclear Generating Stations:Peach Bottom Case Study.Docket Nos. 50-277 and 50-278. (Philadelphia Electric Company) ML20054M1531982-07-0101 July 1982 Adequacy of Station Electric Distribution Sys Voltages for Peach Bottom Atomic Power Station,Units 2 & 3, Technical Evaluation Rept 1998-05-11
[Table view] |
Text
-. -
\.
SAIC-85/1519-3 DRAFI REVIEW OF LICENSEE AND APPLICANT RESPONSES TO NRC GENERIC LETTER 83-28 (Required Actions Based on Generic Implications of Salem ATWS Events) Item 1.2
" POST-TRIP REVIEW: DATA AND INFORMATION CAPABILITIES" FOR PEACH BOTTOM ATOMIC POWER STATION, UNITS 2 AND 3 (50-277. 50-278)
Technical Evaluation Report Prepared by Science Applications International Corporation 1710 Goodridge Drive McLean, Virginia 22102 Prepared for U.S. Nuclear Regulatory Comission Washington, D.C. 20555 Contract No. NRC-03-82-096 i
8505290220 850515 yDR ADOCK 05000277 PDR
FOREWORD This report contains the technical evaluation of the Peach Bottom Atomic Power Station responses to Generic Letter 83-28 (Required Actions Based on Generic Implications of Salem ATWS Events) Item 1.2 " Post Trip Review: Data and Information Capabilities."
For the purposes of this evaluation, the review criteria, presented in part 2 of this report, were divided into five separate categories. These are:
- 1. The parameters monitored by the sequence of events and the time history recorders,
- 2. The performance characteristics of the sequence of events recorders,
- 3. The performance characteristics of the time history recorders,
- 4. The data output format, and
- 5. The long-term data retention capability for post-trip review material.
All available responses to Generic Letter 83-28 were evaluated. The plant for which this report is applicable was found to have adequately responded to, and met, category 4. g The report describes the specific methods used to det mine the cate-gorization of the responses to Generic Letter 83-28. Sine this evaluation report was intended to apply to more than one nuclear pow r plant specifics regarding how each plant met (or failed to meet) the r:q:f e eate are not presented. Instead, the evaluation presents a categorization of the responses according to which categories of ;;;ef e eats are satisfied and which are not. The evaluations are based on' specific criteria (Section 2) derived from the requirements as stated in the generic letter, re. vie.w m Q
TABLE OF CONTENTS .
Section- Page Introduction. . . . . . . . . . . . . . . . . . . . . . . . . I
- 1. Background. . . . . . . . . . . . . . . . . . . . . . . . . . 2
- 2. Review Criteria . . . . . . . . . . . . . . . . . . . . . . . 3
- 3. Evaluation. . . . . . . . . . . . . . . . . . . . . . . . . . 8
- 4. Conclusion. . . . . . . . . . . . . . . . . . . . . . . . . . 9
- 5. References. . . . . . . . . . . . . . . . . . . . . . . . . . 10
- 6. Jc/#eeJ2W 6- Bo 0 vMuer r=e4e 7r cewy . . . . . , , , , l(
. l 1
e 4
d 4
- m , , , , -- ----,,--,,,,,-,,w,,,,,,------
, - , -,r- ,--g-, ,. mea----,- p.,-e,- , - , , m.-, ,, ,,, + - - n.mr-,m-,,-w -m--v -r-.-e ----e ,,w-,- - - - -----,v--- n
l l
INTRODUCTION U
SAIC has reviewed the,ltdTs's submTttals prepared in response to Generic Letter i 83-28, item 1.2 " Post-Trip Review: Data and Information Capability",
. The submittals (see references) contained sufficient information to determine that the' data and information capabilities at this plant are acceptable in the following area.
e The output format of the recorded data.
However, the data and information capabilities, as described in the submittal, either fail to meet the review criteria or provide insufficient information to allow determination of the adequacy of the data and information capabilities in the following areas.
e The parameters monitored by both the sequence-of-events and time history recorders.
e The sequence-of-events recorder (s) performance charac-I teristics.
e The time history recorder (s) performance characteris-tics.
l e The long-term data retention, record keeping, capa-bility.
4 1
- 1. Background On February 25, 1984, both of the scram circuit breakers it Unit 1 of ,l l
the Salem Nuclear Power Plant failed to open upon an automatic reactor trip signal from the reactor protection system. This incident occurred during the plant startup and the reactor was tripped manually by the operator about 30 seconds after the initiation of the automatic trip signal. The failure
)
of the circuit breakers has been determined to be related to the sticking of j the under voltage trip attachment. Prior to this incident; on February 22,
) 1983; at Unit 1 of the Salem Nuclear Power Plant an automatic trip signal
] was generated based on steam generator low-low level during plant startup.
In this case the reactor was tripped manually by the operator almost coinci-
{
dentally with the automatic trip. At that time, because the utility did not I have a requirement for the systematic evaluation of the reactor trip, no j investigation was performed to determine whether the reactor was tripped automatically as expected or manually. The utilities' written procedures l required only that the cause of the trip be determined and identified the )
responsible personnel that could authorize a restart if the cause of the trip is known. Following the second trip which clearly indicated the problem with the trip breakers, the question was raised on whether the l circuit breakers had functioned properly during the earlier incident. The most useful source of information in this case, namely the sequence of
- events printout which would have indicated whether the reactor was tripped i automatically or manually during the February 22 incident, was not retained after the incident. Thus, no ju.dgment on the proper functioning of the trip system during the earlier incident could be made.
l Following these incidents; on February 28, 1983; the NRC Executive Director for Operations (EDO), directed the staff to investigate and report j on the generic implications of these occurrences at Unit 1 of the Salem Nuclear Power Plant.' The results of the staff's inquiry into the generic j i implications of the Salem Unit incidents is reported in NUREG-1000. " Generic Implications of ATWS Events at the Salem Nuclear Power Plant." Based on the 1 results of this study, a set of required actions were developed and included in Generic Letter 83-28 which was issued on July 8,1983 and sent to all I
licensees of operating reactors, applicants for operating license, and construction permit holders. The required actions in this generic letter consist of four categories. These are: (1) Post-Trip Review. (2) Equipment 2 ;
i
. . _ . - - , _ _ _ _ . _ . . . _ _ _ , . - _ - _ . , . . . . . , _ , _ _ ,____.-......,,,_-,___.-m _-,,_,., _ . - _ _ . _ , . - ..
Classification and Vender Interface, (3) Post Maintenance Testing, and (4)
Reactor Trip System Reliability Improvements. ~
.. O The first required action of the generic letter, Post-Trip Review, is the subject of this TER and consists of action item 1.1 " Program Description and Procedure" and action item 1.2 " Data and Information Capability." In the next section the review criteria used to assess the adequacy of the utilities' responses to the requirements of action item 1.2 will be 0 discussed.
- 2. Review Criteria The intent of the Post Trip Review requirements of Generic Letter 83-28 is to ensure that the licensee has adequpfe procedures and data and j v
information sources to understand the causen,tnd progression of a reactor trip. This understanding should go beyond a simple identification of the course of the event. It should include the capability to determine the root cause of the reactor trip and to determine whether safety limits have been exceeded and if so to what extent. Sufficient information about the reactor trip event should be available so that a decision on the acceptability of a reactor restart can be made. .
The following are the review criteria developed for the requirements of Generic Letter 83-28, action item 1.2:
The equipment that provides the digital sequence of events (SOE) record
- and the analog time history records of an unscheduled shutdown should pro-vide a reliable source of the necessary information to be used in the post trip review. Each plant variable which is necessary to determine the cause(s) and progression of the event (s) following a plant trip should be 5
monitored by at least one recorder {such as a sequence-of-events recorder or a plant process computer for digital parameters; and strip charts, a plant process computer or analog recorder for analog (time history) variabled Ea.ch device used to record an analog or digital plant variable should be described in sufficient detail so that a determination can be made as to whether the following performance characteristics are met:
3
. 1 MM e Each sequence-of-events recorder should be capable of detecting and recording the- sequence of events with a sufficient time discrimination capability to ensure that the time reshnser-asso- d ciated with each monitored safety-related system can be ascer- 1 tained, and that a determination can be made as to whether the time response is within acceptable limits based on
. FSAR Chapter 15 Accident Analyses. The recommended guideline for the SOE time discrimination is approxi-mately 100 usec. If current SOE recorders do not have this time discrimination capability the licensee or applicant should show that the current time discrimination capability is sufficient for an adequate reconstruction of the course of the reactor trip. As a minimum this should include the ability to adequately recon-struct the accident scenarios presented in Chapter 15 of the plant
! FSAR.
e Each analog time history data recorder should have a sample inter-val small enough so that the incident can be accurately reconstructed following a reactor trip. As a minimum, the licensee or applicant should be able to reconstruct the course of
- the accident sequences evaluated in the accident analysis of the
- plant FSAR (Chapter 15). The recommended guideline for the sample interval is 10 sec. If the time history equipment does not meet this guideline, the licensee or applicant should show that the current time history capability is sufficient to accurately recon-I struct the accident se'quences presented in Chapter 15 of the FSAR.
e To support the post trip analysis of the cause of the trip and the proper functioning of involved safety related equipment, each
! analog time history data recorder should be capable of updating and retaining information from approximately five minutes prior to 2
the trip until at least ten minutes after the trip.
e The information gathered by the sequence-of-events and time history data collectors should be stored in a manner that will i allow for retrieval and analysis. The data may be retained in either hardcopy (computer printout, strip chart output, etc.)
or in an accessible memory (magnetic disc or tape). This 4
l
- , , - ,------,--,,-+,w--e n.,-,--n , . . . . - - . . . , - ~ - --.,.~,--.,--........._.--,,-..._--....__,.-,___--n.-,n--..<.-n
' ~
I information should be presented in a readable and meaningful format, taking into consideration good human factors, practices (such as 'those outlined in NUREG-0700).
s All equipment used to record sequence of events and time history 4 information should be powered from a reliable and non-interruptible power source. The power source used need not be
- safety related.
4 The sequence of events and time history recording equipment should monitor sufficient digital and analog parameters, respectively, to assure that the course of the reactor trip can be reconstructed. .The parameters monitored should provide sufficient information to determine the root cause of the reactor trip, the progression of the reactor trip, and the response <
- of the plant parameters and systems to the reactor trip. Specifically, all input parameters associated with reactor trips, safety injections and other safety-related systems as well as output parameters sufficient to record the ,
proper functioning of these systems should be recorded for use in the post trip review. The parameters deemed necessary, as a minimum, to perform a post-trip review (onesthat would determine if the plant remained within its
$ design envelope) are presented on Tables 1.2-1 and 1.2-2. If the appli-cants' or licensees' SOE recorders and time history recorders do not monitor
~
all of the parameters suggested in these tables the applicant or licensee should show that the existing set of monitored parameters are sufficient to establish that the plant remaine,d within the design envelope for the appro- i priate accident conditions; such as those analyzed in Chapter 15 of the plant Safety Analysis Report. 1
^
l
- Information gathered during the post trip review is required input for 1 future post trip reviews. Data from all unscheduled shutdowns provides a valuable reference sourse for the determination of the acceptability of the i plant vital parameter and equipment response to future unscheduled shut '
downs. It is therefore necessary that information gathered during all post trip reviews be maintained in an accessible manner for the life of the plant.
I 5 i
- . - . . . _ , _ . . . ,. m,_-- _ . . _ _ . . . _ . _ . - - _ . , . _ . _ _ . - _ , , - - - - _ , _ . , _ _ _ . . _ - - _ - , _ __ _ - - - . . _
Table 1.2-1. PWR Parameter List SOE Time History Recorder Recorder Parameter / Signal (Q x Reactor Trip (1) x Safety Injection x Containment Isolation (1) x Turbine Trip x Control Rod Position
-(1) x x Neutron Flux, Power x E Containment Pressure (2) Containment Radiation x Containment Sump Level (1)x x Primary System Pressure (1)x x Primary System Temperature (1) x Pressurizer Level (1)x Reactor Coolant Pump Status (1) x x Primary System Flow (3) Safety Inj.; Flow. Pump / Valve Status x MSIV Position
^
x x Steam Generator Pressure (1)x x Steam Generator Level (1) x x Feedwater Flow (1)x x . Steam Flow (3). Auxiliary Feedwater System; Flow.
Pump /Value Status i x AC and DC System Status-(Bus Voltage)
'~
4 x Diesel Generator Status (Start /Stop,
!, On/Off) i x PORV Position f
(1.): Trip parameters (2): Parameter may be monitored by either an SOE or time history recorder.
(3): Acceptable recorder options are: (a) system flow recorded on an SOE recorder, (b) system flow recorded on a time history recorder, or (c)
, equipment status recorded on an SOE recorder.
i i
! 6
n Table 1.2-2. .BWR Parameter List
~
SOE Time History -
l Recorder Recorder Parameter / Signal x Reactor Trip i x Safety Injection 4 x Containment Isolation x Turbine Trip x Control Rod Position x (1) x Neutron Flux, Power x (1) Main Steam Radiation (2) Containment (DryWell) Radiation x (1) x Drywell Pressure (Containment Pressure) l- (2) Suppression Pool Temperature x (1) x Primary System Pressure s j x (1) x Primary System Level x MSIV Position x (1) Turbine Stop Valve / Control Valve Position x Turbine Bypass Valve Position f x Feedwater Flow x Steam Flow i (3) Recirculation; Flow. Pump Status
, x (1) Scram Discharge Level x (1) ,
Condenser Vacuum x AC and DC System Status (Bus Voltage)
(3)(4) Safety Injection; Flow. Pump / Valve Status x Diesel Generator Status (On/0ff, Start /Stop) i (1): Trip parameters.
(2): Parameter may be recorded by either an 50E or time history recorder.
(3): Acceptable recorder options are: (a) system flow recorded on an SOE recorder, (b) system flow recorded on a time history recorder, or (c) equipment status recorded on an SOE recorder.
(4): Includes recording of parameters for all applicable systems from the l
l following: HPCI, LPCI, LPCS, IC, RCIC.
]
1 l
__ ,. _ _ _ _ _ _ l _ ..,_. _, -
- 3. Evaluation h
The parameters identified in part 2 of this report as a part of the ,
review criteria are those deemed necessary to perform an adequate post-trip l review. The recording of these parameters on equipment that meets the l guidelines of the review criteria will result in a source of information that can be used to determine the cause of the reactor trip and the plant response to the trip, including the responses of important plant systems. l The parameters identified in this submittal as being recorded by the sequence of events and time history recorders do not correspond to the j parameters specified in part 2 of this report.
l i
l The review criteria require that the equipment being used to record the sequence of events and time history data required for a post-trip review '
meet certain performance characteristics. These characteristics are !
j intended to ensure that, if the proper parameters are recorded, the record- 1 ing equipment will provide an adequate source of information for an effec-tive post-trip review. The information provided in this submittal does not indicate that either the time history or SOE equipment used would meet the intent of the performance criteria outlined in part 2 of this report.
The data and information recorded for use in the post-trip review !
should be output in a format that allows for ease of identification and use of the data to meet the review criterion that calls for information in a readable and meaningful format. The information contained in this submittal i
, indicates that this requirement is met.
The data and information used during a post-trip review should be retained as part of the plant files. This informa ry ion could prove useful so n g
- during future post-trip reviews. Therefore, one t is that infor-mation used during a post-trip review be maintained in an accessible manner for the life of the plant. The information contained within this submittal 1 does not indicate that this criterion will be met.
4 4
l' ,
8
- . - .w. -. - - - - ..r----y-4.,-t--,-ymerwww-w,.,--.--, -
,w .-,---,.-r ,,,,y-
.em e.. 3._-,+-n....., -..,...v-- .
.---wm-:
- 4. Conclusion
-The information supplied in response to Generic Letter 83-28 indicates that the current post-trip review data and information capabilities are edequate in the following area:
- 1. The recorded data is output in a readable and meaningful format.
The information supplied in response to Generic Letter 83-28 does not indicate that the post-trip review data and information capabilities are adequate in the following areas.
- 1. Based upon the information contained in the submittal, all of the parameters specified in part 2 of this report that should be recorded for use in a post-trip review are not recorded.
- 2. Time history recorders, as described in the submittal, do not meet the minimum performance characteristics.
l 3. The sequence of events recorders, as described in the submittal, do not meet the minimum performance requirements.
+-
- 4. The data retention procedures, as described in the submittal, do not indicate that the information recorded for the post-trip
[ review is maintained in an accessible manner for the life of the plant.
It is possible that the current data and information capabil tje,sgt nuclear power plant are adequate to meet the intent of these ;;r.t s . 7:wir;;gs A
but were not completely described. Under these circumstances, the licensee should provide an updated, more complete, description to show in more detail the data and information capabilities at this nuclear power plant. If the information provided accurately represents all current data and information capabilties, then the licensee should either show that the data and informa-tion. capabilities meet the intent of the criteria in part 2 of this report, or detail future modifications that would enable the licensee to meet the i
intent of the evaluation criteria.
I 9
- . . ._. - .- - _ _ - - _ _ - - . , - - - ------ . _ _ = _ - - . _ - - - - _ -
~
REFERENCES NRC Generic Letter 83-28. " Letter to all licensees of operating reactors, applicants for operating license, and holders of construction permits regarding Required Actions 8ased on Generic Implications of Salem ATWS Events." July 8, 1983.
NUREG-1000. Generic Implications of ATWS Events at the Salem Nuclear Power Plant. April 1983.
i Letter from S.L. Daltroff Philadelphia Electric Company, to D.G.
Eisenhut, NRC, dated November 4,1983, . Accession Number 8311090209 in response to Generic Letter 83-28 of July 8,1983, with attachment.
Letter from S.L. Daltroff, Philadelphia Electric Company, to D.G.
Eisenhut, NRC, dated April 23, 1984 Accession Number 8404270100 providing supplemental response to Generic Letter 83-28 of July 8, 1983.
i d
e l
l l
i I
l 10
+
l l
d0 //0472#& 0ocan<#r & mek,ew ' DRIFT l
Peach Bottom l l 1. Parameters recorded: Unsatisfactory See attached table for discrepancies.
- 2. SOE recorders performance characteristics: Unsatisfsctory
- Plant process computer
- (two CPUs provide redundancy) time discrimina-l tion of Ims but power supply is not specified
- 3. Time history recorders performance characteristics: Unsatisfactory l
Plant process computer: sample interval of 1 minute for the period from 20 minutes pre-trip to 20 minutes post-trip, power supply is not specified Strip charts are also used,1:ut little or no information is provided.
- 4. Data output format: Satisfactory SOE data: output includes time, event descriptor, and data point ID Analog data: output includes time, parameter value and name, and sensor ID i
- 5. Data retention capability: Unsatisfactory No information is provided.
l l
II
yW
- Bagtf$id BWR Parameters for Post Trip Review (circled parameters are not recorded)
~
SOE Time History '
Recorder Recorder Parameter / Signal x_ Reactor Trip
@ Safety Injection
@ Containment Isolation x Turbine Trip
@ Control Rod Position x (1) ,
x Neutron Flux, Power l Main Steam Radiation j
@ @(1) Containment (Dry Well) Radiation x (1) x Drywell Pressure (Containment Pressure)
(2)- Suppression Pool Temperature x (1) x Primary System Pressure x (1) @ Primary System Level x MSIV Position x'(1) Turbine Stop Valve / Control Valve Position x Turbine Bypass Valve Position x Feedwater Flow x Steam Flow (3) Recirculation; Flow. Pump Status x (1) Scram Discharge Level x (1) Condenser Vacuum AC and DC System Status
@ x
@ (4) Safety Injection; Flow. Pump / Valve Status Diesel Generator Status l
l (1): Trip parameters.
! (2): Parameter may be recorded by either an SOE or time history recorder. l (3): Acceptable recorder options are: (a) system flow recorded on an SOE I recorder (b) system flow recorded on a time history recorder, or l (c) equipment status recorded on an SOE recorder. l (4): Includes recording of parameters for all applicable systems from the j following: HPCI, LPCI, LPCS, IC, RCIC.
I l