| Issue date | Title | Topic | |
|---|---|---|---|
| ML20216G587 | 24 September 1999 | Corrected Page 1 to Amend 182 to License DPR-35,reflecting New Licensee,Entergy | |
| ML20209G378 | 15 July 1999 | Amend 182 to License DPR-35,modifying TS Table 4.6-3, Reactor Vessel Material Surveillance Program Withdrawal Schedule | |
| ML20198H559 | 21 December 1998 | Amend 180 to License DPR-35,authorizing Boston Edison Co to Change Updated FSAR Section 10.7, Salt Service Water System, to Address Single Failure Vulnerability | |
| ML20198A232 | 11 December 1998 | Amend 179 to License DPR-35,revising TSs 3/4.5.F.1, Core & Containment Cooling Sys, to Extend Allowed Outage Time for Emergency Diesels | Shutdown Margin High Radiation Area Offsite Dose Calculation Manual Annual Radiological Environmental Operating Report Offsite Circuit Water hammer |
| ML20195B893 | 10 November 1998 | Amend 178 to License DPR-35,modifying Various Pilgrim Nuclear Power Station TS Pages to Correct Typographical Errors,Remove Inadvertent Replication of Info & Update Various Bases Sections | Overtravel |
| ML20236X463 | 31 July 1998 | Amend 177 to License DPR-35,relocating Radioactive Effluent TS & Radiological Environ Monitoring Program to Offsite Dose Calculation Manual,Iaw Recommendations of GL 89-01 | Safe Shutdown Shutdown Margin Packing leak High Radiation Area Offsite Dose Calculation Manual Scram Discharge Volume Annual Radiological Environmental Operating Report Safeguards Contingency Plan Fuel cladding Pressure Boundary Leakage Fire Protection Program Unidentified leakage |
| ML20236U973 | 28 July 1998 | Amend 176 to License DPR-35,changing Plant TS 3/4.5.B Bases to Incorporate Ultimate Heat Sink Temp to 75 F as Required by Amend 173 | Ultimate heat sink |
| ML20249B831 | 19 June 1998 | Amend 175 to License DPR-35,modifying Plant TS Section 3.6.A.4 W/Respect to Monitoring Requirements for Vessel Flange & Adjacent Shell Differential Temp During Heatup & Cooldown | Hydrostatic |
| ML20198R704 | 30 October 1997 | Amend 174 to License DPR-35,adding Footnote to TS 3.7.A.5, Primary Containment. Footnote Provides one-time Exception to Reverse Flow Testing Requirement for Containment Isolation Check Valve 30-CK-432 | |
| ML20148U640 | 3 July 1997 | Amend 173 to License DPR-35,evaluating Unreviewed USQ Associated W/Operation of Plant to Credit Use of Containment Overpressure to Suppl NPSH for Emergency Core Cooling Pumps & Increase Accident Analysis Design UHS Temp | Ultimate heat sink |
| ML20140B020 | 28 May 1997 | Amend 172 to License DPR-35,revising TSs Definition 1.M, Primary Containment Integrity, Note 6 on Table 3.2.A for High Flow Main Steam Line Instrumentation & Table 3.2.D for Typo | Earthquake |
| ML20137R805 | 7 April 1997 | Amend 171 to License DPR-35,revises TS Safety Limit 2.1.2, Minimum Critical Power Ratio & Associated Bases Section & Note 5 to Table 3.2.C.1, Instrumentation That Initiates Rod Blocks | Anticipated operational occurrence Fuel cladding |
| ML20147D873 | 10 February 1997 | Amend 170 to License DPR-35,revising Definition of operable- Operability,Tss & Associated Bases Section for TSs 3.9.B.2 & 3.9.B.3 | |
| ML20134L693 | 12 November 1996 | Amend 168 to License DPR-35,relocating Administrative Controls Re QA Review & Audit Requirements of Section 6, TS 6.5.B.8 | |
| ML20128N856 | 4 October 1996 | Amend 167 to License DPR-35,changing TSs to Implement 10CFR50,App J,Option B | Excess Flow Check Valve |
| ML20116L314 | 12 August 1996 | Amend 166 to License DPR-35,modifying Definition of Core Alteration & Limiting Condition for Operation,Surveillance Conditions & Bases Section Associated W/Ts 3.7.C | |
| ML20096H269 | 23 January 1996 | Amend 165 to License DPR-35,revising TS to Convert Current percentage-based Scram Time Limits to notch-based Limits in TS 3.3.C & Updating Bases for notch-based Limits in TS 3/4.3.C | |
| ML20092C571 | 11 September 1995 | Corrected Tech Spec Page to Amend 164 to License DPR-35, Changing Control Value for Reactor High Pressure Trip Level Setting 76 Psig | |
| ML20086A155 | 22 June 1995 | Corrected TS Pages of Amend 164 to License DPR-35 for Plant | |
| ML20085K979 | 15 June 1995 | Amend 164 to License DPR-35,revises Reactor High Water Level Trip Level Setting for Group 1 Isolation | |
| ML20081L889 | 27 March 1995 | Amend 162 to License DPR-35,reducing Reactor Pressure Setpoint at Which Shutdown Cooling Sys Automatically Isolates | Restart |
| ML20081H894 | 22 March 1995 | Amend 161 to License DPR-35,re Changes to Listed TS & Addition of Sections 3.7.B.1.f & 3.7.B.2.e to Require That Both Trains of Standby Gas Treatment & CR Air Filtration Sys Operable | Shutdown Margin |
| ML20081J032 | 22 March 1995 | Amend 160 to License DPR-35 Re Changes to TS to Revise Allowable Leak Rate MSIVs | |
| ML20080T716 | 8 March 1995 | Amend 159 to License DPR-35,removing TS Requirement, Instrumentation That Initiates Control Rod Blocks to Have Scram Discharge Instrument Volume-Scram Trip Bypassed Operable in Run & Startup Modes | |
| ML20080J720 | 16 February 1995 | Amend 158 to License DPR-35,relocating Alarms for Drywell to Suppression Chamber Vacuum Breaker to Different Annunciator Panel | |
| ML20078Q328 | 2 February 1995 | Amend 157 to License DPR-35,removing TS Section 4.5.H.4 Which Requires Testing & Calibration of Pressure Switches in Certain ECCS Lines | Water hammer |
| ML20072H964 | 22 August 1994 | Amend 156 to License DPR-35,increasing Allowed out-of-svc Time from 7 Days to 14 Days for Ads,Hpcis & Rcics | Reactor Vessel Water Level |
| ML20070A132 | 22 June 1994 | Amend 155 to License DPR-35,increases Allowed Fuel Assembly Storage Cells from 2,320 to 3,859 & Changes Max Loads Allowed to Travel Over Spent Fuel Assemblies from 1,000 to 2,000 Lbs | Earthquake |
| ML20070B336 | 21 June 1994 | Amend 154 to License DPR-35,removing Scram & Group I Isolation Valve Closure Functions Associated W/Main Steamline Radiation Monitors | Reactor Vessel Water Level Scram Discharge Volume Fuel cladding |
| ML20029E681 | 16 May 1994 | Amend 153 to License DPR-35 Changing TS by Revising Wording for License | Hydrostatic |
| ML20065R445 | 5 May 1994 | Amend 152 to License DPR-35,removing Low Condenser Vacuum Scram & Reducing Turbine First Stage Setpoint to Bypass Turbine Control Valve Fast Closure & Turbine Stop Valve Closure Trip Signals | Scram Discharge Volume Fuel cladding |
| ML20065H437 | 6 April 1994 | Amend 151 to License DPR-35,changing TS to Support 24-month Fuel Cycle | Half scram Grab sample Scram Discharge Volume Excess Flow Check Valve |
| ML20059J165 | 4 November 1993 | Corrected Amend 149 to License DPR-35,correcting Administrative Errors | Grace period |
| ML20059J308 | 3 November 1993 | Amend 150 to License DPR-35,reducing Main Steam Isolation Valve Low Turbine Inlet Pressure Setpoint to Greater than or Equal to 810 Psig & Reducing Min Pressure in Definition of Run Mode to 785 Psig | Fuel cladding Loss of condenser vacuum |
| ML20057D755 | 28 September 1993 | Amend 149 to License DPR-35,revising TS to Specify LCO & SRs for Inservice Code Testing | Scram Discharge Volume Grace period |
| ML20035C670 | 2 April 1993 | Amend 148 to License DPR-35,changing Low Pressure Isolation Signal from HPCI Steam Inlet Piping to Reactor Vessel as Sensed by Analog Trip Sys | |
| ML20035B164 | 25 March 1993 | Amend 147 to License DPR-35,revising RPS Instrumentation Surveillance Test Intervals from 1 Month to 3 Months, Provides for 12- & 6-hr Allowable out-of-svc Times for Repairs,Tests & Deletes Water Level Perturbation | |
| ML20127P557 | 27 January 1993 | Amend 146 to License DPR-35,revising Scram Insertion Times to Reflect Use of Advanced GE-10 Design in Fuel Cycle 10 | |
| ML20128E857 | 27 January 1993 | Corrected Page Two of Amend 146 to License DPR-35 | |
| ML20127P531 | 25 January 1993 | Amend 145 to License DPR-35,revising TS SRs for Station Batteries by Replacing Rated Load Discharge Test W/Svc Discharge Test once-per-cycle & Performance Discharge Test Every Five Yrs | Half scram |
| ML20126F293 | 16 December 1992 | Amend 144 to License DPR-35,incorporating Asterisk Referencing Footnote Granting Relief to Allow One Train of SGTS & Crheaf Sys Operable Prior to & During Refueling Activities | |
| ML20116M557 | 16 November 1992 | Amend 143 to License DPR-35,revising TS by Relocating Parts of Section 3/4.12, Fire Protection | Safe Shutdown Safeguards Contingency Plan Fire Protection Program Hourly Fire Watch |
| ML20101T513 | 15 July 1992 | Amend 142 to License DPR-35,revising Surveillance Interval for Local Leak Rate Testing of Main Steam Isolation Valves & Personnel Airlock Door Seals | Local Leak Rate Testing |
| ML20094S440 | 7 April 1992 | Amend 141 to License DPR-35,revising Auxiliary Electrical Sys to Incorporate Surveillance for Inverters Associated W/Hpci & RCIC Sys & Improving Clarity of Tech Specs | |
| ML20100Q201 | 29 January 1992 | Amend 140 to License DPR-35,revising Thermal & Pressurization Limit Curves of Figure 3.6.1 & 3.6.2 of Tech Specs | |
| ML20091C865 | 29 July 1991 | Amend 139 to License DPR-35,changing Tech Spec by Imposing New Limit of 2 Gpm Increase,Over Any 24 H Period,Of Reactor Coolant Leakage Into Primary Containment from Unidentified Sources | Packing leak Offsite Dose Calculation Manual Hydrostatic Scram Discharge Volume Stress corrosion cracking Pressure Boundary Leakage Pressure boundary leak Unidentified leakage |
| ML20076C936 | 17 July 1991 | Corrected Amend 138 to License DPR-35,adding Correct Page 217a of Tech Specs | Shutdown Margin |
| ML20081K526 | 19 June 1991 | Amend 137 to License DPR-35,establishing Revised Basis for Safety Analysis Based on Results of LOCA Analysis Performed Using GE SAFER/GESTR-LOCA Application Methodology | Shutdown Margin |
| ML20070F114 | 4 March 1991 | Amend 135 to License DPR-35,changing Surveillance Requirements for Redundant Core & CCS & Allowing out-of-svc Period for CCS & LPCI Pumps | Reactor Vessel Water Level Half scram Scram Discharge Volume Water hammer |
| ML20070B820 | 29 January 1991 | Amend 134 to License DPR-35,changing Expiration Date from 080826 to 120609 |