Semantic search

Jump to navigation Jump to search
 Issue dateTitleTopic
ML20216G58724 September 1999Corrected Page 1 to Amend 182 to License DPR-35,reflecting New Licensee,Entergy
ML20209G37815 July 1999Amend 182 to License DPR-35,modifying TS Table 4.6-3, Reactor Vessel Material Surveillance Program Withdrawal Schedule
ML20198H55921 December 1998Amend 180 to License DPR-35,authorizing Boston Edison Co to Change Updated FSAR Section 10.7, Salt Service Water System, to Address Single Failure Vulnerability
ML20198A23211 December 1998Amend 179 to License DPR-35,revising TSs 3/4.5.F.1, Core & Containment Cooling Sys, to Extend Allowed Outage Time for Emergency DieselsShutdown Margin
High Radiation Area
Offsite Dose Calculation Manual
Annual Radiological Environmental Operating Report
Offsite Circuit
Water hammer
ML20195B89310 November 1998Amend 178 to License DPR-35,modifying Various Pilgrim Nuclear Power Station TS Pages to Correct Typographical Errors,Remove Inadvertent Replication of Info & Update Various Bases SectionsOvertravel
ML20236X46331 July 1998Amend 177 to License DPR-35,relocating Radioactive Effluent TS & Radiological Environ Monitoring Program to Offsite Dose Calculation Manual,Iaw Recommendations of GL 89-01Safe Shutdown
Shutdown Margin
Packing leak
High Radiation Area
Offsite Dose Calculation Manual
Scram Discharge Volume
Annual Radiological Environmental Operating Report
Safeguards Contingency Plan
Fuel cladding
Pressure Boundary Leakage
Fire Protection Program
Unidentified leakage
ML20236U97328 July 1998Amend 176 to License DPR-35,changing Plant TS 3/4.5.B Bases to Incorporate Ultimate Heat Sink Temp to 75 F as Required by Amend 173Ultimate heat sink
ML20249B83119 June 1998Amend 175 to License DPR-35,modifying Plant TS Section 3.6.A.4 W/Respect to Monitoring Requirements for Vessel Flange & Adjacent Shell Differential Temp During Heatup & CooldownHydrostatic
ML20198R70430 October 1997Amend 174 to License DPR-35,adding Footnote to TS 3.7.A.5, Primary Containment. Footnote Provides one-time Exception to Reverse Flow Testing Requirement for Containment Isolation Check Valve 30-CK-432
ML20148U6403 July 1997Amend 173 to License DPR-35,evaluating Unreviewed USQ Associated W/Operation of Plant to Credit Use of Containment Overpressure to Suppl NPSH for Emergency Core Cooling Pumps & Increase Accident Analysis Design UHS TempUltimate heat sink
ML20140B02028 May 1997Amend 172 to License DPR-35,revising TSs Definition 1.M, Primary Containment Integrity, Note 6 on Table 3.2.A for High Flow Main Steam Line Instrumentation & Table 3.2.D for TypoEarthquake
ML20137R8057 April 1997Amend 171 to License DPR-35,revises TS Safety Limit 2.1.2, Minimum Critical Power Ratio & Associated Bases Section & Note 5 to Table 3.2.C.1, Instrumentation That Initiates Rod BlocksAnticipated operational occurrence
Fuel cladding
ML20147D87310 February 1997Amend 170 to License DPR-35,revising Definition of operable- Operability,Tss & Associated Bases Section for TSs 3.9.B.2 & 3.9.B.3
ML20134L69312 November 1996Amend 168 to License DPR-35,relocating Administrative Controls Re QA Review & Audit Requirements of Section 6, TS 6.5.B.8
ML20128N8564 October 1996Amend 167 to License DPR-35,changing TSs to Implement 10CFR50,App J,Option BExcess Flow Check Valve
ML20116L31412 August 1996Amend 166 to License DPR-35,modifying Definition of Core Alteration & Limiting Condition for Operation,Surveillance Conditions & Bases Section Associated W/Ts 3.7.C
ML20096H26923 January 1996Amend 165 to License DPR-35,revising TS to Convert Current percentage-based Scram Time Limits to notch-based Limits in TS 3.3.C & Updating Bases for notch-based Limits in TS 3/4.3.C
ML20092C57111 September 1995Corrected Tech Spec Page to Amend 164 to License DPR-35, Changing Control Value for Reactor High Pressure Trip Level Setting 76 Psig
ML20086A15522 June 1995Corrected TS Pages of Amend 164 to License DPR-35 for Plant
ML20085K97915 June 1995Amend 164 to License DPR-35,revises Reactor High Water Level Trip Level Setting for Group 1 Isolation
ML20081L88927 March 1995Amend 162 to License DPR-35,reducing Reactor Pressure Setpoint at Which Shutdown Cooling Sys Automatically IsolatesRestart
ML20081H89422 March 1995Amend 161 to License DPR-35,re Changes to Listed TS & Addition of Sections 3.7.B.1.f & 3.7.B.2.e to Require That Both Trains of Standby Gas Treatment & CR Air Filtration Sys OperableShutdown Margin
ML20081J03222 March 1995Amend 160 to License DPR-35 Re Changes to TS to Revise Allowable Leak Rate MSIVs
ML20080T7168 March 1995Amend 159 to License DPR-35,removing TS Requirement, Instrumentation That Initiates Control Rod Blocks to Have Scram Discharge Instrument Volume-Scram Trip Bypassed Operable in Run & Startup Modes
ML20080J72016 February 1995Amend 158 to License DPR-35,relocating Alarms for Drywell to Suppression Chamber Vacuum Breaker to Different Annunciator Panel
ML20078Q3282 February 1995Amend 157 to License DPR-35,removing TS Section 4.5.H.4 Which Requires Testing & Calibration of Pressure Switches in Certain ECCS LinesWater hammer
ML20072H96422 August 1994Amend 156 to License DPR-35,increasing Allowed out-of-svc Time from 7 Days to 14 Days for Ads,Hpcis & RcicsReactor Vessel Water Level
ML20070A13222 June 1994Amend 155 to License DPR-35,increases Allowed Fuel Assembly Storage Cells from 2,320 to 3,859 & Changes Max Loads Allowed to Travel Over Spent Fuel Assemblies from 1,000 to 2,000 LbsEarthquake
ML20070B33621 June 1994Amend 154 to License DPR-35,removing Scram & Group I Isolation Valve Closure Functions Associated W/Main Steamline Radiation MonitorsReactor Vessel Water Level
Scram Discharge Volume
Fuel cladding
ML20029E68116 May 1994Amend 153 to License DPR-35 Changing TS by Revising Wording for LicenseHydrostatic
ML20065R4455 May 1994Amend 152 to License DPR-35,removing Low Condenser Vacuum Scram & Reducing Turbine First Stage Setpoint to Bypass Turbine Control Valve Fast Closure & Turbine Stop Valve Closure Trip SignalsScram Discharge Volume
Fuel cladding
ML20065H4376 April 1994Amend 151 to License DPR-35,changing TS to Support 24-month Fuel CycleHalf scram
Grab sample
Scram Discharge Volume
Excess Flow Check Valve
ML20059J1654 November 1993Corrected Amend 149 to License DPR-35,correcting Administrative ErrorsGrace period
ML20059J3083 November 1993Amend 150 to License DPR-35,reducing Main Steam Isolation Valve Low Turbine Inlet Pressure Setpoint to Greater than or Equal to 810 Psig & Reducing Min Pressure in Definition of Run Mode to 785 PsigFuel cladding
Loss of condenser vacuum
ML20057D75528 September 1993Amend 149 to License DPR-35,revising TS to Specify LCO & SRs for Inservice Code TestingScram Discharge Volume
Grace period
ML20035C6702 April 1993Amend 148 to License DPR-35,changing Low Pressure Isolation Signal from HPCI Steam Inlet Piping to Reactor Vessel as Sensed by Analog Trip Sys
ML20035B16425 March 1993Amend 147 to License DPR-35,revising RPS Instrumentation Surveillance Test Intervals from 1 Month to 3 Months, Provides for 12- & 6-hr Allowable out-of-svc Times for Repairs,Tests & Deletes Water Level Perturbation
ML20127P55727 January 1993Amend 146 to License DPR-35,revising Scram Insertion Times to Reflect Use of Advanced GE-10 Design in Fuel Cycle 10
ML20128E85727 January 1993Corrected Page Two of Amend 146 to License DPR-35
ML20127P53125 January 1993Amend 145 to License DPR-35,revising TS SRs for Station Batteries by Replacing Rated Load Discharge Test W/Svc Discharge Test once-per-cycle & Performance Discharge Test Every Five YrsHalf scram
ML20126F29316 December 1992Amend 144 to License DPR-35,incorporating Asterisk Referencing Footnote Granting Relief to Allow One Train of SGTS & Crheaf Sys Operable Prior to & During Refueling Activities
ML20116M55716 November 1992Amend 143 to License DPR-35,revising TS by Relocating Parts of Section 3/4.12, Fire ProtectionSafe Shutdown
Safeguards Contingency Plan
Fire Protection Program
Hourly Fire Watch
ML20101T51315 July 1992Amend 142 to License DPR-35,revising Surveillance Interval for Local Leak Rate Testing of Main Steam Isolation Valves & Personnel Airlock Door SealsLocal Leak Rate Testing
ML20094S4407 April 1992Amend 141 to License DPR-35,revising Auxiliary Electrical Sys to Incorporate Surveillance for Inverters Associated W/Hpci & RCIC Sys & Improving Clarity of Tech Specs
ML20100Q20129 January 1992Amend 140 to License DPR-35,revising Thermal & Pressurization Limit Curves of Figure 3.6.1 & 3.6.2 of Tech Specs
ML20091C86529 July 1991Amend 139 to License DPR-35,changing Tech Spec by Imposing New Limit of 2 Gpm Increase,Over Any 24 H Period,Of Reactor Coolant Leakage Into Primary Containment from Unidentified SourcesPacking leak
Offsite Dose Calculation Manual
Hydrostatic
Scram Discharge Volume
Stress corrosion cracking
Pressure Boundary Leakage
Pressure boundary leak
Unidentified leakage
ML20076C93617 July 1991Corrected Amend 138 to License DPR-35,adding Correct Page 217a of Tech SpecsShutdown Margin
ML20081K52619 June 1991Amend 137 to License DPR-35,establishing Revised Basis for Safety Analysis Based on Results of LOCA Analysis Performed Using GE SAFER/GESTR-LOCA Application MethodologyShutdown Margin
ML20070F1144 March 1991Amend 135 to License DPR-35,changing Surveillance Requirements for Redundant Core & CCS & Allowing out-of-svc Period for CCS & LPCI PumpsReactor Vessel Water Level
Half scram
Scram Discharge Volume
Water hammer
ML20070B82029 January 1991Amend 134 to License DPR-35,changing Expiration Date from 080826 to 120609