MONTHYEARML20217N3001999-10-21021 October 1999 Proposed Tech Specs,Correcting Two Textual Errors & Changing Designation of Referenced Figure ML20217K8731999-10-18018 October 1999 Proposed Tech Specs Revising Activated Charcoal Testing Methodology IAW Guidance Provided in GL 99-02 ML20212F6941999-09-21021 September 1999 Proposed Tech Specs,Increasing Required Vol of Stored Fuel in Diesel Fuel Oil Storage Tank ML20211J0211999-08-31031 August 1999 Proposed Tech Specs Bases Page 91,allowing Reactivity Anomaly BOC Steady State Core Reactivity to Be Normalized Between off-line (Predicted) Uncorrected Solution & on-line (Measured) 3D-Monicore Exposure Corrected Solution ML20211B7051999-08-18018 August 1999 Proposed Tech Specs Revising Reactor Core Spiral Reloading Pattern to Begin Around SRM ML20211B6781999-08-18018 August 1999 Proposed Tech Specs Revising Definition of Surveillance Frequency to Incorporate Provisions That Apply Upon Discovery of Missed TS Surveillance ML20210D2481999-07-20020 July 1999 Proposed Tech Specs Revising & Clarifying Operability & SRs of High Pressure Core Cooling Systems ML20210D3371999-07-20020 July 1999 Proposed Tech Specs Re Enhancements to Support Implementation of Increased Core Flow ML20209G1671999-07-12012 July 1999 Proposed Tech Specs Revising Value for SLMCPR & Deleting Wording Which Specifies These as Cycle 20 Values ML20196K2951999-06-29029 June 1999 Proposed Tech Specs Pages for Proposed Change 220,revising Leak Rate Requirements of TS 3.7.A.4 & 4.7.A.4 for Main Steam Line Isolation Valves ML20196H2881999-06-24024 June 1999 Proposed Tech Specs Revising & Clarifying Terminology Re Certain RPS Scram Bypass Permissives ML20195J8691999-06-15015 June 1999 Proposed Tech Specs Increasing Stis,Adding Allowable OOS Times,Replacing Generic ECCS Actions for Inoperable Instrument Channels with function-specific Actions & Relocating Selected Trip Functions from TS ML20195F9531999-06-0909 June 1999 Proposed Tech Specs,Supplementing Proposed Change 213, Allowing Use of ASME Code Case N-560,per GL 88-01 ML20195C8841999-05-26026 May 1999 Proposed Tech Specs Clarifying Suppression Chamber Water Temp SR 4.7.A, Primary Containment & Modifying Associated TS Bases ML20206H3771999-05-0606 May 1999 Proposed Tech Specs Pages ,Eleting Specific Leak Rate Requirements of TS 3.7.A.4 & 4.7.A.4 ML20206J7231999-05-0505 May 1999 Proposed Tech Specs Pages for Proposed Change 212,modifying TS to Enhance Limiting Conditions for Operation & Surveillance Requirements Relating to SLC Sys ML20205S9431999-04-20020 April 1999 Proposed Tech Specs,Revising Reactor Core Spiral Reloading Pattern Such That It Begins Around Source Range Monitor ML20205T4721999-04-19019 April 1999 Marked-up Tech Specs Pages Re Suppl to 990201 Request for Amend to License DPR-28,revising Portions of Proposed Change 208 ML20205S4081999-04-16016 April 1999 Proposed Tech Specs Modifying Inservice Insp Requirements of Section 4.6.E to Allow NRC-approved Alternatives to GL 88-01 ML20205S3121999-04-15015 April 1999 Proposed Tech Specs Revised Bases Pages 90,227,164 & 221a, Accounting for Change in Reload Analysis,Reflecting Change in Condensation Stability Design Criteria & Accounting for More Conservative Calculation ML20202E5451999-01-25025 January 1999 Proposed Tech Specs Re Technical Requirements Manual Content ML20206S0661999-01-22022 January 1999 Proposed TS to Change Number 189,proposing Relocation of Fire Protection Requirements from TSs to TRM ML20198D5381998-12-15015 December 1998 Proposed Tech Specs Page 142,correcting Wording to Reflect Previously Approved Wording,Last Revised in Amend 160 ML20198B7421998-12-11011 December 1998 Proposed Tech Specs Changing Wording of Primary Containment Integrity Definition to State That Manual PCIVs Which Are Required to Be Closed During Accident Conditions May Be Opened Intermittently Under ACs ML20197J4631998-12-10010 December 1998 Proposed Tech Specs Section 4.9.2,revising Info Re Calibr of Augmented Offgas Sys Hydrogen Monitors ML20197H0031998-12-0707 December 1998 Proposed Tech Specs Change 209,resolving Emergency Concern Re Potential Operation Outside of LCO Contained in Current TS & Potential USQ with Respect to Opening of Manual PCIVs During Plant Operation ML20155F7421998-11-0303 November 1998 Proposed Tech Specs Incorporating Minor Corrections or Clarifications Which Enhance Clarity of TSs Without Materially Changing Meaning or Application ML20155G5061998-11-0202 November 1998 Proposed Tech Specs Re ECCS Actuation Instrumentation - LPCI A/B RHR Pump Start Time Delay Requirements & CS Sys A/B Pump Start Delay Requirements ML20151U0131998-09-0404 September 1998 Proposed Tech Specs,Increasing Spent Fuel Storage Capacity of Util Spent Fuel Pool from 2,870 to 3,355 Fuel Assemblies ML20236H4551998-06-30030 June 1998 Proposed Tech Specs Modifying Table 4.2.1 to Delete ECC Actuation Instrumentation Re Core Spray Sys & LPCI Sys Auxiliary Power Monitor Calibr Requirement ML20247E5671998-05-0808 May 1998 Proposed Tech Specs Page 270,containing Wording Inadvertently Deleted from TS Proposed Change 202 ML20247J8121998-05-0808 May 1998 Proposed Tech Specs Reducing Normal Operating Suppression Pool Water Temp Limit & Adding Time Restriction for Higher Temp Allowed During Surveillances That Add Heat to Suppression Pool ML20217P4171998-05-0101 May 1998 Proposed Tech Specs Re Administrative Controls Section ML20217G7131998-04-23023 April 1998 Proposed Tech Specs Change 200 Revising Station SW & Alternate Cooling Sys Requirements ML20217C4591998-03-20020 March 1998 Proposed Tech Specs Re Containment Purge & Vent ML20217A1271998-03-13013 March 1998 Proposed Tech Specs Bases Section 3.10.B,updated to Require That Station Battery,Eccs Instrumentation Battery,Or Uninterruptable Power Sys Battery Be Considered Inoperable If Any One Cell Is Below Specification Cell Voltage ML20202H2611998-02-0606 February 1998 Revised TS Pages Re Change 190,w/typos Corrected ML20197E8481997-12-22022 December 1997 Replacement Pages 160 & 279 & mark-up Pages to Proposed TS Change 190 Containing Editorial Changes ML20203F0131997-12-11011 December 1997 Proposed Tech Specs Revising Current Value for SLMCPR for Cycle 20,next Operating Cycle ML20199K8501997-11-21021 November 1997 Replacement Pages 147,156,157 & mark-up Pages to Proposed TS Change 190,removing Ref to Documents Outside of TS That Define Components to Which Program Applies ML20199J7661997-11-20020 November 1997 Proposed Tech Specs Pages,Revising Requirements for Main Station Batteries ML20217H6931997-10-10010 October 1997 Proposed Tech Specs Revising & Clarifying Requirements for Offsite Power Sources ML20211A6461997-09-18018 September 1997 Proposed Tech Specs,Providing marked-up Pages for Proposed Changes 192 & 193 ML20217Q3311997-08-22022 August 1997 Proposed Tech Specs Pages 245 & 252,amending App a to Modify TS to More Clearly Describe Separation of Switchgear Room Into Two Fire Areas & Incorporate Specifications for New Low Pressure CO2 Suppression Sys ML20217N4111997-08-20020 August 1997 Proposed Tech Specs Pages 270 & 270a,updating Section 6 in Order to Add & Revise Ref to NRC Approved Methodologies Which Will Be Used to Generate cycle-specific Thermal Operating Limits to COLR ML20141H1171997-07-11011 July 1997 Proposed Tech Specs,Replacing Pages 147,156 Through 161,168 & 279 of Util TS W/Corrected Pages ML20148J1861997-06-0909 June 1997 Proposed Tech Specs Change 191,updating Section 6.0 Administrative Controls ML20132B5771996-12-10010 December 1996 Proposed Tech Specs 3.13 Re Fire Protection Sys ML20129C4521996-10-17017 October 1996 Proposed Tech Specs,Revising Pages 89,89a & 90 to Incorporate Changes from Amends 148 & 149 ML20128N6031996-10-11011 October 1996 Proposed Tech Specs,Revising Existing Requirements Re Amount of Foam Concentrate Required to Support Operability of Recirculation Motor Generator Set Foam Sys in TS 3.13.G.1 & 3.13.G.2 1999-09-21
[Table view] Category:TECHNICAL SPECIFICATIONS & TEST REPORTS
MONTHYEARML20217N3001999-10-21021 October 1999 Proposed Tech Specs,Correcting Two Textual Errors & Changing Designation of Referenced Figure ML20217K8731999-10-18018 October 1999 Proposed Tech Specs Revising Activated Charcoal Testing Methodology IAW Guidance Provided in GL 99-02 ML20212F6941999-09-21021 September 1999 Proposed Tech Specs,Increasing Required Vol of Stored Fuel in Diesel Fuel Oil Storage Tank ML20211J0211999-08-31031 August 1999 Proposed Tech Specs Bases Page 91,allowing Reactivity Anomaly BOC Steady State Core Reactivity to Be Normalized Between off-line (Predicted) Uncorrected Solution & on-line (Measured) 3D-Monicore Exposure Corrected Solution ML20211B6781999-08-18018 August 1999 Proposed Tech Specs Revising Definition of Surveillance Frequency to Incorporate Provisions That Apply Upon Discovery of Missed TS Surveillance ML20211B7051999-08-18018 August 1999 Proposed Tech Specs Revising Reactor Core Spiral Reloading Pattern to Begin Around SRM ML20210D2481999-07-20020 July 1999 Proposed Tech Specs Revising & Clarifying Operability & SRs of High Pressure Core Cooling Systems ML20210D3371999-07-20020 July 1999 Proposed Tech Specs Re Enhancements to Support Implementation of Increased Core Flow ML20209G1671999-07-12012 July 1999 Proposed Tech Specs Revising Value for SLMCPR & Deleting Wording Which Specifies These as Cycle 20 Values ML20196K2951999-06-29029 June 1999 Proposed Tech Specs Pages for Proposed Change 220,revising Leak Rate Requirements of TS 3.7.A.4 & 4.7.A.4 for Main Steam Line Isolation Valves ML20196H2881999-06-24024 June 1999 Proposed Tech Specs Revising & Clarifying Terminology Re Certain RPS Scram Bypass Permissives ML20195J8691999-06-15015 June 1999 Proposed Tech Specs Increasing Stis,Adding Allowable OOS Times,Replacing Generic ECCS Actions for Inoperable Instrument Channels with function-specific Actions & Relocating Selected Trip Functions from TS ML20195F9531999-06-0909 June 1999 Proposed Tech Specs,Supplementing Proposed Change 213, Allowing Use of ASME Code Case N-560,per GL 88-01 ML20195C8841999-05-26026 May 1999 Proposed Tech Specs Clarifying Suppression Chamber Water Temp SR 4.7.A, Primary Containment & Modifying Associated TS Bases ML20206H3771999-05-0606 May 1999 Proposed Tech Specs Pages ,Eleting Specific Leak Rate Requirements of TS 3.7.A.4 & 4.7.A.4 ML20206J7231999-05-0505 May 1999 Proposed Tech Specs Pages for Proposed Change 212,modifying TS to Enhance Limiting Conditions for Operation & Surveillance Requirements Relating to SLC Sys ML20205S9431999-04-20020 April 1999 Proposed Tech Specs,Revising Reactor Core Spiral Reloading Pattern Such That It Begins Around Source Range Monitor ML20205T4721999-04-19019 April 1999 Marked-up Tech Specs Pages Re Suppl to 990201 Request for Amend to License DPR-28,revising Portions of Proposed Change 208 ML20205S4081999-04-16016 April 1999 Proposed Tech Specs Modifying Inservice Insp Requirements of Section 4.6.E to Allow NRC-approved Alternatives to GL 88-01 ML20205S3121999-04-15015 April 1999 Proposed Tech Specs Revised Bases Pages 90,227,164 & 221a, Accounting for Change in Reload Analysis,Reflecting Change in Condensation Stability Design Criteria & Accounting for More Conservative Calculation ML20202E5451999-01-25025 January 1999 Proposed Tech Specs Re Technical Requirements Manual Content ML20206S0661999-01-22022 January 1999 Proposed TS to Change Number 189,proposing Relocation of Fire Protection Requirements from TSs to TRM ML20198D5381998-12-15015 December 1998 Proposed Tech Specs Page 142,correcting Wording to Reflect Previously Approved Wording,Last Revised in Amend 160 ML20198B7421998-12-11011 December 1998 Proposed Tech Specs Changing Wording of Primary Containment Integrity Definition to State That Manual PCIVs Which Are Required to Be Closed During Accident Conditions May Be Opened Intermittently Under ACs ML20197J4631998-12-10010 December 1998 Proposed Tech Specs Section 4.9.2,revising Info Re Calibr of Augmented Offgas Sys Hydrogen Monitors ML20197H0031998-12-0707 December 1998 Proposed Tech Specs Change 209,resolving Emergency Concern Re Potential Operation Outside of LCO Contained in Current TS & Potential USQ with Respect to Opening of Manual PCIVs During Plant Operation ML20155F7421998-11-0303 November 1998 Proposed Tech Specs Incorporating Minor Corrections or Clarifications Which Enhance Clarity of TSs Without Materially Changing Meaning or Application ML20155G5061998-11-0202 November 1998 Proposed Tech Specs Re ECCS Actuation Instrumentation - LPCI A/B RHR Pump Start Time Delay Requirements & CS Sys A/B Pump Start Delay Requirements ML20196A7851998-10-0909 October 1998 Rev 19 to Vynp IST Program Plan ML20151U0131998-09-0404 September 1998 Proposed Tech Specs,Increasing Spent Fuel Storage Capacity of Util Spent Fuel Pool from 2,870 to 3,355 Fuel Assemblies ML20237E9571998-08-27027 August 1998 Start-Up Test Rept Vynp Cycle 20 ML20236H4551998-06-30030 June 1998 Proposed Tech Specs Modifying Table 4.2.1 to Delete ECC Actuation Instrumentation Re Core Spray Sys & LPCI Sys Auxiliary Power Monitor Calibr Requirement ML20247J8121998-05-0808 May 1998 Proposed Tech Specs Reducing Normal Operating Suppression Pool Water Temp Limit & Adding Time Restriction for Higher Temp Allowed During Surveillances That Add Heat to Suppression Pool ML20247E5671998-05-0808 May 1998 Proposed Tech Specs Page 270,containing Wording Inadvertently Deleted from TS Proposed Change 202 ML20217P4171998-05-0101 May 1998 Proposed Tech Specs Re Administrative Controls Section ML20217G7131998-04-23023 April 1998 Proposed Tech Specs Change 200 Revising Station SW & Alternate Cooling Sys Requirements ML20217C4591998-03-20020 March 1998 Proposed Tech Specs Re Containment Purge & Vent ML20217A1271998-03-13013 March 1998 Proposed Tech Specs Bases Section 3.10.B,updated to Require That Station Battery,Eccs Instrumentation Battery,Or Uninterruptable Power Sys Battery Be Considered Inoperable If Any One Cell Is Below Specification Cell Voltage ML20202H2611998-02-0606 February 1998 Revised TS Pages Re Change 190,w/typos Corrected ML20197E8481997-12-22022 December 1997 Replacement Pages 160 & 279 & mark-up Pages to Proposed TS Change 190 Containing Editorial Changes ML20203F0131997-12-11011 December 1997 Proposed Tech Specs Revising Current Value for SLMCPR for Cycle 20,next Operating Cycle ML20199K8501997-11-21021 November 1997 Replacement Pages 147,156,157 & mark-up Pages to Proposed TS Change 190,removing Ref to Documents Outside of TS That Define Components to Which Program Applies ML20199J7661997-11-20020 November 1997 Proposed Tech Specs Pages,Revising Requirements for Main Station Batteries ML20217H6931997-10-10010 October 1997 Proposed Tech Specs Revising & Clarifying Requirements for Offsite Power Sources ML20211A6461997-09-18018 September 1997 Proposed Tech Specs,Providing marked-up Pages for Proposed Changes 192 & 193 ML20217Q3311997-08-22022 August 1997 Proposed Tech Specs Pages 245 & 252,amending App a to Modify TS to More Clearly Describe Separation of Switchgear Room Into Two Fire Areas & Incorporate Specifications for New Low Pressure CO2 Suppression Sys ML20217N4111997-08-20020 August 1997 Proposed Tech Specs Pages 270 & 270a,updating Section 6 in Order to Add & Revise Ref to NRC Approved Methodologies Which Will Be Used to Generate cycle-specific Thermal Operating Limits to COLR ML20141H1171997-07-11011 July 1997 Proposed Tech Specs,Replacing Pages 147,156 Through 161,168 & 279 of Util TS W/Corrected Pages ML20148J1861997-06-0909 June 1997 Proposed Tech Specs Change 191,updating Section 6.0 Administrative Controls ML20149M7451997-01-24024 January 1997 Startup Test Rept,Vermont Yankee Cycle 19 1999-09-21
[Table view] |
Text
_ _ _ _ _ _ _ _ . _ . _ . . __ ____ _ __ .__ __ . ._ __ . _ . _ _ _ _
1 113 e
'N-b VYNpS
( R8 n==
i:
$o 3.7 STATION CONTAINMENT __ SYSTEMS g 4 gr A. primary Containment
-gM The integrity of the primary containment and operation of the core standby cooling systems in combination' limit the off-site doses to values less than to those suggested in 10 CFR 160 in the event of a break in j, the primary system piping. Thus, containment integrity is specified whenever the potential for violation jp of the primary reactor system integrity exists. Concern about such a violation exists whenever the reactor
- is critical, above atmospheric pressure and temperature above 2120F. An exception is sede to this l requirement during initial core loading and while a low power test program is being conducted and ready j access to the reactor vessel is required. The reactor may be taken critical during the period; however,
, restrictive operating procedures will be in effect again to minimize the probability of an accident'
{ occurring. Procedures and the Rod Worth Minimizer'would limit control worth to less'than 1.30% dolca k.
The pressure suppression pool water provides the heat sink for the coactor primary system energy release
~
.. following posulated rupture of the system. The pressure suppression chamber. water volume must absorb the j associated decay and structural sensible heat released during primary system blowdown from 1000 psig.
- Since all the gases in the drywell are purged into the pressure suppression chamber air space during a loss-of-coolant accident, i.he pressure resulting from isothecmal compression' plus the vapor pressure of the '
- liquid must not exceed 62 psig, the allowable pressure suppression chamber pressure. .The design' volume of
! the suppression chamber (water and air) was obtained-by considering that the total volume of reactor l coolant to be condensed is discharaed.to the suppression chamber and that the drywell volume is purged to l the suppression chamber (Reference Section 5.2 FSAR).
Using the minimum or maximum water volumes given in the specification, containment pressure during the design' basis accident is approximately 44 psig, Which is below the design of 56 psig.(3) The minimum
! volume of 68,000 ft3 results in a submergency of approximately four feet. The majority of the Bodega I tests (2) were run with a submerged length of four feet and with complete condensation. Thus,.with
! respect to downconer submergence, this specification is adequate.
The maximum temperature at the end of blowdown tested during the Humbolt Bay (1) and Bodega Bay tests was 1700F and this is conservatively taken to be the limit for complete condensation of the reactor coolant, although condensation would occur for temperature above 1700F.
Amen 6 ment No. 50 138
4 li ;)
VYNpS ,, n.
3.7.A (Cont'd) - 1' In conjunction with the Mark I Containment Long-Term program, a plant unique analysis was performed (see:
Vermont Yankee letter, dated April 27, 1984, transmitting Teledyne Engineering Services Company P.eports- j TR-5319-1, Revision 2, dated November 30, 1983 and TR-5319-2, Revision'0) which demonstrated that all stresses in the suppression chamber structure including shell, external supports, vent system, internal-structures, and attached piping meet the structural acceptance criteria of NUREC-0661. The maintenance of a drywell-suppression chamber differential pressure of 1.7 psid and a suppression chamber water level
~
! corresponding to a downcomer submergence range of 4.29 to 4.54 feet will assure the integrity of the suppression chamber when subjected to post-LOCA suppression pool hydrodymanic forces.
Using a 500F rise (section 5.2.4 FSAR) in the suppression chamber water temperature and a minimum water i
volume of 68,000 ft ,3 the 1700F temp 6rature which is used for complete condensation would be approached l only if.the suppression pool temperature is 2100F prior to the DBA-LOCA. Maintaining a' pool temperature l of 90 0 F will asstre that the 1700F limit is not approached, i
! Experimental data indicate that excessive steam condensing loads can be avoided if.the peak' temperature cf 3
the suppression pool is maintained below 1600F during any period of relief valve operation with sonic j conditions at the discharge exit. Specifications have been placed on the envelope of reactor. operating l conditions so that the reactor can be depressurized in a timely manner to avoid the regime of potentially j high suppression chamber loadings.
l In addition to the limits on temperature of the suppression chamber pool water, operating procedures define-
! the action to be taken.in the event a relief valve inadvertently opens or sticks open. This action would include: (1) use of all available means to close the valve, (2) initiate suppression pool water cooling heat exchangers (3) initiate reactor shutdown, and-(4) if other relief valves are used to depressurize the reactor, their discharge shall be separated from that-of the stuck-open relief valve to assure mixing and j
uniformity of energy insertion to the pool.
j Double isolation valves are provided on lines which penetrate the primary containment and open to the free
- space of the containment. ' Closure of one of.the valves in each line would be sufficient to maintain the
! integrity of the pressure suppression system. Automatic initiation is required to minimize the potential-I leakage paths from the containment in the event of a loss-of-coolant accident. Details of the isolation.
valves are discussed in Section 5.2 of the FSAR.
Amendment-No. 50 139 4
y.
VYNpS 3.7.A (Cont'd)- .
The purpose of the vacuum relief valves is to equalize the pressure between the drywell and suppression chamber and suppression chamber and reactor building so that the structural integrity of the containment-is maintained.
Technical Specification 3.7.A.9.c is based on the assumption that the operability testin5 of the pressure
' suppression chamber-reactor building vacuum breaker, when required, will normally be performed during the.
same four hour testing interval as the pressure suppression chamber-drywell vacuum breakers -in order to minimize operation with (1.7 psi, differential pressure.
The vacuum relief system from the pressure suppression chamber to Reactor Building consists of two 100E vacuum relief breakers (2 parallel sets of 2 valves in' series). Operation of'either system will maintain the pressure differential less than 2 psig; the external design pressure is 2 pois.
The capacity.of the ten (10) drywell vacuum relief valves is sized to limit the pressure differential-between the suppression chamber and drywell during post-accident drywell cooling operations to'the design limit of 2 psig. They are sized on the basis of the Bodega Bay pressure suppression tests. The ASME l
Boiler and pressure Vessel Code,Section III, Subsection B, for this vessel allows e'.ght (8) operable valves, therefore, with two (2) valves secured, containment integelty is not impaired.
Each drywell-suppression chamber vacuum breaker is fitted with a redundant pair of limit switches to i provide fail-safe signals to panel mounted indicators in the Reactor Building and alarms in the Control
~
Room when'the disks are open more than 0.050" at all points.along the seal surface of the disk. These
- switches are capable of transmitting the disk closed to open signal with 0.01" movement of the switch plunger. Continued reactor operation with failed components is justified because of the redundance of
[ components and circuits and, most importantly, the . accessability of the valve lever am and position
! reference external to the valve. The fail safe feature of the alam circuits assures operator. attention if a line' fault occurs.
i 1
(1) Robbins, C.H., " Tests on a Full Scale 1/48 Segment of the Humbolt Bay pressure Suppression Containment",
l j GEAp-3596, November 17, 1960.
1 l (2) Bodega Bay preliminary Hazards Susunary Report, Appendix 1 Docket 50-205, December 28, 1962. .
l- (3) Code Allowable' peak accident pressure is 62 psig.
139a i