Safety Evaluation Supporting Amend 87 to License NPF-8
ML20113G683
Person / Time
Site: Farley Southern Nuclear icon.png
Issue date: 04/01/1992
From:
Office of Nuclear Reactor Regulation
To:
Shared Package
ML20113G681 List:
References
NUDOCS 9204160092
Download: ML20113G683 (16)


Text

. _ _ _ - - - _ _ - -

f* h ty J

4' \\

UNITED STATES E

' U (( 1

/ i NUCLEAR REGULATORY COMMISSION I

[

WASHINGTON. D C. 20%S gv y SAFETY EVALVATION BY THE OFFICE OF NUCLEAR REACTOR REGULATION RELATED TO AMENDMENT NO. 87 TO FACillTY OPERATING LICENSE NO. NPF-8 SOUTHERN NVCLEAR OPERATING COMPANY. INC.

JOSEPH M. FARLEY NUCLEAR PLANT. UNIT 2 DOCKET NO. 50-364

1.0 INTRODUCTION

By letter dated February 20, 1992, as supplemented on March 27, 1992 (Reference 7), Southern Nuclear Operating Company, Inc. (the licensee),

submitted a request for changes to the Joseph M. Farley Nuclear Plant (Farley), Unit 2, Technical Specifications.

The requested amendment revises Technical Specifications 4.4.6.4 and 3.4.7.2, and Bases 3/4.4.6 to allow the implementation of interim steam generator (SG) tube plugging criteria for the tube support plate (TSP) elevations.

The amendment also reduces the allowed primary-to-secondary operational leakage from any one SG from 500 gallans per day (gpd) to 150 gpd.

The total allowed primary-to-secondary operation leakage from all three SGs is reduced from one gallon per minute (gpm), which is 1440 gpd, to 450 gpd.

Leakage subsequent to a main steamline break (SLB) accident is not expected to exceed the currently postulated value of one gpm.

The March 27, 1992, letter provided clarifying information that did not change the initial proposed no significant hazards consideration determination.

2.0 BACKGROUND

Previous inservice inspections and examinations of the SG tubes at Farley, Units 1 and 2, have identified extensive intergranular stress corrosion cracking (IGSCC) on the outer diameter of the tubes at the TSP intersections.

The licensee refers to this particular form of IGSCC as outer diameter stress corrosion cracking (0DSCC).

00 SCC activity at TSP intersections is a common degradation phenomenon in SGs in nuclear power plants. Approximately 21 tubes, including 57 tube-to-TSP intersections, have been removed from affected SGs across the industry for examination and testing.

These include one tube from Farley, Unit 1 (including 1 TSP intersection) and seven tubes from Farley, Unit 2, (13 TSP intersections).

Each of these pulled tube TSP intersections was sectioned and metallographically examined.

in general, these examinations have revealed multiple, segmented, axial cracks with short lengths for the deepest penetra-tions.

The ODSCC is generally confined to within the thickness of the TSPs, consistent with the corrnsion mechanism which involves the concentration of impurities, including caustics, in the tube-to-TSP crevices.

The staff

$bDo P

_l l

, i notes that there is some potential for snallow ODSCC for a short distance above or below the TSP.

This has been observed for two of the pulled TSP intersections, including one from Farley, Unit 1, which exhibited short, very l

shallow (510%) crack segments extending 0.25 inch above the TSP.

The pulled tube specimens from Farley, Units 1 and 2, to dato have shown minimal intergranular attack (IGA) involvement with the ODSCC. However, more significant IGA involvement has been observed on some pulled tube specimens from other plants. These results suggest that the degradation develops as IGA plus SCC, particularly when maximum IGA depths greater than 25% are found. A large number (>100) of axial cracks around the circumference ars commonly found on these tubes. The maximum depth of IGA is typically 1/2 to 1/3 of the stress corrosion cracking (SCC) depth.

Patches of-cellular IGA /0DSCC formed by combined axial and circumferential orientation of microcracks are frequently found in pulled tube examinations.

The staff notes, however, that the axial crack segments have been the dominant flaw fcature affecting the structural integrity of the pulled tube specimens as evidenced by results of burst tests (discus:;ed in Section 4.3), performed for 29 of the pulled TSP intersections prior to sectioning.

Technical Specification 4.4.6.4.a.6, Plugging or Repair Limit, requires that tubes with imperfections exceeding 40% of the nominal tube wall thickness be repaired by sleeving or removed from service by plugging. The licensee stated that this repair criterion would result in unnecessary removal of significant numbers of SG tubes from service.

To preclude this, the licensee developed proposed alternative plugging criteria (APC) that was-submitted by letter dated February 26, 1991 (Reference 1).

This proposal was revised by letter l

dated Hovember 13, 1991 (Roference 2), (1) to respond to questions and I

comments from the Nuclear Regulatory Commission staff (the staff) transmitted l

by letter dated August 8,1991 (Reference 3), and (2) to reflect additional pulled tube information from the Trojan Nuclear Plant. The proposed APC l

involves a voltage amplitude limit of 4 volts, as measured by the industry standard eddy current bobbin probe (referred to herein as a bobbin) using the 400/100 KHz mix differential channel, in lieu of the current 40% depth-based plugging or repair limit.

These criteria would only apply to 00 SCC degradation confined to within the thickness of the TSPs.

Staff comments and questions concerning the "ovember-13,1991, APC proposal (Reference 2 were provided by letter dated January 29, 1992 (Reference 4).

The licensee) responded to these questions and comments during a meetin February 6, 1992.

By letter dated February 20, 1992 licensee submitted an updated technical. support docume(Reference 5), the nt'for the APC, WCAP-12871, Revision 2 (Reference 6).

WCAP-12871, Revision'2, is intended to a

1

^

4 8

3-support a 3.6 volt repair limit; however, the licensee has not yet revised its 1'

4.0 volt APC proposal in Reference 2.

In their February 20, 1992, letter (Reference 5), the licensee requested interim modifications to the tube repair limits and primary-to-secondary leakage limits in the Farley, Unit 2, Technical Specifications for the ninth operating cycle only, pending completion of the staff's review of the APC proposal. The proposed modifications to the tube repair limits are described in detail in Section 3.0 of this Safety. Evaluation, and include a 1 volt repair criterion for' flaws confined to-the thickness of the TSP in lieu of the currently applicable depth-based limit of 40%. The proposed modifications to the leakage limits, dcscribed in Section 4.0 of this Safety Evaluation are more restrictive than the present limits.

3.0 JECHNICAL SPECIFICATION CHANGES Farley, Unit 2. Technical Specification 4.4.6.4.a.6, Plugging or Repair Limit, and Bases 3/4.4.6, Steam Generators, are revised to specify that the repair limit at the TSP intersections for the ninth operating cycle is based on the-analyses in-WCAP-12871, Revision 2, to maintain SG tube serviceability as~

described below:

a.

An eddy current inspection using a bobbin of 100% of-the hot and-cold leg SG TSP intersections will be performed for tubes in

service, b.

Degradation within the bounds of_ the TSP with a bobbin voltage'less than or equal to 1.0 volt will be allowed to remain in service.

c.

Degradation within the bounds of the TSP with a' bobbin voltage greater than 1.0 volt will be repaired or plugged except as noted in

d. below, d.

Indications of potential degradation within the bounds of the TSP with a bobbin voltage greater than 1.0_ volt,~ but less than or equal-to 3.6 volts, may remain in service if a rotating pancake coil probe (RPC) inspection does not detect degradation.

Indications of _

degradation with a bobbin voltage greater than 3.6-volts. Will be plugged or repaired.

Farley, Unit 2, Technical Specification 3._4.7.2, and Bases 3/4.4.6 are revised-to specify that for the ninth operating cycle only, primary-to-secondary leakage.through all-SGs shall be limited to 450 gpd and 150.gpd:through any one SG.

Primary-to-secondary leakage during a steam line break (SLB) wi'. not -

I exceed the current Technical Specification basis of I gpm.

1 i

-e+

m w

,- ~,,-

e,n

-vvw,-v-

,-,-~,e---,Nm+m,,-e-r---w-w~ q-

-s

~,,

-es-n-e s

-m u, - r w,-w w

-e-e--- mv N g-,,,

-m1--

yv w y,

, e

,e

,e-

=-.

. 4.0 EVALVAT10ff 4.1 Insoection Issues In support of the proposed interim repair limit, the licensee proposes to utilize the eddy current test guidelines provided in Attachment 7 of the February 20, 1992, letter (Reference 5) to ensure the field bobbin indication voltage measurements are obtained in a manner consistent with how the voltage i

limit was developed.

These guidelines define the bobbin specifications, 1

calibration requirements, specific acquisition and analyses criteria, and flaw recording guidelines to be used for the inspection of the SGs.

The staff finds these guidelines to be consistent with the Westinghouse NDE [non-destructive examination) Data Acquisition and Analysis Guidelines recommended in WCAP-12871 (Reference 6).

However, the guidelines contained in the licensee's February 20, 1992, letter (Reference 5, Attachment 7) specify that bobbin indications exceeding 1.0 volt will be recorded. The staff notes that knowledge of the voltage distribution of indications being accepted for continued service (i.e., bobbin indications equal to or less than 1.0 volt),

is an integral element of the technical justification being proposed by the licensee in support of the interim repair limit, as discussed in Section 3.5.

At the staff's request, the licensee agreed in their March 27, 1992, submittal (Reference 7) to record all flaw indications regardless of voltage amplitude.

With this commitment, the staff finds the licensee's eddy current test guidelines to be acceptable.

The staff finds that the proposed 100% bobbin inspection program is consistent with the development of voltage based repair limits; namely the establishment of a relationship between burst pressure and bobbin voltage.

In addition, the licensee states in their February 20, 1992, submittal (Reference 5) that it will perform an RPC sample inspection of 100 tubes, including all tubes with dent indications exceeding 5 volts as measured by the bobbin, and TSP intersections with artifact indications or indications with unusual phase angles.

The RPC can provide improved resolution of flaw indications (as compared to the bobbin), in the presence of dents and artifacts and is sensitive to both axial and circumferential flaws. The licensee states that the sampling plan will be expanded as necessary, based on the nature and number of the flaws discovered. At the staff's request, the licensee stated in the March 27, 1992, submittal (Reference 7) that RPC flaw indications not found by the bobbin due to masking effects (e.g., denting, artifact indications, and noise), will be plugged or repaired.

In addition, tubes with greater than 5 volt dent indications (as measured with the bobbin), will be plugged or repaired if they are found to contain RPC flaw indications.

l l

l l

. The Farley eddy test guidelines state that all TSP intersections exhibiting a bobbin indication exceeding 1.0 volt are to be inspected with an RPC.

The RPC inspections will permit better characterization of the indications found by bobbin to verify the applicability of the pronosed interim repair limit.

The proposed repair limit is based on the premise of axially oriented ODSCC as the dominant degradation mechanism with some IGA involvement. The proposed repair limit is also based on the premise that any significant degradation is confined to the TSP. At the staff's request, the licensoe agreed in their March 27, 1992, letter (Reference 7) to inform the staff prior to Cycle 9 operation of any unexpected RPC findings relative to the assumed characteristics of the flaws at the TSPs.

lhis includes any detectable circumferential indications or detectable indications extending outside the thickness of the TSP.

The licensee's safety evaluation of these unexpected findings will also be provided.

4.2 Tube Intearity issun the purpose of the Technical Specification tube repair limits is to ensure that tubes accepted for continued service will retain adequate structural and leakage integrity during normal operating, transient, and postulated accident conditions, consistent with General Design Criteria 14, 15, and 31 of 10 CFR Part 50, Appendix A.

Structural integrity refers to maintaining adequate margins against gross failure, rupture, and collapse of the 3G tubing.

Leakage integrity refers to limiting primary-to-secondary leakage to within acceptable limits.

The traditional strategy for accomplishing these objectives has been to establish a minimum wall thickness requirement in accordance with the structural criteria of Regulatory Guide 1.121. " Bases for Plugging Degraded PWR Steam Generator Tubes." Allowance for eddy current measurement error and flaw growth between inspections has been added to the minimum wall thickness requirement (consistent with the Regulatory Guide) to arrive at a depth-based repair limit.

Enforcement of a minimum wall thickness requirement would implicitly serve to ensure leakage integrity (during normal operation and accidents), as well as structural integrity, it has been recognized, however, that defects, especially cracks, will occasionally grow entirely through-wall and develop small leaks.

For this reason, tight limits on allowable primary-to-secondary leakage have been established in the Technical Specifications to ensure timely plant shutdown before adequate structural and leakage integrity of the affected tube is impaired.

l The proposed tube repair limits for Farley, Unit 2, consist of voltage amplitude criteria rather than the traditional depth-based criteria.

Thus, the proposed repair criteria represent a departure from the past practice of explicitly enforcing a minimum wall thickness requirement.

. The pulled tube examinations show that for bobbin !ndications at or me.r 1 volt (i.e., the proposed interim limit) maximum crack depths range between 20%

and 98% through-wall.

The likelihood of through-wall or near through-wall crack penetrations appears to increase with increasing voltage amplitude.

For indications at or near 3.6 volts (i.e., the APC limit), the maximum crack depths have been found to range between 90% and 100% through-wall.

Clearly, many of the tubes which will be found to contain "non-repairable" indications under the proposed interim criteria may develop through-wall and r. ear through-wall crack penetrations during the upcoming cycle, thus creating the potential for leakage during normal operation and postulated SLB accidents.

The staff's 3

evaluation of the proposed repair criteria from a structural and leakage integrity standpoint is provided in this Safety Evaluation in Sections 4.3 and 4.4, respectively.

4.3 Structural Intearity 4.3.1 Burst Intearity The licensee has developed a burst strength / voltage correlation to demonstrate that bobbin indications satisfying the proposed 1.0 volt interim repair criterion or the 3.6 volt APC criterion will retain adequate structural margins durinn Cycle 9 operation, consistent with the criteria of Regulatory Guide 1.121.

The burst strength / voltage correlation includes the burst pressure versus field bobbin voltage data (pre-pull values), for twenty-nine pulled tube TSPs, includia 3 1$Ps from Farley, Unit 2.

These pulled tube data are supplemented by 30 data points from laboratory tube specimens containing ODSCC flaws produced in model boiler tests under simulated field conditions.

The bobbin voltage data used to construct the burst pressure / voltage correlation have been normalized to reflect calibration standard voltage setups and voltage measurement procedures consistent with the NDE Data Acquisition and Analysis Guidelines in WCAP-12871, Revision 2, Appendix A (Reference 6). The staff finds that this normalization ensures consistency among the voltage data in the burst pre'sure/ voltage correlation and, in addition, ensures consistency between the voltage data in the correlation and the field voltage measurements at Farley, Unit 2.

The most limiting burst pressure criterion of Regulatory Guide 1.121 is that degraded tubes shall retain a margin of 3 against burst at normal operating differential pressure across the tube.

For Farley, Unit 2, this translates to a limiting burst pressure criterion of 4380 psi.

From the burst pressure / voltage correlation, the maximum voltage which will satisfy this burst pressure criterion at a 95% confidence intervals is 6.2 volts.

The 3.6 volt APC limit, which WCAP-12871 is intended to support, includes an allowance for 20% NDE measurement uncertainty and for a 50% increases in voltage during the next operating cycle.

The NDE measurement uncertainty

estimate considered measurement uncertainties stemming frui bobbin design characteristics, bcbbin wear (which affects centering), variability among American Society of Mechanical Engineers (ASME) calibration standards, and variability in the analysts' interpretation of the signal voltage. The staff concurs that the NDE Data Acquisition and Analysis Guidelines (Reference 6, Appendix A), which have been incorporated into the Farley, Unit 2, eddy current test guidelines, will be effective in minimizing the uncertainties as they apply to the interim criteria.

Based on implementation of these guidelines, a cumulative probability distribution of the residual measurement uncertainty (applicable to each bobbin indication). has been developed.

The assumed 20% uncertainty in the voltage measurements is conservative with respect to the upper 95% cumulative probability value of'16% as determined from the cumulative probability distribution.

Potential flaw growth betwes,i inspctions has been evaluated based on observed voltage aniplitude changes during Cycles 6 and 7 at Farley, Unit 2.

Specifically, the eddy current data from the 1987 and 1989 inspections were reexamined for each indication reported during the most recent previous inspection in 1990, using a consistent data analysis procedure.

This examination showed that many of the 1990 indications were traceable back to the 1987 and 1989 inspections. The average percent changes in voltage considering the entire data set, were 45% between 1987 and 1989 and 29%

between 1989 and 1990.

These averages conservatively treat negative voltage changes as zero changes.

If the data set is restricted to voltage changes where the initial indication exceeded 0.7 volts, the average voltage changes are smaller, e.g.,

10% between 1989 and 1990.

The 50% average voltage growth allowance used to support the 3.6 volt APC limit is intended to provide margins for variation in future growth rates at Farley, Unit 2.

For any specific individual tube, NDE measurement uncertcinty.and/or voltage growth may exceed the values assumed in the above deterministic basis for the 3.6 volt APC repair limit,-since the deterministic basis does not consider the tail of the voltage measurement and voltage growth distribution.

In addition, burst pressure for some tubes may be lass than the 95% confidence values in the burst pressure / voltage calculatior... The licensee proposes that these uncertainties be directly accounted for by use of Monte Carlo methods to demonstrate that the probability of burst during St.B accidents is acceptably low for the distribution of voltage indications being left in service.

Under this approach, the beginning-of-cycle (B0C) indications left in service are projected to the end-of-cycle (E00) by randomly sampling the_ probability distributions for NDE uncertainties and voltage growth per cycle. _For each E0C Monte Carlo sample of bobbin voltage, the burst pressure / voltage correlatior is randomly-sampled to obtain a burst pressure.

100,000 Monte

.i

8-Carlo samples are performed for the BOC distribution.

The probability of tube burst at SLB is ob'.ained as the sum of the samples resulting in burst pressures less than the SLB pressure differential of 2650 psi divided by the number of times the distribution of indications left in service is sampled.

This kind of Monte Carlo analysis was performed for the distritution of indications found during the previous (i.e.,1990) inspection at Farley, Unit 1

2.

This analysis indicated that 5plementation of a 3.6 volt repair criterion at that time would SLB, of about 3x10' pave yielded a txditional probability of burst, given an The strff corcurs that this is an extremely low probability, three orders of magnitude less than the value considered in a staff generic risk assessm:.nt for SCs (NUREG-0844). Over time, the number of indications found between 0 and 3 6 iolts can ba expected to increase.

Therefore, the APC proposal (involving the 3.6 volt repair ;riterion),

includes a provision for determining the probability of burst at SLB conditions following each outage for indications left in service to confirm the continued adequacy of the repair criterion.

The staff is continuing to evaluate the technical basis for the proposed APC (i.e., 3.6 volt criterion).

In the meantime, the staff concludes that the proposed 1.0 volt interim criterion will provide adequate assurance that tubes with indications which are accepted for continued service will meet the burst pressure criteria of Regulatory Guide 1.121.

The staff notes that the bounding value of voltage growth / cycle at Farley, Units 1 and 2, since 1987 has not exceeded 2.6 volts.

The staff estimates this 2.6 volts to represent a bounding value, assuming no increase in corrosion rates over what has been observed previously at Farley, Units 1 and 2.

Assuming a 20% voltage measurement uncertainty (upper 95% confidence value determined by the licensee) for a 1.0 volt indication left in service, the E0C voltage is expected by the staff to be bounded by 3.8 volts.

This is substantially below the 6.2 voltage limit evaluated by the licensee as the lower 95% confidence limit for meeting the most limiting burst pressure criterion (i.e., thrta times normal operating pressure differential).

Finally, the licensee is proposing as part of the interim repair criteria that indications with bobbin voltages greater than 1.0 volt, but less than or equal to 3.6 volts, remain in service if RPC inspection does not confirm the indication.

The staff notes that short and/or relatively shallow cracks that are detectable by the bobbin may sometimes not be detectable by RPC, although the RPC is considered by the staff to be more sensitive to longer, deeper l

flaws which are of structural significance.

1

,y,--

.y-

4 4 The staff further notes that burst strength is not a unique function of voltage, rather for a given voltage there is a statistical dis'ribution of possible burst strengths as indicated in the burst pres 2ure/ voltage correlation.

The staff concludes that burst pressures for bobbin indications which were not confirmed by RPC will tend to be at the upper end of the burst pressure distribution.

The 3.6 volt cutoff, such that all bobbin indications would be plugged or repaired (with or without confirming RPC indications),

provides additional assurance that all excessively degraded tubes will be removed from service.- Thus, the staff finds the preposed exception to the 1.0 volt criterion to be acceptable.

4.3.2 Combined Accident Loadinas I

The licensee has evaluated-the effects of combined safe shutdown earthquake-(SSE) and loss-of-coolant acciden*. (LOCA) loads and SSE plus SLB loads on tube integrity, consistent with the General Design Criterion 2 (GDC-2) of 10 CFR Part 50, Appendix A.

A combined LOCA plus SSE must be evaluated for potentiel yielding of the TSPs which could result in subsequent deformation of the tubes.

If significant tube deformation should oc:ur, primary flow area could be reduced and postulated cracks in tubes could open up which might create the potential for in-leakage (i.e., secondary-to-primary), under LOCA conditions.

In-leakage ouring LOCA would pose a potential concern since it may cause an increase in the core peak clad temperature (PCT).

The most limiting accident conditions for tube deformation' considerations result from the combination of SSE and LOCA' loads. The seismic excita~.an defineJ for SGs is in the form of acceleration response spectra at the SG l

supports.

In the seismic analysis, the licensee has used generic response spectra which envelop the F rley-specific response spectra. A finite element model of the Series 51 SG was developed, and the analysis was performed using the WECAN computer program.

The mathematical model consisted of three dimensional lumped mass, beam, and pipe elements as well as general matrix input 'ai represent the piping and support stiffness.

Intenctions at the TSP shell and wrapper /shell connections were represented by c ncentric spring-gap dynan lc elements.

Impact damping was used to account for energy dissipation at these locations.

LOCA loads, developed as a result of transient flow following a postulated l

primary coolant pipe break, were calculated for five different pipe break locations.

These included three large and.two minor pipe breaks.

The large pipe break locations evaluated were the SG inlet and outlet lines and the reactor coolant t. ump outlet line, while the minor pipe breaks analyzed were two branch line breaks.

Prior qualification of the Farley, Unit 2, primary piping for leak-before-break requirements resulted in the limiting LOCA event l

v.~

,,,.,,,-,r.-~,-

,--~,_,r-.-,.r,.r.

w.

1 - <. - - - < - -,,.,,., -.,

, - ~,, - -

-.,. ~, -, -.

,-,,,,,,n

-,-w,n.

-lC-being the break of a minor branch line.. The licensee, however, has used the loads for the primary piping break as li conservative approximation.

The principal tube loading during a LOCA is caused by the rarefaction wave:in the primary fluid. This wave initiates at the postulated break location and travels around the tube U-bends, A differential pressure is created acr the two legs of the tube which causes an in-plane horizontal motion of tne U-bends and induces significant lateral loads on the tubes.

The pressure time-histories needed for creating the differential pressure across the tube are obtained from transient thermal hydraulic analyses. asing the MULTIFLEX:

computer code.

For the rarefaction wave induced loadings, the predominant motion of the U-bends is in the plane of _ the U-bend. Thus, the individual tube motions are not coupled by the anti-vibration bars and the structural analysis is performed using single tube models limited to the U-bend and the straight leg region over the top two TSP's.

In addition to the rarefaction wave loading discussed above, the tube bundle-is subjected to bending loads during a LOCA.

These loads are due-to.the shaking of-the SG caused by the break hydraulics and reactor coolant loop motion.- However, the resulting TSP loadi from this-motion-are small compared to those due to the ratefaction wave-induced motion.

To obtain the LOCA induced hydraulic forcing functions, a dynamic blowdown-analysis is performed to obtain the system hydraulic forcing functions assuming an instat 6aneous (1.0 msec break opening'. time), d'uble-ended guillotine break. The bydraulic forcing functions are the.. applied, along with the displacement time-his'tary of the reactor pressure vessel _(obtained l-from a separate reactor vesse'i blowdown analysis) to a system structural model l

thA includes the SG, the reactor coolant pump and the primary piping.- This-analysis yields the time histcry displacements of the SG at its upper lateral and lower support nodos. These time-history-displacements formulate the forcing functions for obtaining.the tube stresses due:to LOCA shaking of the SG.

In calculating a combined TSP load, the licensee combined the LOCA rarefaction and LOCA-shaking loads directly, while the LOCA and SSE loads were combined using the square root of the sum of the squares.. The staff found 31s=

combinatica methodology acceptable. The overall TSP load was tran.ferred to the SG shell through wedge groups located at. discrete locations around the.

plate circumference.

The radic1-loads due to combined LOCA and SSE could potentially result in -

yielding of the TSP at the wedge supports, causing some tubes in-the vicinity of the wedge supports to be deformed.

Utilizing results-from recent l

tests and analysis programs, the licensce has shown that tubes will, undergo permanent deformation if the change in diameter exceeds a minimum threshold va!ue. This thresholj:ror tube deformation is related to-the concern-for

. ~. 2,_;

.u

y w tubes with pre-existing tight cracks that could potentially open during a combined LOCA plus SSE event.

For Farley, Unit 2, the LOCA plus SSE loads were determined to be of such maov ade that none of the tubes (which are assumed to contain pre-existing 3;h. racks) are predicted to exceed this deformation threshold value anC t?

efore, will not lead to significant tube leakage.

The licensee has assessed the effect of SSE bending stresses on the burst strength of tubes with axial cracks. Tensile stress in the tube wall would tend to close the cracks while compressive s' ess would tend to open the cracks. On the basis of previously performed tests, the licensee has concluded that the burst strength of tubes with through-wall cracking is not affected by an SSE event.

Based on a review of the information provided by the licensee, the staff concludes that at Farley, Unit 2, no significant tube deformation or leakage is likely to occur during an SSE plus LOCA event.

In addition, burst strength of tubing with through-wall cracks is not affected by an SSE event.

4.4 Leakaoe Intearity As discussed earlier, a number of the indications satisfying the proposed interim 1.0 volt repair limit can be expected to have or to develop through-wall and/or near through-wall crack penetrations during the next cycle, thus creating the potential for primary-to-secondary leakage @ ring normal operation, transients, or postulated accidents.

The staff finds that adequate leakage integrity during normal operating conditions is assured by the proposed restrictive Technical Specification limits o' llowable primary-to-econdary leakage as discussed in Section 4.5 of this fety Evaluation.

Adequate leakage integrity during transients and postulated accidents is Gmonstrated by showing that for the niost limiting accident, the resulting leakage will not exceed the rate assumed in the Farley, Unit 2, design basis analysis.

The licensee has identified the Final Safety Analysis Report (FSAR), Chapter 15, accidents which result in secondary steam release, and thus whose consequences could be affected by the extent of primary-to-secondary leakage.

Of these accidents, the SLB was determined to be the most ' limiting.

In this case, since the SG in the faulted loop is subject to dryout, the activity release path is conservatively assumed to be direct to the environment, without any mitigation resulting from mixing with secondary liquid coolant in the SG.

9

O

. The licensee has submitted an analysis (Reference 6) in support of the APC (3.6 volt based criteria) proposal to demor. strate 55 gpm as the allowable leakage rato during SLB.

This analysis is under staff review.

For the purpose of supporting the laterim repair limit proposal, the licensee has proposed that the maximum lowable leak rate during SLB be 1.0 gpm, consistent with the assumed leak rate in the FSAR design basis analysis.

Therefore, there is no change in the offsite dose as a result of the use of t

the interim repair limit.

The staff concurs that use of an accident leakage of 1.0 gpm is an acceptable leak rate limit.

The SLB leakage calculation model in Reference 6 utilizes a correlation between leakage test data obtained under simulated SLB conditions (at a given TSP location), and the corresponding normalized bobbin voltage (SLB leakage / voltage correlation).

The SLB leakage data includes 27 data points from the model boiler specimens described earlier and-7 data points from the pulled tube specimens. The calculation method involves establishing '.he voltage distribution of the indications being accepted for continued service.

Probability distributions of voltage measurement uncertainty, voltage growth / cycle, and SLB leak rate versus voltage are accounted for by Monte Carlo techniques in predicting the distribution of E00 voltages and the associated SLB leakage. One thousand Monte Carlo simulations of the BOC distribution of indications are performed.

SLB leakage is evaluated at the 90% cumulative probability level.

Based on the voltege distributions found during previous inspection (1990) at Farley, Unit 2, and assuming implementation of the 3.6 volt repair criterion, the estimated leakage during a postulated SLB at EOC 8 was 0.4 gpm at the 90%

cumulative probability level, well within the current licensing basis of 1.0 gpm.

The estimate is almost entirely made up of leakage from indications whose B0C voltages were greater than 2 volts.

Utilizing the same model, the licensee has determined that about 4000 B0C indications at 2 volts would be recessary to produce an SLB leak rate of 1.0 gpm (at 90% cumulative probability) at E0C.

In support of the 1 volt interim repair criterion, the licensee will update the above analyses to consider the distribution of voltages fer indications satisfying the 1 volt criterion during the eighth refueling outage inspection. The analysis will also reflect the distribution-of voltage changes observed during Cycle 8 (i.e., 1990 to 1992).

The licensee states in their February 20, 1992, letter (Reference 5) that if potential leakage during a postulated SLB from indications left in service is found to exceed 1 gpm, additional tubes will be plugged or repaired as necessary to satisfy the 1.0 gpm criterion.

This is not acceptable to the l

__.q

. staff.

The staff's approval of the proposed interim repair limit is based on the licensee's being able to demonstrate that acceptance of all bobbin indications satisfying the 1.0 volt criterion will not create the potential for leakage in excess of the 1.0 gpm licensing basis for a postulated SLB.

Plugging or repair of tubes meeting the 1.0 vo1+ criterion is not permitted to meet the 1.0 gpm limit.

At the staff's request, the licensee has agreed in their March 27, 1992, letter (Reference 7) to report, prior to restart from the eighth refueling outage, the results of its SLB leakage analysis.

This analysis shall confirm that the leakage from a post 91ated SLB at E0C 9 will not exceed 1.0 gpm.

4.5 Proposed Itsterim Leakaae limits 4.5.1 Description The licensee is proposilg an interim change to the reactor coolant system leakage limit criteria in Technical Specification 3.4.7.2 that is applicable to the ninth operating cycle only.

Specifically, the licensee is proposing to reduce the current 500 gpd limit for primary-to-secondary leakage through any one SG to 150 gpd.

In addition, the limit on total leakage through all SGs would be reduced from 1.0 gpm (1440 gpd) to 450 gpd.

Leakage during a SLB would not exceed the current design basis of 1.0 gpm.

4.5.2 Discussion l

The current 500 gpd limit per SG is intended to ensure that through-wall cracks which leak at rates up to this limit during normal operation will not propagate and result in tube rupture under postulated accident conditions consistent with the criteria of Regulatory Guide 1.171. The current 1.0 gpm l

limit for total primary-to-secondary leakage is consistent with the assumptions used in the FSAR design basis accident analyses.

Development of the proposed 150 gpd limit per SG has utilized the extensive industry data base regarding burst pressure as a function of crack length and leakage during normal operation.

Based on leakage evaluated at the lower 95%

confidence interval for a given crack size, the proposed 150 gpd. limit would be exceeded before the crack length reaches the critical crack length for SLB pressures.

Based on nominal, best estimate leakage rates, the 150 gpd limit l

would be exceeded before the crack length reaches the critical length for three times normal operating pressure, i

The proposed interim change is more restrictive than the existing limits, and is intended to provide a greater margin of safety against rupture. The proposed interim limits are also intended to provide additional margin to-

. accommodate a rogue crack which might grow at much greater than expected rates, or unexpectedly extend outside the thickness of the TSP, and thus provide additional protection against exceeding SLB leakage limits.

The staff finds the proposed interim leakage limits to be acceptable.

4.6 Summary Based on the above evaluation, the staff concludes that-the proposed interim-tube repair limits and leakage limits will ensure adequate structural and leakage integrity of the SG tubing at Farley, Unit 2, consistent with applicable regulatory requirements.

The staff's approval of the proposed interim repair limit is based on the licensee's being able to demonstrate that acceptance of all indications satisfying the 1.0 volt criterion will not create the potential for leakage in excess of the 1.0 gpm licensing basis for a postulated SLB occurring at E0C 9.

The licensee has agreed to report, prior to testart from the eighth refueling outage, the results of the SLB leakage analysis that confirms that the leakage during a postulated SLB at E0C 9 will not exceed 1.0 gpm.

5.0 STATE CONSULTATION

in accordance with the Commission's regulations, the State of Alabama official was notified of the proposed issuance of the amendment. The State official had no comments.

6.0

. ENVIRONMENTAL CONSIDERATION The amendment changes a requirement with respect'to installation or use of a facility component located within the restricted area as defined in 10 CFR Part 20. The NRC staff has determined that the amendment involves no significant increase in the amounts, and no significant change in the types, of any effluents that may be released offsite, and that there is no significant-increase in individual or cumulative occupational radiation exposure.

The Commission has previously issued a proposed finding that the amendment involves no significant hazards consideration, and there has been no public comment on such finding (57 FR 7405). Accordingly,-the amendment meets the eligibility criteria for categorical exclusion set forth in 10 CFR 51.22(c)(9).

Pursuant to 10 CFR 51.22(b) no environmental impact statement or environmental assessment need be prepared in connection with_the issuance of the amendmen..

l

1

7.0 CONCLUSION

The Commission has concluded, based on the considerations discussed above, that:

(1) there is reasonable assurance that the health and safety of the public will not be endangered by operation in the proposed manner, (2) such activities will be conducted in compliance with the Commission's regulations, and (3) the issuance of the amendment will not be inimical to the common defense and security or to the health and safety of the public.

8.0 REFERENCES

1.

Alabama Power Company letter dated February 26, 1991, " Joseph M. Farley Nuclear Plant - Units 1 and 2, Steim Generator (SG) Tube Support Plate (TSP) Alternate Plugging Criteria APC)."

2.

Alabama Power Company letter, datec November 13,1991, " Joseph H. Farley Nuclear Plant, Steam Generator (SG) Tube Support Plate (TSP) Alternate Plugging Criteria (APC)."

3.

NRC letter to Alabama Power Company, dated August 8, 1991," Request for Additional Information Concerning Steam Generator' Tube Support Plate Alternate Tube Plugging Criteria for Joseph M. Farley Nuclear Plant, Units 1 and 2."

4.

NRC letter to Southern Nuclear Operating Company, dated January 29, 1992, " Steam Generator Tube Support Plate Alternate Plugging Criteria for Joseph Farley Nuclear Plant, Units 1 and 2."

5.

Southern Nuclear Operating Company, Inc., letter, dated February 20, 1992, " Joseph M. Farley Unit 2, Steam Generator Tube Support Plate Interim Plugging Criteria," February 1992.

6.

Westinghouse Reports WCAP-12871, Revision 2 (Proprietary Version) and WCAP-12872, Revision 2 (Non-Proprietary Version), "J.M.

eley Units 1 and 2 SG Tube Plugging Criteria for ODSCC at Tube Support Plates."

7.

Southern Nuclear Operating Company, Inc. letter, dated March 27, 1992,-

" Joseph h. Farley Nuclear Plant - Unit 2 Interim Plugging Criteria."

Principal Contributor:

E. Murrhy K. Desai J. Rajan Date: April 1, 1992

. - ~.

ADR/3 ROSTER ASSISTANT DIRECTOR for REGLON III Mail Stop 13-H-24 PLANT BACKPM ZWOLINSKI, John A,-

504-1335 Room 13-H-22 LEEDS, Eric J.

504-1336 13-H-23 WlENS, Carilyn (Sue) 504-1335 13-H-24 PROJECT DIRECTORATE 111-1 Mail Stop 13-D-18 MARSH, Ledyard (Tad) 504-1340 Room 13-D-18 DELGADO, Jessie 504-1340 13-D-17 YINGLING, Dana 504-1340 13-D-20

  • CARPTENER, Gene 504-1347 PE 13-C-17 COLBURN, Timothy G.

504-1341 13-D-19 Fermi B. Stransky DIEC, David 504-1366 13-F-19 (INTERN)

CAMBER 0NI, Marsha 504-3024 PE 13-C-22 LONG, William 504-3026 13-D-15 Monticello/

A. Masciantonio Prairie Island MASCIANTONIO, Armand 504-1337 13-G-22 Palisades M.Gamberoni 3HUTTLEWORTH, Peggy 504-1333 LA 13-G-20 STRANSKY, RoNrt 504-1346 13-D-16 Big Rock J. Stang STANG, John F.

504-1345 13-D-14 DC Cook W. Long PROJECT DIRRECTORATE III-2 Mail Stop 13-D-1 BARRETT, Richard J.

504-1395 Room-13-D-1 AUSTIN, Tammy 504-1395 13-D-G REINHART, Jeannie 504-1395 13-D-1 ELLIOTT, Robert 504-1397 PE 13-C-11 HICKMAN, John 504-3017 13-C-7 Zion-R. Pulisfer HSIA, Tory 504-3028 13-D-11 Byron C. Patel LYNCH, Dave 504-3023 PE 13-D-5 MOORE, Christy 504-3100 LA 13-D-12 OLSHAN, Leonard N.

504-3018 13-D-8 Quad Cities B. Siegel PATEL, Chandu P.

504-3025 13-D-10 Zion R. Pultsfer PULISFER, Robert 504-3016 13-C-9

-Braidwood

-T..Hsia SIEGEL, Byron S k 3019 13-D-7 Dresden/

R. Elliott

.LaSalle ORDAZ, Vonna 504-1391 13-F-19 (INTERN)

PP,0 JECT DIRECTORATE III-3 Mail 'Stop 13-E HANNON, John N.

504-1389 13-E-19 J0NES, Brenda 504-1389 13-E-21.

TOR 0, Elaine 504-1389 13-E-24 (2 days per week)

    • GODY, Anthony 504-1387 13-E-20 Clinton-C. Shiraki HALL, Randy 504-3063 13-F-21 Perry J. Hopkkins HANSEN, Allen 504-1390 13-E-22 Vewanee R. Samworth..

HOPKINS, Jon 504-3027 13-D-13 Davis /Besse A.'Hansen KREUTZER, Pat 504-1392 LA 13-F LOMBARDO, Jim 504-1221 PE 13-E-10 SAMWORTH, Robert 504-1364 13-E-9

-Point Beach A. Hansen SHIRAKI, Clyde 504-3101 13-D-9 _

_Duane Arnold R.-Hall WHARTON, Ray-504-1386 13-C-13 Callaway T. Gody

  • G. Carpenter (PM) for Clinton 4/17-8/3 (Can be reached'on 504-1387)
    • T. Gody on rotational to RV 4/17-8/3 REVISED 4/8/92