Category:INTERNAL OR EXTERNAL MEMORANDUM
MONTHYEARML20211G2671999-08-27027 August 1999 Notification of 990909 Meeting with Util in Rockville,Md to Discuss Proposed TSs for Emergency Feedwater Sys at Waterford 3 ML20209G2421999-07-14014 July 1999 Notification of 990722 Meeting with License in Rockville, MD to Discuss Changes in EOI Licensing Organization Including Division of Responsibilities within New EOI Corporate Licensing Group ML20206F8831999-04-30030 April 1999 Informs That NRC Staff Will Discuss Encl Draft for RAI with Eoi,Re EOI Response to GL 95-07, Pressure Locking & Thermal Binding ML20205R8871999-04-20020 April 1999 Notification of 990504 Meeting with Util in Rockville,Md to Discuss Proposal to Submit Consolidated Security Plan for Util Sites ML20197J6251998-12-0909 December 1998 Revised Notification of Licensee Meeting with Licensee on 981216 in Arlington,Tx to Discuss Actions Being Implemented in Performance Improvement Plan for Selected Weaknesses Identified During Architect Engineer Insp ML20195G1121998-11-17017 November 1998 Notification of 981201-02 Meeting with Entergy Operations in Taft,Louisianna to Conduct Joint Workshop for Licensing Personnel from Entergy & Nrc,Project Directorate IV-1 ML20153F8051998-09-23023 September 1998 Notification of Licensee Meeting with Util on 981216 in Arlington,Tx to Discuss Actions Being Implemented in Performance Improvement Plan for Selected Weaknesses Identified During Architect Engineer Insp ML20151U7971998-09-0808 September 1998 Notifies of 980929 Meeting with Util in Rockville,Md to Discuss Level of Instructions & Details for Transferring Quality Assurance Plan Details from Current Program Plans at Four Sites to Std Quality Assurance Program Plan ML20153H6671998-09-0808 September 1998 Revised Notification of 981007 Meeting with Util to Discuss Level of Instructions & Details for Transferring QA Plan Details from Current Program Plans at Four Sites to Std Program Plan at All Sites.Originally Scheduled for 980929 ML20237A2811998-08-12012 August 1998 Notification of 980827 Meeting W/Nrc & Util in Rockville,Md to Discuss Level of Instructions & Details for Transferring QA Plan Details from Current Program Plans at Four Sites ML20249A2101998-06-11011 June 1998 Notification of 980702 Meeting W/Util in Rockville,Md to Discuss Level of Instructions & Details for Transferring Quality Assurance Plan Details from Current Program Plans at Four Sites to Std Quality Assurance Program Plan for Site ML20216D6351998-04-13013 April 1998 Notification of 980416 Meeting W/Util in Rockville,Md to Discuss Entergy Operations,Inc Initial Proposal to Standardize Security Plans for Listed Plants ML20216B5481998-04-0808 April 1998 Notification of 980512 Meeting W/Entergy Operations,Inc in Arlington,Texas to Present Results of SALP Rept for Waterford Steam Electric Station,Unit 3 ML20217E8471998-03-26026 March 1998 Notification of Significant Licensee Meeting W/Util on 980402 to Discuss Entergy Operations,Inc Annual Performance Assessment ML20197B8721998-03-0505 March 1998 Notification of 980401 Meeting W/Util in Jackson,Ms to Discuss Licensing Issues & Regulatory Performance Efficiencies W/Licensing Staff for Plants.Meeting Agenda Encl ML20203A0411998-02-0505 February 1998 Notification of 980219 Meeting W/Util in Rockville,Md to Discuss SFP re-rack & SFP Cooling at Plant,Unit 3 ML20203B4131998-02-0505 February 1998 Notification of 980319 Meeting W/Entergy Operations,Inc,In Rockville,Md to Discuss Level of Instructions & Details of Transferring QA Plan Details from Current Program Plans at Four Sites to Standard QA Program Plan for Use at All Sites ML20198N9261998-01-13013 January 1998 Revised Notification of Meeting W/Util in Arlington,Tx Re Enforcement Conference to Discuss Details Re Valve ACC-126A Being Left in Manual Position.Purpose of Meeting Revised ML20198M8351998-01-12012 January 1998 Notification of 980122 Meeting W/Util in Rockville,Md to Discuss Site Licensing Status for Listed Plants & to Explore Ways to Standardize Licensing Submittals & Issuances ML20198P2561998-01-12012 January 1998 Notification of Significant Licensee Meeting W/Util on 980120-21 in Arlington,Tx to Review Examination for Operator Licensing ML20198G1071998-01-0707 January 1998 Notification of Significant Licensee Meeting W/Util on 980206 in Arlington,Tx to Discuss Engineering Issues & Process That Were Evaluated During Insp in Dec 1997 ML20198G3421998-01-0606 January 1998 Notification of Licensee Meeting W/Util on 980123 in Arlington,Tx to Discuss Details Re Valve ACC-126A Being Left in Manual Position ML20198L1701997-10-21021 October 1997 Notification of Significant Licensee Meeting W/Util on 971113 to Discuss Results of Aug 1997 Operability Assessment Insp ML20198K0791997-10-15015 October 1997 Notification of 971022 Meeting W/Entergy Operations,Inc in Rockville,Md Re Standard Quality Assurance Manual for Entergy Sites IR 05000382/19970131997-07-15015 July 1997 Notification of Meeting W/Licensee in Arlington,Tx on 970729 Re Operability of Containment Isolation Valves Concerning Insp Rept 50-382/97-13 ML20141D2511997-06-25025 June 1997 Notification of Licensee Meeting W/Listed Attendees on 970806 in Region IV Training Room Re W3 Performance Improvement Meeting ML20148D8171997-05-28028 May 1997 Revised Notification of Licensee Meeting W/Util on 970529 to Discuss Licensee Progress in Implementing Focus Plan ML20138H5111997-05-0101 May 1997 Notification of 970529 Meeting W/Util in Taft,La to Discuss Licensee Progress in Implementing Focus Plan ML20137Y8401997-04-21021 April 1997 Notification of 970423 Meeting W/Util in Killona,La to Discuss Containment Isolation Design & Licensing Basis for Plant,Unit 3 ML20137W6841997-04-15015 April 1997 Notification of 970502 Meeting W/Listed Attendees in Jackson,Mi.Meeting Agenda Encl ML20216H9971997-04-10010 April 1997 Responds to Region IV 961113 Memo Requesting Review of Licensee Position on Compliance W/General Design Criteria for Dual Function air-operated Containment Penetration Valves ML20137C9201997-03-20020 March 1997 Forwards Documentation of Meeting Conducted in Region 4 Office on 970225 to Discuss NRC Enforcement Policy as Applied to Nonescalated Enforcement ML20137A1991997-03-18018 March 1997 Notification of 970321 Meeting W/Util in Rockville,Md to Discuss Containment Isolation Design & Licensing Basis for Facility ML20135F8821997-03-13013 March 1997 Notification of Licensee Meeting W/Util on 970408 to Discuss Inadequate Containment Fan Cooler Flows ML20135B3721997-02-25025 February 1997 Notification of Licensee Meeting W/Util on 970324 to Discuss Update of W3 Focus Plan ML20134P2231997-02-20020 February 1997 Discusses Ti 2515/122 Evaluation or Rosemount Pressure Transmitter Performance & Licensee Enhanced Surveillance Programs multi-plant Action B-122 ML20134M2471997-02-14014 February 1997 Submits List of Plants Not Meeting Selection Criteria for Ti 2515/118 Insp on Basis of Factors Such as SWS Operating Experience,Contribution of SWS to Plant Risk Assessment, Licensee Programs in Response to GL-89-13 ML20236M1381997-01-14014 January 1997 Recommends That Region IV Pursue Appropriate Enforcement Action Re Waterford 3 Interpretation of Surveillance Requirement 4.6.2.2 for Containment Air Coolers.Tsb Concludes That Plant in Violation of LCO 3.6.2.2 ML20133G3981997-01-13013 January 1997 Forwards NRC Approved Operator Licensing Exam (Facility Outline & Initial Exam Submittal & as-given Operating Exam) for Tests Administered on 960909-20 ML20133D8061997-01-0707 January 1997 Notification of 970122 Licensee Meeting W/Util in Taft,La to Discuss Results of Systematic Assessment of Licensee Performance Rept ML20149M0471996-12-10010 December 1996 Forwards Internet Mail Received from PM Blanch ML20135B6231996-11-27027 November 1996 Notification of 961217 Licensee Meeting W/Util in Arlington, Tx to Discuss Evaluation Approach & Results of UFSAR Assessments at Each Facility ML20135B7021996-11-27027 November 1996 Notification of 961218 Public Meeting W/Util in Arlington, Tx to Discuss Status of Plant Performance Improvement Program ML20134L6121996-11-19019 November 1996 Notification of 961121 Meeting W/Entergy Operations,Inc,In Rockville,Md to Discuss Views on Funding for Decommissioning Costs of Nuclear Power Plants as May Apply for Each of Four Nuclear Plant Sites ML20129K2221996-11-0606 November 1996 Notification of 961120 Predecisional Enforcement Conference W/Util in Arlington,Tx to Discuss Inservice Testing of Valves ML20134C9121996-10-0808 October 1996 Notification of 961114 Meeting W/Util in Rockville,Md to Discuss Results of Self Assessment of Accuracy of Info in FSAR for Each Plant Site ML20129B5691996-10-0101 October 1996 Forwards Final Accident Sequence Precursor Program Analysis of Operational Event Which Occurred at Plant on 950610 ML20203C0191996-04-0909 April 1996 Discusses OI Rept 4-95-070 Re Alleged Discrimination Against Employee of Wackenhut Corp (Twc) Who Disagreed with Supervisor Instruction to Move Morse Watchman Key.Action Not Appropriate at This Time ML20203C0161996-02-23023 February 1996 Discusses Initiation of OI Rept 4-95-044 Re False Allegations That Fire Watch Records Were Being Falsified ML20203C0041996-02-12012 February 1996 Discusses OI Rept 4-95-047 Re Alleged Discrimination. Allegation Not Substantiated,Therefore Enforcement Action Not Appropriate in This Case 1999-08-27
[Table view] Category:MEMORANDUMS-CORRESPONDENCE
MONTHYEARML20211G2671999-08-27027 August 1999 Notification of 990909 Meeting with Util in Rockville,Md to Discuss Proposed TSs for Emergency Feedwater Sys at Waterford 3 ML20209G2421999-07-14014 July 1999 Notification of 990722 Meeting with License in Rockville, MD to Discuss Changes in EOI Licensing Organization Including Division of Responsibilities within New EOI Corporate Licensing Group ML20206F8831999-04-30030 April 1999 Informs That NRC Staff Will Discuss Encl Draft for RAI with Eoi,Re EOI Response to GL 95-07, Pressure Locking & Thermal Binding ML20205R8871999-04-20020 April 1999 Notification of 990504 Meeting with Util in Rockville,Md to Discuss Proposal to Submit Consolidated Security Plan for Util Sites ML20197J6251998-12-0909 December 1998 Revised Notification of Licensee Meeting with Licensee on 981216 in Arlington,Tx to Discuss Actions Being Implemented in Performance Improvement Plan for Selected Weaknesses Identified During Architect Engineer Insp ML20195G1121998-11-17017 November 1998 Notification of 981201-02 Meeting with Entergy Operations in Taft,Louisianna to Conduct Joint Workshop for Licensing Personnel from Entergy & Nrc,Project Directorate IV-1 ML20153F8051998-09-23023 September 1998 Notification of Licensee Meeting with Util on 981216 in Arlington,Tx to Discuss Actions Being Implemented in Performance Improvement Plan for Selected Weaknesses Identified During Architect Engineer Insp ML20151U7971998-09-0808 September 1998 Notifies of 980929 Meeting with Util in Rockville,Md to Discuss Level of Instructions & Details for Transferring Quality Assurance Plan Details from Current Program Plans at Four Sites to Std Quality Assurance Program Plan ML20153H6671998-09-0808 September 1998 Revised Notification of 981007 Meeting with Util to Discuss Level of Instructions & Details for Transferring QA Plan Details from Current Program Plans at Four Sites to Std Program Plan at All Sites.Originally Scheduled for 980929 ML20237A2811998-08-12012 August 1998 Notification of 980827 Meeting W/Nrc & Util in Rockville,Md to Discuss Level of Instructions & Details for Transferring QA Plan Details from Current Program Plans at Four Sites ML20249A2101998-06-11011 June 1998 Notification of 980702 Meeting W/Util in Rockville,Md to Discuss Level of Instructions & Details for Transferring Quality Assurance Plan Details from Current Program Plans at Four Sites to Std Quality Assurance Program Plan for Site ML20216D6351998-04-13013 April 1998 Notification of 980416 Meeting W/Util in Rockville,Md to Discuss Entergy Operations,Inc Initial Proposal to Standardize Security Plans for Listed Plants ML20216B5481998-04-0808 April 1998 Notification of 980512 Meeting W/Entergy Operations,Inc in Arlington,Texas to Present Results of SALP Rept for Waterford Steam Electric Station,Unit 3 ML20217E8471998-03-26026 March 1998 Notification of Significant Licensee Meeting W/Util on 980402 to Discuss Entergy Operations,Inc Annual Performance Assessment ML20197B8721998-03-0505 March 1998 Notification of 980401 Meeting W/Util in Jackson,Ms to Discuss Licensing Issues & Regulatory Performance Efficiencies W/Licensing Staff for Plants.Meeting Agenda Encl ML20203A0411998-02-0505 February 1998 Notification of 980219 Meeting W/Util in Rockville,Md to Discuss SFP re-rack & SFP Cooling at Plant,Unit 3 ML20203B4131998-02-0505 February 1998 Notification of 980319 Meeting W/Entergy Operations,Inc,In Rockville,Md to Discuss Level of Instructions & Details of Transferring QA Plan Details from Current Program Plans at Four Sites to Standard QA Program Plan for Use at All Sites ML20198N9261998-01-13013 January 1998 Revised Notification of Meeting W/Util in Arlington,Tx Re Enforcement Conference to Discuss Details Re Valve ACC-126A Being Left in Manual Position.Purpose of Meeting Revised ML20198P2561998-01-12012 January 1998 Notification of Significant Licensee Meeting W/Util on 980120-21 in Arlington,Tx to Review Examination for Operator Licensing ML20198M8351998-01-12012 January 1998 Notification of 980122 Meeting W/Util in Rockville,Md to Discuss Site Licensing Status for Listed Plants & to Explore Ways to Standardize Licensing Submittals & Issuances ML20198G1071998-01-0707 January 1998 Notification of Significant Licensee Meeting W/Util on 980206 in Arlington,Tx to Discuss Engineering Issues & Process That Were Evaluated During Insp in Dec 1997 ML20198G3421998-01-0606 January 1998 Notification of Licensee Meeting W/Util on 980123 in Arlington,Tx to Discuss Details Re Valve ACC-126A Being Left in Manual Position ML20198L1701997-10-21021 October 1997 Notification of Significant Licensee Meeting W/Util on 971113 to Discuss Results of Aug 1997 Operability Assessment Insp ML20198K0791997-10-15015 October 1997 Notification of 971022 Meeting W/Entergy Operations,Inc in Rockville,Md Re Standard Quality Assurance Manual for Entergy Sites IR 05000382/19970131997-07-15015 July 1997 Notification of Meeting W/Licensee in Arlington,Tx on 970729 Re Operability of Containment Isolation Valves Concerning Insp Rept 50-382/97-13 ML20141D2511997-06-25025 June 1997 Notification of Licensee Meeting W/Listed Attendees on 970806 in Region IV Training Room Re W3 Performance Improvement Meeting ML20148D8171997-05-28028 May 1997 Revised Notification of Licensee Meeting W/Util on 970529 to Discuss Licensee Progress in Implementing Focus Plan ML20138H5111997-05-0101 May 1997 Notification of 970529 Meeting W/Util in Taft,La to Discuss Licensee Progress in Implementing Focus Plan ML20137Y8401997-04-21021 April 1997 Notification of 970423 Meeting W/Util in Killona,La to Discuss Containment Isolation Design & Licensing Basis for Plant,Unit 3 ML20137W6841997-04-15015 April 1997 Notification of 970502 Meeting W/Listed Attendees in Jackson,Mi.Meeting Agenda Encl ML20216H9971997-04-10010 April 1997 Responds to Region IV 961113 Memo Requesting Review of Licensee Position on Compliance W/General Design Criteria for Dual Function air-operated Containment Penetration Valves ML20137C9201997-03-20020 March 1997 Forwards Documentation of Meeting Conducted in Region 4 Office on 970225 to Discuss NRC Enforcement Policy as Applied to Nonescalated Enforcement ML20137A1991997-03-18018 March 1997 Notification of 970321 Meeting W/Util in Rockville,Md to Discuss Containment Isolation Design & Licensing Basis for Facility ML20135F8821997-03-13013 March 1997 Notification of Licensee Meeting W/Util on 970408 to Discuss Inadequate Containment Fan Cooler Flows ML20135B3721997-02-25025 February 1997 Notification of Licensee Meeting W/Util on 970324 to Discuss Update of W3 Focus Plan ML20134P2231997-02-20020 February 1997 Discusses Ti 2515/122 Evaluation or Rosemount Pressure Transmitter Performance & Licensee Enhanced Surveillance Programs multi-plant Action B-122 ML20134M2471997-02-14014 February 1997 Submits List of Plants Not Meeting Selection Criteria for Ti 2515/118 Insp on Basis of Factors Such as SWS Operating Experience,Contribution of SWS to Plant Risk Assessment, Licensee Programs in Response to GL-89-13 ML20236M1381997-01-14014 January 1997 Recommends That Region IV Pursue Appropriate Enforcement Action Re Waterford 3 Interpretation of Surveillance Requirement 4.6.2.2 for Containment Air Coolers.Tsb Concludes That Plant in Violation of LCO 3.6.2.2 ML20133G3981997-01-13013 January 1997 Forwards NRC Approved Operator Licensing Exam (Facility Outline & Initial Exam Submittal & as-given Operating Exam) for Tests Administered on 960909-20 ML20133D8061997-01-0707 January 1997 Notification of 970122 Licensee Meeting W/Util in Taft,La to Discuss Results of Systematic Assessment of Licensee Performance Rept ML20149M0471996-12-10010 December 1996 Forwards Internet Mail Received from PM Blanch ML20135B6231996-11-27027 November 1996 Notification of 961217 Licensee Meeting W/Util in Arlington, Tx to Discuss Evaluation Approach & Results of UFSAR Assessments at Each Facility ML20135B7021996-11-27027 November 1996 Notification of 961218 Public Meeting W/Util in Arlington, Tx to Discuss Status of Plant Performance Improvement Program ML20134L6121996-11-19019 November 1996 Notification of 961121 Meeting W/Entergy Operations,Inc,In Rockville,Md to Discuss Views on Funding for Decommissioning Costs of Nuclear Power Plants as May Apply for Each of Four Nuclear Plant Sites ML20129K2221996-11-0606 November 1996 Notification of 961120 Predecisional Enforcement Conference W/Util in Arlington,Tx to Discuss Inservice Testing of Valves ML20134C9121996-10-0808 October 1996 Notification of 961114 Meeting W/Util in Rockville,Md to Discuss Results of Self Assessment of Accuracy of Info in FSAR for Each Plant Site ML20129B5691996-10-0101 October 1996 Forwards Final Accident Sequence Precursor Program Analysis of Operational Event Which Occurred at Plant on 950610 ML20203C0191996-04-0909 April 1996 Discusses OI Rept 4-95-070 Re Alleged Discrimination Against Employee of Wackenhut Corp (Twc) Who Disagreed with Supervisor Instruction to Move Morse Watchman Key.Action Not Appropriate at This Time ML20203C0161996-02-23023 February 1996 Discusses Initiation of OI Rept 4-95-044 Re False Allegations That Fire Watch Records Were Being Falsified ML20203C0041996-02-12012 February 1996 Discusses OI Rept 4-95-047 Re Alleged Discrimination. Allegation Not Substantiated,Therefore Enforcement Action Not Appropriate in This Case 1999-08-27
[Table view] |
Text
- % UNITED STATES
' [' ... M'
> a. - u..:
- 3' i c NUCLEAR REGUL ATORY COMf41L'.,10i.
WASHINGTO N, D. C. 20555
%o ne<*
f; . .
it
(;/J NAY 0 41#4 MEMORANDUM T0: '
John Rebello, Chief - --
Administrative Contracts Branch Division of Contracts --
Office of Administration ,.
FROM: Jesse L. Funches, Director .
Planning & Program Analysis Staff Office of Nuclear Reactor Regulation .
SUBJECT:
REQUISITION FOR NRC TASK FORCE AT WATERFORD 3 Attached is a requisition for costs incurred from the NRC Task Force effort at Waterford 3. NRR, as the Task Force leader, feels that these costs
incurred from the use of Louisiana Power & Light equipment and supplies is justified because of the cost-benefit advantage this approach has over contracting these services commercially.
If you have any questions concerning this requisition, please contact .
William H. Foster in Region IV.
/
sse L. Funches, Director Planning & Program Analysis Staff l Office of Nuclear Reactor Regulation 1 -
Attachment:
l As stated cc: William H. Foster, R-IV l ..
t .
e 8506250359 850411 PDR FOIA BERNABE85-123 PDR
r gW,w
,f!
i!!' Louisiana Power & Light Company '
({tjh.g J;si New 142 De2ardnde Street Orleans, Louisiana 70174 by 7, 1984 u:ontr ocurn INVOICE UTAJitd tysigAt NUMaca 12873 -
ifJ ACCOUNr WITH REFERENCE
. NUMDER Nuclear Regulatory Commission 611 Ryan Plaza Drive-Suite 1000 ,
YounoRotn Arlington, Texas 76011 NUMDER Attn: ,Mr. Chip Foster To bill yor for rervices of equipment / facility which the Waterford April 1 to April3 Appraisal 30, 1984. Team (WAT) are using for period i
Facilities:
Trailer #42 "
Trailer !!12 $650.00 Electricity 350.00 Water f
Telephones 200.00 50.00 h
_50.00 $1,300.00 Wministrative/ Clerical Support:
Photocoping Supplies .
$100.00 Equipment: _50.00 150.00 .g Displaywriter unit with printer Displaywriter w/o printer . $850.00
- _360.00 1,210.00 (This unit was in use for 3 weeks of the month)
.. Total . .
A
_S2.660.00
~
a.:'
Please remit payment to: e 5 .
Louisiana Power & Light Confpany 142 Delaronde Street }l d
New Orleans, Louisiana 70174 -
Attention: Treasurer __
4
[
? h I
b..
!L 9
c .
o
. u V.
,- .m ~ m-i: u? 9y "
Wn-Distribution:
Central File PRAB R/F May 17, 1984 Subject File:
J. Funches L. Solander K. McGrath SUE - KAY-YELLOW TICKET MEMORANDUN FOR: Timothy F. Hogan, Acting Chief -
Administrative Contracts Branch Division of Contracts Office of Administration FROM: Jesse L. Funches, Director Planning & Program Analysis Staff Office of Nuclear Reactor Regulation
SUBJECT:
LA. POWER & LIGHT CO. INVOICE 12873 RE: SERVICES RENDERED NRC WATERFORD-3 TASK FORCE Enclosed is the first of probably three invoices expected from subject vendor for services being extended to NRC's Waterford-3 Appraisal Team. This invoice is for the period April 1 - 30, 1984 in the amount of $2,660.00 On May 4, 1984, I forwarded a memorandum to J. Rebello, attaching a requisition to cover such expenditures. I am also enclosing a copy of that correspondence for you.
Future invoices will be processed through nomal channels as soon as we are
-- advised of our purchase order nunber. .
Original Signef.by Jesse Funches .
Jesse L. Funches, Direct 6r Planning & Program Analysis Staff Office of Nuclear Reactor Regulation l
Enclosures:
l As stated .
l l
i cc: William H. Foster, R-IV Dennis Crutchfield foiA -8S -GS
\ +- -
i
- T-ig3 w m -
, 8J $
g w& ..
l H => . .PRA,B,:J,@,, ,, R B R ,,,,,,, , , ;,P,P,AS, , , , , , , ,,,,,,,,,,,,,,,,,,,,, ,,,,,,,,,,,.......... ,,,,,,,.............. ..................
' * * > ..KM9.Gr,qt,,,,q , ,1, . ,,,pL..$d W 4 RS........ ..................... ..................... ..................... ..................
""> 51/4../.84.... 5/.. 184...... 5/.11/.81....... ..................... ..................... .................... .................
66B
W -
~ ' ' Distribution
~/PPASReading C. FOSTER JF2
~
May 24,1984 MEMORANDUM FOR: Chip Foster Director Division of Resource Management
& Administration Region IV FROM: Jesse L. Funches, Director Planning and Program Analysis Staff Office of Nuclear Reactor Regulation
SUBJECT:
WATERFORD TASK FORCE PROCUREMENT The Division of Contracts requires completion of the attached before they will process the small ;c chase order for the Waterford equipment and supplies that Louisiana Power and Light Company provided. Since'I ,
am not familiar with the circumstances that cau~ sed the delay, please complete the attached and return to me. Also, let me know whether 2i mon'th duration is still valfd. - -
Original Signed by Jesse Funches l Jesse L. Funches, Director Planning and Program Analysis Staff Office of Nuclear Reactor Regulation t
Enclosure:
As stated cc: D. Crutchfield - -
For A - K -111
,l o.
e, S 0
- 4.IACM h 1
-~ .
~~t> .Mu,n,c,h,e,s,(,b3,,,,,,,,,,,,,,,,,,,, ,,,,,,,,,,,,,,,,,,,,, ,,,,,,,,,,,,,,,,,;,,, ,,,,,,,,,,,,,,,,,,,,, ,,,,,,,,,,,,,,,,,,,,, ,,,,,,,,,,,,,,,,
oncy 5/.f.7./84
.- 1
%. 9
\
. l
\
Jesse Funches '
P-415 l*
Per our phone conversation on 5/21, I am sending you the unauthorized procurement form Please explain on this form all the facts pe .
r-taining to this action and let us know how long this requirement will be required with the Louisiana Power & Light Co.
This requisition needs proper funding documentation and enough funds to cover the period of performance .
Any further please questions call me regarding this procurem on 492-7640. ent,
}
ve.c l/
Anne Hoyle Procurement Agent 9 O O e
4
san c.a rs, ,
. UNITED STATES a .
, . ,,og NUCLEAR R'EGULATORY COMMIS$10N .
~E, ,g -
WASHINGTON, D. C. 20555
. ys 7g n
MFJCRANDUM FOR: Jesse L. Funches jf s 7 FROM - Timothy F. Hagan, Con tingg +ff cer - - -
Small Purchases Section, ACB Division of Contracts *
SUBJECT:
UNAUTHORIZED PROCUREENT COMMITMENT This office has received a requisition to award a purchase order for a service /
supply that has been accepted by your office (copy attached). The provisions of the Federal Procurement Regulations as supplemented by NRC Manual .1101, Part I, state that no contract shall be entered into unless all applicable requirements ,
of lawmecutive orders and regulations have been met.
Failure to suksnit a requisition prior to the acceptance of the service / supply results in the Government incurring a debt which has not been funded or authorized and constitutes an unauthorized co:nmitment which requires ratification by an appointed Contracting Officer. Such une.uthorized commitments are not only contrary to procure-ment regulations, they also rt- esent unfair treatment of Vendors who act in good faith in response to requests :or service that they presume to be proper and are then required to wait for many months for payment while ratification of the unauthor-ized ccanmitment is obtained.
Failure to check with this office prior to' purchase can, in some instances, result
- in the user being liable for payment if the item cannot be purchased under our procurement authority. Procedures must exist in each office to insure that requests
_, for_ requirements are suls:d.tted in sufficient time prior to the date of requirement to preclude recurrance of this problem.
In order to determine the basis for ratification of this unauthorized commitment, please furnish a written statement of facts explaining why this ccanmitment occurred and actior instituted to prevent its recurrence.
Your cooperation in eliminating unauthorized commitments is appreciated.
STATEMENT OF FACTS:
S.ignatures -
l Based on the above, ratification is ( ) is not ( ) approved for this unauthorized i
co:nmitztent.
l i Timothy F. Hagan, Contracting Officer Small Purchases Section, ACB Division of' Contracts
ATTACHMENT The service and equipment procured from Louisiana Power & Light (LP&L) were urgently needed to support the NRC Task Force established by the
. Executive Director for Operations to expedite the licensing of the Waterford 3 plant. The Task Force was put together and began work on short notice and logistical support needed to be inmediately obtained to accommodate the NRC staff at the site. Delays in providing this support would have resulted in prolonging the licensing effort for Waterford. The requisite paperwork was processed immediately upon receipt of initial cost estimates from LP&L. This information was provided to the Contracting Officer in April.
l l
l
m
..: ~
s -
, ppas ase ,%,
! UNITED STATES 5 NUCLEAR REGULATORY COMMISSION l
WASHINGTON, D.C. 20555
...../ .
.' ~;~ .' ' ' ' '
May 24, 1984 .
-s . -s Note to: Jim Leonard .
)
The attached needs D. Crutchfield or someone .
else's signature before Contracts will process -
the procurement request for supplies utilized .
on Waterford that Louisiana Power & Light .
provided.
M Pleaseasign ASAP and return to me.
3
~- -
-6 J sse L. Funches
_ _ = - . _
s . _
.a :- - .
~-
e