ML20127B116

From kanterella
Jump to navigation Jump to search
Forwards Update of Sholly Statistics Covering 830506-1122
ML20127B116
Person / Time
Site: Salem, Grand Gulf, Pilgrim, Susquehanna, Turkey Point, 05000000, Crane
Issue date: 12/09/1983
From: Eisenhut D
Office of Nuclear Reactor Regulation
To: Harold Denton
Office of Nuclear Reactor Regulation
Shared Package
ML20127A737 List:
References
FOIA-84-794 NUDOCS 8312230001
Download: ML20127B116 (2)


Text

c.- -

/

lE/w y;t, fp;n:s'h, UNITED STATES 5 'A

..f)7' 7-E wAssmcTon, s. c. :osss NUCLEAR REGUL.ATORY COMM!S2!ON

.IJ j.g.t Vjf7 g 91981 sq 25a>, 2 n U D7 - rd MEMORANDUM FOR:

Harold R. Denton, Director 7>

Office of Nuclear Reactor Ragulation qy( q LT-FROM:

Darrell G. Eisenhut, Director 7'69 N b Division of Licensing

/

SUBJECT:

"SHOLLY" STATISTICS M

,. ~ ~

Attached f 3 the update of the Sholly statistics covering the period May 6

.through November 22, 1983 (publication date o_f the seventh monthly FRN).

_.. r., z

m
:

,7.

Two requests for hearing were received on the, Turkey Point Units'~3 and 4 m

~'

. noti.ce related to proposed operatienal limits for current and; future. reloads.

1;.

-One comment was received on the Susquehanna notice on ESW pump load sequenc'e 3.L timers.

The eighth monthly FRN is scheduled for publication on Decembet 21.after

~

which date the statistics wil1 be updated.

D

.:Efsenut, i

ctor Division..of. Licensing

~,

-As stated

~*

Contact:

Pat X'reutzer X29516

+

cc: DL ads DL BCs

.. t".',

t..

DL LAs

,u

  • j"'

3

. f 7-**

=

.. ;. e.... e..--i-t j

a. i 1.,

T W.

i....

i

- 'p 8

e 5

O 4

"SH0LLY" STATISTICS Monthly FRN Individual FRN Individual FRN Total May 6,1983 - Nov. 22,1983 Proposed NSHC Proposed NSilC SHC titJtBER 631 168 11 810 Period for public coment:

30 days 631-157 11 700 Less than'30 days:

Short FRtl 11 11 X

X

/

x

/

x

[

\\

['

\\

Press release 3

2 (Grand Gulf) 8 (THI-1)

Public come.nts received 1 (Susquehanna)*

11 2(TMI-1)

Requests for hearing 1 (Salem-1).

1 (Pilgrim) 6

~

2 (Turkey Pt. 3/4)**

Amendments Issued - Total las (1) with 30 days notice

.166 (2) l es s th a n 3 0 d ays o r no no t i c e................................................... -

17 (3) llearing reques ted but final NSHC determi na tion made (50.91(a )(4 )).................

2***

Backlog: (applications r eceived whi,ch have not been noticed. either in monthly FRN or individually through flovember 28, 1983

):

ilUMBER 232 This number includes items which have been prepared and approved for publication in'the December monthly FRN; items which are in concurrence, and items for which additional information is needed from the licensee.

  • one comment received from member of the public.
    • proposed operational liinits for current and future reloads.
      • Salem-1 integrated leak rate - one amendment with final NSHC. 3 n