ML20127B135
| ML20127B135 | |
| Person / Time | |
|---|---|
| Site: | Salem, Grand Gulf, Pilgrim, Susquehanna, Turkey Point, 05000000, Crane |
| Issue date: | 01/06/1984 |
| From: | Eisenhut D Office of Nuclear Reactor Regulation |
| To: | Harold Denton Office of Nuclear Reactor Regulation |
| Shared Package | |
| ML20127A737 | List:
|
| References | |
| FOIA-84-794 NUDOCS 8401160341 | |
| Download: ML20127B135 (6) | |
Text
o
?<
W),,
Q er po nroq g
,e 3[
jo UNITED STATES
- g g
NUCLEAR REGULATORY COMMISSION o
E WASHINGTON, D. C. 20655
%,.....,o!
JAN <G B64 MEMORANDUM FOR:
Harold R. Denton, Director 5$- 9.L 6 28'f i
Office of Nuclear Reactor Regulation
/
f 387,3%, 272 i
FROM:
Darrell G. Eisenhut, Director I
Division of Licensing, NRR 2-gp 2 Q,2g
SUBJECT:
"SH0LLY" STATISTICS Attached is the update of the Sholly statistics covering the period May 6 through December 21, 1983 (publication date of the eighth monthly FRN).
One request for hearing was received in response to a Notice of Issuance l
of Amendment No.10 for Grand Gulf-1. Amendment No. 10 redefined HPCS operation and resulted in a calculated increase in peak clad temperature.
I The ninth monthly FRN is scheduled for publication on January 25, after l
which the statistics will be updat d.
'fUJC' Darrell G.
senhut, Director Division of Licensing, NRR
Attachment:
As stated cc: DL ads 4
DL BCs DL LAs J. Scinto
Contact:
Pat Kreutzer X29516 0
- ~ ' ~.
"SHOLLY" STATISTICS May 6.1983 Dec. 21,1983.
Monthly FRN Individual FRN Individual FRN Total Proposed NSHC Proposad NSHC SHC NUMBER 687 183 11 881 Period for public comment:
30 days 687 172 11 870 Less than 30 days:
Short FRN Il 11 X
X
/
~
/
~
Press release
- [
\\
[
\\
3 8 TMI-l Public comments received 2 (Grand Gulf) 11 1 Susquehanna*
~~'
2 TMI-l Requests for hearing 1 (Grand Gulf)**
1 Salem-1 1 Pilgrim 7
2 Turkey Pt. 3/4 Amendments Issued - Total............................................................
' 222 (1) with 30 days notice
. 201 (2) l es s th a n 3 0 d ays o r no no t i c e................................................... '
19 (3) Hearing reques ted but final NSHC determina tion made (50.91(a )(4)).................
2* *
- Backlog: (applications received which have not been noticed, either in monthly FRN or individually through December 23. 1983
):
NtJMBER 275
- cne comment received from member of the public.
- Hearing request received on Amendment No. 10 - Grand Gulf in response to Notice of Issuance. Amendment No.10 redefined HPCS operation and resulted in a calculated increase in peak clad temperature.
- THI-l SG hot testing; Salem-1 integrated leak rate test.
bt?
h e>=-
-