ML20077M945
| ML20077M945 | |
| Person / Time | |
|---|---|
| Site: | Farley |
| Issue date: | 08/08/1991 |
| From: | Woodard J ALABAMA POWER CO. |
| To: | NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM) |
| Shared Package | |
| ML20077M948 | List: |
| References | |
| NUDOCS 9108140167 | |
| Download: ML20077M945 (1) | |
Text
. - _. - _ - _ _ _ _ -
Ih$N IW'y N
J
, HIT Ii
'g i
A CXf iT?"" ^ ',
A.,.
tu...,
% po a
.1 s v.t >,
n a o.wooouo Akil)am;ll\\nver
.,, m, m in,"
August 8, 1991 10CFR50.55a(g) 10CFR50.36 Docket No. 50-348 U. S. Nuclear Regulatory Commission Attn:
Document Control Desk Washington, D.C.
20555 Jaseph M. Farley Nuclear Plant - Unit 1 Intt.tval 2/ Period 1/0utage 3
.lD M rYLGi inspection Report Gentlemen:
Pursuant to the requirements of 10CFR50.55a(g) and 10CFR50.36, Alabama Power Company herewith submits the Joseph M. Farley Nuclear Plant Unit 1 interval i / Period 1/0utage 3 Inservice Inspection Report prepared by Farley Nuclear Plant.
This report describes and summarizes the inservice inspection activities performed during the Unit 1 tenth refueling outage. These activities were completed May 17, 1991.
Included in this report are the results of the steam generator eddy current testing conducted during this outage as required by 10CFR50.55a(g) and Section 4.4.6.5.b of the f arley Nuclear Plant Unit 1 Technical Specifications.
Specifically, the results and a sungnary may be found in Tab B.
Other pertinent report information is available at f arley Nuclear Plant for your review. This information includes as applicable, examination plans and schedules, examination results and reports, examination methods and procedures, evaluation of results, and corrective actions and repairs.
If there are any questions, please advise.
Respectfully submitted, kM eM QD Woodard JDW/ CDP:pgr cdp-oa Enclosure xc: Mr. S. D. Ebneter w/l encl.