t e
Januarb.14,E91985 nt,
- 3 M C UNITED STATES OF AMERICA
'85 JAN 17 Pi :57 NUCLEAR REGULATORY COMMISSION BEFORE THE ATOMIC SAFETY AND LICENSING BOARD 50N$ijkbj$.4
" U NCH In the Matter of
)
)
CAROLINA POWER & LIGHT COMPANY
)
and NORTH CAROLINA EASTERN
)
Docket No. 50-400 OL MUNICIPAL POWER AGENCY
)
)
(Shearon Harris Nuclear Power
)
Plant)
)
AFFIDAVIT OF ROBERT G.
BLACK, JR. ON EDDLEMAN 213 County of Wake
)
)
ss.
State of North Carolina
)
ROBERT G. BLACK, JR.,
being duly sworn, deposes and says:
1.
I am the Director - Emergency Preparedness for Appli-cant, Carolina Power & Light Company.
In my professional ca-pacity, I have been personally involved in the development of the onsite emergency plan and procedures for the Harris plant for the past three and a half years.
Further, I have attended numerous industrial symposiums, am active in related profes-sional associations, and have participated in numerous emergen-cy exercises at operating nuclear plants.
A current statement of my professional qualifications and experience is attached hereto.
My business address is Carolina Power & Light Company, 0501180416 850114 i
1-
{
P.O.
Box 1551, Raleigh, North Carolina 27602.
I have personal knowledge of the matters stated herein and believe them to be true and correct.
I make this affidavit in response to Eddleman Contention 213.
2.
The purpose of this Affidavit is to describe the mea-sures being taken to assure that boaters, waterskiers and swimmers on Harris Lake would be promptly alerted in the event of an emergency at the Harris plant.
3.
Harris Lake is a recreational area within the Harris EPZ.
The lake covers approximately 4000 acres, has an average depth of approximately 18 feet, and i: located entirely within Wake and Chatham Counties.
Recreational activities on the lake include boating, waterskiing, and swimming.
4.
The fixed siren system will be the primary means of alerting boaters, waterskiers and swimmers on the lake in the event of an emergency at the Harris plant.
Because current plans do not contemplate the use of vehicles as part of the warning system design on Harris Lake, no risk of " boat or traf-fic accidents" will be associated with the alerting process.
5.
Carolina Power & Light Company ("CP&L") is in the process of contracting with Acoustic Technology, Inc. ("ATI")
to analyze and evaluate the existing siren system as a means of alerting boaters, waterskiers and swimmers on Harris Lake.
As a result of this study, ATI will prepare a report which docu-ments the analysis of the warning system design for alerting of boaters, waterskiers and swimmers.
6.
Based upon the results of ATI's study, the existing siren system will bc enhanced as necessary to ensure that the siren signal is distinguishable above the projected ambient i
noise levels aboard a boat, Robert G. BlacY,gr.
sworn to and subscribed before me this d ay of January, 1985.
/
g w a tery runnc 7,l1,;i{yg,,, %
(,. //;,,j,y I }.)
My commission expires:. -- -, a
''j'{j.), /,,
'//h)lalintM l
l l
3
r 1
Robert G. Black, Jr.
813 silver Leaf Place l
North Carolina 27609 I
Halei4h,(919) 782-4993 EstEation/TrainW 4
Univeralty of Edinburgh, Scotland (1 year undergraduate study)
BIS Degree at Georgia Institute of Technology 1969 (Major:
Industrial Engineering)
Haral Muclear Power Sohoci, Mare Island, California (6 reonths)
Haral Nuolaar Power Prototype (SIW), Idaho (6 months)
Haval Submarine Senoot, aroton, Connecticut VarLous Naval Courses Various Carolina Power & Light Company Management Training Courses i
Experience January 1981 to Present - Carolina Power & Light Company Director - Emergency Preparedness Promoted to Director Eastgency Preparedsess, responsible for the 1
overall direction and coordination of Corporate level amar6eacy planning activities. This position reports directly to Corporate Managessent and supervises a staff of emergency preparedness specialists who formulate and recommend Corporate level emergency policies and programs; maintain and distribute the Corporate Emergency Plan (CRP) in compliance with federal, state, and local requirements; evaluate existing plans and emergency preparedness at nuolaar facilities and recommends improvements and modifications to meet expanded regulatory requirements for emergency planning; provide project management support for the design, procurement, and construction of emergency facilittes and early warning systenal provide support in the selection, construction, and application of emergency response information and cosmanication facilities; provide support for the development of emergency plans for hydro plants in the event of dam failures; provide meteorological asseestsents to appropriate personnel within the Company during emergencies as well as during normal operating conditions provide maintenance support for the Company's meteorological and estamolostoal monitoring program; and serve as prirmary interface with regulatory agencies on energeney planntng and relatec metters.
Spooial Assignment - Served as Exercise Director, Lead Controller, and Lead Evaluator on nine emergency preparedness exaroises.
January 1977 to January 1981 - Carolina Power & Light Company, Nuclear Licensing Project Engineer Promoted to Project Engineer responsible for the nuclear licensing activities related to Shearon Harris Huolear Power Plant (SHNPP),
planned as a four-unit pressurized water reactor plant.
(2tl35aPD/krs) l L
o Responsibilities included coordinating activities during the Construction Permit review of the SHNPF which involved responding to over 200 formal NRC questions in safety, environmental, and financial areaal preparing testimony to be used before the Advisory Committee l
on Reactor Safeguards and the Atonio Safety Lice'ising Board; and representing Carolina Power & Light Company in technical meetings held with the NRC Staff. Emphasis placed on ayates and plant design, industry codes and standards application, and construction procedures and techniques.
A staff of tW0 engineers and four technicians reported directly to see in this assignment.
Special Assignment - Coordinated the development, publication, and submittal of the Operating License Application, Final Safety Analysis Report, and Environmental Report-Operating License Stage, for the SHHPP.
Special Assignment - Chairman of Corporate SIDIPP Action Itee Management Team charged with the responsibility to ensure that commitments made to the Nuclear Regulatory Commission on the SIDIPP project are met.
. January 1975 to January 1977 - Carolina Power & Light Company, Nuclear Licensing Project Engineer Promoted to Project Engineer responsible for nuclear licensing activities related to one operating boiling water reactor and to a separate oct11ng water reactor racility under construction at the Rann.n nu t d.r S h aa nn ElmaFatn Bl as.P E m a n n a i t h t i t h 1 a.a,Laa.laAA.ad coordinating the development of meterial obtained from the architect engineer (United Engineers), nuclear steam supply vendor (General Electrio) and Carolina Power & Light company personnel to meetins regulatory anc corporate requirements. Particular empnasis was placed upon development of startup procedures, training and i
retraining progratta, and plant technical specificationn.
3pecial Assignments - Company co-representative on industry Mark I Containment and Anticipated Transient Without Scram ( ATWS) Owners' Groups.
september 1973 to January 1976 - Carolina Power & Light Coeupany, Nuolear Licensing Senior Engineer Duties included ooordination of various licensing antivities associated with obtatning Operating Licenses for the Brunswick Steam Electric Plant.
Areas of responsibility included review of the engineering, construction, and operation of a boiling water reactor from a regulatory licensing standpoint. Emphasis during this period was placed on rinal design considerations, preoperational test prococure and tecnnteal specification development; and preparation of material to De presented to the Advisory Committee on Raaetor
.~
safeguards and the Nuclear Regulatory Commission Staff.
(24358PU/krs)
L 1.
s
-3 I
o Special Assignment - Represented the ald-east group of utilities including Carolina Power & Light Company and five neighboring j
utilities on a national ocamittee to interface with the NRC l
concerning the initial development of Standard Technical Specifiostione. for Boiling Water Reactors.
June 1969 to July 1973 - U. S. Naval officer Served as Auxiliary Division Officer, Sonar Officer, First Lieutenant, and weapona officer on the U. S. Flying Fish (38N673).
Licensed to operate and direct othera in the safe operation and maintenanos of pressurised water nuclear reactors. Trained in the safe operation, mintenanos, and security for nuclear weapons.
Professional Affiliations Professional Engineers of North Carolina (registered in North Carolina)
American Huolear Society Eastern Carolinas Section (Chairman)
Amerloan Nuolear Society - National Mastership Committee Vice Chairman Naval Reserve Officers Association Comander U. S. Naval Reserve - Military Saalift cousand (MSC) (qualified for command of MSc Office) 1 f
iv f&
(2435EPD/krs)
< - - ~.. - - - -
__