ML20127B135

From kanterella
Jump to navigation Jump to search
Forwards Update to Sholly Statistics for 830506-1231.Request for Hearing Received in Response to Notice of Issuance of Amend 10.Ninth Monthly Fr Notice Scheduled for Publication on 840125
ML20127B135
Person / Time
Site: Salem, Grand Gulf, Pilgrim, Susquehanna, Turkey Point, 05000000, Crane
Issue date: 01/06/1984
From: Eisenhut D
Office of Nuclear Reactor Regulation
To: Harold Denton
Office of Nuclear Reactor Regulation
Shared Package
ML20127A737 List:
References
FOIA-84-794 NUDOCS 8401160341
Download: ML20127B135 (6)


Text

o

?<

W),,

Q er po nroq g

,e 3[

jo UNITED STATES

  • g g

NUCLEAR REGULATORY COMMISSION o

E WASHINGTON, D. C. 20655

%,.....,o!

JAN <G B64 MEMORANDUM FOR:

Harold R. Denton, Director 5$- 9.L 6 28'f i

Office of Nuclear Reactor Regulation

/

f 387,3%, 272 i

FROM:

Darrell G. Eisenhut, Director I

Division of Licensing, NRR 2-gp 2 Q,2g

SUBJECT:

"SH0LLY" STATISTICS Attached is the update of the Sholly statistics covering the period May 6 through December 21, 1983 (publication date of the eighth monthly FRN).

One request for hearing was received in response to a Notice of Issuance l

of Amendment No.10 for Grand Gulf-1. Amendment No. 10 redefined HPCS operation and resulted in a calculated increase in peak clad temperature.

I The ninth monthly FRN is scheduled for publication on January 25, after l

which the statistics will be updat d.

'fUJC' Darrell G.

senhut, Director Division of Licensing, NRR

Attachment:

As stated cc: DL ads 4

DL BCs DL LAs J. Scinto

Contact:

Pat Kreutzer X29516 0

  • ~ ' ~.

"SHOLLY" STATISTICS May 6.1983 Dec. 21,1983.

Monthly FRN Individual FRN Individual FRN Total Proposed NSHC Proposad NSHC SHC NUMBER 687 183 11 881 Period for public comment:

30 days 687 172 11 870 Less than 30 days:

Short FRN Il 11 X

X

/

~

/

~

Press release

- [

\\

[

\\

3 8 TMI-l Public comments received 2 (Grand Gulf) 11 1 Susquehanna*

~~'

2 TMI-l Requests for hearing 1 (Grand Gulf)**

1 Salem-1 1 Pilgrim 7

2 Turkey Pt. 3/4 Amendments Issued - Total............................................................

' 222 (1) with 30 days notice

. 201 (2) l es s th a n 3 0 d ays o r no no t i c e................................................... '

19 (3) Hearing reques ted but final NSHC determina tion made (50.91(a )(4)).................

2* *

  • Backlog: (applications received which have not been noticed, either in monthly FRN or individually through December 23. 1983

):

NtJMBER 275

  • cne comment received from member of the public.
    • Hearing request received on Amendment No. 10 - Grand Gulf in response to Notice of Issuance. Amendment No.10 redefined HPCS operation and resulted in a calculated increase in peak clad temperature.

bt?

h e>=-

-