ML20127B116
| ML20127B116 | |
| Person / Time | |
|---|---|
| Site: | Salem, Grand Gulf, Pilgrim, Susquehanna, Turkey Point, 05000000, Crane |
| Issue date: | 12/09/1983 |
| From: | Eisenhut D Office of Nuclear Reactor Regulation |
| To: | Harold Denton Office of Nuclear Reactor Regulation |
| Shared Package | |
| ML20127A737 | List:
|
| References | |
| FOIA-84-794 NUDOCS 8312230001 | |
| Download: ML20127B116 (2) | |
Text
c.- -
/
lE/w y;t, fp;n:s'h, UNITED STATES 5 'A
..f)7' 7-E wAssmcTon, s. c. :osss NUCLEAR REGUL.ATORY COMM!S2!ON
.IJ j.g.t Vjf7 g 91981 sq 25a>, 2 n U D7 - rd MEMORANDUM FOR:
Harold R. Denton, Director 7>
Office of Nuclear Reactor Ragulation qy( q LT-FROM:
Darrell G. Eisenhut, Director 7'69 N b Division of Licensing
/
SUBJECT:
"SHOLLY" STATISTICS M
,. ~ ~
Attached f 3 the update of the Sholly statistics covering the period May 6
.through November 22, 1983 (publication date o_f the seventh monthly FRN).
_.. r., z
- m
- :
,7.
Two requests for hearing were received on the, Turkey Point Units'~3 and 4 m
~'
. noti.ce related to proposed operatienal limits for current and; future. reloads.
1;.
-One comment was received on the Susquehanna notice on ESW pump load sequenc'e 3.L timers.
The eighth monthly FRN is scheduled for publication on Decembet 21.after
~
which date the statistics wil1 be updated.
D
.:Efsenut, i
ctor Division..of. Licensing
~,
-As stated
~*
Contact:
Pat X'reutzer X29516
+
cc: DL ads DL BCs
.. t".',
t..
DL LAs
,u
- j"'
3
. f 7-**
=
.. ;. e.... e..--i-t j
- a. i 1.,
T W.
i....
i
- 'p 8
e 5
O 4
"SH0LLY" STATISTICS Monthly FRN Individual FRN Individual FRN Total May 6,1983 - Nov. 22,1983 Proposed NSHC Proposed NSilC SHC titJtBER 631 168 11 810 Period for public coment:
30 days 631-157 11 700 Less than'30 days:
Short FRtl 11 11 X
X
/
x
/
x
[
\\
['
\\
Press release 3
2 (Grand Gulf) 8 (THI-1)
Public come.nts received 1 (Susquehanna)*
11 2(TMI-1)
Requests for hearing 1 (Salem-1).
1 (Pilgrim) 6
~
2 (Turkey Pt. 3/4)**
Amendments Issued - Total las (1) with 30 days notice
.166 (2) l es s th a n 3 0 d ays o r no no t i c e................................................... -
17 (3) llearing reques ted but final NSHC determi na tion made (50.91(a )(4 )).................
2***
Backlog: (applications r eceived whi,ch have not been noticed. either in monthly FRN or individually through flovember 28, 1983
):
ilUMBER 232 This number includes items which have been prepared and approved for publication in'the December monthly FRN; items which are in concurrence, and items for which additional information is needed from the licensee.
- one comment received from member of the public.
- proposed operational liinits for current and future reloads.
- Salem-1 integrated leak rate - one amendment with final NSHC. 3 n