Requests Authorization for ORNL to Execute Program Described in Encl NRC Order 60-83-143
ML20126G018
Person / Time
Issue date: 01/25/1983
From: Arlotto G
NRC OFFICE OF NUCLEAR REGULATORY RESEARCH (RES)
To: Hart R
ENERGY, DEPT. OF
Shared Package
ML20126E434 List:
References
CON-FIN-A-9042-3, CON-FIN-B-0103-3, CON-FIN-B-0119-3, CON-FIN-B-0415-3, CON-FIN-B-0417-3, CON-FIN-B-0484-3, CON-FIN-B-0489-3, CON-FIN-B-103-3, CON-FIN-B-119-3, CON-FIN-B-415-3, CON-FIN-B-417-3, CON-FIN-B-484-3, CON-FIN-B-489-3, FOIA-85-143 NUDOCS 8506180039
Download: ML20126G018 (4)


Text

. _ ._-_ . _._ _ _ _ ._ __ _ _ _ _ _ _ _ . _ -_--_ ___ _..

t<

i o

1 JAN 2 5 M3 i

i Mr. R. J. Hart, Manager Oak Ridge Operations Office U. 5. Department of Energy .

P. O. Box E ,

Oak Ridge, Tennessee 37830 .

Dear Mr. Hart:

1 FY 1983 HUCLEAR REGULATORY RESEARCH ORDER NO. 60-83-143 FOR 0AK RIDGE NATIONAL LABORATORY .

j Please authorize Oak Ridge NaUonal Laboratory to execute the program described in the enclosed NRC.0rder.

If this meets with your approval, it is requested that acceptance be indicated on the enclosed fom and the original be sent to the NRC Office of Resource Management.and one copy retumed to this office.

Sincerely, 1

ORIGldal. SIGNED BY G. A. ARLOTT0 Guy A. Arlotto, Director Division of Engineering Technology Office of Nuclear Regulatory Research I

Enclosures:

DISTR

1. NRC Order .

Subj

2. Program Brief .

Circ Chron s cc w/ enclosures: ..

Riggs:rdg

. R. W. Barber DOE /EP .

A. Puglise, ORM J. Witherspoon ORNL ' "

J. Mate, ORM 1 .'Arndt, DET M. Vagins, DET h/8- D M C. Feldman, DET 8506180039 850325 A. Taboada. DET C. Serpan. DET N -

$TB N-143 PDR

-J. -Nusca ra .-DET RECORD NOTE: See previous 173's RES:D for 1102 Wylbur Fin File

, ,, A. Eiss. DET e , /. -

"""* ..RES : RMB... , .

ES;0EI.Mg hES;D .. ...

g.. .k '.
.m...

... R ggs

. ....B)ajid/Shht Forel ei Anderson /Shpan..RES;.QET.

/Steyer ss 5 o to spie

.t...........................g py . . . ..<.

. . . . . .. ! .. .. .l

$. . . . $$Y[4........ ...... !,!i.hg y.....I........ 4 .... .}.. 4. h..;. . 7. . . .... . . .h f nac peau m no so Nacu creo DFFICIAL RECORD COPY //

capa c e.uw s o

  • u s c:wc6saa maguge,tga, cr pssioN

,' NIC er w 173 '

60 1/3 O STANDARD ORDER FOR DOE WORK yp,;,s193 l

ACCov%TsNG cit ATiON j

' 1550to sv.(NaC 0ffset apenonnia.teo%svwsos 1 essut D 10 40010*t.cel '

Divisien of Engineering 31X0200.603 Oak Ridge Operations Office -

es= =wwet a Technolooy See Attached etmFonMiNo onsANir ATeoN ANo LocAfsoN Pi ~ww.c a See Attached Oak Ridge National Laboratory WORK PimiOD TMis ORDER FlutD D EsTivatto.1 FIN TITLE FROM. 10 See Attached 10/1/82 9/30/83 OBLIGATION AVAILABILITY PROvlDED BY; s 4,605,00r ,

A. THis ORDER TOT AL 08 08 0185 *L act o Pas 0R 10 TwiS D ATI Wsta TMt Pamp o MING o G AN12 ATioNs 7,485,00C S

uNot a Tai sact AnaceasafioN svMooL" AND T*E FiasT F ova DiciTs of Tat Sta NUUtir4 CITE D 800Vf 12.090,00C (TOTAL A & si g C. TOT AL OADERS TO DATs s See Attached o AWouwt :NCouotDiN -c APruCAstE To THE -fin Nuust a CITED iN THis OaDEn.

I FIN ANCi AL FLEXIBILITY.

D AUTHOR FUNDS 6 ZED.

WiLL NOT BE REPROGRAMMED BETWEEN FINS LINE D CONST '

LINE C CONSTITUTES A LIMITATION 3 FUNDS MAY Bf mEPmOGR AMMED NOT TO EMCEED 210% OF FIN LEVEL UP 70 8500 ON CBLiGATioNs AUTwom 2ED sT AND AMD TERMS AND CONDITIONS PROVIDED DOE ARE CONilDERED PART OF THIS ORD UNLEss OTHERWISE NOTED.

ATTACHVENTS. SECumiTY; THE FQLLOWING ATTACHMENTS ARE MERE 8Y Q WomE ON THi$ ORDEm IS NOT CLASSiflED MADE A PART OF THis ORDER:

O Wo== es Twis omDEm involves CLASSIFIED (B STATEMENT OF Wom K - A9042 INFORM ATION. NRC FORM 10715 ATT ACHED.

D ADDITIONALTERMS AND CONDITIONS i D oTHER dated 10/21/82for work scope and previous funding.

nEuanas: REF: SOEW #60-83412 Also, SOEW #60-83-065 dated 11/18/82 and 60-83-071 dated 11/18/82 n

ACCEPTING ORG ANIZ ATIOld )'

// IWING/4OTHQAjTY sio=ATwas sionatuW // (LU i rect 5F Eu'j 4. Arcttt , . T TLE .. --__.._._._ _. .

j Tifts/ Offich Divi (ion of Engineering of Nuclear Technology Regulatory Research DATs ,

esRC FOMM 17312 79) e e

G s

. .' l l

O

OAK RIDGE NATIONAL LABORATORY
FY 1983 (DOLLARS IN THOUSANDS)
FY 83 PREVIOUSLY THIS B&R NO. FIN NO. TITLE AMOUNT OBLIGATED OBLIG l

60190101 A9042-3 Technology and Costs of Termination Surveys Associated With Decommissioning of Nuclear Facilities $ 50 $ '20 $ 30 60190101 80103-3 Additional Requirements For Materials 100 20 80 60190101 B0119-3 Heavy-Section Steel Technology 4.920 %7 3,%3 60190101 B0415-3 Pressure Vessel Simulation 319 -65 254 1'

60190101 80417-3 Improved Eddy-Current Inservice Inspection For Steam Generator l Tubing 175 .30 145

., 60190101 80484-3 Resident Engineer in Germany 128 25 103 60190101 80489-3 Containment Leak Test Sensitivity Study 50 10 40 TOTAL $5,742 $1,137 14,605 9

i j -

e J

t

0

.- FY 1983 AMENDED PROJECT BRIEF PROGRAM: DET TITLE: TECHNOLOGY AND COSTS OF TERMINATION SURVEYS FIN: A9042 ASSOCIATED WITH DECOMMISSIONING OF NUCLEAR CONTRACTOR: ORNL

' FACILITIES SITE: OAK RIDGE STATE: TENNESSEE NRC PROGRAM MANAGER: CARL FELDMAN PRINCIPAL INVESTIGATOR: J. WITHERSPOON PERIOD OF WORK: 1/1/83 - 9/30/83 FY 1983 ADDITI'ONAL OBLIGATION: $30K BUDGET ACTIVITY: 60190101 OBJECTIVE:

THF PRIMARY OBJECTIVE OF THIS PROGRAM IS TO DEVELOP INFORMATION IN THE AREAS OF' TECHNOLOGY AND COSTS FOR PLANNING TERMINATION SURVEYS OF s

RESIDUAL ACTIVITY FOR DECOMMISSIONING NUCLEAR FACILITIES. '

! l SCOPE:

THE PROJECT IS A CONTINUATION OF WORK ALREADY BEING PERFORMED IN FY 1983 (DESCRIBED IN FY 1983 PROJECT BRIEF) PROVIDING A DATA BASE FOR ACCEPTABLE RESIDUAL RADIOACTIVITY LEVELS REQUIRED FOR CONF 1RMATORY TERMINATION SURVEYS FOR UNRESTRICTED USE OF A NUCLEAR FACILITY. TECHNICAL SUPPORT TO THE NRC STAFF FOR EXPLICIT DEVELOPMENT OF REGULATORY GUIDES IS REQUIRED.

FY 1983 GUIDANCE:

AN ADDITIONAL AMOUNT OF $30K(ABOVE THE INITIAL FY 1983 $20K COMMITMENT)

HAS BEEN ADDED TO THIS PROJECT TO ACCELERATE WORK INTENDED TO BE COMPLETED IN FY 1984 BY FY 1983. FUNDING IS TO BE USED FOR TECHNICAL SUPPORT TO THE NRC STAFF IN THE PREPARATION OF REGULATORY GUIDES.

5 e.

6 i