Text
's y
.# "%,?
t UNITED STATES p
-t NUCLEAR REGULATORY COMMISSION k
h S(
REGION IV l
0
.I oo x
DEC 0 4 IM Q
J ',. 6 /[
huc liEMORANDUM FOR:
H. R. Denton, Director Off4ce of Nuclear Reactor Regulation j
FROM:
R. D. Martin, Regional Administrator
SUBJECT:
LOUISIANA POWER & LIGHT COMPANY (LP&L)
WATERFORD 3 STEAM ELECTRIC STATION (DN: 50-382)
Based on the results of our inspection effort, we have detennined that construction and preoperational testing of the subject facility have been completed in substantial agreement with docketed coninitments and regulatory requirements, with the exception of items indicated in Attachment 1.
These remaining items have been grouped according to our recommended mandatory completion milestones.
As part of our inspection efforts, we have reviewed the implementation of the licensee's Quality Assurance Program for operations and have found that their program meets the requirements of 10 CFR 50, Appendix B.
Based on our inspections, we conclude that construction is complete, preoperational testing has not revealed any significant unresolved problems, and the licensee is ready and, in our judgement, competent to operate the Waterford 3 plant. The licensee has sufficient trained and licensed staff to safely operate the Waterford 3 plant. We have no items which would preclude issuance of a low power operating license. We recommend that the operating license be conditioned as described in Attac t 1.
/
h +
Ib kl R. D. Martin Regional Administrator
Attachment:
As stated FotA-w -Is3 8/ 2-8506250295 B50411 hAB
-123 PDR
ATTACHMENT 1 WATERFORD STEAM ELECTRIC STATION OPERATING LICENSE NPF-26 This attachment identifies items which must be completed to the Commission's satisfaction prior to placing the facility into the operational modes identified below.
A.
The following items must be completed prior to proceeding to Operational Mode 2 (initial criticality).
1.
The licensee shall submit a final report for the following significant construction deficiencies:
SCD-037 TemperatureDetectors(RTDs) Failure SCD-080 Unsatisfactory Stroking of EFW Pump Turbine Steam Supply Shut-Off Valves S00-093 Charging and Letdown Containment Isolation Valve Deficiency 2.
The licensee shall complete the loading and testing of the air cleaning systems for the auxiliary and containment buildings.
(8211-09) 3.
The licensee will complete rework on masonary wall S-24.
(CAT l
Findings 6.2 and 6.3)
B.
The following items must be completed prior to proceeding to Operational Mode 1 (power operation).
1.
The licensee shall evaluate the emergency load testing using maximum and minimum voltages.
(8223-04) 2.
The licensee shall develop a suitable method for verifying the postaccident sampling capability to provide representative samples.
l (8405-02) 3.
The licensee shall provide verification that the particulate and iodine grab sampling portion of the high range effluent monitor for the main ventilation stack yields a representative sample.
(8405-03)
_ _ _ _