ML20127J653
| ML20127J653 | |
| Person / Time | |
|---|---|
| Site: | North Anna |
| Issue date: | 02/11/1985 |
| From: | NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II) |
| To: | |
| Shared Package | |
| ML20127J603 | List: |
| References | |
| 50-338-84-44, 50-339-84-44, NUDOCS 8505210537 | |
| Download: ML20127J653 (2) | |
Text
O %-., _,
7 y-o
.y y
,X
.A 3
Q
,A l
4 77 "_'
- ENCLOSURE 1 c[9
',(
w c
,LW
, - g.
.VihginiaElectric&'PowerCompany
-Docket Nos. 50 338 and:50-339 g
North._ Anna ~
' The - following' violations were. identified during an -inspection conducted - on December 6, _ _1984 - January 5,'
1985.
The Severity Levels were assigned 11n accordance with-the.NRC Enforcement Policy (10 CFR Part 2, Appendix C).
LI.
Technical = Specification l6.8.1 requires that written procedures be estab-3' '.
lished, implemented and maintained to control' safety-related activities.
Annunciator Response Procedure 1-AR-3 specifies the necessary actions to 1 respond to panel.1C main control' board-annunciator A-8 (charging ' Pump 18 g
215J6 lockout).
- );
't
- North Anna Power Station Administrative Procedure (ADM 19.3), " Shift Conduct" ' outlines the minimum turnover to be performed by ' the shift supervisor ~and control room operator.
x-S' Contrary to :the above, during the December 4 timeframe, the annunciator.
response -procedure and -shift turnover' procedure were not followed when the: alarm was ~ received, resulting in the continued lockout of IB charging pump; thus. reducing to 'one the number of operable. charging pumps for. the unit.
This is a Severity Level IV violation and applies to North Anna Unit.1.
2.
North Anna: Power Station,- Unit 2 Facility Operating License NPF-7, dated
-August 21, 1980, condition 2.c.(5) requires, '" Prior to operating the facility ~at a power level-above 25 percent, VEPC0 shall develop 'a surveil-'
tlance. program for fiberglass spray. pond piping and suppor.ts that is in -
~
compli.ance with the regulatory position in Revision 2 of Regulatory
. Guide.1.72,'or an alternative position acceptable to the Commission."
The? regulatory position-in Revision 2 of Regulatory Guide 1.72 specifies
- a - yearly ' inspection. frequency for fiberglass piping without an exterior weather resistant coating.
Contrary to the above, the North Anna spray pond piping, which does not have a 'special weather-resistant coating, was being inspected on a frequency less than annual.
This is a Severity level IV violation and applies to North Anna Unit 2.
p-mu mg.
v-
~
~
?, ;
, Virginia Electric & Power Company
-2 Docket Nos. 50 338 and 50-339
. North Anna License Nos. NPF-4 and NPF-7 Pursuant to,10'CFR 2.201, -you are required to submit to this' office within 30 1 days of. the date of this Notice, a written statement or explanation in reply, including:
(1) admission or denial -of the alleged violations; (2) the reasons
. for the-violations' if admitted;- (3) the corrective steps which have been taken.
and the results achieved; (4) corrective - steps which will be taken to avoid further' violations; and (5) the date when full compliance will be achieved.
- Security or Jsafeguards information should be submitted as an enclosure to facilitate withholding it,from public disclosu're as required by 10 CFR 2.790(d) or 10-CFR-73.21.
FEB 111985
. Date:
'k
.~p 1
f 6
- -._4 s
[.
"