ML20046C005
| ML20046C005 | |
| Person / Time | |
|---|---|
| Site: | 05200001 |
| Issue date: | 08/03/1993 |
| From: | Charemagne Grimes Office of Nuclear Reactor Regulation |
| To: | Grimes B Office of Nuclear Reactor Regulation |
| References | |
| NUDOCS 9308090111 | |
| Download: ML20046C005 (3) | |
Text
...
0]
Q- 0 August 3, 1993 HEMORANDUM FOR:
Brian K. Grimes, Director Division of Operating Reactor Support, NRR t
FROM:
Christopher I. Grimes, Chief Technical Specifications Branch Division of Operating Reactor Support, NRR
SUBJECT:
MEETING WITH GENERAL ELECTRIC COMPANY DATE & TIME:
August 19 and 20, 1993, 8:00 a.m. to 5:00 p.m.
LOCATION:
U.S. Nuclear Regulatory Commission One White Flint North 11555 Rockville Pike Room 13B9 Rockville, Maryland 20852 PURPOSE:
To discuss Section 3.8, Electrical Power Systems, of the draft proof & review technical specifications for the advanced boiling water reactor (ABWR).
PARTICIPANTS *:
NRC GE C. C. Harbuck Cal Tang F. M. Reinhart et. al.
M. L. Wohl J. J. Lazevnick, EELB D. T. Diec, SRXB C. Poslusny, PDST Original Signea Oy:
C. l. Grimes Christopher I. Grimes, Chief Technical Specifications Branch Division of Operating Reactor Support, NRR
Enclosure:
Agenda
- Meetings between NRC technical staff and applicants _ or licensees are open for interested members of the public, petitioners, intervenors, or other parties to attend as observers pursuant to "Open Meeting Statement of the NRC Staff Policy," 43 FR20805 dated June 28, 1978.
Individuals interested in attending this meeting should contact C. I. Grimes at (301) 504-1161.
Document Name: G:MTG81993.CCH OTSB: DORS:NRR C:0TSB: DORS:NRR FMReinhart p CIGrimes 08/3 /93 08/g/9 930B090111 930803 PDR ADDCK 05200001 A
pyg
Enclosure PRINCIPAL AGENDA ITEMS FOR MEETING BETWEEN NRC STAFF AND GENERAL ELECTRIC TO DISCUSS SECTION 3.8. ELECTRICAL POWER SYSTEMS DRAFT PROOF & REVIEW ABWR STANDARD TECHNICAL SPECIFICATIONS AUGUST 19 AND 20. 1993 GD The combustion turbine generator.
Inclusion of the CTG in the technical specifications LC0 when the o
ACTIONS rely on it being OPERABLE.
for AC sources, relying on the CTG as a standby backup to one o
diesel generator or one offsite AC source (provided no other required diesel generators or required offsite circuits are inoperable).
CTG surveillance requirements (SRs).
o 8
Justification of Completion. Time relaxations using PRA results.
9 Design of the power supplies to the AC vital buses.
O Bracketed values for parameters in SRs (particularly for LCO 3.8.1).
O Description of what an offsite circuit consists of (for Bases of LC0 3.8.2).
8 Is inadvertant draindown of the reactor vessel a concern for the ABWR (see Bases Applicability discussion for LC0 3.8.2).
9 Design of fuel oil storage tanks.
O Consistency of Completion Times for restoring inoperable DC sources, inverters, DC buses, and AC vital buses.
O Which accomplishes coping for loss of all AC, the CTG or the batteries?
O Accuracy and completeness of Table B 3.8.9-1.
I MEETING NOTICE For Auoust 19-20. 1993 DISTRIBUTIOJt{:
Central Files OTSB R/F PDR T. Murley/F. Miraglia J. Partlow A. Chaffee, EAB OGC E. Jordan B. Grimes Receptionist ACRS (10)
OPA E. Tana, PMAS P. O' Dell, PMAS V. McCree L. Plisco J. Wechelberger, EDO 17G21 OTSB Members 1
l DM' 06000G
\\\\o