ML20127F837

From kanterella
Jump to navigation Jump to search
Partial Response to FOIA Request for Three Categories of Documents Re Waterford 3.Forwards App a & B Documents. Documents Also Available in Pdr.App C Documents Partially Withheld (Ref FOIA Exemption 5)
ML20127F837
Person / Time
Site: Waterford Entergy icon.png
Issue date: 04/11/1985
From: Felton J
NRC OFFICE OF ADMINISTRATION (ADM)
To: Bernabei L
GOVERNMENT ACCOUNTABILITY PROJECT
Shared Package
ML20127B509 List:
References
FOIA-85-123 NUDOCS 8506250269
Download: ML20127F837 (6)


Text

.

s r i

/ ,, UNITED STATES 8 g, NUCLEAR REGULATORY COMMISSION p l f' j WASWNGTON, D. C. 20655 5,

..... APR 11 W Ms. Lynne Bernabei Government Accountability Project 1555 Connecticut Avenue, NW Suite 202 IN RESPONSE REFER

- Washington, DC 20036 TO F01A-85-123

Dear Ms. Bernabei:

19, 1985, in which you This is in partial requested, response pursuant to your letter to the Freedom of February of Information Act (F0IA), three categories of documents relating to the Waterford Steam Electric Station, Unit 3.

The records identified on the enclosed Appendix A are subject to your request and are already available in the NRC Public Document Room (PDR). -

The records identified on the enclosed Appendix B are now available for public inspection and copying at the PDR in folder F01A-85-123 under your name.

Portions of the two records identified on tne enclosed Appendix C are being withheld from public disclosure, pursuant to Exemption 5 of the F0IA (5 U.S.C.

552(b)(5)) and 10 CFR 9.5(a)(5) of the Commission's regulations. The portion of each record entitled " Potential Violations" was deleted because each contains a predecisional opinion and recommendation of NRR.

Pursuant to 10 CFR 9.9 of the Commission's regulations, it has been determined that the information withheld is exempt from production or disclosure, and that its production or disclosure is contrary to the public interest. The persons responsible for denial of the information are the undersigned and Mr.

Harold R. Denton, Director, Office of Nuclear Reactor Regulation. ..e

~

This denial may be appealed to the NRC's Executive Director for Operations within 30 days from the receipt of this letter. As provided in 10 CFR 9.11, any such appeal must be in writing, addressed to the Executive Director for Operations, U.S. Nuclear Regulatory Commission, Washington, DC 20555, and should clearly state on the envelope and in the letter that it is an " Appeal from an Initial F0IA Decision."

8506250269 850411 PDR FOIA BEgNp2E85-123 PDR

.The staff is continuing to search for additional records subject to your request. We will notify you upon completion of this search.

Sirgerely, ,

J J. M. Felton, ';irector

[ Division of Rules and Records Office of Administration  ;

Enclosures:

As stated -

..l W

.a 4

i

9 APPENDIX A DOCUMENTS SUBJECT TO F01A-85-123 ALREADY IN PDR Category 2 .

1. 08/09/84 Letter from P. V. Judd, NUS Corporation, to Dennis M.

Crutchfield, NRR, PDR Accession No. 8408140401.

2. 08/15/84 Letter from P. V. Judd, NUS Corporation, to Dennis M.

Crutchfield, NRP, PDR Accession No. 8408210403.

3. 01/14/85 Memo for Chairman Palladino, et al., from Darrell G. Eisenhut, NRR, entitled " Board NotificatTon~No.85-006" PDR Accession No. 8501180052.

k

'I

~

. o

-* APPENDIX B DOCUMENTS IN PDR FILE F01A-85-123 Category 1 -

1. 12/84 Briefing handout package prepared by Louisiana Power and Light Company entitled "Waterford 3 SES, Presentation of Operational Readiness" (72 pages).
2. 12/04/84 Memo for Harold R. Denton, NRR, from Robert S. Martin, Region IV, entitled " Louisiana Power & Light Company (LP&L) Waterford 3 Steam Electric Station (DN: 50-382)"

with attached list of items requiring completion prior to operational mode status (2 pages).

3. 12/13/84 Memo for Darrell G. Eisenhut, NRR, from Robert D. Martin, Region IV, entitled "Waterford Drug Abuse Program" with attached letter dated 12/13/84 to R. S. Leddick, LP&L, from Robert D. Martin, Region IV, entitled " Confirmation of Action Letter" (3 pages).

Category 2

4. 05/04/84 Memo to John Rebello, ADM:DC, from Jesse L. Funches, NRR, entitled " Requisition for NRC Task Force at Waterford 3" (3 pages).
5. 05/17/84 Memo for Timothy F. Hagan, ADM:DC, from Jesse L. Funches, NRR, entitled "LA. Power & Light Co. Invoice 12873 Re:

Services Rendered NRC Waterford-3 Task Force" (3 pages).

6. 05/24/84 Memo for Chip Foster, Region IV, from Jesse L. Funches, NRR, entitled "Waterford Task Force Procurement" (5 pages).
7. 07/02/84 Letter to Murray G. Fincher, from Harold R. Denton, NRP.,

regarding licensing issues at Waterford 3 (2 pages).

8. 07/13/84 Computer printout entitled "Sumary Table for 183 Sample Size" (13 pages).
9. 08/15/84 Memo to Dennis M. Crutchfield, NRR, from J. J. Harrison, Region III, entitled "Waterford Task Force Followup" (8 pages).
10. 09/27/84 Memo for Dennis M. Crutchfield, NRR, from J. J. Harrison, Region III, entitled "Waterford Task Force Followup" (6 pages).

Re: F01A-85-123 l ,

11. 10/01/84 Chart entitled "NRC Pre-Licensing Issues" (1 page).
12. 11/06/84 Memo for Waterford 3 Task Force Leaders from Dennis M.

[ Crutchfield, NRR, entitled "SSER 9 Input" (1 page).

l 13, 11/13/84 Letter to Dennis Crutchfield, NRR, from Peter V. Judd, l NUS Corporation regarding pre-licensing reports (1 page).

I i 14, 11/29/84 Memo for Dennis M. Crutchfield, NRR, from Dale F. Thatcher,

! NRR, entitled "SSER 9 Input" (4 pages).

15, 12/03/84 List entitled "Submittals in Response to 6/13/84 letter on 23 Task Force Issues" (2 pages).

16. 12/18/84 Note to Dennis M. Crutchfield, NRR, from Robert Shewmaker, WTF, entitled "SSER 9 Input" (46 pages).

I

17. 02/28/85 ASLAB, "NRC Staff's Further Res'ponse Pursuant to the Appeal Board's Order of February 13, 1985" (52 pages).

l 18. Undated Memo for Dennis M. Crutchfield, NRR, from J. J. Harrison, Region III, entitled " Schedule and Personnel Requirements for Waterford QA Team Follow-Up" (5 pages).

I

19. Undated Errata to the Safety Evaluation Report Supplement No. 9--

NUREG-0787" (1 page).

20. Undated Handwritten draft of memo to Waterford Task Force Re:

SSER input (4 pages).

j 21. Ur. dated Handwritten draft introductio.n to SSEP No. 9 (3 pages).

22. Undated Typed draft introduction to SSER No. 9 (5 pages).

Category 3

23. 04/10/84 Memo for Kellogg V. Morton, ADM:DC, fron Jesse L. Funches, NRR, entitled " Consultant Contracts for Waterford" (I page).

l

24. 04/25/84 Memo for Kellogg V. Morton, ADM:DC, from Jesse L. Funches, NRR, entitled " Consultant Contracts for Waterford" (1 page).

[

)

APPENDIX C DOC lMENTS WITH PARTIALLY WITHHELD MATERIAL IN PDR FILE FOIA-85-123 Category 2

1. 12/18/84 Draf t 2 of SSER No. 9 input entitled " Allegation A-109" (4 pages).

2.

12/18/84 Draft 4 of SSER No. 9 input entitled " Allegation A-141" (7 pages).

-;b ;w

.m. --"