2,k, SOUTHERN CALIFORNIA EDISON COMPANY ~
SAN DIEGO GAS AND ELECTRIC COMPANY THE CITY OF~ RIVERSIDE, CALIFORNIA
.THE CITY OF ANAHEIM, CALIFORNIA DOCKET NO. 50-361 y
SAN ONOFRE NUCLEAR GENERATING STATION, UNIT 2 AMENDMENT TO FA.CILITY OPERATING LICENSE o
i-Amendment No. 24 License No.'NPF-10 1.
The Nuclear Regulatory Comission (the Comission) has found that:
A..
The application for amendment to the license for San Onofre Nuclear Generating Station, Unit 2 (the facility) f.iled by the Southern California Edison Company on behalf of itself and San' Diego Gas a.nd Electric Com California (pany, The City of Riverside and The City of Anaheim, licensees) dated July 23, 1982, as' supplemented by letters dated August 16, 1982, December 17, 1982, January 28, 1983, January 25, 1984 and April 13, 1984 complies with the standards and requirements of the Atomic Energy Act of 1954, as amended (the Act) and the Comission's regulations as set forth in 10 CFR Chapter I; B.
The facility will operate in conformity with the application, as amended, the provisions of the Act, and the regulations of the Comission; C.
There is reasonable assurance:
(1)thattheactivitiesauthorized by this amendment can be conducted without endangering -the health and safety of the public, and (ii) that such activities will be conducted in compliance with the Comission's regulations set forth in 10 CFR Chapter I; D.
The issuance of this license amendment will not be inimical to the comon defense and security or to the health and safety of the public; 8411010393 840924 DR ADOCK 05000
f;
'-~
o
{ '.
es 4
4
~ E.-
The issuance of this amendment is.in accordance with-10 CFR Part 51 of the Conunission's regulations and all applicable requirements have been satisfied.
- 2. ' Accordingly, the license is amended by changes to the Technical Specifica-tions as indicated in the attachment to this license amendment, and paragraph 2.C(2). of Facility Operating License No. NPF-10 hereby amended to read as follows:
(2) Technical Specifications
, p.,
The Technical Specifications contained in Appendix A and the Environ-mental t'rotection Plan contained in Appendix B, as revised through knendment No.
24, are hereby incorporated in the license. SCE shall operate the facility in accordance with the Technical Specifications and the Environmental Protection Plan.
3.
This amendment is effective as of the date of issuance.
FOR THE NUCLEAR REGULATORY COMMISSION George W. Knighton, Chief Licensing Branch No. 3 Division of Licensing
Attachment:
,.'3 Changes'to the Technical
+
I Specifications Date of Issuance:
SEP 2 419P4 4
(
DL:LB#3 Bf3 HRood/ch i
n 8/p84 8/
84 4d 8/pB4
.cw
.g
. - - =
. i
~
~
~
w Ve-SEP 2 41984 l
o, v
~
~~3-4 i
' ATTACHMENT TO LICENSE AMENDMENT NO. 24 FACILITY OPERATING LICENSE NO.-NPF-10
^
- DOCKET NO. 50-361~
-s; ' Replace the following pages of the Appendix A Technical Specifications with the enclosed pages. The revised pages are identified by-Amendment number and contain vertical lines indicating the area of change. Also to be replaced are the following overleaf pages to the amended pages.
Amendment Pages Overleaf Pages' s
3/4 3-33 3/4 3-34
~
4 4
4 A
-k
\\
I
~
.,--,..,,.,-,,-vc. _,.,
TABLE 4.3-2 (Continued) u, 2
ll ENGINEERED SAFETY FEATURE ACTUATION SYSTEM INSTRUMENTATION SURVEILLANCE REQUIREMENTS 5
CHANNEL MODES FOR WHICH i
EE CHANNEL CHANNEL FUNCTIONAL SURVEILLANCE FUNCTIONAL UNIT CHECK CALIBRATION TEST IS REQUIRED 11.
FUEL HANDLING IS0;.ATION (FHIS) a.
Manual (Trip Buttons)
N.A.
N.A.
R N.A.
b.
Airborne Radiation i.
Gaseous S
R M
ii. Particulate / Iodine S
R M
c.
Automatic Actuation Logic N.A.
N.A.
R(3)
't 12.
CONTAINMENT PURGE ISOLATION (CPIS) a.
Manual (Trip Buttons)
N.A.
N.A.
R N.A.
b.
Airborne Radiation i.
Gaseous (2)
(2)
(2)
All u,
30 ii.
Particulate (2)
(2)
(2)
All iii. Iodine (2)
(2)
(2)
All u,
J, c.
Containment Area Radiation (Gamma)
S R
M 6
d.
Automatic Actuation Logic N.A.
N.A.
R (3)
All 4
TABLE NOTATION (1) Each train or logic channel shall be tested at least every 62 days on a STAGGERED TEST BASIS.
(2) In accordance with Table 4.3-9 surveillance requirements for these instrument channels.
2 (3) Testing of Automatic Actuation Logic shall include energization/de-energization of each initiation Ri relay and verification of the OPERABILITY of each initiation relay.
2 5[
(4) A subgroup relay test shall be performed which shall include the energization/de energization of each 52 subgroup relay and verification of the OPERABILITY of each subgroup relay.
Relays exempt from testing during plant operation shall be limited to only those relays associated with plant equipment which
'is cannot be operated during plant operation.
Relays not testable during plant operation shall be tested during each COLD SHUTDOWN exceeding 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> unless tested during the previous 6 months.
SE (S) Actuated equipment only; does not resuit in CIAS.
With irradiated fuel in the storage pool.
i
--- m m
'\\_
TABLE 3.3-6 N
RADIATION MONIl0 RING ALARM INSTRUMENTATION b
k MINIMLM
/-
CHANNELS APPLICABLE ALARM MEASUREMENT INSTRLDENT OPERABLE MODES SETPOINT RANGE ACTION N
1.
Area Monitors a.
Containment - High 2
1,2,3 10 R/hr 1-10s R/hr 18 Range 4
10 R/hr 19 b.
Containment - Purge 1
1,2,3,4
< 325 nR/hr 10 1-105 mR/hr 19 1
Isolation 6
7 (a) i c.
Main Steau Line 1/line 1, 2, 3 1 mR/br (low);
10 1-104 mR/hr; 18 1 R/hr (high) m
}
4 1 mR/hr (low);
19 1 R/hr (high) m 2.
Process Monitors a.
Fuel Storage Pool Airborne 101'.107 cpm (d) 1.
Gaseous 1
101 -107 cpm (d) ii.
Particulate / Iodine 1 i
b.
Containment Airborne 1.
Gaseaus 1
all Per ODCM 101 -107 cpm (a)(b)(c) 1i.
Particulate 1
All Per 00CM 101 -107 cpm (a)(b)(c) lii.
Iodine 1
All Per 00CM 101 -107 cpm (a)(c) c.
Control Room Airborne i
1.
Particulate / lodine 1 All 101 -107 cpm (e) l ii. Gaseous 1
All 101 -107 cpm (e)
~
e i
e
--m
eg y
~
(
.1 s
?
I
~
E SOUTHERN CALIFORNIA EDIS0N COMPANY s-SAN DIEGO GAS AND ELECTRIC COMPANY g
THE CITY OF RIVERSIDE, CALIFORNIA THE CITY OF ANAHEIM, CALIFORNIA DOCKET NO. 50-362 SAN ONOFRE NUCLEAR GENERATING STATION, UNIT 3 AMEN 0 MENT TO FACILITY OPERATING LICENSE Amendment No.13 License No. NPF-15 1.
The Nuclear Regulatory Comission (the Comission) has found that:
A.
The application for amendment to the license for San Onofre Nuclear Generating Station, Unit 3 (the facility) filed by the Southern California Edison Company on behalf of itself and San Diego Gas and Electric Com California (pany The City of Riverside and The City of Anaheim, licensees)datedJanuary 25, 1984, as supplemented by letter dated April 13, 1984 complies with the standards and require-ments of the Atomic Encrgy Act of 1954, as amended (the Act) and the Comission's regulations as set forth in 10 CFR Chapter I; B.
The facility will operate in conformity with the appitcation, r.s amended, the provisions of the Act, and the regulations of the Comission; C.
There is reasonable assurance:
(i) that the activities authorized by this amendment can be conducted without endangering the health and safety of the public, and (ii) that such activities will be conducted in compliance with the Comission's regulations set forth in 10 CFR Chapter I; D.
The issuance of this license amendment will not be inimical to the comon defenso and security or to the health and safety of the public; k
g
(
e 1
_ 2'_
, N ti.~
The issuance of this amendment'is in accordance with 10-CFR Fart 51 of the Comission's regulations and all applicable requirements have been satisfied.
2.
'Accordingly, the license is amended by c'hanges to the Technical Specifica-tions as indicated in'the attachment to this license amendment, and paragraph 2.C(2) of_ Facility Operating License No. NPF-15 hereby amended to read as follows:
(2) Technical Specifications TheTechnicalbpecificationscontainedinAppendixAandtheEnviron-
-mental Protection Plan contained in Appendix B, as revised through Amendment No.13. are hereby incorporated in the license. SCE shall operate the facility in accordance with the Technical Specifications and the Environmental Protection Plan.
3.
This amendment is effective as of the date cf issuance.
-FOR THE NUCLEAR REGULATORY COMMISSION George W. Knighton, Chief Licensing Branch No. 3 Division of Licensing
Attachment:
Changes to the Technical Specifications Date of Issuance:
SEP 2 41984 l
DL:LB#3 Bf3 CEL i -
HRood/ch 8/gp/84 ton 8$Q84 8
84 i
--m-g.
x_
SEP 24 tgg4
-3'-
v
' ATTACHMENT'TO LICENSE AMENDMENT NO 13 FACILITY OPERATING LICENSE NO. NPF o 4
-DOCKET NO. 50-362
~
4 Replace the following pages of the Appendix A Technical Specifications sith; the enclosed pages. The revised pages are identified by Amendment number and.
contain vertical lines indicating the area of change. Also to be ' replaced are
-the following overleaf pages to the amended pages.
Amendment Pagss 0verleaf Pages --
3/4 3-33 3/4 3 34
.s
(
x
+-
,.e.-
e-
_n.+.N.,,,
s s,.,,
s
,,, n
,,.h--
-e.---
TABLE 4.3-2 (Continued) v, ENGINEERED SAFETY FEATURES ACTUATION SYSTEM INSTRUMENTATION SURVEILLANCE REQUIREMENTS EE-CHANNEL MODES FOR WHICH 55 CHANNEL CHANNEL FUNCTIONAL SURVEILLANCE.
i E:-
FUNCTIONAL UNIT CHECK CALIBRATION TEST IS REQUIRED 5
11.
FUEL HANDLING ISOLATION (FHIS) a.
Manual (Trip Buttons)
N.A.
N.A.
R N.A.
b.
Airborne Radiation 1.
Gaseous S
R M
fi. Particulate / Iodine S
R M
c.
Automatic Actuation Logic N.A.
N.A.
R(3) 12.
CONTAINMENT PURGE ISOLATION (CPIS) a.
Manual (Trip Buttons)
N.A.
N.A.
R N.A.
b.
Airborne Radiation i.
Gaseous (2)
(2)
(2)
All w
3 11.
Particulate (2)
(2)
(2)
All iii. Iodine (2)
(2)
(2)
All wa c.
Containment Area Radiation (Gamma)
S R
M 6
i d.
Automatic Actuation Logic N.A.
N.A.
R (3)
All TABLE NOTATION (1) Each train or logic channel shall be tested at least every 62 days on a STAGGERED TEST BASIS.
(2) In accordance with Table 4.3-9 Surveillance Requirements for these instrument channels.
(3) Testing of Automatic Actuation Logic shall include energization/de-energization of each initiation relay and verification of the OPERABILITY of each initiation relay.
2, (4) A subgroup relay test shall be performed which shall include the energization/de-energization of each l
Ri' subgroup relay and verification of the OPERABILITY of each subgroup relay.
Relays exempt from testing Es during plant operation shall be limited to only those relays associated with plant quipment which Ri cannot be operated during plant operation.
Relays not testable during plant operation shall be tested during each COLD SHUTDOWN exceeding 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> unless tested during the previo6s 6 months.
i is (5) Actuated equipment only; does not result in CIAS.
With irradiated fuel in the storage pool.
w
=
INSTRUMENTATION 3/4.3.3 MONITORING INSTRUMENTATION RADIATION MONITORING ALARM INSTRUMENTATION LIMITING CONDITION FOR OPERATION 3.3.3.1 The radiation monitorin'g alarm instrumentation channels shown in Table 3.3-6 shall be OPERABLE with their alarm / trip setpoints within the specified limits.*
APPLICABILITY: As shown in Table 3.3-6.
ACTION:
a.
With a radiation monitoring channel alarm setpoint exceeding the value shown in Table 3.3-6, adjust the setpoint to within the limit within 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> or declare the channel inoperable.
b.
With one or more radiation monitoring alarm channels inoperable, take the ACTION shown in Table 3.3-6.
c.
The provisions of Specifications 3.0.3 and 3.0.4 are not applicable.
juRVEILLANCEREQbIREMENTS i
4.3.3.1 Each radiation monitoring alarm instrumentation channel shall be demonstrated OPERABLE by the performance of the CHANNEL CHECK, CHANNEL CALIBRATION and CHANNEL FUNCTIONAL TEST operations for the MODES and at the frequencies shown in Table 4.3-3.
l l
- Continuous monitoring and sampling of the containment purge exhaust directly from the purge stack shall be provided for the low and high volume (8-inch L
and 42-inch) containment purge prior to startup following the first refueling outage.
Containment airborne-monitor 3RT-7804-1 or 3RT-7807-2.and associated sampling media shall perform these functions prior to initial criticality.
From initial criticality to the startup fnllowing the first refueling outage I
containment airborne monitor 3RT-7804-1 and associated sampling media shall perform the above required functions.
l SAN ON0FRE-UNIT 3
'3/4 3-34