| | | Reporting criterion |
|---|
| 05000298/LER-1992-001, :on 920111,both Pumps Exceeded Setpoints of High Flow Isolation Switch.Caused by Insufficient Throttling of Valve.Group 3 Isolation Was Reset & B Pump Placed Into Operation |
- on 920111,both Pumps Exceeded Setpoints of High Flow Isolation Switch.Caused by Insufficient Throttling of Valve.Group 3 Isolation Was Reset & B Pump Placed Into Operation
| 10 CFR 50.73(a)(2)(iv), System Actuation |
| 05000298/LER-1992-002, :on 920203 & 4,reactor Vessel Water Setpoint Inaccuracy Resulted from Reference Leg Temp Effects That Had Not Been Correctly Addressed.Setpoint Calculations Were Performed |
- on 920203 & 4,reactor Vessel Water Setpoint Inaccuracy Resulted from Reference Leg Temp Effects That Had Not Been Correctly Addressed.Setpoint Calculations Were Performed
| 10 CFR 50.73(a)(2)(v), Loss of Safety Function 10 CFR 50.73(a)(2)(vii), Common Cause Inoperability 10 CFR 50.73(a)(2)(1) |
| 05000298/LER-1992-003, Provides Supplemental Info on Rev 0 to LER 92-003 Re Degradation in safety-related Battery Cells,Per NRC Info Notice 89-017.Existing Monitoring of Battery Cells Provides Ample Advanced Notification of Need to Replace Cells | Provides Supplemental Info on Rev 0 to LER 92-003 Re Degradation in safety-related Battery Cells,Per NRC Info Notice 89-017.Existing Monitoring of Battery Cells Provides Ample Advanced Notification of Need to Replace Cells | |
| 05000298/LER-1992-004, :on 920210,Group 3 Isolation Occurred on High Reactor Water Cleanup Temp.Caused by Failure to Maintain Interim Corrective Actions.Operating Procedures Revised & Isolation Was Reset |
- on 920210,Group 3 Isolation Occurred on High Reactor Water Cleanup Temp.Caused by Failure to Maintain Interim Corrective Actions.Operating Procedures Revised & Isolation Was Reset
| 10 CFR 50.73(a)(2)(iv), System Actuation |
| 05000298/LER-1992-005, :on 920325,RCIC Sys Declared Inoperable Due to Evidence of Water in Turbine Casing.Caused by Malfunctioning Turbine Exhaust Line Steam Trap.Steam Trap Removed & Cleaned & Internals Installed |
- on 920325,RCIC Sys Declared Inoperable Due to Evidence of Water in Turbine Casing.Caused by Malfunctioning Turbine Exhaust Line Steam Trap.Steam Trap Removed & Cleaned & Internals Installed
| |
| 05000298/LER-1992-006, :on 920407,250-volt Battery Charger 1B Input Breaker Tripped.On 920408,250-volt Battery Charger 1A Tripped.Charger 1A Trip Due to Inadequate Preventive Maint. Relay K-3 Replaced & Calibr |
- on 920407,250-volt Battery Charger 1B Input Breaker Tripped.On 920408,250-volt Battery Charger 1A Tripped.Charger 1A Trip Due to Inadequate Preventive Maint. Relay K-3 Replaced & Calibr
| 10 CFR 50.73(a)(2)(1) |
| 05000298/LER-1992-007, :on 920420,Shutdown Cooling Isolation Valves Automatically Closed.Caused by Void Formation & Collapse in RHR Lines.Pressure in Vessel Was Increased & Isolation Valve Opened |
- on 920420,Shutdown Cooling Isolation Valves Automatically Closed.Caused by Void Formation & Collapse in RHR Lines.Pressure in Vessel Was Increased & Isolation Valve Opened
| 10 CFR 50.73(a)(2)(iv), System Actuation |
| 05000298/LER-1992-008, :on 920611,HPCI Sys Determined Inoperable When Pump Suction Valve from Torus Would Not Stroke Properly. Caused by Worn Bronze Stem Nut Internal Diameter Threads. Nut Replaced,Operator Reinstalled & Settings Adjusted |
- on 920611,HPCI Sys Determined Inoperable When Pump Suction Valve from Torus Would Not Stroke Properly. Caused by Worn Bronze Stem Nut Internal Diameter Threads. Nut Replaced,Operator Reinstalled & Settings Adjusted
| 10 CFR 50.73(a)(2)(v), Loss of Safety Function |
| 05000298/LER-1992-008-01, :on 920611,HPCI Sys Discovered Inoperable Due to Stem Nut Wear of Mov.Worn Stem Nut Replaced.Independent Failure Evaluation of Stripped Stem Nut Being Performed.W/ |
- on 920611,HPCI Sys Discovered Inoperable Due to Stem Nut Wear of Mov.Worn Stem Nut Replaced.Independent Failure Evaluation of Stripped Stem Nut Being Performed.W/
| |
| 05000298/LER-1992-009, :on 920611,noncompliance w/10CFR50 App R, Failure of Post Fire Safe Shutdown Equipment Discovered. Caused by Inadequate Alternate Shutdown (ASD) Design Criteria.Asd Procedures Revised |
- on 920611,noncompliance w/10CFR50 App R, Failure of Post Fire Safe Shutdown Equipment Discovered. Caused by Inadequate Alternate Shutdown (ASD) Design Criteria.Asd Procedures Revised
| 10 CFR 50.73(a)(2) |
| 05000298/LER-1992-010, :on 920621,during Performance of Surveillance Procedure CR HVAC Emergency Bypass Inlet Valve Failed to Actuate Correctly.Caused by Failure of Pneumatic Relay in Control Circuit.Temporary Mod Installed |
- on 920621,during Performance of Surveillance Procedure CR HVAC Emergency Bypass Inlet Valve Failed to Actuate Correctly.Caused by Failure of Pneumatic Relay in Control Circuit.Temporary Mod Installed
| 10 CFR 50.73(a)(2)(v), Loss of Safety Function |
| 05000298/LER-1992-011, :on 920625,two Installations of Thermo-Lag 330 Fire Barrier Matl,Used to Provide 1 H Protection,Identified Per Review of NRC Bulletin 92-001.Caused by Inadequate Qualification Testing.Restoration Underway |
- on 920625,two Installations of Thermo-Lag 330 Fire Barrier Matl,Used to Provide 1 H Protection,Identified Per Review of NRC Bulletin 92-001.Caused by Inadequate Qualification Testing.Restoration Underway
| |
| 05000298/LER-1992-012, :on 920715,RCIC Sys Declared Inoperable Due to Intrusion Into Motor Operator.Caused by Packing Leak & Defective Conduit Shield.Mov Motor Replaced.Conduit Will Be Replaced During 1993 Refuleing Outage |
- on 920715,RCIC Sys Declared Inoperable Due to Intrusion Into Motor Operator.Caused by Packing Leak & Defective Conduit Shield.Mov Motor Replaced.Conduit Will Be Replaced During 1993 Refuleing Outage
| 10 CFR 50.73(a)(2)(v), Loss of Safety Function |
| 05000298/LER-1992-013, :on 920730,error Discovered in Limiting Single Failure Assumption for ECCS Performance Analysis.Analysis in 1976 Contained Erroneous Evaluation of Eccs.Plant Mods Will Be Made to Restore Validity of Previous Assumptions |
- on 920730,error Discovered in Limiting Single Failure Assumption for ECCS Performance Analysis.Analysis in 1976 Contained Erroneous Evaluation of Eccs.Plant Mods Will Be Made to Restore Validity of Previous Assumptions
| 10 CFR 50.73(a)(2)(i) |
| 05000298/LER-1992-014, :on 920731,HPCI Sys Declared Inoperable Due to Severe Oil Leak from Diaphragm Area of Mechanical/Hydraulic Overspeed Trip Auto Reset Control Assembly.Valve Assembly Replaced & HPCI Sys Tested Satisfactorily & Returned to Svc |
- on 920731,HPCI Sys Declared Inoperable Due to Severe Oil Leak from Diaphragm Area of Mechanical/Hydraulic Overspeed Trip Auto Reset Control Assembly.Valve Assembly Replaced & HPCI Sys Tested Satisfactorily & Returned to Svc
| |
| 05000298/LER-1992-015, :on 920911,RV Level Fell Below Low Level Setpoint Initiating Group 2,3 & 6 Isolations.Caused by Procedures Governing Normal Shutdown of Plant.Procedure Changes & Training Will Be Provided |
- on 920911,RV Level Fell Below Low Level Setpoint Initiating Group 2,3 & 6 Isolations.Caused by Procedures Governing Normal Shutdown of Plant.Procedure Changes & Training Will Be Provided
| 10 CFR 50.73(a)(2)(iv), System Actuation |
| 05000298/LER-1992-016, :on 921001,identified Inadequate Isolation of DG 2 Differential Protection.Caused by Failure of Alternate Shutdown Design Review.Issued Change to Procedure for Operation of DG 2 from DG Room |
- on 921001,identified Inadequate Isolation of DG 2 Differential Protection.Caused by Failure of Alternate Shutdown Design Review.Issued Change to Procedure for Operation of DG 2 from DG Room
| 10 CFR 50.72(b)(3)(ii), Degraded or Unanalyzed Condition 10 CFR 50.73(a)(2)(1) |
| 05000298/LER-1992-017, :on 921209,HPCI-MOV-MO058 Automatically Opened,Resulting in Closure of Pump Suction Valve from Emergency Condensate Storage Tank.Caused by Procedural Deficiency.Valves Realigned & Event Reviewed |
- on 921209,HPCI-MOV-MO058 Automatically Opened,Resulting in Closure of Pump Suction Valve from Emergency Condensate Storage Tank.Caused by Procedural Deficiency.Valves Realigned & Event Reviewed
| 10 CFR 50.73(a)(2)(iv), System Actuation |
| 05000298/LER-1992-018, :on 921217,HPCI,RCIC & SLC Sys Declared Inoperable Due to Missed Insps of Pump Suction Piping.Caused by Lack of Scheduling Info for Class 3 Piping.Addl Enhancement Will Be Implemented for Program |
- on 921217,HPCI,RCIC & SLC Sys Declared Inoperable Due to Missed Insps of Pump Suction Piping.Caused by Lack of Scheduling Info for Class 3 Piping.Addl Enhancement Will Be Implemented for Program
| 10 CFR 50.73(a)(2)(v), Loss of Safety Function 10 CFR 50.73(a)(2)(1) |
| 05000298/LER-1992-019, Forwards Corrected LER 92-019-00,including Event Date Inadvertently Omitted from 930128 Memo | Forwards Corrected LER 92-019-00,including Event Date Inadvertently Omitted from 930128 Memo | |
| 05000298/LER-1992-019-01, :on 921230,design Deficiency W/Ac Electrical Sys Confirmed When Single Nonaccident Event Could Result in Common Mode Failure of Both Dgs.Permanent Electrical Jumper Installed in Each Breaker Trip Circuit |
- on 921230,design Deficiency W/Ac Electrical Sys Confirmed When Single Nonaccident Event Could Result in Common Mode Failure of Both Dgs.Permanent Electrical Jumper Installed in Each Breaker Trip Circuit
| 10 CFR 50.73(a)(2)(v), Loss of Safety Function |
| 05000298/LER-1992-020, :on 920130,containment Level Instruments Were Removed & re-installed Without Being Declared Inoperable. Caused by Personnel Failure to Follow Procedures.Operators Retrained |
- on 920130,containment Level Instruments Were Removed & re-installed Without Being Declared Inoperable. Caused by Personnel Failure to Follow Procedures.Operators Retrained
| 10 CFR 50.73(a)(2)(v), Loss of Safety Function 10 CFR 50.73(a)(2)(i) 10 CFR 50.73(a)(2)(x) 10 CFR 50.73(a)(2) 10 CFR 50.73(a)(2)(viii)(A) 10 CFR 50.73(a)(2)(1) |