ML20036B478
| ML20036B478 | |
| Person / Time | |
|---|---|
| Site: | 05200001 |
| Issue date: | 05/20/1993 |
| From: | Poslusny C Office of Nuclear Reactor Regulation |
| To: | Borchardt R Office of Nuclear Reactor Regulation |
| References | |
| NUDOCS 9305240115 | |
| Download: ML20036B478 (4) | |
Text
May 20, 1993 Docket No.52-001 MEMORANDUM FOR:
R. W. Borchardt, Acting Director Standardization Project Directorate Associate Directorate for Advanced Reactors and License Renewal, NRR FROM:
Chester Poslusny, Project Manager Standardization Project Directorate Associate Directorate for Advanced Reactors and License Renewal, NRR
SUBJECT:
NOTICE OF MEETING WITH GE NUCLEAR ENERGY (GE)', THE STAFF 0F THE ADVISORY COMMITTEE ON REACTOR SAFEGUARDS (ACRS) SUB-COMMITTEE ON THE ADVANCED BOILING WATER REACTOR (ABWR), AND THE OFFICE OF NUCLEAR REACTOR REGULATION STAFF DATE & TIME:
June 15 and 16, 1993 - 8:30 a.m. - 4:30 p.m.
LOCATION:
GE Nuclear Energy 175 Curtner Avenue San Jose, California PURPOSE:
To provide the ACRS sub-committee the opportunity to gather information about concerns and issues associated with the review of the GE ABWR standard safety analysis report and the final safety evaluation report. See enclosed agenda.
PARTICIPANTS:*
NRC GE I. Catton J. Carroll H. Lewis J. Fox C. Michelson W. Lindblad C. Wylie et al.
C. Poslusny S. Koenick E. Igne R. Seale M. El-Zeftawy 00 h1Sica n 9
ChesterPoslusny[ProjectManager Standardization Project Directorate Associate Directorate for Advanced Reactors and License Renewal, NRR
Enclosure:
As stated cc:
See next page
- Meetings between NRC technical staff and applicants or licensees are open for interested members of the public, petitioners, intervenors, or other parties to attend as observers pursuant to "Open Meeting. Statement of NRC 3
n
' 10 0 02 Staff Policy, 43 rederal Reaister 28058, 6/28/78. Members of the public who wish to attend should contact me at (301) 504-1132.
DISTRIBUTION:
See next page
[lf) h 0FC:
LA:PDST:ADAR PM:PDST:ADAR SbSSTlADAR v
r, NAME:
PShea,A CPoslusny:tz JNWidon DATE:
05/ % /93 05///3 05/9/93 0FFICIAL RECORD COPY:
/
I 9305240115 930520 h
y 1
PDR ADDCK 05200001
'D M 4h M L: J w a <: IE A
pyg
~
GE Nuclear Energy Docket No.52-001 cc: Mr. Patrick W. Marriott, Manager Mr. Joseph Quirk i
~*
Licensing & Consulting Services GE Nuclear Energy GE Nuclear Energy General Electric Company 175 Curtner Avenue 175 Curtner Avenue, Mail Code 782 San Jose, California 95125 San Jose, California 95125 i
Mr. Robert Mitchell General Electric Company 175 Curtner Avenue San Jose, California 95125 Mr. L. Gifford, Program Manager Regulatory Programs GE Nuclear Energy 12300 Twinbrook Parkway Suite 315 Rockville, Maryland 20852 Director, Criteria & Standards Division Office of Radiation Programs U. S. Environmental Protection Agency 401 M Street, S.W.
Washington, D.C.
20460 Mr. Sterling Franks U. S. Department of Energy NE-42 Washington, D.C.
20585 Mr. Steve Goldberg Budget Examiner 725 17th Street, N.W.
Room 8002 Washington, D.C.
20503 Mr. Frank A. Ross U.S. Department of Energy, NE-42 Office of LWR Safety and Technology 3
19901 Germantown Road Germantown, Maryland 20874 Mr. Raymond Ng 1776 Eye Street, N.W.
Suite 300 Washington, D.C.
20006 Marcus A. Rowden, Esq.
Fried, Frank, Harris, Shriver & Jacobson 1001 Pennsylvania Avenue, N.W.
Suite 800 Washington, D.C.
20004 i
t Jay M. Gutierrez, Esq.
Newman & Holtzinger, P.C.
j 1615 L Street, N.W.
_l Suite 1000 i
Washington, D.C.
20036
DISTRIBUTION:
"l Docket Eile,:2 PDR PDST R/F TMurley/FMiraglia,12G18 DCrutchfield WTravers ERossi, 9A2 JNWilson CPoslusny SNinh SKoenick MMalloy PShea BPerch, 8H7 AChaffee, EAB JMoore, 15B18 EJordan, 3701 ACRS (11)
NRR Mailroom,12G18 P0' Dell, 12E4 SBajwa, 12G18 CMcCracken, 8D1 GGrant, 17G21 J0'Brien, RES BHardin, RES LShao, RES Elgne, P-315 ICatton, ACRS JCarroll, ACRS HLewis, ACRS WLindblad, ACRS CMichelson, ACRS CWylie, ACRS HPatis, 12E4 RSeale MEl-Zeftawy, P-315
Agenda for ACRS Subcommittee Visit To General Electric Nuclear Energy (GE) Facility San Jose, California June 15-16, 1993 I
The following issues will be discussed during the visit:
1.
Design of Physical Separation Barriers and Associated Penetrations.
2.
Cooling of Solid State Electronic Components.
3' 3.
Safety Evaluation of Essential Chilled Water Systems 4.
Design of Heating, Ventilating, and Air Conditioning Systems.
5.
Representative Conceptual Design of Ultimate Heat Sink and Reactor Service Water Systems.
6.
Design and Safety Evaluation of Reactor Water Cleanup System.
7.
Computer Aided Design Demonstration.
t 6
f I
Enclosure