ML20127B050

From kanterella
Jump to navigation Jump to search
Forwards Update of Sholly Statistics for 830506-1023.Request for Hearing Re Salem Notice on Extending Interval for Second Integrated Leak Rate Test Received
ML20127B050
Person / Time
Site: Salem, Grand Gulf, Pilgrim, 05000000, Crane
Issue date: 11/14/1983
From: Eisenhut D
Office of Nuclear Reactor Regulation
To: Harold Denton
Office of Nuclear Reactor Regulation
Shared Package
ML20127A737 List:
References
FOIA-84-794 NUDOCS 8311300410
Download: ML20127B050 (2)


Text

1

/~ /8

~c,#

s u

l'

' 1g

. UNITED STATES

~

NUCLEAR REGULATORY COMMISSION o

. ASHINGTON D. C. 20555 W

/

NOV 14 1983 C

S(p.26'Q,27Z,*J MEMORANDUM.FOR:

Harold R. Denton, Director LjLly t?, 2A 3 Office of Nuclear Reactor Regulation FROM:

Darrell G. Eisenhut, Director Division of Licensing

~

SUBJECT:

"SHOLLY" STATISTICS

~

. Attached for your information ~is an update of the Sholly statistics covering the period May 6 through Octcber 26, 1983 (publication date of the sixth es.

monthly FRN).

A're~ quest for hearing has been received on the Salem notice regarding ex-tending the interval for the second inservice integrated leak rate test.

One additional comment was received on TMI-1 as a result of publication on August 25, 1983 of a Notice of Additional Opportunity.

The seventh monthly FRN is scheduled for publication on November 23 after which the statistics will b updated.

Darrell G. Eisenhut, irector Division of Licensing

Attachment:

As stated

Contact:

Pat Kreutzer,

~~

X25516 a

C e

e

.M 13 tl 3 6eHg 9

N

.^

b,, [y; "SH0LLY" STATISTICS

~

, Month 1 FRN Individual FRN Individual FRN Total May 6,1983 - Oct. 26,1983 Propose NSHC Proposed NSHC SHC l

l NUM8ER 500 136 9

645

)

g 4 if jl W 4

[,

Period for public comment:

i l

l 30 days 500 126 9

635 Less than 30 days:

l o

h j

Short FRN ll 6

1).

X 10 10 i

s X

?

i f

[

[

\\

Press release 3

g y-Public coments received 2/(Grandbulf)*

8 (TMI-1) **

10 l

I bij j 2(TMI-l) 1 (Pilgrim) 4 i

uo f

g Requests for hearing j

1 (Salem.- 1) hy 1

siJ i l

Amendments Issued.

Total'............................................................

148 (1) with 30 days notice

. 131 t

q,

.. d (2) l es s th a n 3 0 d ays o r no no ti c e.....:......................'........................ d 16

k. 3 (3) Hearing reques ted but final NSHC determination made (50.91(a )(4)).................

,1***

i

$?

ifhd,9 Backlog: (applications received which have not been noticed either in monthly FRN or individually E

(p !

through November 1, 1983

' NUMBER 341 This nurrber includes items which have been y

preparea and approvea f or pub ication in tne riovember monthly FRN; items which are in concurrence, P

and items for whi,ch additional information is needed from the -licensee.

j

.j one com'ent from State, one from member of public.

h-one additional comment received as result of Notice of Additional Op'portunity published 8/25/83.

      • @ne partial amendmmt issued for TMI-l with partial Fial NSMC,

-