Text
__ -_____ ______ __ _____ __ _ __ _ _ ___
lpcso v
3" UNITED STATES n
I i
NUCLEAR HEGULATORY COMMISSION i
f WASHINGTON. D C. 205%
%~
/
jlQSTON EDISON COMPANY DOCKET NO. 50-293 PILGRIM NUCLEAR POWER STATION AMENDMENT 10 FACILITY OPERATING LICENSE Amendment No. 142 License No. DPR-35 1.
The Nuclear Regulatory Commission (the Commission or the NP.C) has found that:
A.
The ap>11 cation for amendment filed by the Boston Edison Company (the 11censee) dated April 8,1992, compiles with the standards and recuirements of the Atomic Energy Act of 1954, as amended (the Act)R
- and the Commission's rules and regulations set forth in 10 CF Chapter I; B.
The facility will operatt. In conformity with the application, the provisions of the Act, and the rules and regulations of tha Commission; C.
There is reasonable assurance: (i) that the activities authorized by this amendment can be cosducted without endangering the health and safety of the public, and (ii) that such activities will be conducted in compliance with the Commission's regulations set forth in 10 CFR Chapter I; D.
The issuance of this amendment will not be inimical to the common defense and security or to the health and safety of the public; and E.
The issuance of this amendment is in accordance with 10 CFR Part 51 of tne Comniission's regulations and all applicable requirements have been satisfied.
?.
Accordingly, the license is amended by changes to the Technical Specifica-tions as indicated in the attachment to this license amendment, and paragraph 3.8 of facility Operating License No. DPR-35 is hereby amended to read as follows:
.h-
{
p p
O e
a
+e
.v
-+ee 9
w g----
--ggm-9>ps,%
u-
l
' Technical Specificttions The Technical Specifications contained in Appendix A, as revised through Amendment No.142, are hereby incorporated in the license.
The licensee shall operate the facility in accordance with the Technical Specifications.
3.
This license amendment is effective at of its date of issuance and shall be implemented within 30 days.
FOR THE NUCLEAR REGULATORY COMMISSION Vb Victor Nerses, Acting Director Project Directorate 1-3 Division of Reactor Projects - 1/11 Office of Nuclear Reactor Regulation
Attachment:
Changes to the Technical Specifications Date of Issuance:
July 15, 1992 b
m.
ATTACHMENT 10 11 CENSE AMENDMENT NO.142 FACILITY OPERATING llCENSE NO. DPR-35 DOCKET Ns..
50-291 1
Replace the following page of the Appendix A Technical Specifications with _the attached page. The revised page is identified by Amendment number and contains vertical lines indicating the area of change.
Remove Insert 155 155 r
L L-l-
-)
L
L e
LIMITING Ct)NDITIONS FOR OPERATION SURVEILLANCE REOUIREMENTS 3.7.A Primary Containment (Con't) 4.7.A Primary Containment (Con't)
Primary Containment Jntearity Primary Containment Int 12111Y 2.a Primary containment integrity shall 2.a The primary containment be maintained at all times when the integrity shall be demonstrated reactor is critical or when the by performing Primary reactor water temperature is above Containment Leak Tests in 212'F and fuel is in the reactor accordance with 10CFR50 Appendix vessel except while performing open J, with exemptions as approved vessel" physics test at power levels by '.le NRC and exceptions as not to exceed 5 Hw(t).
follows:
Primary containment integrity means (1) The main steam line that the drywell and pressure isolation valves shall be suppression chamber are intact and tested at a pressure 123 that all of the fol)owing conditions psig, and normalized to a are satisfied:
value equivalent to 45 psig.
(1) All manual containment isolation (2) Personnel air lock door valves on lines connected to the seals shall be tested at a reactor coolant system or pressure 210 psig.
l containment which are not Results shall be normalized required b) be open during
.to a value equivalent to 45 accident tonditions are closed, psig.
(2) At least one door in each airlock If the total leakage rates is closed and sealed.
listed below are exceeded, repaits and retests shall be (3) All blind flanges and manways are performed to correct the closed.
conditions.
(4) All automatic primary containment (1) All double-gasketed seals:
isolation valves and all 10% Lt (X) instrument line flow check valves are operable except as specified (2) All testable penetrations in 3.7.A.2.b.
and isolation valves:
(5) All containment isolation check valves are operable or at least (3) Any one penetration or one containment isolation valve isolation valve except in each line having an inoperable main steam line isolation valve is secured in the isolated valves: 51 Lt (X) position.
(4) Any one main steam line isolation valve:
11.5 scf/hr 023 psig.
where x - 45 psig Lt. 75 L a-1.07.$yweihtofthe L
contained a r 0 45 psig for 24 hrs.
155 Amendment No. 17, 113, 136,142