Text
_
l
'f i
i i
i i
4 a
l l
i COOPER NUCLEAR STATION 1
INSERVICE INSPECTION j
SUMMARY
REPORT 1
FALL 1995 REFUELING OUTAGE I
4 l
s 1
i 9604040237 960329 PDR ADOCK 05000298 G
i Cooper Nuclear Station NRC Docket No. 50-298 i
License No. DPR-46 i
\\
Table of Contents 1.
NIS-1 Form (NPPD,1 page) 2.
Summary Report (GE, 6 pages)
Abstract of Examinations (GE,47 Pages) i
-.1 - Abstract of Examinations (NPPD,2 Pages)
Examination Personnel (GE,1 Page)
-.1 - Examination Personnel (GE and NPPD,3 Pages)
- Examination Procedures (GE,3 Pages).1 - Examination Procedures (NPPD, 3 Pages)
Equipment and Materials (GE,3 Pages)
-.1 - Equipment and Materials (NPPD,1 Page)
Ultrasonic Calibration Standards (GE) 3.
NIS-2 Form and Summary Table (NPPD,13 pages) i i
4 4
Attachment to NLS960048 NIS-1 Form (NPPD,1 Page)
FORM NIS-1 OWNER'S REPORT FOR INSERVICE INSPECTIONS As required by the Provisions of the ASME Code Section XI 1.
omr: u,hra t.a runti, nnm., n;.,,ict 2.
Plant: rnaaar N"etaar Riatinn IY111ny OR 11rnumstle MF /M71 3.
Plant Unit-N
- 4. Owner Certificate of Authorization (if required): N/A 5.
Commercial Service Date: I"ly 107a
- 6. National Board Number for Unit: Sn?At 7.
Components Inspected: % AnacheA Dennre Rommarv l
8.
Examination Dates: EmM en 19.9L04 Mnte-evaminatinne perfnrmeA Anting earlier notagee have been incinAed in thie anrnrnarv rennrf in enmnlete thse rentt$reA evaminatinnt [nr the interYn] refer in I EN o$M9 9.
Inspection Period Identification: Wrd DerinA.1/im en ?nc/oA 10.
Inspection Interval Identification: hand interval ^/t /R5 en ?no/oA i 1.
Applicable Edition of Section XI: 1ORn FAitina winter t oR1 A AAenda l
l 12.
Date/ Revision ofInspection Plan: Das4einn d. inty 17 toos 13.
Abstract of Examinations and Tests: % AttachcA nem* Rnmmary Att interval ? Fvaminatinne enmntet,-
1 l
14.
Abstract of Conditions Noted: % ^"arhcA nennd Rummarv l
l i
15.
Abstract of Corrective Measures Recommended and Taken: % AttachnA nennd Rommarv CERTIFICATE OF COMPLIANCE We certify that the statements made in this report are correct and the examinations and corrective measures taken conform to the rules of the ASME Code,Section XI.
Certificate of Authorization No N/A Expiration Date M/A 3M ~ b Signed Date f
9 or owner Dawnee, Tide
\\
)
V CERTIFICATE OF INSERVICE INSPECTION I, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the State of Nebraska and Employed by liartford Steam Boiler Inspection and Insurance Company of1Iartford, Connecticut have inspected the components described in this Owner's Report during the period August 2,1993 to December 23,1995, and state that to the best of my knowledge and belief, the Owner has performed examinations and taken corrective measures described in this Owner's Report in accordance with the requirements of the ASME Code,Section XI.
l By signing this certificate neither the Inspector nor his employer makes any warranty, expressed or implied, conceming the examinations and corrective measures described in this Owners's Report. Furthermore, neither the Inspector nor his employer shall be liable in any manner for any personal injury or property damage or a loss of any kind arising from or connected with this inspection.
Y # l$Y?, State, Prownce, and Endorse M
Commissionc Natmnal Waard Inspectors Sqpint O Ni b Date 4
Attachment to NLS9f,0048 1
a Summary Report (GE,6 Pages) s s
h O GE Nuclear Energy NPPD Cooper Nuclear Station Unit i I
Commercial Service Date: July 1974 Refueling Outage RFOl6
1.0 INTRODUCTION
Nondestructive examinations were performed by GE Nuclear Energy personnel under contract 188P3, Task Authorization No. 305 for the Fall 1995 Refueling Outage (RFO16) at Nebraska Public Power District's Cooper Nuclear Station Unit 1.
Additional examinations were performed by CNS personnel during the operating cycle prior to and including RFO16 and GE personnel in outages prior to RFO16.
1 2.0
SUMMARY
OF EXAMINATIONS I
A total of 1013 Nondestructive examinations were performed utilizing Visual Testing (VT), Remote Visual (IWI), Liquid Penetrant (PT), Magnetic Particle (MT), manual Ultrasonic (UT) and Remote Ultrasonic i
(Smart UT & Geris 2000) inspection techniques. These examinations were performed between Oct.15, 1995 and Dec. 23,1995 on 468 components to meet the requirements of the CNS ISI Program for
)
Preservice inspections (PSI), inservice inspections, and Augmented Inservice Inspections.
j The following table lists the number of components examined by ASME or Augmented Category and describes the indications and / or conditions which were recorded. Also included in this report is the Abstract of Examinations (Attachment 1), qualifications of personnel who performed the exams (Attachment 2), NDE procedures (Attachment 3) and equipment used to perform the exams (Attachments 4 & 5). Supporting records are included in the final report for RFO16.
Also included in the following table are the examinations performed prior to RFO16 and credited in this report. Specific information regarding these examinations is provided separately from the RFO16 work scope in Attachments 1 through 5.
COMPONENTS EXAMINED FOR ASME SECTION XI CREDIT ASME Number of Cateaory Components Description
nditions Noted B-A 13 Vessel Welds A-BA See Data Report R-223, recorded (1) subsurface indication in the outer 3/4 t of weld metal.
This indication is acceptable per ASME Section XI using flaw sizing techniques of UT-CNS-104VO R.1.
VLA-BA-1, VLA-BA-2, VLA-BA-3, HMB-BB-1 and HMB-BB 100% of the wold length is not accessible for examination.
See Relief Request RI-06.
VCB-BCS-3 is accessible from one side which limits the examination to 74.5% coverage of the exam volume.
12 components had No Recordable Indications. (NRI)
Page 1 of 6 3/15/96
)
r GE Nuclear Energy I-NPPD Cooper Nuclear Station Unit 1 Commercial Senice Date: July 1974 Refueling Outage RFOl6 COMPONENTS EXAMINED FOR ASME SECTION XI CREDIT Cont.
ASME Number of Cateoory Components Description Conditions Noted j
B-D 6
Nozzle to Vessel N1B Examination limited to 32.2% Coverage (NRI)
N2A Examination limited to 40.3% Coverage (NRI)
N2B Examination limited to 40.3% Coverage (NRI)
N2D Examination limited to 40.3% Coverage (NRI)
NSB Examination limited to 31.7% Coverage (NRI)
N3C Examination limited to 35.0% Coverage (NRI) 6 Nozzle inner (NRI) 6 Components Radius B-E 10 Pressure Retaining (NRI)
- Performed by CNS personnel
- Partial Penetration Welds in Vessels B-F 6
Pressure Retaining RVD-BF-14 Exam limited to 83.3% Coverage (NRI)
Dissimilar Metal Welds 5 components had geometric indications.
B-G-1 51 Pressure Retaining (NRI) 51 Components Bolting 2' and Greater in Dia.
B-G-2 25 Pressure Retaining (SAT) 15 ISI Exams Performed Bolting 2" and (SAT) 10 PSI Exams Performed
. Less in Dia.
B-J 76 Pressure Retaining FWA-BJ-81 Exam limited to 82% Coverage Welds in Piping (Geometry)
RAS-BJ-10 Exam limited to 82% Coverage (NRI)
RBS-BJ-6A Exam limited to 67% Coverage (NRI)
CWB-BJ-27 Preservice exam (Geometry)
RAS-BJ-21 Preservice exam (NRI) 18 Components Geometry Recorded 53 Components (NRI)
B-M-2 9
Class i Valve Body (SAT) 5 ISI Exams performed (SAT) 4 PSI Exams performed B-N-1 2
Vessel Interior (SAT) 2 Components Page 2 of 6 3/15/96
D (O GE Nucu br Energy NPPD Cooper Nuclear Station Unit 1 I
Commercial Service Date: July 1974 Refueling Outage RFOl6 COMPONENTS EXAMINED FOR ASME SECTION XI CREDIT Cont.
ASME Number of Cateaory Components Description Conditions Noted B-N-2 11 Interior Attachments (SAT) Unlatching pins off center. Acceptable per GENE Debris in Guide Tubes. Removed by vacuuming.
Core Shroud exams performed by UT. See UT Data Reports SR-01 thru SR-07 (SAT) All 4 sets of Feedwater End Brackets, 1993 exam (SAT) Specimen Holder Bracket # 1,1993 exam (SAT) Specimen Holder Bracket # 2,1993 exam (SAT) Specimen Holder Bracket # 3,1993 exam B-O 8
Pressure Retaining CRD-02-27-1 Exam limited to 50% Coverage (NRI)
Welds in CRD CRD-02-31-1 Exam limited to 50% Coverage (NRI)
Housings (NRI) 6 Components l
B-P All Pressure
- Performed by CNS Personnel
- j Retaining One through wall leak. Reference CR 1-18732 Components C-A 4
Class ll Vessels (NRI) 4 Components C-B 3
Class 11 Nozzles (NRI) 2 Components
- VT-2 of tell-tale hole in RHR-CB-2A reinforcing plate performed by CNS Personnel
- C-C 1
Integral Attachments (NRI) HPID-CC-5, Examined in 1986 C-F 32 Pressure Retaining HPEX-CF-3 (7) MT indications, acceptable per UT Welds in Piping RHC-CF-17 (2) MT indications, acceptable per UT RHC-CF-28 (1) MT indications, acceptable per UT RBW-CF-91 (4) MT indications, acceptable per UT 11 Components Geometry Recorded 14 Components (NRI) i 3 Components Deleted from work scope per RI-23 l
C-G 2
Pressure Retaining (NRI) 2 Components Welds in Pumps C-H Pressure Retaining
- Performed by CNS Personnel
- Components Page 3 of 6 3/15/96
m GE Nuclear Energy NPPD Cooper Nuclear Station Unit 1 I
Commercial Senice Date: July 1974 Refueling Outage RFOl6 COMPONENTS EXAMINED FOR ASME SECTION XI CREDIT Cont.
i ASME Number of Cateaory Components Description Conditions Noted D-A 29 Class ill Pressure REC-TK-ST-A1 Cracked Weld. Accepted by Retaining NPPD CR-95-0776 Components (SAT) 28 Components examined D-B Systems in Support
- Performed by CNS Personnel
- of Emer. Core Coo!
F-A 42 Supports SW-STRA-S1 Corrosion noted See CR-1 14953 Use as is per NPPD Eng.
i (SAT) 37 Components examined (SAT) SW-S-69 examined in 1993 (SAT) SW-H-223 examined in 1993 (SAT) SW-S-178A examined in 1993 (SAT) SW-H-46 examined in 1993 Page 4 of 6 3/15/96
GE Nuclear Energy i
NPPD Cooper Nuclear Station Unit 1 Commercial Senice Date:.luly 1974 Refueling Outage RFOl6 COMPONENTS EXAMINED FOR AUGMENTED REQUIREMENTS Number of Cateaory Components Description Conditions Noted j
GL88-01 33 UT Exams for 32 ISI Components examined, no IGSCC detected IGSCC 1 PSI Component examined, no IGSCC detected GL94-03 8
RPV Shroud UT H-1 (8) lD Indications See CR-1-14742 H-3 (8) 10 Indications See CR-1-14742 i
H-5 (1) OD Indications See CR-114742 H-6A (1) OD Indications See CR-1 14742 IWI 10 Intemal Vessel IEB80-13 Exam detected (2) cracks on Core Spray i
Piping. See CR1-14955 and UT Report R-CS-101 Debris found in Core Spray Sparger Flow Nozzle # 51C. See CR 95-1191 SIL 289 Exam detected (1) crack at Tee Box See CR-1-14955 SIL-588 Exam detected (1) cracked Alignment Pin See CR-1-14960 IV-UT 1
SIL-433 UT 25 Shroud Head Bolts (SHB) were examined (4) Bolts # 15,30, 32 & 36 were cracked & replaced (2) Bolts # 19 & 29 were suspect and replaced See CR-1-14951 6
CS Pipe Weld # 1 @ 170' Confirmed visual crack with UT See Report R-CS-101 and CR-1-14998 Weld # 21 @ 10' Confirmed visual crack with UT See Report R-CS-101 and CR-1-14998 NBI-SE 3
SIL-571 (NRI) 3 Components examined NUREG 0619 12 Feedwater IR (NRI) 4 Feedwater Nozzles examined Page 5 of 6 3/15/96
l l
i l
j'}
(] GE Nuclear Energy i
Commercial Senice Date: July 1974 Refueling Outage RFOl6 COMPONENTS EXAMINED FOR AUGMENTED REQUIREMENTS Cont.
Number of Cateaory Components Description Conditions Noted REC 68 UT exams for 2848-2-W11 (1) indication removed.
Nitrate Induced See CR-1-15290 Stress Corrosion Cracking 2848-2-W112 (1) indication removed.
See CR-1-15290 2848-14-W14 (1) indication removed.
See CR-1-14749 2848-14-W30 (1) indication removed.
See CR-1-15289 2848-21-WAA (1) indication removed.
See CR-1-1493' 2848-21-WAB (2) indications removed.
See CR-1-14937 2848-22-W19 (1) indication removed.
See CR-1-14937 RCC-2848-4-38-SW-W2 - Re-examination of 1994 indication with no change noted.
RCC-2848-4-38-SW-W1 - Repair of previous indication recorded in 1994.
2848-14-W15 PSI exam of weld due to repair of Weld 2848-14-W14. See CR-1-14937 2848-21-W4 - Weld was replaced in the workscope with 2848-15-W21 due to limited exam of W4.
REX 3
Nozzle to Shell NVE-BD-N4A Re-examination of indications recorded in 1991. See Report RG-001 NVE-BD-N4C Re-examination of indications recorded in 1991. See Report RG 006 NVE-BD-N4D Re-examination ofindications recorded in 1991. See Report RG-007 Page 6 of 6 3/15/96
Attachinent to NLS960048 i
i j
k i - Abstract of Examinations l
i (GE,47 Pages) i 4
I' i
l i
a i
i 4
]
1 4
. _ _ _ -. _. _. - ~.. _ -,
m_
GE NucintEntrgy NPPD Cooper NucisRr Station Unit 1 m,,,,1
,,1,o,e., u17 1,,,
ABSTRACT of EXAMINATIONS R.? fueling Outage RFOl6 03/17/1996 PAGE 1 of 47 ASME COrwte r5: / CONFIGURATION SIZE REPORT EXAM PROCEDURE REV BLOCK DATE 180.
CC m a.
13 COMPONENTS EXAMINED FOR CATEGORY B-A t
B-A VCB-BB-1 BHD-C 218 R-236 0
UT-CNS-300VO R.0 16 11/20/95 GE-BN-3 94% COVERAGE 45S UT-CNS-300VO R.0 15 REPLACES WELD #
60S (TT-CNS-300VO R.0 15 VCB-BB-4 45S UT-CNS-300VO R.0 16 I
60S W-CNS-300VO R.0 16 B-A VLA-BA-1 VE LS 218 R-208 0
UT-CNS-300VO R.0 16 11/21/95 GE-BN-3 RI-06 l
45S UT-CNS-300VO R.0 16 93.1% COVERAGE 60S UT-CNS-300VO R.0 16 EXAMINED 56.5" B-A VLA-BA-2 VE-LS 218 R-209 60S LTf-CNS 300VO R.0 16 11/20/95 GE-BN-3 RI-06 45S UT-CNS-300VO R.0 16 95% COVERAGE O
ITT-GS-300VO R.0 16 56.5" EXAMINED B-A VLA-BA-3 VE-LS 218 R-223 0
(TF-CNS-300VO R.0 16 12/2/95 GE-BN-3 RI 06 45S ITT-CNS-300VQ R.0 16 LINEAR SUB-SURFACE 60S UT-CNS-300VO R.0 16 INDICATION f
455 UT-CNS-300VO R.0 16 SIZING DATA 95% COVERAGE 60S UT-CNS-300VO R.0 16 56.7* EXAMINED
(
45S UT-CNS-104V0 R.0 16 GE NCR # 95003 B-A VLD-BB-1 VE-LS 218 R-186 45S ITI-CNS-300VO R.0 16 11/17/95 GE-BN 3 NRI 60S UT-CNS-300VO R.0 16 95.8% COVERAGE O
UT+CNS-300VO R.0 16 B-A VLD-BB-3 VE LS 218 R-187 45S UT-CNS-300VO R.0 16 11/20/95 GE-BN-3 95.2% COVERAGE 60S UT-CNS-30b0R.0 16
~
NRI O
UT-CNS-300VO R.0 16 EXAMINED 132.5" B-A HMC-BB-1 BHD-C 218 R 239 60S UT-CNS-300VO R.0 15 11/20/95 GE-BN-3 PERFORM TO COMPLETE EXAM COV5: RAGE FROM PREVIOUS OUTAGES.
86.8% COVERAGE 91.4% WELD COVERAGE B-A HMB-BB-1 BHD-M 218 R-233 0
UT-CNS-300VO R.0 16 11/20/95 GE-BN-3 RI-06 45S UT-CNS-300VO R.0 16 91.8% COVERAGE ON 60S ITI-CNS-300VQ R. 0 16 4" AREA EXAMINED B-A HMB-BB-2 BHD-M 218 R-238 0
UT-CNS-300VO R.0 16 11/20/95 GE-BN-3 RI-06 45S UT-CNS-300VO R.0 16 91.8% COVERAGE OF 60S LTT-CNS-300VO R.0 16 4* AREA EXAMINED t
1
ar
[,g j
8 l
9 k/
%J GE NucI:: rEn:rgy NPPD Cooper Nuciser Station Unit 1 m,e u,,,,,,,,,,,,,,,,,,,
ABSTRACT of EXAMINATIONS Refueling Outage RFOl6 03/17/1996 PAGE 2 of 47 f
i CAL COMP.
ASME COMPONENT / CONFIGURATION SIZE REPORT EXAM PROCEDURE REV BLOCK DATE ISO.
CO+r.n i s B-A VCB-BC5-3 VE-F 218 R-188 45S UT-CNS-300VO R.0 16 11/27/95 GE-BN-3 248-7 Deg.
60S ITT-CNS-300VO R.0 16 74.6% COVERAGE O
ITT-CNS 300VD R.0 16 NRI l
B-A VCB-BC6-1 THD-F 218 R-215 0
UT-CNS-300VO R.0 15 11/22/95 GE-BA-3,4 0 120 Deg.
45S trr-OS-300VO R.0 15 91.3% COVERAGE 60S ITT-CNS-300VO R. 0 15 NRI B-A VCB-BC6-2 THD-F 218 R-216 0
UT-CNS-300VO R 0 15 11/22/95 GE-BA-3,4 120-240 Deg.
45S ITT-CNS-300VO R.0 15 91.3% COVERAGE 60S LTT-GS-300VO R.0 15 NRI B-A VCB-BC6-3
-THD-F 218 R-217 0
UT-CNS-300VO R.0 15 11/22/95 GE-BA-3,4 240-360 Deg.
^
45S UT-CNS-300VO R.0 15 91.3% COVERAGE 60S UT-CNS-300VO R.0 15 NRI 13 COMPONENTS EXAMINED FOR CATEGORY B-A
(
I
(m,p k/'
NPPD Cooper Nucisar Station Unit 1
\\_- GE NucI: rEn:rgy 37,AC_r 1 Comerci.1 Smic, D,t.,
auly 1,74 ABSTRACT of EXAMINATIONS Refueling Outage RF016 03/17/1996 PAGE 3 of 47 ASME COMPONENT / CONFIGURATION SIZE REPORT EXAM PROCEDURE REV BIoCK DATE 7S0.
COPNENTS 12 COMPONENTS EXAMINED FOR CATEGORY B-D B-D NVIR-BD-N1B NIR 28 R-220 2-1 UT-CNS-311VD R.0 16 12/1/S5 CE.232-231 NRI Z-2A UT-CNS-311VO R.0 16 GE NCR # 95002 B-D NVIR BD-N2A NIR 12 R-183 Z-1 tTT-CNS-311VD R 0 16 11/17/95 CE.232-231 NRI Z-2A LTT-CNS-311VD R. 0 16 B-D NVIR-BD-N2B NIR 12 R-184 Z-1 UT-CNS-311V0 R.0 36 11/17/95 CE.232-231 NRI Z-2A ITT-CNS-311VD R 0 16 B-D NVIR-BD-N2D NIR 12 R-185 Z-1 UT-CNS-311VO R.0 16 11/17/95 CE.232-231 NRI Z-2A UT-CNS-311VO R.0 16 B-D NVIR-BD-N5B NIR 10 R-168 Z-1 ITT-CNS-311VO R.0 16 11/8/95 CE.232-231 NRI Z-2A UT-CNS-311VO R.0 16 B-D NVIR-BD-N3C NIR 24 R-169 Z-1 UT-CNS-311VO R.0 16 11/11/95 GE.731E611 NRI Z-2A ITT-CNS-311VO R.0 16 B-D NVE-BD-N1B N-VE 28 R-235 45S UT-CNS-300VO R.0 16 11/22/95 CE.232-231 32.2% OVERAGE 60S ITI-CNS-300VO R.0 16 NRI
(
B-D NVE-BD-N2A N-VE 12 R-204 0
UT-CNS-300VO R.0 16 11/22/95 CE.232-231 40.3% COVERAGE 45S ITT-OiS-300VO R. 0 16 T & P SCANS 45S LTF-CNS-300VO R. 0 16 OD BLEND 60S UT-CNS-300VO R.0 16 T & P SCANS 60S LTf-CNS-300VO R.0 16 OD BLEND B-D NVE BD-N2B N-VE 12 R-205 0
tTT-CNS-300VO R 0 16 11/22/95 CE.232-231 40.3% COVERAGE 45S (TT-CNS-300VO R. 0 16 T& P SCANS 45S LTF-CNS-300VO R. 0 16 OD DLEND I
1 60S UT-CNS-300VO R.0 16 T & P SCANS 60S ITF-CNS-300VO R.0 36 OD BLEND B-D NVE-BD-N2D N-VE 12 R-206 0
LTT-CNS-300VD R. 0 16 11/25/95 CE.232-231 40.3% COVERAGE 45S UT-CNS-300VO R.0 16 T & P SCANS 45S UT-CNS-300VO R.0 16 OD BLEND 60S UT-CNS-300VO R.0 16 T & P SCANS 60S LTf-CNS-300VO R. 0 16 OD BLEND B-D NVE-BD-NSB N VE 10 R-170 0
ITT-CNS-3 00VO R. 0 16 11/18/95 CE.232-231 31.7% COVERAGE 45S LTT-CNS-3 00VO R.O 16 T& P SCANS 45S UT-CNS-300VO R.0 16 OD BLEND l
60S ITT-CNS-300VO R 0 16 T& P SCANS 60S UT-CNS-300VO R.0 16 OD BLEND
{
1 gg
[
k
/
NPPD Cooper Nucl K r Stttion Unit 1
(/%J' GE Nucl.~:r En:rgy
,m _,
w res,1 g,1c, o,e,,
,,1,1,,,
ABSTRACT of EXAMINATIONS Refueling Outage RF016 03/17/1996 PAGE 4 of 47 l
ASME COMPONENT / CONFIOURATION SIZE REPORT EXAM PROCEDURE REV BIOCK DATE ISO.
COMMENTS B-D NVE-BD-N3C N-VE 24 R-172 45S UT-CNS-300VD R.0 16 11/22/95 GE.731E611 35% COVERACE 60S (TT-CNS-300VO R.0 16 T & P SCANS 45S LTT-CNS-300VO R.0 16
& OD BLEND 60S tTr-CNS-300VO R.0 16 NRI l
12 COMPONEwrS EXAMINED FOR CATEGORY B-D l
i
)
4 t
t i
i I
I l
l
_..m._._.. _ _ _ _ _ _ _.., _. _.. _._ _.... _.. -.. _. _. _ _ _. _.. _ _.. _... _
ABSTRACT of EXAMINATIONS Refueling Outage RPC16 03/17/1996 PAGE 5 of 47 ASME COMPONENT / CONFIGURATION SIZE REPORT EXAM PROCEDURE REV BIDCK DATE ISO.
COPMENTS I
10 COMPONEtrPS EXAMINED FOR CATEGORY B-E B-E CRD-42-11 BHD-PE 7.5 HYDRO VT-2 SP95-128 R.0 N/A 12/20/95 GE197R576 (NRI)
- PERFORMED BY r
CNS PERSONNEL i
B-E CRD-42-15 BHD-PE 7.5 HYDRO VT-2 SP95-128 R.0 N/A 12/20/95 GE197R576 (NRI)
- PERFORMED BY CNS PERSONNEL
{
B-E CRD-42-39 BHD-PE 7.5 HYDRO VT-2 SP95-128 R 0 N/A 12/20/95 GE197R576 (NRI)
- PERFORMED BY CNS PERSONNEL l
B-E CRD-46-23 BHD-PE 7.5 HYDRO VT-2 SP95-128 R.0 N/A 12/20/95 GE197R576-(NRI)
- PERFORMED BY CNS PERSONNEL f
B-E CRD-46-31 BHD-PE 7.5 HYDRO VT-2 SP95-128 R.0 N/A 12/20/95 GE197R576 (NRI)
- PERFORMED BY CNS PERSONNEL i
B-E CRD-46-43 BHD-PE 7.5 HYDRO VT-2 SP95-128 R.0 N/A 12/20/95 GE197R576 (NRI)
- PERFORMED BY CNS PERSONNEL 3
B-E INCORE-28-45 BHD-PE 2 HYDRO VT-2 SP95-128 R.0 N/A 12/20/95 GE197R576 (NRI)
- PERFORMED BY CNS PERSONNEL
(
B-E INCORE-36-05 BHD-PE 2 HYDRO VT-2 SP95-128 R.0 N/A 12/20/95 GE197R576 (NRI)
- PERFORMED BY l
CNS PERSONNEL I
l B-E NVE-BE-N12A RPV-PE 2.5 HYDRO VT-2 SP95-128 R.0 N/A 12/20/95 CE232-242 (NRI)
- PERFORMED BY CNS PERSONNEL B-E NVE-BE-N12B RPV-PE 2.5 HYDRO VT-2 SP95-128 R.0 N/A 12/20/95 CE232-242 (NRI)
- PERFORMED BY CNS PERSONNEL 10 COMPONENTS EXAMINED FOR CATEFARY B-E j
i I
1-m c-y e
-..e
+
e---v-e bi i.
e s.
i
\\
/t k#
NPPD Cooper Nuciser St!. tion Unit 1 v GENuct:crEn:rgy 3,,,c,_
1
_,,,,1
, m ic,,
,1, ABSTRACT of EXAMINATIONS Refueling Outage RFOl6 03/17/1996 PAG 3 6 of 47 COMPONENT / CONFIGURATION SIZE REPORT EXAM PPOCEDtUtR REV BIACK DATE ISO.
N NTS ASME i
l 6 COMPONENTS FXAMINED FOR CATEGORY B-F B-F RCA-BF-1 N-C 5
R-202 45S W.CNS-102VO R.0 20 11/17/95 CE.232-242 SS CAL 45S UT-CNS-102V0 R.0 20 CS CAL GEOMETRY RECORDED B-F RRA-BF-1 SE-N 14 R-241 PT PT-CNS-100V1 R.0 N/A 11/22/95 CNS-RR-38 GEOMETRY 45S UT-CNS-209V0 R.1 52 RECORDED 45RL UT-CNS-209VD R.1 121 63RL ITT-CNS-209VO R.1 121 I'T PT-C243-100V1 R.0 N/A PT FOR THERMOCOUP!E REMOVAL B-F RRB-BF-1 SE-N 14 R-131 PT PT-CNS-100V1 R.0 N/A 11/11/95 CNS-RR-38 GEOMETRY 45S UT-CNS-209VO R.1 52 RECORDED 45RL ITT-CNS-209VD R.1 121 60RL UT-CNS-209VO R.1 121 B-F RRD-BF-1 SE-N 14 R-194 FT PT-CNS-100V1 R.0 N/A 11/18/95 CNS-RR-38 GEOMETRY 45S UT-CNS-209VD R.1 52 RECORDED 45RL LTT-CNS-209VO R.1 121 60RL UT-CNS-209VO R.1 121
(
B-F RAS-BF-12 E-P 20 R-207 PT VT-CNS-100V1 R.0 N/A 11/25/95 CNS-RR-37 CEOMETRY RECORDED i
45S UT-CNS-102VO R.0 53 L.S. ?b Ier RI-12 45S 17T-CNS-102VD R.0 103 CS 45L Ifr-CNS-102VD R.0 53 SS 45L ITT-CNS-102VD R.0 103 CS 0
tJT CNS-102VD R.0 53 SS 0
(TT-CNS 102VD R.O 103 CS B-F RVD-BF-14 P-P 2
R-040 PT PT-CNS-100V1 R.0 N/A 11/29/95 X2512-200 83.3% COVERAGE DUE TO WELDED SUPPORT.
6 COMPONENTS EXAMINED FOR CATEGORY B-F
._.__m
..._m_._
_ _ _. _ _ _ = _. _ _ _ _ _ _ _... _. _ _ _ _ _ ~ _ _.. __
o.__
t~.
- ~
NPPD Cooper Nuclear Station Unit 1
"- ~~ Ob NUCfMIbOffE7 m ACHMENT 1 Comercial Service Date: July 1974 ABSTRACT of EXAMINATIONS Refueling Outage RFOl6 03/17/1996 PAGE 7 of 47 i
(
Cu.
COMP.
i ASME COMPONENT / CONFIGURATION SIZE REPORT EXAM PROCEDURE REV Bt4CK DATE ISO.
COPHENTS l
51 COMPONENTS EXAMINED FOR CATEGORY B-G-1 j
B-0-1 PRB-BG1-36 NT 8x7 R-245 MT MT-CNS-100V1 R.1 N/A 11/20/95 CE.232-239 HRI f
B-G-1 PRB BGl*37 NT 8x7 R-245 MT MT-CNS-100V1 R.1 N/A 11/20/95 CE.232-239 NRI B-G-1 PRB-BG1-38 NT 8x7 R-245 MT MT-CNS-100V1 R.1 N/A 11/20/95 CE.232-239 NRI B-G-1 PRB-BG1-39 NT 8x?
R-245 Mr MT-CNS-100V1 R.1 N/A 11/20/95 CE.232-239 NRI 4
B-G-1 PRB-DG1-40 NT 8x7 R-245 MT MT-CNS-100V1 R.1 N/A 11/20/95 CE.232-23S NRI I
B-G-1 PRB-BG1-41 NT 8x7 R-246 Mr MT-CNS-100V1 R.1 N/A 11/20/95 CE.232-239 NR1 1
B-G-1 PRB-BG1-42 NT 8x7 R-246 MT MT-CNS-100V1 R.1 N/A 11/20/95 CE.232-239 NRI i
B-G-1 PRB-BG1-43 NT 8x7 R-246 MT MT-CNS-100V1 R.1 N/A 11/20/95 CE.232-239 NRI
)
B-G-1 PRB-BGi-44 NT 8x7 R-246 MT MT CNS-100V1 R.1 N/A 11/20/95 CE.232-239 NRI J
B-G-1 PRD-BGI-45 NT 8x7 R-246 MT NT-CNS-100V1 R.1 N/A 11/20/95 CE.232-239 NRI
[
G-1 PRB-BGI-46 NT 8x?
R-246 Mr MT-CNS-100V1 R.1 N/A 11/20/95 CE.232-239 NRI B-G-1 PRB-BG1-47 NT 8x7 R-246 MT MT-CNS-100V1 R.1 N/A 11/20/95 CE.232-239 NRI B-G-1 PRB-BGi-48 NT 8x7 R-246 Mr MT-CNS-100V1 R.1 N/A 11/20/95 CE.232-239 NRI B-G-1 PRB-BG1-49 NT 8x7 R-246 MT NT-CNS-100V1 R.1 N/A 11/20/95 CE.232-239 NRI B-G-1 PRB-BG1-50 NT 8x7 R-246 MT MT-CNS-100V1 R.1 N/A 11/20/95 CE.232-239 NRI B-G-1 PRB-BG1-51 NT 8x7 R-246 MT NT-CNS 100V1 R.1 N/A 11/20/95 CE.232-239 NRI B-G-1 PRB-BGI-52 NT 8x7 R-246 MT MT-CNS-100V1 R.1 ?/A 11/20/95 CE.232-239 NRI B.G-1 PRE-BG1-36 LIG 6
R-001 0
ITT-CNS-308VO R.0 16 10/21/95 CE.232-239 NRI B-0-1 PRE BGI-37 LIG 6
R-001 0
(TT-CES-308VO R.0 16 10/21/95 CE.232-239 NRI B-G-1 PRE-BGi-38 LIG 6
R-001 0
(TT-CNS-308VO R.0 16 10/21/95 CE.232-239 NRI B-G-1 PRE-BGi-39 LIG 6
R-001 0
UT-CNS-308VO R.0 16 10/21/95 CE.232-239 NRI B-G-1 PRE-BG1-40 LIG 6
R-001 0
LTT-CNS-308V0 R. 0 16 10/21/95 CE.232-239 NRI B-G-1 PRE-BGI-41 LIG 6
R-001 0
LTT-CNS-308V0 R 0 16 10/21/95 CE.232-239 NRI
l
- m
/ o
/-
% GENuctrrEn:rgy NPPD Coopsr Nuclear Station Unit 1 377,c cy, 1 Co rci.1 S.,ylc,o,t,,,17 1,n ABSTRACT of EXAMINATIONS Refueling Outage RFOl6 01/17/1996 PAGE 8 of 47 CAL COMP.
l ASME COMPONENT / WNFIGURATION SIZE REPORT EXAM PROCEDUPE REV BLOCK DATE ISO.
COMMENTS B G-1 PRE-BGI-42 LIG 6
R-001 0
W-CNS-308VD R.0 16 10/21/95 CE.232-239 NRI l
l B-G-1 PRE-BG1-43 LIG 6
R-001 0
W-CNS-308VO R.0 16 10/21/95 CE.232-239 NRI I
I B-G-1 PRE-BG1-44 LIG 6
R-001 0
UT-CNS-308VO R.0 16 10/21/95 CE.232-239 NRI l
l i
B-G-1 PRE-BGi-45 LIG 6
R-001 0
(TT-CNS-308VO R.0 16 10/21/95 CE.232-239 NRI l
B-G-1 PRE-BGi-46 LIG 6
R-001 0
UT-CNS-308V0 R.0 16 10/21/95 CE.232-239 NRI l
B-G-1 PRE-BG1-47 LIG 6
R-001 0
UT-CNS-308VO R.0 16 10/21/95 CE.232-239 NRI B-G-1 PRE-BG1-48 LIG 6
R-001 0
tTT-CNS-308VD R.0 16 10/21/95 CE.232-239 NRI B-G-1 PRE-BG1-49 LIG 6
R-001 0
UT-CNS-308V0 R.0 16 10/21/95 CE.232-239 NRI B-G-1 PRE-BGi-50 LIG 6
R-001 0
UT-CNS-308VO R.0 16 10/21/95 CE.232 239 NRI B-G-1 PRE-BG1-51 LIG 6
R-001 0
UT-CNS-308V0 R.0 16 10/21/95 CE.232-239 NRI B-G-1 PRE-BGi-52 LIG 6
R-001 0
UT-CNS-308VO R.0 16 10/21/95 CE.232-239 NRI B-G-1 PRC-BG1-36 WA 6
R-244 VT-1 VT-CNS-101VO R.0 N/A 11/20/95 CE.232-239 SAT B-G-1 FRC-BG1-37 WA 6
R-244 VT-1 VT-CNS-101VO R.0 N/A 11/20/95 CE.232-239 SAT B-G-1 PRC-BG1-38 WA 6
R-244 VT-1 VT-CNS-101VO R.0 N/A 11/20/95 CE.232-239 SAT B-G-1 PRC-BGi-39 WA 6
R-244 VT-1 VT-CNS-101VD R 0 N/A 11/20/95 CE.232-239 SAT B-G-1 FRC BGi-40 WA 6
R-244 VT-1 VT-CNS-101VO R.0 N/A 11/20/95 CE.232-239 SAT B-G-1 PRC-BG1-41 WA 6
R-244 VT-1 VT CNS-101VO R.0 N/A 11/20/95 CE.232-239 SAT B-G-1 PRC-BG1-42 WA 6
R-244 VT-1 VT-CNS-101VD R.0 N/A 11/20/95 CE.232-239 SAT B-G-1 PRC-BGi-43 WA 6
R-244 VT-1 VT-C2iS-101VO R. 0 N/A 11/20/95 CE.232-239 SAT B-G-1 PRC-BG1-44 WA 6
R-244 VT-1 VT-CNS-101VD R.0 N/A 11/20/95 CE.232-239 SAT B-G-1 PRC-BGI-45 WA 6
R-244 VT-1 VT-CNS-101VD R.0 N/A 11/20/95 CE.232-239 SAT B-G-1 PRC-BG1-46 WA 6
R-244 VT-1 VT-CNS-101VO R.0 N/A 11/20/95 CE.232-239 SAT B-G 1 PRC-BG1-47 WA 6
R-244 VT-1 VT-CNS-101VO R.0 N/A 11/20/95 CE.232-239 SAT j
B-G-1 PRC-BG1-48 WA 6
R-244 VT-1 VT-CNS-101VO R.0 N/A 11/20/95 CE.232-239 SAT l
B-G-1 PRC-BG1-49 WA 6
R-244 VT-1 VT-CNS-101VD R.0 N/A 11/20/95 CE.232-239 SAT t
fI
\\
e
(/
L/ GE NucirrEn:rgy NPPD Coopar Nuclair Station Unit 1 3 m o gy, 1 c _,ci,1 g m,c,o,,,,,,37 1,,,
ADSTRACT of EXAMINATIONS Refueling Outage RFOl6 03/17/1996 PAGE 9 of 47
(
CAL COMP.
ASME COMPONENT / CONFIGURATION SIZE REPORT EXAM PROCEDURE REV BLOCK DATE ISO.
COMMFNTS B-G-1 PRC-BG1-50 WA 6
R-244 VT-1 VT-CNS-101VO R.0 N/A 11/20/95 CE.232-239 SAT B-O-1 PRC-B01-51 WA 6
R-244 VT-1 VT-CNS-101VO R.0 N/A 11/20/95 CE.232-239 SAT B-G-1 PRC-DG1-52 WA 6
R-244 VT-1 VT-CNS-101VO R.0 N/A 11/20/95 CE.232 239 SAT 51 COMPONENTS EXAMINED FOR CATEGORY B-G-1
(
i l
l
.m._m.. _.
--...-.__-..m.___
m._ __ _ _
___,_._...m.
. kv' GENucintEntrgy I
NPPD Cooper Nuclear Station Unit 1 ABSTRACT of EXAMINATIONS Refueling Outage RFOl6 l
03/17/1996 PAGE 10 of 47 l
CAL COMP.
ASME COMPONENT / CONFIGURATION SIZE REPORT EXAM PROCEDURE REV B!4CK DATE ISO.
Co n g 22 COMPONENTS EXAMINED FOR CATEGORY B-G-2 B-G-2 MSA-BG2-17 FL-BLT R-020 VT-1 VT-CNS-101V0 R.0 N/A 10/25/95 GE731E611 SAT 6
l B-G-2 MSA-BG2-22 FL-BLT R-021 VT-1 VT-OfS-101VO R.0 N/A 10/25/95 GE731E611 SAT B-0-2 MSA-BG2-27 FL-BLT R-022 VT-1 VT-CNS-101VO R.0 N/A 10/25/95 GE731E611 SAT
[
l B-G-2 MSB BG2-16 FL-BLT R-023 VT-1 VT-CNS-101VO R.0 N/A 10/21/95 GE731E611 SAT B-G-2 MSB-BG2-21 FL-BLT R-024 VT-1 VT-CNS-101VD R.0 N/A 10/21/95 GE731E611 SAT B-G-2 MSC-BG2-19 FL-BLT R-028 VT-1 VT-CNS-101V0 R.0 N/A 10/25/95 GE731E611 SAT B-G-2 MSC-BG2-24 FL-BLT R-029 VT-1 VT-CNS-101VO R.0 N/A 10/25/95 GE731E611 SAT t
B-G-2 MSD-BG2-17 FL-BLT R-027 VT-1 VT-CNS-101VO R.0 N/A 10/25/95 GE731E611 SAT B-G-2 MSD-BG2 22 FL-BLT R-025 VT-1 VT-CNS-101VO R.0 N/A 10/25/95 GE'731E611 SAT l
B-0-2 MSD-BG2-27 FL-BLT R-051 VT-1 VT-CNS 101V0 R.0 N/A 10/25/95 GE731E611 SAT B-G-2 MSD-BG2-31 FL-BLT R-026 VT-1 VT-CNS-101VO R.0 N/A 10/25/95 GE731E611 SAT I
B-G-2 MS-RV-70A V-BLT R-018 VT-1 VT-CNS-101VD R.0 N/A 12/1/95 GE731E611 SAT
[
INSPECTED BEFORE I
DISASSEMBLY R-285 VT-1 VF-CNS-101VO R.0 N/A ACTURATOR BOLTING PERFORMED IN CALF.
ISI EXAM SAT B-G-2 MS-RV-71A V-BLT R-348 VT-1 VT-CNS-101VD R.0 N/A 12/23/95 GE731E611 PSI EXAM SAT MSRV # 379 l
B-0-2 MS-RV-71B V-BLT R-019 VT-1 VT-CNS-101VO R.0 N/A 10/25/95 GE731E611 SAT l
INSPECTED BEFORE DISASSEMBLY R-307 - VT-1 VT-CNS-101VD R.0 N/A ACTURATOR BOLTING PERFORMED IN CALF.
ISI EXAM SAT B-G-2 MS-RV-71C V-BLT R-291 VT-1 VT-CNS 101VD R.0 N/A 11/30/95 GE731E611 PSI EXAM SAT MSRV # 383 INSTALLED DURING RFOl6 R-349 VT-1 VT-CNS-101VO R.0 N/A 12/23/95 PSI EXAM SAT 1
MSRV # 385 REMOVED DURING RFOl6 I
xR s s (g'u/.GE Nuc/rr Energy NPPD Cooper Nuciccr Stttion Unit 1
,mcm 1
Co rci.1 S.,yic, o,e.,,,17 1,,.
ABSTRACT of EXAMINATIONS Refueling Outage RF016 03/17/1996 FAGE 11 of 47
(
CAL COMP.
ASME COMPONENT / CONFIGtMATION SIZE REPORT EXAM PROCEDURE REV BIhCK DATE ISO.
COMMENTS B-G-2 MS-RV-710 V-BLT R-350 VT-1 VT-CNS 101VO R.0 N/A 12/23/95 GE731E611 PSI EXAM SAT MSRV # 376 B-G-2 CS-CV-18CV V-BLT 10 R-133 VT-1 VT-CNS-101VD R.0 N/A 11/7/95 2501-1 PSI EXAM SAT B-G-2 MSA-BG2-17 FL-BLT R-295 VT-1 VT-CNS-101V0 R.0 N/A 11/30/95 GE731E611 PSI EXAM SAT B-G-2 MSA-BG2-22 FL-BLT R-296 VT-1 VT-OIS-101VD R.0 N/A 11/30/95 GE731E611 PSI EXAM SAT i
)
B-G-2 MSA-BG2-27 FL-BLT R-297 VT-1 VT-CNS-101VO R.0 N/A 11/30/95 GE731E611 PSI EXAM SAT B-G-2 MSB-BG2-16 FL-BLT R-298 VT-1 VT-CNS-101VD R.0 N/A 11/30/95 GE731E611 PSI EXAM SAT B-G-2 MSC-BG2-19 FL-BLT R-299 VT-1
(
I l
. _. ~..
.__m
-m_
____m
,M NPPD Cooper Nuclear Station Unit 1
~ GE NuclDir En:rgy ABSTRACT of EXAMINATIONS Refueling Outage RFOl6 03/17/1996 PAGE 12 of 47 ASME COMPONENT / CONFIGURATION SIZE REPORT EXAM PROCEDURE REV BIDCK DATE ISO.
CODNEFPS 76 COMPONENTS EXAMINED FOR CATEGORY B-J B-J CSA-BJ-26 P-FH 10 R-082 Mr MT-CNS-100V1 R.0 N/A 11/7/95 2501-1 GEOMETRY 0
(TT-CNS-106V0 R.0 79 RECORDED 45S UT-CNS-106VD R.0 79 i
B-J CSA-BJ-2*
P-SE 10 R-096 PT PT-CNS-100V1 R.0 N/A 11/11/95 2502-1 GEOMETRY 45S tTT-CNS-208V0 R.0 49 RECORDED 45S ITT-CNS-208VD R.0 49 j
B-J CSB-BJ-18 VA-P 10 R-305 MT MT-GS-100V1 L1 N/A 11/30/95 2501-1 GEOMETRY 0
UT-CNS 106VD R.1 79 RECORDED 45S ITT-CNS-106VO R.1 79 l
B-J CSB BJ-26 P-FH 10 R-347 Mr Mr CNS-100V1 R.i
- '/ A 12/1/95 2501-1 GEOMETRY l
0 UT-CNS-106VD K.1 79 RECORDED l
45S (TT-GS-106VO R.1 79 l
l
(
B-J FWA-BJ-1*
P-SE 12 R-163 Kr Mr-CNS-100V1 R.0 N/A 11/11/95 2509-1 GEOMETRY 45S LTT-CNS 208VO R.0 83 RECORDED j
0 (TT mS-106VO R.0 83 l
B-J FWA-BJ-111 SE-N 14 R-164 Mr MT-GS-100V1 R.0 N/A 11/11/95 2509-1 GEOMETRY 45S ITF-CNS-208VD R 0 89 RECORDED B-J FWA-BJ-19' T-RED 18 R-228 Mr MT-CNS-100V1 R.0 N/A 11/17/95 2509-1 NRI 45S tTT-CNS-106VO R.0 97 0
UT GS-106VO R.0 97 B-J FWB-BJ-1*
P-SE 12 R-151 MT MT-CNS-100V1 R.0 N/A 11/11/95 2509-1 GEOMETRY 45S ITT-CNS-208VO R.0 83 RECORDED 0
UT-CNS-106VO R.0 83 l
B.J FWB-BJ-111 SE-N 14 R-171 Mr MT-CNS-100V1 R.0 N/A 12/1/95 2509-1 GEOMETRY RECORDED i
45S Ifr-GS-208V0 R.0 89 THERMOCOUPLES LIMIT 45S UT-CNS-106VD R.0 89 MANUAL PICKUP CE-NCR N 95004 l
B-J FWC-BJ-1*
P-SE 12 R-165 Mr MT-CNS-100V1 R.0 N/A 11/11/95 2509-2 GEOMETRY 45S ITT-CNS-208VO R.0 83 RECORDED 0
tTT-CNS-106VO R.0 83 B-J FWC-BJ-111 SE-N 14 R-166 MT MT-CNS-100V1 R.0 N/A 11/11/95 2509-2 GEOMETRY 45S (TT-CNS-208VO R.0 89 RECORDED l
B-J FWD-BJ-1*
P-SE 14 R-198 MT MT-CNS-100V1 R.0 N/A 11/17/95 2509-2 GEOMETRY l
45S LTr-CNS-208VD R.0 83 RECORDED 0
UT-CNS-106VO R.0 83 l
I
..... _. _ _. - _ _. - -,. _.. - -.. ~,. - - ~. _ ~.
_ ~ _ _ ~. _. ~
GE NucintEntr9Y NPPD Cooper Nuclear Station Unit 1 mm1 c ~ res.1 S. n se. D.e., Ju1y 1,,4 ABSTRACT cf EXAMINATIONS Refueling Outage RPOl6 l
03/17/1996 PAGE 13 of 47 CAL COMP.
ASME COMPONENT / CONFIGURATION SIZE REPORT EXAM PROCEDURE REV BIACK DATE ISO.
CODNENTS B-J FWD-BJ-111 SE-N 14 R-203 MT MT-CNS-100V1 R.0 N/A 12/1/95 2509-2 GEOMETRY RECORDED 45S UT-CNS-208VD R.0 89 THERMOCOUPLE LIMITS 0
(TT-GS 106VD R.0 89 MANUAL PICKUP GE-NCR # 95004
.B-J FWD-BJ-18*
' T-RED 18 R-229 MT NT-CNS-100V1 R.0 N/A 11/17/95 2509-2 GEOMETRY 45S LTT-CNS-106VD R 0 97 RECORDED 0
(TT-CNS-106VO R.0 97 B-J MSB-BJ-1*
SE-P 24 R-137 MT MT-OIS-100V1 R.0 N/A 11/10/95 GE731E611 NRI 45S (TT-CNS-106VO R.0 106 L.S. 1A EXAMINED l
0 ITF-OIS-106VO R. 0 106 PER RI-12 l
B-J MSB-BJ-ill N-SE 24 R-146 MT MT-OfS-10C*O b. 6 N/A 11/11/95 GE731E611 NRI 45S tTT-CNS-106V6 115 0
ITT-GS-106VO R.0 115 B-J MSB-BJ-2 P-E 24 R-144 Mr MT-CNS-100V1 R.0 N/A 11/17/95 GE731E611 NRI l
45S tTT-CNS-106VO R.0 106 L.S. 1A, 2A & 28 0
ITT CNS-106VO R.0 106 EXAMINED PER RI-12 B-J MSB BJ-3 E-P 24 R-145 MT MT-OIS-100V1 R.0 N/A 11/10/95 GE731E611 NRI 45S ITF-CNS-106VD R.0 106 L.S. 3A, 2A & 2B 0
(TT-CNS-106VO R.0 106 EXAMINED PER RI-12 B-J MSB-BJ-42 FH-P 24 R-243 MT MT-CNS-100V1 R.0 N/A 11/20/95 GE731E611 NRI 45S LTT-CNS-106VO R.0 106 l
0 LTT-CNS-106VD R.0 106 I
B-J MSC-BJ-1*
SE-P 24 R-201 Mr MT-CNS-100V1 R.0 N/A 11/17/95 GE731E611 NRI 45S UT-OIS-106V0 R.0 106 L.S. 1A EXAMINED 0
LTT-CNS-106VO R.0 106 PER RI-12 B.J MSC-BJ-111 N-SE 24 R-200 MT MT-OIS-100V1 R.0 N/A 11/17/95 GE731E611 NRI 45S LTT-CNS-106VO R. 0 115 0
ITT-CNS-106VO R.0 115 B-J MSC-BJ-2 P-E 24 R-148 Mr MT-CNS-100V1 R.0 N/A 11/11/95 GE731E611 NRI 45S LTT-CNS-106VO R. 0 106 L.S. 1A, 2A & 2B 0
LTT-CNS-106VO R.0 106 EXAMINED PER RI-12 B-J MSC-BJ-3 E-P 24 R-147 Mr MT-CNS-100V1 R.0 N/A 11/11/95 GE731E611 NRI 45S UT-OIS-106VO R.0 106 L.S. 3A, 2A & 2B 0
LTT-CNS-106VD R.0 106 EXAMINED PER RI-12 B-J MSC-BJ-35*
E-P 24 R-088' Mr MT-CNS-100V1 R.0 N/A 11/9/95 GE731E611 NRI 45S UT-CNS-106VO R.0 106 L.S.
34A & 34B i
0 LTT-CNS-106VD R.0 106 EXAMINED PER RI-12 l
l l
l l
.. _ _ _. _. ~. _. - _ _ _ _.. _. _ - _ _ _ _ _ _ _..
i NPPD Cooper Nuclear Station Unit 1 GENuc/: rEnrrgy 3,.,_
1 m,ci,1,, y,,,,,,,,,17 1,,,
ABSTRACT of EXAMINATIONS Refueling Outage RPOl6 l
03/17/1996 PAGE 14 of 47
(
a m.
l ASME COMPONENT / CONFIGURATION SIZE REPORT EXAM PROCEDURE REV B14CK DATE ISO.
CODE 4ENTS B-J MSD-BJ-111 N-SE 24 R-149 MT NT-OS-100V1 R.0 N/A 11/11/95 GE731E611 NRI 45S UT-CNS-106V0 R.0 115 i
.O UT-G S-106VD R.0 115 l
l B-J MSD BJ-50 PH-P 24 R-240 Mr MT-G S-100V1 R.0 N/A 11/20/95 GE731E611 NRI i
45S UT-CNS-106VO R.0 106 0
UT-CNS-106VO R.0 106 i
B-J CWA-BJ-1*
WOL-P 6 R-189~
PT PT-CNS-100V1 R.0 N/A 11/10/95 2503 1 NRI 45S UT-CNS-102VD R.0 48 l
45L UT-GS-102VD R.0 48 l
0 UT-CNS-102VD R.0 48
\\
BJ CWA-BJ-4 P-VA 6
R-199 PT PT-GS-100V1 R.0 N/A 11/17/95 2503-1 NRI 45S UT-CNS-102VO R.0 48 60L UT-CNS-102VD R.0 48 j
0 UT-CNS-102VD R.0 48 B-J RAD-BJ-1 PU-P 28 R-232 PT PT-CNS-100V1 R.0 N/A 11/22/95 CNS-RR-37 NRI 45S UT-CNS-102VO R.0 56 l
60L Ur-CNS-102VO R.0 56 l
0 UT-CNS-102VO R.0 56 l
B-J RAD-BJ-6 P-T 24 R-237 PT PT-GS-100V1 R.0 N/A 11/20/95 GS-RR-37 NRI 45S UT-CNS-102VO R 0 55 l
60L UT-CNS-102VO R.0 55 l
0 UT-CNS-102VO R 0 56 I
B-J RAS-BJ.9 T-E 20 R-230 PT PT-CNS-100V1 R.0 N/A 11/20/95 CNS-RR-37 GEOMETRY 45S UT-CNS-102VO R.0 53 RECORDED 45L UT-CNS-102VO R.0 53 0
UT-CNS-102VO R.0 53 l
l B-J RRH-BJ-2 P-SE 12 R-224 PT PT-GS-100V1 R.0 N/A 11/20/95 CNS-RR-37 GEOMETRY 45S UT-CNS-208VO R.0 50 RECORDED 45S UT-CNS-208VO R.0 50 60L UT-CNS-206VO R.0 50 1
l B-J RBD-BJ-6 P-T 24 R-234 PT PT-CNS-100V1 R.0 N/A 11/20/95 CNS-RR-38 NRI i
45S tTT-CNS-102VO R 0 55 60L ITT-CNS-102VD R.0 55 0
UT-CNS-102VO R,0 55 B-J RRA-BJ-2 P-SE 12 R-231 PT PT-CNS-100V1 R.0 N/A 11/21/95 GS-RR-3 8 GEOMETRY 45S UT-GS-208VD R. 0 50 RECORDED 45S UT-CNS-208V0 R.0 50 60L UT-CNS-208VO R.0 50 PT EXAM FOR PT PT-CNS-100V1 R.0 N/A THERMOCOUPLE REMOVAL i
i 1
. ~
_..,.n-_... -. -. -. - -- -. -. - ~. - ~ _ -.
.... _. - -. - _... -.. ~, _ ~ _., _ _ _
i i
h NPPD Cooper Nuclear Station Unit 1 GE NuctscrEn:rgy
,m _ 1 c _,,1,1, m ic, m,
,,1,1,,,
ABSTRACT of EXAMINATIONS Refueling Outage RFOl6 03/17/1996 PAGE 15 of 47 l
CAL COMP.
ASME COMPONENT / CONFIGURATION SIZE REPORT EXAM PROCEDURE REV BIDCK DATE ISO.
COP 94E W S B-J RRB-BJ-2 P-SE 12 R-122 PT PT-CNS-100V1.R.0 N/A 11/11/95 CNS-RR-38 GEOMETRY 45S (TT-CNS-208V0 R.0 50 RECORDED 45S W-CNS-208VO R.0 50 60L LTT-CNS-208V0 R.0 50 B-J RAD-BJ-2 P SE 12 R-193 PT PT-OIS-100V1 R.0 N/A 11/17/95 CNS-RR-38 NRI 45S ITT-CNS-208VO R.0 50 98.3% COVERAGE 45S (TT-CNS-208V0 R.0 50 GEOMETRY 60L (fr-CNS-208VO R.0 50 RECORDED j
B-J CWA-BJ-5 VA-P 6
R-161 PT PT-CNS-100V1 R.0 N/A 11/17/95 2503-1 NRI 45S UT-CNS-102V0 R.0 48 60L UT-CNS-102VD R.0 4'8 0
ITT-CNS-102VD R.0 48 B-J RSA-BJ-14 FH-P 3
R-178 MT MT-CNS-100V1 R.0 N/A 11/17/95 2506 2 NRI B-J RSA-BJ-21 P-VA 3
R-179 MT NT-CNS-100V1 R.0 N/A 11/17/95 2506-2 NRI l
B-J MSDR-BJ-2 P-VA 3
R-062 MT NT-CNS-100V1 R.0 N/A 11/1/95 2506-3 NRI B-J MSDR-BJ-4 FH-P 3
R-180 Mr MT-CNS-100V1 R.0 N/A 11/22/95 2506 3 NRI I
B-J RVD-BJ-16 E-P 2
R-039 PT PT-CNS-100V? R.0 N/A 10/25/95 X2512-200 NRI B-J RVD-BJ-18 E-P 2
R-038 PT PT-CNS-100V1 R.0 N/A 10/25/95 X2512-200 NRI
\\
B-J RVI-BJ-11A1 N-SE 2
R-160 PT PT-CNS-100V1 R.0 N/A 11/17/95 N2512-219 NRI l
B-J RVI-BJ-16Al N-SE 2
R-012 PT PT-CNS-100V1 R.0 N/A 10/21/95 X2512-219 NRI B-J S14-BJ-1 N-SE 2
R-128 PT PT-CNS-100V1 R.0 N/A 11/6/95 X2512-200 NRI
]
l t
B-J SLC-BJ-27 P-FH 2
R-104 PT PT-CNS-100V1 R.0 N/A 11/7/95 X2512-201 NRI B-J FWA-BJ-81 WOL-P 18 R-248 KT NT-OTS-100V1 R.0 N/A 11/20/95 2509-1 82% COVERAGE l
45S (TT-QIS-106V0 R.0 97 GEOMETRY 70L UT-CNS-106VO R.0 97 RECORDED 0
Iff-CNS-106VO R.0 97 B-J MSB-BJ-18 P-SWL 24 R-041 MT MT-CNS-100V1 R.0 N/A 11/1/95 GE731E611 NRI l
l 45S LTT-CNS-106VO R.0 106 l
B-J MSC-BJ-16 P-SWL 24 R 042 KT MT-CNS 100V1 R.0 N/A 11/1/95 GE731E611 NRI 45S ITT-CNS 106VO R.0 106 B-J MSC-BJ-8*
P-SWL 24 R-043 0
(TT-CNS-106VO R.0 106 11/1/95 GE731E611 TEC FOR COVERAGE PROM PREVIOUS EXAMS f
l I
I
.- -. __ - - - m.
-m.--
- - - ~ - - - - - - - - - - - - - - - - ~ - " -
,_-._._____m_
i.
l l
k' g;
NPPJ Coopa: Nuels.r Station Unit 1 GE NucturEnugy mAcuan 1 Co res.1 suvre. Dae., Ju1y 1,,4 ABSTRACT of EXAMINATIONS Refueling Outage RFOl6 i
03/17/1996 PAGE 16 of 47 ASME CG.mm e.n i / CONFIGURATION SIZE REPORT EXAM PROCEDURE REV BLOCK DATE ISO.
COfMENTS B-J RAS-BJ.10 E WOL 20 R-197 PT PT-CNS-100V1 R.0 N/A 11/17/95 CNS-RR-37 NRI 45S LTT-CNS-102VD R.0 53 821 COVERAGE 45S ITT-CNS-102VO R.0 108 6
- is 20" EXAMS 45L UT-CNS-102VD R.0 108 PERFORMED B.J RBS-BJ-6A P-WOL 28 R-258 PT PT-CNS-100V1 R.0 N/A 11/22/95 CNS-RR-38 NRI 45S UT-CNS-102VO R.0 56 67% COVERAGE 1 SIDE j
0 UT-CNS-102VD R.0 56 MAX COVER OBTAINED l
B-J CWA-BJ-45 NOL-P 2 R-173 PT PT-CNS-100V1 R.0 N/A 11/17/95 2503 1 96.5% COVERACE
)
(
B-J CSA-BJ-32 V-P 2
R-107 Mr MT-CNS-100V1 R.0 N/A 11/6/95 X2501-201 NRI f
i B-J CSA-BJ-35 V-P 2
R-108 Mr MT-CNS-100V1 R.0 N/A 11/7/95 X2501-201 NRI B-J CSB-BJ-32 VA-P 2
R-300 Mr MT-CNS-100V1 R.1 N/A 11/29/95 X2501-201 NRI i
l l
B-J CSB-BJ-35 VA-P 2
R-301 Mr MT-CNS-100V1 R.1 N/A 11/30/95 X2501-201 NRI B-J RVI-BJ-1183 P-R 2
R-015 PT PT-CNS-100V1 R.0 N/A 10/21/95 X2 ?7-218 NRI B-J RVI-BJ-16B5 I-P 1.5 R-014 PT PT-CNS-100V1 R.0 N/A 10/21/95 X2507-218 NRI l
l B-J RVI-BJ-16A5 I-P 1.5 R-013 PT PT-CES-100V1 R.0 N/A 10/21/95 X2507-218 NRI B-J CWA-BJ-30 V-P 2
R-075 PT PT-CNS-100V1 R.0 N/A 11/1/95 X2503-200 NRI B-J CWA-BJ-35 P-E 2
R-076 PT PT-CNS-100V1 R.0 N/A 11/1/95 X2503-200 NRI l
B-J CWA-BJ-35 E-P 2
R-077 PT PT-CNS-100V1 R.0 N/A 11/1/95 X2503-200 NRI B-J CWA-BJ-44 P-WOL 2 R-174 PT PT-CNS-100V1 R.0 N/A 11/17/95 X2503-200 NRI B-J SLC-BJ-23 P-V 1.5 R-125 PT PT-CNS-100V1 R.0 N/A 11/6/95 X2512-200 NRI B-J SLC-BJ-24 E-P 1.5 R-126 PT PT-CNS-100V1 R.0 N/A 11/6/95 X2512-200 NRI B-J SLC-BJ-5 P-RED 1.5 R-127 PT PT-CNS-100V1 R.0 N/A 11/6/95 X2512-200 NRI B-J SLC-BJ-28 E-P 1.5 R-103 PT PT-CNS-100V1 R.0 N/A 11/7/95 X2512-201 NRI B-J SLC-BJ-37 P-E 1.5 R-102 PT PT-CNS-100V1 R.0 N/A 11/7/95 X2512-201 NRI B-J SLC-BJ-38 E-P 1.5 R-101 PT PT-CNS-100V1 R.0 N/A 11/7/95 X2512-201 NRI B-J SLC-BJ-44 E-P 1.5 R-100 PT PT-CNf,-100V1 R 0 N/A 11/7/95 X2512-201 NRI i
j B-J-SLC-BJ-45 P-E 1.5 R-099 PT PT-CAS-100V1 R.0 N/A 11/7/95 X2512-201 NRI s
1
- %g i
/ #
Jg GENuc/ frEn rgy NPPD Cooper Nuctsar Stttion Unit 1 3TTx-1 Comerci.1 S.ryic azt., July 29u ABSTRACT of EXAMINATIONS Refueling Outage RPOl6 03/17/1996 PAGE 17 of 47 g
CAL COMP.
ASME COMPONENT / CONFIGURATION SIZE REPORT EXAM PROCEDURE REV BLOCK DATE ISO.
COMMENTS D-J SLC-BJ-55 V-P 1.5 R-098 PT PT-CNS-100V1 R 0 N/A 11/7/95 X2512-201 NRI B-J CWB-BJ-27 V-P 4
R-257 Mr MT-CNS-100V1 R.0 N/A 11/27/95 2509-1 PRE-SERVICE EXAM 0
tff-CNS-106VD R.1 2
GEOMETRY 45S Iff-CNS-106VO R.1 2
RECORDED l
B-J RSA-BJ-21 P-V 3
R-302 MF MT-CNS-100V1 R.1 N/A 11/30/95 2506-2 PRE-SERVICE EXAM NRI 16 COMPONENTS EXAMINED POR CATEGORY B-J 1
(
-==-- -
- - 1
~.g 8$
i%
GENuciarrEn:qy NPPD Cooper Nuciser Station Unit 1
,_,, 1 m,,1,1, m ic,,,,,,,,17 1,,,
ABSTRACT of EXAMINATIONS Refueling Outage RPOl6 i
03/17/1996 PAGE 18 of 47 f
CAL COMP.
ASME COria,.m es i / CONFIGURATION SIZE REPORT EXAM PROCEDURE REV BLOCK DATE ISO.
COMu. ads 9 COMPONENTS EXAMINED FOR CATEOORY B-M-2 4
B-M-2 MS-RV-70A-BM2 VA 6
R-286 VT-3 VT-CNS-103VC R 0 N/A 12/4/95 GE731E611 ISI EXAM SAT PERFORMED IN CALP.
SN # BL-2463 B-M-2 CS-MO-12B-BM2 VAL 10 R-336 VT-3 VT-CNS-103VD R.0 N/A 11/29/95 2501-1 SAT B-M-2 CS-CV-18CV-BM2 10 R-134 VT-3 VT-OIS-103VD R.0 N/A 11/7/95 2501-1 SAT i
B-M-2 MS-AO-86C-BM2 V-INT 24 R-343 VT-3 VT-CNS-103VO R.0 N/A 12/1/95 2506-4 SAT B-M-2 MS-RV-71B-BM2 6
R-284 VT-3 VT-CNS-103vo R.0 N/A 12/1/95 GE731E611 ISI EXAM SAT PERFORMED IN CALP.
SN # 387 B-M-2 MS-RV-71A-BK!
VA R-287 VT-3 VT-CNS 103VD R.0 N/A 11/29/95 GE731E611 VALVE # 382 SAT WAREHOUSE EXAM PSI B-M MS-RV-71H-BM2 VA R-288 VT-3 VT-CNS-103VO R.0 N/A 11/29/95 GE731E611 VALVE # 386 SAT WAREHOUSE EXAM PSI B-M-2 MS-RV-71C-BM2 VA R 289 VT-3 VT-CNS-103VO R.0 N/A 11/29/95 GE731E611 VALVE # 383 SAT WAREHOUSE EXAM PSI B-M-2 MS-RV-718-BM2 VA R-290 VT-3 VT-CNS-103V0 R.0 N/A 11/29/95 GE731E611 VALVE # 384 SAT WAREHOUSE EXAM PSI 9 COMPONENTS EXAMINED FOR CATECORY B-M-2 I
1 i
i i
i l
l 1,
L t
)
l i
l l
1
k /'
NPPD Coopir Nucisar Station Unit 1 Ve GE Nuc/ rEn:rgy
, m,,7y,1 c,,,,,1,1, m ic,o,,,,
,,1,1,,,
ABSTRACT of EXAMINATIONS Refueling Outage RFOl6 03/17/1996 PACE 19 of 47 f
CAL COMP.
ASME COMPONENT / CONFIGURATION SIZE FEPORT FXAM PROCEDURE REV BLOCK DATE ISO.
COMMFNTS 2 COMPONENTS EXAMINED FOR CATEGORY B-N-1 B-N-1 VES INT WALL VESSEL N/A IWI VT-3 VT-CNS-202VD R.0 N/A 11/28/95 IWI NRI B-N-1 JET PUMP 1-10 JET PU N/A IWI VT-3 VT-C2iS-202V0 R.0 N/A 11/28/95 IWI GAP ON JP-6 ACCEPTABLE PER GENE SAN JOSE 1
2 COMPONENTS EXAMINED FOR CATEGORY B-N-1 l
(
l
~ - - - - - - -,_, _ _ _ _... - - _ _ _ - - - -
-- - - - ~
~~ ~
t a,
t VGENuct srEnergy NPPD Cooper Nuclear Station Unit 1 l
ArrA - 1 Co erci.1 Smt D.t., July 19u ABSTRACT of EXAMINATIONS Refueling Out.ge RPOl6 03/17/1996 PAGE 20 of 47
(
CAL COMP.
ASME COMPONENT / CONFIGURATION SIZE REPORT EXAM PROCEDURE REV BIDCK DATE ISO.
CC=..as I
7 COMPONENTS EXAMINED FOR CATEOORY B-N-2 l
4 B-N 2 CORE SPLT AT 0-180 PLT-AT N/A IWI VT-1 VT-CNS-202VO R.0 N/A 11/28/95 IWI NRI CORE PLATE i
ATTACHMENTS B-N 2 JP RISER ATT 1-10 JPR AT N/A IWI VT-1 VT CNS-202VO R.0 N/A 11/28/95 IWI NRI t
B-N-2 CRD GUIDE TUBES TUBES N/A IWI VT-3 VT-CNS-202VO R.0 N/A 11/28/95 IWI DEBRIS IN 26-35 PINS OFF CENTER AT
.18-27 & 18-39 I
l B-N-2 CORE SPLT 0-180 SUP-PL N/A IWI VT-1 VT-CNS-202VO R,0 N/A 11/28/95 IWI NRI
/
JP6-7 UNACCESSABLE l
B-N-2 CORE PLT HWDWARE COREPL N/A IWI VT-3 VT-CNS-202VO R.0 N/A 11/28/95 IWI NRI i
B-N-2 CORE SHROUP SHROUD N/A IWI N/A N/A N/A 11/28/95 N/A SEE ITF DATA REPORTS SR-01 THRU SR-07 UT PERFORMED IN LIEU l
OF IWI.
B-N-2 FUEL SUP CASTING CAST N/A IWI VT-3 VT-CNS-202VD R.0 N/A 11/28/95 IWI NRI
{
EXAMINED 06-35,18-27 26-19, 76-35, 34-15, l
42-35 l
7 COMPONENTS EXAMINED FOR CATEGORY B-N-2 I
s i
sg s
/
3
(
k/- -
NPPD Cooper Nuc1&cr Stttion Unit 1
%> GE Nuc/=r Enrrgy
%,,,u1, m ic,,,,,,,17 1,,,
ABSTRACT of EXAMINATIONS Refueling Outage RFOl6 03/17/1996 PAGE 21 of 47
(
Cn.
- P.
ASME COMPONENT / CONFIGURATION SIZE REPORT EXAM PROCEDURE REV BLAX'K DATE
- ISO, COMMENTS l
9 COMPONENTS EXAMINED FOR CATEGORY B-O l
B-O CRD-02-27-1 HOU-F 6 R-009 PT PT-CNS-100V1 R.0 N/A 10/21/95 CE197R576 50% EXAMINED 1
RI-15 B-O CRD-02-31-1 HOU-F 6 R-008 PT PT-CNS-100V1 R.0 N/A 10/21/95 GE197R576 50% EXAMINED RI-15 B-O CRD-22-51-1 HOU-F 6 R-005 PT PT-CNS-100V1 R.0 N/A 10/21/95 GE197R576 NRI RI-15 B-O CRD-26-03-1 HOU-F 6 R-007 PT PT-CNS-100V1 R.0 N/A 10/21/95 GE197R576 NRI RI-15 B-O CRD-26-51-1 HOU-F 6 R-004 PT PT.OIS-100V1 R.0 N/A 10/21/95 GE197R576 NRI RI-15 B-O CRD-30-03-1 HOU-F 6 R-006 PT PT-CNS-100V1 R.0 N/A 10/21/95 GE197R576 NRI RI-15 B-O CRD-50-23-1 HOU-F 6 R-003 PT PT-CNS-100V1 R.0 N/A 10/21/95 GE197R576 NRI RI-15 D-O CRD-50-27-1 HOU-F 6 R-002 PT PT-CNS-100V1 R.0 N/A 10/21/95 GE197R576 NRI RI-15 8 COMPONENTS EXAMINED FOR CATEGORY B-O l
l
- ge
%>)g
(
/
GE NucI:cr En:rgy NPPD Coopar Nuc1str Station Unit 1
,,cume,Y,
w rci,1,,1c,D,e.,,,17 1,,4 ABSTRACT of EXAMINATIONS Refuezing Outage RFOl6 03/17/1996 PAGE 22 of 47 CAL COMP.
ASME COMPONENT / CONFIGURATION SIZE REPORT EXAM PROCEDURE REV BIX)CK DATE ISO.
COMMENTS 4 COMPONENTS EXAMINED FOR CATEGORY C-A C-A RHR-CA-2A SH-DRE 46 R-181 0
LTT-CNS-301VD R.0 40 11/20/95 M-82454 92% COVERAGE D
ITT CNS-301VD R.0 136 45S (TT-CNS-301VO R.0 40 i
45S ITT-OIS-301VO R. 0 136 C-A RHR-CA-4A DRET-D 62 R-249 0
ITT-CNS-301VD R.0 40 11/20/95 M-82454 94% COVERAGE 0
UT-CNS-301VO R.0 136 NRI 45S (TT-CNS-301VO R.0 40 45S (TT-CNS-301VO R.0 136 f
C-A RHR-CA-5A DR-DRE 62 R-247 0
UT-CNS-301V0 R.0 40 11/20/95 M-82454 93% COVERAGE O
UT-CNS-301VO R.0 136 NRI 45S Ur-CNS-301VO R.0 40 45S LTT-CNS-301VO R.0 136 C-A RHR-CA-1A THD-SH 46 R-138 0
(TT-CNS-301VD R. 0 106 11/9/95 M-82454 NRI 45S UT-CNS-301VO R.0 106 4 COMPONENTS EXAMINED FOR CATEGORY C-A
(
)
4 4
4 l
1 i
l l
l
>:Y f
)
(
NjGENuclear En:rgy NPPD Cooper Nucla r Station Unit 1 ArTACnMEn 1 Co rei.1 S.rvic. D t., auly 1974 ABSTRACT of EXAMINATIONS Refueling Out.ge RFOl6 03/17/1996 PAGE 23 of 47 CAL COMP.
ASMR COMPONENT / CONFIOURATION SIZE REPORT EXAM PROCEDURE REV BI4CK DATE ISO.
COMMENTS 3 COMPONENTS EXAMINED FOR CATECORY C-B C-B RHR-CD-1A THD-N 20 R-140 0
UT-CNS-301VO R.0 106 11/9/95 M-82454 NRI 45S 17f-C2iS-301VO R.0 106 60S UT-CNS-301VD R.0 106 C-B Rict-CB-2A DR-N 20 HYDRO VT-2 6.1RHR.501 R.1 10/4/95 N/A PERFORMED BY CNS C-B RIDt-IR-1A THD-NI 20 R-167 70S UT-CNS-311VD R.0 106 11/8/95 M-82454
.P ;R RADIUS EXAM 3 COMPONENTS EXAMINED FOR CATEOORY C-B
I ff 4 D Cooper Nuclear Stttion Unit 1-GE NucisseEnrigy 3,,,c,,,,,
1
%,ci 1,,mio, me,,,,,37 1,,,
ABSTRACT of EXAMINATIONS Refueling Outage RPOl6 03/17/1996 PAGE 24 of 47
(,
CAL COMP.
ASME COMPONENT / CONFIGURATION SIZE REPORT EXAM PROCEDURE REV B!hCK DATE ISO.
CL-=TS I
i 32 COMPONENTS EXAMINED FOR CATEGORY C-F C-F CSA-CF-28 E-V 12 R-196 MT MT-CNS-100V1 R.0 N/A 11/17/95 2602-2 GEOMETRY I
0 UT-CNS-106VD R.0 130 RECORDED 45S UT-CNS-106VO R.0 130 i
C-F CSA-CF-29 V-P 12 R-195 MT HT-CNS-100V1 R.0 N/A 11/17/95 2602-2 NRI O
UT-CNS-106VO R 0 130 45S UT-CNS-106VD R.0 130 l
n C-F CSB-CF-33 E-V 12 R-327 MT MT-CNS-100V1 R.1 N/A 11/29/95 2602-1 NRI 0
UT-CNS-106VD R.1 130 45S UT-CNS-106VO R.1 130 i
C-F CSB-CF-34 V-P 12 R-328 MT MT-CNS-100V1 R.1 N/A 11/29/95 2602-1 NRI i
0 UT-CNS-106VD R.1 130 i
45S UT-CNS-106VD R.1 130 l
i C-F CSB-CP-17 V-P 14 R-306 MT MT-CNS-100V1 R.1 N/A 11/30/95 2603-2 NRI C
UT-CNS-106VO R.1 131 l
45S UT-CNS-106VD R.1 131
/
C-F HPID-CF-1 PU-R 10 R-124 MT MT-CNS-100V1 R.0 N/A 11/7/95 2609-1 NRI l
0 UT-CNS-106VO R.0 77 45S UT-CNS-106VD R.0 77 l
I C-F HPID-CF-10A P-F 14 R-123 MT MT-CNS-100V1 R.0 N/A 11/9/95 2609-1 NRI O
UT-CNS-106VO R.0 89 45S UT-CNS-106VO R.0 89 i
C-F HPID-CP-3 E-P 14 R-121 MT HT-CNS-100V1 R.0 N/A 11/8/95 2609-1 NRI O
UT-CNS-106VD R.0 89 45S UT-CNS-106VD R.0 89 C-F HPEX-CF-3 RE-P 20 R-087 MT MT-CNS-100V1 R.0 N/A 11/17/95 2614-3 7 MT INDICATIONS 0
UT-CNS-106VO R.1 102 ACCEPTABLE BY 45S UT-CNS-106V0 R.1 102 SUPPLEMENTAL UT PER IKB-3514.2 (b) i CR # 1-14959
{
C-F RWA-CP-14 N-P 6
R-081 MT MT-CNS-100V1 R.0 N/A 11/1/95 2621-1 NRI C
UT-CNS-106VD R.0 135 45S UT-CNS-106VO R.0 135 I
C-F RKA-CP-10 T-F 6
RI-23 MT MT-CNS-100V1 R.0 N/A N/A CB&I-69 RELIEF REQUEST 0
UT-CNS-106VO R.0 135 DELETED FROM WORK 45S UT-CNS-106VD R.0 135 SCOPE l
l l
l r
v, w
y r
,y-y
~.. ~..
.. ~. ~. ~.. -. - - - - -.
~.
.. _ ~.
- - --.. -.. ~.
,f 9
' ((,
NPPD Cooper Nuct.ar Station init 1 GE Nucteer Energy ATTAc Nr 1 Co-orci.1 Servie. D.e., auty im ABSTRACT of EXAMINATIONS Refueline, Outage RF016 f,
03/17/1!96 PAGE 25 of 47 CAL COMP.
ASME COMPONENT / CONFIGURATICc ZE REPORT EXM4 PROCEDURE REV BIOCK DATE ISC.
CopectarrS C-F RWA-CF-11 T-F RI-23 MT M-CNS-100V1 R.0 N/A N/A CB&I-69 RELIEF REQt'EST 0
(TT-CNS-106VO R.0 135 DELETED FROM WORK l
45S LTF-CNS-106V0 R.0 135 SCOPE C-F RNA-CF-12 P-T 6
RI-23 MT MT-CNS-100V1 R.0 N/A N/A CB&I-69 RELIEF REQUEST 0
(TT-OIS-106V0 R.0 135 DELETED PROM WORK 45S ITF-CNS-106VO R.0 135 SCOPE C-F RHB-CF-20 P-E 20 R 083 Mr MT-CNS-100V' B N/A 11/3/95 2624-1 NRI l
0 LTr-CNS-10(VO k. 0 102 l
45S UT-CNS-106Vu d.0 102 C-F RPA-CF-18A P-E 16 R-135 Mr MT-CNS-100V1 R.0 N/A 11/9/95 2624-1 NRI C
UT-CNS-106VD R.0 132 458 (TT-CNS-106VO R.0 132 C-F RHB-CF-60 E-E 24 R-084 Mr Mr-CNS-100V1 R.0 N/A 11/1/95 2624 2 GEOMETRY O
ITT-CNS-106VD R.0 104 RECORDED l
l 0
ITT-OIS-106VD R.0 115 I
45S ITT-GS-106VO R.0 104 45S ITF-CNS-106VD R.0 115 C-F RAW-CF-66 N-E 20 R-085 Mr MT-CNS-100V1 R.0 N/A 11/1/95 2624-3A GEOMETRY
{
0 tTT-CNS-106VD R.0 102 RECORDED l
0 (TT-GS-106VO R.0 103 45S (TT-CNS-106VO R.0 102 45S LTr-GS-106VO R.0 103 C-F SW CF-2 E-P 14 R-120 Mr MT-CNS-100V1 R.0 N/A 11/7/95 2624-3A GEOMETRY O
LTT-CNS-106V0 R.0 138 RECORDED i
45S ITF-CNS-106VD R.0 138 C-F SW-CF-5 V-P 14 R-095 MT MT-CNS-100V1 R.0 N/A 11/1/95 2624-3A NRI i
0 ITr CNS-106VO R.0 138 45S tTF-CNS-106VD R.0 138
(
C-F RAW-CF-1 P-T 20 R-130 Mr MT-CNS-100V1 R.0 N/A 11/11/95 2625-2 GEOMETRY 0
UT-CNS-106V0 R.0 133 RECORDED 0
(TT-CNS-106VO R.0 102 45S UT-CNS-106VO R.0 133 45S LTI-CNS-106VO R.0 102 C-F RAW-CF-5 P-E 20 R-136 MT MT-CNS-100V1 R.0 N/A-11/8/95 2625-2 GEOMETRY 0
(TT-CNS-106VO R.0 133 RECORDED 45S (TT-CNS-106VO R.0 133 C-F RCT-CF-25 P-R 20 R-344 MT MT-CNS-100V1 R.1 N/A 12/1/95 2624 38 Mr EXAM 96% COVERAGE i
0 UT-CNS-106VD R.1 102 NRI
[
45S LTT-CNS-106VD R.1 102 100% COVERAGE
?
r i
i I
l-
~
--- - - -_-_~ - -.
.=~ -..
_. ~ - -.. +_-. - - ~
- i e p
- GE Nuct:rr Ensigy NPPD Cooper Nucisar Station Unit 1 AmCN,Wn.1 Co-real Smic. D.t.,
auty in.
ABSTRACT of EXAMINATIONS Refueling Outage RFOl6 l
03/17/1996 PAGE 26 of 47 i
CAL COMP.
ASME COMPONENT / CONFIGURATION SIEE REPORT EXAM PROCEDURE REV BICCit DATE ISO.
CC&im C-F RHC-CF-13 V-E 16 R-320 MT M-CNS-100V1 R.1 N/A 11/30/95 2624-3B GEOMETRY 0
W CNS-106V0 R.1 132 RECORDED 45S W-CNS-106VD R.1 132 CF RHC-CF-17 T-R 20 R-342 MT MT-CNS-100V1 R.1 N/A 12/4/95 2624-38 2 LINEAR INDICATIONS 0
W-CNS-106VO R.1 102 ACCEPTABLE BY 45S UT-CNS-106VO R 1 102 SUPPLEMEMAL UT PER IWB 3514.2 (b) l C-F RHC-CF 28 V-P 20 R-345 MT M-CNS-100V1 R.1 N/A 12/4/95 2624-3B 1 LINEAR INDICATION 0
W-CNS-106VD R.1 102 ACCEPTABLE BY i
45S W-CNS-106VO R.1 102 SUPPLEMENTAL W PER I
.IWB 3514.2 (b)
C-F RPB-CF-22 E-V 16 R-319 M
M-CNS-100V1 R.1 N/A 11/29/95 2624-3C GEOMETRY 0
W-CNS-106VO R.1 132 RECORDED 45S W-CNS-106VD R.1 132 C-F RPD-CP-21 E-V 16 R-315 MT MT-CNS-100V1 R.1 N/A 11/30/95 2624-3C GEOMETRY 0
W-CNS-106VO R.1 132 RECORDED 45S. W-CNS-106VD R.1 132 C-F RBW-CF-45 T-R 24 R-334 W
M-CNS-100V1 R.1 N/A 11/30/95 2624-5 GEOMETRY 0
UT-CNS-106VO R.1 113 RECORDED O
UT-CNS-106VO R.1 104 45S UT-CNS-106VO R.1 113 I
45S W-CNS-106VO R.1 104 C-F RHC-CF-48 P-E 24 R-321 MT M-CNS-100V1 R.1 N/A 11/30/95 2624 GEOMETRY 0
W-CNS-106VO R.1 104 RECORDED l
45S W -CNS-106V0 R.1 104 C-F RBW-CF-13 V-E 20 R-346 MT M-CNS-100V1 R.1 N/A 12/1/95 2625 4 NRI l
0 W-CNS-106VO R.1 133 45S W-CNS-106VD R.1 133
' C-F SDS-CF-6 P-T 8
R-182 MT M-CNS-100V1 R.0 N/A 11/10/95 SW13095.19 NRI l
0 UT-CNS-106VO R.0 42 45S UT-CNS-106VO R.0 42 C-F-RBW-CF-91 P-WOL 18-6 R-316 M
MT-03S-100V1 R.1 N/A 12/4/95 2624-5 4 LINEAR INDICATIONS E
M-CNS-100V1 R.1 N/A ACCEPTABLE BY 45S W-CNS-106VO R.1 132 SUPPLEMENTAL W PER IWA 3514.2 (b) 32 COMPONENTS EXAMINED FOR CATEGORY C-F l
r
t /
L/ GE Nuc/: r En:rgy NPPD Cooper Nucicer Station Unit 1
,,, _ 1
_,ci,1, m ic,o,,,,,,1,1,,,
ABSTRACT of EXAMINATIONS Refueling Outage RFOl6 03/17/1996 PACE 27 of 47
(
CAL COMP.
ASME COMPONENT / CONFIGURATION STER REPORT EXAM PROCEDURE REV BIDCF DATE
- ISO, mgg-jg 2 N PONENTS EXAMINED FOR CATEGORY C-O C-G PNC-CG-36A VA 24 R-175 PT PT-CNS-100V1 R.0 N/A 11/17/95 RCC-755-2 NRI C-O PNC-CG-368 VA 24 R-176 PT PT-CNS-100V1 R.0 N/A 11/17/95 RCC-755-2 NRI 2 COMPONENTS EXAMINED POR CATEGORY C-G i
(
~-
--.--n---~
~-
-~~
-~"--~7
- j NPPD Cooper Nuclear Station Unit 1
\\ ##% /[lGE NucturEnrrgy
(
ATTACHMElfr 1 Commercial Servics Date: July 1974 A.STRAer or ExAnINAT1C::S R.ru.unS Oue.S. Rro16 03/17/1996 PAGE 28 or 47 CAL COMP.
ASME COMPONENT / CONFIGURATION SIZE REPORT EXAM PROCEDURE REV BIDCK DATE
- ISO, COMMENTS
)
t l
29 umrunwin EXAMINED FOR CATEGORY D-A l
l i
D-A ECST-TK-A1 SP-TK N/A R-045 VT-1 VT-CNS-101VO R.0 N/A 10/25/95 2821-12 SAT i
i h
D-A 2 CST-TK-A2 SP-TK N/A R-046 VT-1
.-CNS-101VO R.0 N/A 10/25/95 2821 12 SAT l
k D-A ECST-TK-A3 SP-TK N/A R 047 VT-1 VT-CNS-101VO R.0 N/A 10/25/95 2821-12 SAT I
l D-A ECST-TK-A4 SP-TK N/A R-048 VT-1 VT-CNS-101VO R.0 N/A 10/25/95 2821-12 SAT l
D-A ECST-TK-A5 SP-TK N/A R-049 VT-1 VT-CNS-101VO R.0 N/A 10/25/95 2821-12 SAT I
D-A ECST-TK-A6 SP-TK N/A R-050 VT-1 'VT-CNS-101VD R.0 N/A 10/25/95 2821-12 SAT D-A REC-TK-ST-Al SP-TK N/A R-044 VT-1 VT-CNS-101VD R.0 N/A 11/1/95 2848-7 INDICAT10N IN NELD j
ACCEPTABLE PER CR 95-0776 i
D-A REC-TK-ST-A2 SP-TK N/A R-030 VT-1 VT-CNS-101VO R.0 N/A 10/21/95 2848-7 SAT I
D-A REC-TK-ST-A3 SP-TK N/A R-031 VT-1 VT-CNS-101VO R.0 N/A 10/21/95 2848-7 SAT D-A REC-TK-ST-A4 SP-TK N/A R-032 VT-1 VT-CNS-101VD R.0 N/A 10/21/95 2848-7 SAT c
1 D-A REC-HXA-Al SP-HX N/A R-330 VT-1 VT-CNS-101VO R.0 N/A 11/29/95 2852-9 SAT j
D-A REC-HXA-A2 SP-HX N/A R-331 VT-1 VT-CNS-101VO R.0 N/A 11/29/95 2852-9 SAT D-A REC-HXA-A3 SP-HX N/A R-332 VT-1 VT-CNS-101VD R.0 N/A 11/29/95 2852-9 SAT D-A REC-HXA-A4 SP-HX N/A R-333 VT-1 VT-CNS-101VD R.0 N/A 12/1/95 2852-9 SAT D-A SW-STRA-Al STRN N/A R-112 VT-1 VT-O S-101VD R.0 N/A 11/8/95 2852-3 SAT l
D-A HPIS-DB-1 SAD 18 R-036 VT-1 VT-GS-101VD R.0 N/A 10/21/95 2612-2 SAT D-A VR-DA-1 SSL 10 R-052 VT-1 VT-CNS-101VO R.0 N/A 10/25/95 2628-1 SAT D-A VR-DA-2 HSL 10 R-053 VT-1 VT-CNS-101VD R.0 N/A 10/25/95 2628-1 SAT D-A RCC-DD-51 STN N/A R-016 VT-1 VT-CNS-101VD R.0 N/A 10/21/95 2848-14 SAT D-A RCC-DB-97 LUG N/A R-017 VT-1 VT-CNS-101VO R.0 N/A 10/21/95 2848-51 SAT D-A SW-DB-256 STN N/A R-105 VF-1 VT-CNS-101VO R.0 N/A 11/7/95 2852-55 SAT D-A SW-DB-178 LUG N/A R-067 VT-1 VT-CNS-101VD R.0 N/A 10/25/95 2851-1 SAT 1
4 e
i l
1
. _ i
p, g
f 4
l c
4 k# /
t l
wJ GE NucI=r En:rgy NPPD Cooper Nuclear Station Unit 1 i
l ATTAOD4ENT 1 Commercial S'Irvica Dita July 1974 ABSTRACT of EXAMINATIONS Refueling Outage RF016 03/17/1996 PAGE 29 of 47 I
CAL COMP.
ASMR COMPONENT / CVNFIGURATION SIZE PFPORT EXAM PROCEDUPE PEV BIACK DATE ISO.
COMMENTS D-A SW-DB-45 E LUG N/A R-060 VT-1 VT-CNS-101V0 R.0 N/A 10/25/95 2851-6 SAT D-A SW-DB-46 STN N/A R-059 VT-1 VT-CNS 101VD R.0 N/A 10/25/95 2851-6 SAT D-A SW-DB-57 E-LUG N/A R-292 VT-1 VT-CNS-101VO R.0 N/A 11/29/95 2851-3 SAT D-A SW DB-16 SAD N/A R-293 VT-1 VT-CNS-301VD R.0 N/A 11/29/95 2851-3 SAT D-A SW-DB-145 STN N/A R-094 VT-1 VT-CNS-101V0 R.0 N/A 11/7/95 2852-9 SAT l
D-A SW-DB-50 STN N/A R-329 VT-1 VT-CNS-101VO R.0 N/A 11/29/95 2852-9 SAT
)
D-A SW-PA-Al SP-PU N/A R-114 VT-1 VT-CNS-101VO R.0 N/A 11/6/95 2852-3 SAT 29 COMPOrfENTS EXAMINED FOR CATEGORY D-A i
i
{
4 I
l l
T
( / ',jf NPPD Cooper Nucisar Station Unit 1 b GE Nuc/rr En:rgy
,_y, 1
c _,ci,1, m ic, me,,
,.,1,1,,,
ABSTRAC"r of EXAMINATIONS Refueling Outage RFOl6 03/17/1996 PAGE 30 of 47
(
CAL COMP.
ASME COMPONENT / CONFIGURATION SIZE REPORT EXAM PROCEDURE PEV BLOCK DATE ISO.
COMMENTS 33 COMPONENTS EXAMINED FOR CATEGORY 88-01 88-01 CSA-BJ-2*
P-SE 10 R-096 PT PT-CNS-100V1 R.0 N/A 11/11/95 2502-1 88-01 ELAM 45S UT-CNS-208V0 R.0 49 GEOMETRY I
45S Ur-CNS-208VO R 0 49 RECORDED 88-01 CWA-BJ-1*
WOL-P 6 R-189 PT PT-CNS-100V1 R.0 N/A 11/20/95 2503-1 88-01 EXAM 45S UT-CNS-102VD R.0 48 45L UT-CNS-102VD R.0 48 O
UT-CNS-102VO R.0 48 88-01 CWA-BJ-4 P-VA 6
R-199 PT PT'-CNS-100V1 R.0 N/A 11/17/95 2503-1 88-01 EXAM 45S UT-CNS-102VD R.0 48 60L Ur-CNS-102VO R.0 48 0
UT-CNS-102VO R.0 48 88-01 CWA-BJ-5 VA-P 6
R-161 PT PT-CNS-100V1 R.0 N/A 11/17/95 2503-1 88-01 EXAM 45S UT-CNS-102VO R.0 48 60L UT-CNS-102VO R.0 48 0
UT-CNS-102VO R.0 48 88-01 RWCU-80 P-E 4
R-155 45S UT+CNS-102VO R.0 110 11/9/95 2605-2A 88-01 EXAM 0
UT-CNS-102VO R.0 110 t
88-31 RWCU-92 E-P 4
R-156 45S UT-CNS-102VO R.0 110 11/7/95 2605-2A 88-01 EKAM 0
UT-CNS-102VD R.0 110 88-01 RAD-BJ-1 PU-P 28 R-232 PT PT-CNS-100V1 R.0 N/A 11/22/95 CNS-RR-37 88-01 EKAM 45S UT-CNS-102VD R.0 56 60L UT-CNS-102VO R.0 56 0
UT-CNS-102VD R 0 56 88-01 RAD-BJ-6 P-T 24 R-237 PT PT-CNS-100V1 R.0 N/A 11/20/95 CNS-RR-37 88-01 EKAM 45S UT-CNS-102VD R.0 55 60L UT-CNS-102VD R.0 55 0
UT-CNS-102VO R.0 56 88-01 RAS-BF-12 E-P 20 R-207 PT PT-CNS-100V1 R.0 N/A 11/25/95 CNS-RR-37 88-01 EKAM 45S UT-CNS-102VD R.0 53 SS I
45S UT-CNS-102VO R.0 103 CS 45L UT-CNS-102VO R.0 53 ES 45L UT.CNS-102VD R.0 103 CS 0
UT-CNS-102VO R.0 53 SS 0
UT-CNS-102VO R.O 103 CS l
i I
y
[s i
Y/
V GE Nuc/=r En:rgy NPPD Coopsr Nuc1sar Station Unit 1 s m cay,y,1 co _,,ci,1, m ic, o,,,,,,17 1,,,
ABSTRACT of EXAMINATIONS Refueling Outage RF016 i
03/17/1996 PAGE 31 of 47
(
CAL COMP.
ASME COMPONEPrf / CONFIOURATION SIZE REPORT EXAM PROCEDUPE PEV BLOCK DATE ISO.
COMMENTS 88-01 RAS-BJ 10 E-WOL 20 R-197 PT PT-CNS-100V1 R.0 N/A 11/17/95 CNS-RR-37 88-01 EXAM 45S ITT-CNS-102VO R.0 53 NRI 45S LTT-CNS-102VO R. 0 108 82% COVERAGE 45L W-CNS-102VO R.0 108 ACHIEVED 88-01 RAS-BJ-9 T-E 20 R-230 PT PT-CNS-100V1 R.0 N/A 11/20/95 CNS-RR-37 88-01 EXAM 45S UT-CNS-102VD R.0 53 GEOMETRY 45L UT-CNS-102VD R.0 53 RECORDED 0
UT-CNS-302VD R.0 53 88-01 RRM-BJ-2 P-SE 12 R-224 PT PT-CNS-100V1 R.0 N/A 11/20/95 CNS-RR-37 88-01 EXAMS 45S UT-CNS-208VD R.0 50 GEOMETRY 45S ITT-CNS-208VO R.0 50 RECORDED 60L UT-CNS-208V0 R.0 50 88-01 RBD-BJ-6 P-T 24 R-234 PT PT-CNS-100V1 R.0 N/A 11/20/95 CNS-RR-38 88-01 EXAM 45S UT-CNS-102VO R.0 55 60L (TT-CNS-102VD R. 0 55 0
ITT-CNS-102VO R.0 55 88-01 RBS-BJ-6A P-WOL 28 R-258 PT PT-CNS-100V1 R.0 N/A 11/22/95 CNS-RR-38 88-01 EXAM 45S ITT-CNS-102VD R.0 56 67% COVERAGE 1 SIDE O
ITI-CNS-102VO R.0 56 MAX COVER OBTAINED
(
88-01 RRA-BF-1 SE-N 14 R-241 PT PT-CNS-100V1 R.0 N/A 11/22/95 CNS-RR-38 88-01 EXAM 45S UT-CNS-209VD R.1 52 GEOMETRY 45RL UT-CNS-209VO R.1 121 RECORDED 60RL UT-CNS-209VO R.1 121 88-01 RRA-BJ-2 P-SE 12 R-231 PT PT-CNS-100V1 R.0 N/A 11/21/95 CNS-RR-38 88-01 EXAMS 45S UT-CNS-208V0 R.0 50 GEOMETRY 45S UT-OIS-208VO R 0 50 RECORDED 60L ITT-CNS-2 08VD R. 0 50 PT EXAM POR PT PT-CNS-100V1 k.0 N/A THERMOCOUPLE REMOVAL 88-01 RRB-BF-1 SE-N 14 R-131 PT PT-CNS-100V1 R.0 N/A 11/11/95 CNS-RR-38 88-01 EXAM 455 UT-CNS-209VD R.1 52 GEOMETRY 45RL UT-CNS-209VJ R.1 121 RECORDED 60RL UT-CNS-209VO R.,
121 88-01 RRB-DJ-2 P-SE 12 R-122 PT PT-CN.9-100V1 R.0 N/A 11/11/95 CNS-RR-38 88-01 EXAMS 45S UT-CNS-208VO R.0 50 45S UT-CNS-208VO R.0 50 60L LTI-CNS-208VD R. 0 50 88-01 RRD-BF-1 SE-N 14 R-194 PT PT-CNS-100V1 R.0 N/A 11/18/95 CNS-RR-38 88-01 EXAM j
45S LTT-CNS-209VD R.1 52 GEOMETRY l
45RL UT-CNS-209VO R.1 121 RECORDED 60RL UT-CNS-209VO R.1 121 I
t k/J GE Nucl=rEn:rgy NPPD Cooptr Nuclw r Stttion Unit 1 e, _,a a,,,,, ue,,,,,,,,,,
ABSTRACT of EXAMINATIONS Refueling Outage RFOl6 03/17/1996 FAGE 32 of 47
(
CAL COMP.
ASME COMPONENT / CONFIGURATION SIZE REPORT EXAM PROCEDUPE PEV BLOCK DATE ISO.
COMMENTS 68-01 RAD-BJ-2 P-SE 12 R 193 PT PT-CNS-100V1 R.0 N/A 11/17/95 CNS-RR-38 88-01 EXAM 45S W-CNS-208V0 R.0 50 98.3% COVERAGE 45S UT-CNS-208VD 11.0 50 GEOMETRY 60L W-CNS-208VO R.0 50 RECORDED 88-01 RWCU-97 V-P 4.0 R-086 45S W-CNS-102VD R. 0 110 10/31/95 2613-1 88-01 EXAM 0
tTT-CNS-102VD R.0 110 95% COVERAGE 88-01 RWCU 26 P-E 4.0 R-091 45S LTT-CNS-102VO R. 0 110 11/5/95 2605-1 88-01 EXAM 0
UT-CNS-102VD R.0 110 88-01 RWCU-41 P-E 4.0 R-090 45S W-CNS-102VD R.0 110 10/31/95 2605-1 88-01 EXAM 0
W-CNS-102VO R. 0 110 88-01 RWCU-42 E-P 4.0 R-089 45S UT-CNS-102VO R.0 110 10/31/95 2605-1 88-01 EXAM 0
(Tr-CNS-102VD R.0 110 88-01 RWCU-10 t-P 4
R-150 45S Ur-CNS-102VO R.0 110 11/9/95 2605-3 88-01 EXAM 0
(TT-CNS-102VD R. 0 110 88-01 RWCU-11 P-E 4
R-152 45S UT-CNS-102VD R.0 110 11/9/95 2605-3 88-01 EXAM 0
UT-CNS-102VO R.0 110 1
88-01 RWCU-12 E-P 4
R-153 45S ITI-CNS-102VO R. 0 110 11/9/95 2605-3 88-01 EXAM
(
0 ITT-CNS-102VO R. 0 110 88-01 RWCU-13 P-E 4
R-154 45S UT-CNS-102VO R.0 110 11/9/95 2605-3 88-01 EXAM 0
(Tr-CNS-102VO R. 0 110 1
88-01 RCA-BF-1 N-C 5
R-202 45S (TT-CNS-102VD R.0 20 11/17/95 CE.232-242 88-01 EXAM 88-01 RWCU-224 P-E 6
R-157 45S UT-CNS-102VD R.0 48 11/9/95 GE141C7090 88-01 EXAM 0
UT-CNS-102V0 R.0 48 88-01 RWCU-226 E-P 6
R-158 45S UT-CNS-102VO R.0 48 11/9/95 GE141C7090 88-01 EXAM 0
ITT-CNS-102VO R. 0 48 88-01 RWCU-227 P-E 6
R-159 45S UT-CNS-102VO R.0 48 11/9/95 GE141C7090 88-01 EXAM 0
LTT-CNS-102VO R. 0 48 88-01 RWCU-96 P-V 4
R-259 0
UT-CNS-102VD R.0 18 11/22/95 2513-1 PRE-SERVICE EXAM 45S UT-CNS-102VO R.0 13 GEOMETRY 60L UT-CNS-102VO R.0 18 RECORDED 33 COMPONENTS EXAMINED FOR CATEGORY 0A B1
[
\\
J
(
.#?
NPPD Coopsr Nuclatr Station Unit 1 GE Nuctur En:rgy 3,,,c,,,,,
c _,,1,1 g m io, o,,,,,,1y 1,,,
ABSTRAC"T of EXAMINATIONS Refueling Outage RF016 03/17/1996 PAGE 33 of 47 f
CAL COMP.
ASME COMPOdENT / CONFIGURATION SIZE REPORT EXAM PROCEDURE REV BLOCK DATE ISO.
ColeGNTS 8 COMPONENTS EXAMINED FOR CATEGORY CL94-03
-r l
GL94 03 SHROUD H1 SEG-SE 218 SR-01 45S W-OS-503V4 R.0 137 11/14/95 N/A 8 ID INDICATIONS 60L W.CNS-503V4 R.0 137 66.9% COVEHAGE i
80L UT-CNS-503V4 R.0 137 CR # 1-14742 GL94-03 SHROUD H2 SEG-SE 218 SR-02 458 UT-CNS-503V4 R.0 137 11/14/95 N/A-66.9% COVERAGE 60L UT-CNS-503V4 R.0 137 GEOMETRY 80L W-CNS-503V4 R.0 137 RECORDED l
GL94 03 SHROUD H3 SEG-SE 218 SR-03 45S W-CNS-503V4 R. 0 137 11/14/95 N/A 8 ID INDICATIONS l
60L
- ITT-CNS-503V4 R.0 137
.79.9% COVERAGE l
80L UT-CNS-503V4 R.0 137 SEE CR # 1-14742 j
GL94-03 SHROUD H4 SEG-SE 218 SR-04 45S UT-CNS-503V4 R.0 137 11/14/95 N/A 78.5% COVERAGE 60L UT-CNS-503V4 R.0 137 GEOMETRY l
80L UT-CNS-503V4 R 0 137 RECORDED GL94-03 SHROUD H5 SEG-SE 218 SR-05 45S UT-OIS-503V4 R.0 137 11/14/95 N/A 1 OD INDICATION 60L UT-CNS-503V4 R.0 137 76.1% COVERAGE l
80L UT-CNS-503V4 R.0 137 SEE CR # 1-14742 L
f.
GL94-03 SHROUD H6A SEG-SE 218 SR-06A 45S W-CNS-503V4 R.0 137 11/14/95 N/A.
1 OD INDICATION
\\
60L UT-CNS-503V4 R.0 -137 73.4% COVERAGE 80L UT-CNS-503V4 R.0 137 SEE CR # 1-14742 GL94-03 SHROUD H6B SEG-SE 218 SR-060 45S UT-CNS-503V4 R.0 137 11/14/95 H/A 73.4% COVERAGE l
60L UT-CNS-503V4 R.0 137 GEOMETRY I
80L ITf-CNS-503V4 R.0 137 RECORDED l
GL94-03 SHROUD M7 SEG-SE 218 SR-07 45S ITT-CNS-503V4 R. 0 137 11/14/95 N/A 68.6% COVERAGE 60L UT-CNS-503V4 R 0 137 GEOMETRY 80L UT-CNS-503V4 R.0 137 RECORDED 8 COMPONENTS EXAMINED FOR CATEGORY GL94-03 l
i i
f I
i l..
- ^g
/ #
'/
CPPD Cooper Nucist.r Stition Unit 1
)
V GE Nucl: r En:rgy 3,,,cnyty, 1 C,_erci,1 S m ic, oet,,,,17 2,,4 j
ABSTRACT of EXAMINATIONS Refueling Outage RF016 03/17/1996 FAGE 34 of 47
(
CAL COMP.
ASME COMPONENT / CONFIGURATION SIZE REPORT EXAM PPOCEDURE REV BLOCK DATE
- ISO, COMMENTS 10 COMPONENTS EXAMINED FOR CATEOORY IWI i
IWI CS. PIPING IEB80-13 PIPE N/A IWI VT-1 VT-CNS-202VO R.0 N/A 11/28/95 IWI CRACKING ON WELD # 1 and WELD # 21 SEE Ur REPORT R-CS-101 VT-1 VT-CNS-202VO R.0 N/A EXAMINED 30,150,21C and 330 deg.
SEE CR # 1-14955 IWI CSSPARGER IEB80-13 SPARGE N/A IWI VT-1 VT-CNS-202VD R.0 N/A 11/28/95 IWI DEBPIS IN # sic ACCEPTABLE PER CR 95-1191 IVVI VES BELT WELDS BLTLIN N/A IWI VT-3 VT-CNS-202VD R.0 N/A 11/28/95 IWI LIMITED RI-06 ASME CAT B-A VT-3 PERFORMED DUE TO CLADDED WELDS IWI NUREG CR3052VT J.T PU N/A IWI VT-1 VT-CNS-202VD R.0 N/A 11/28/95 IWI NRI IWI SIL289.R1.S1 T-J-BO N/A IWI VT-1 VT-CNS-202V0 R.0 N/A 11/28/95 IWI INDICATION OF CRACK ON WELD # 12 SEE UT REPORT R-CS-101 SEE CR # 1-14955 IWI SIL420.SIL574 SNS-LI N/A IWI VT-1 VT-CNS-202VO R.0 N/A 11/28/95 IWI NRI VT-3 VT-CNS-202VD R.0 N/A NRI IWI SIL462.S3 SHRXSC N/A IWI VT-1 VT-CNS-202VO R.0 N/A 11/28/95 IWI NRI IWI SIL465.SI NOZ-MI N/A IWI VT-3 VT-CNS-202VD R.0 N/A 11/28/95 IWI NRI IWI SIL551.RSILO45 JPR-BK N/A IWI VT-1 VT-CNS-202VD R.0 N/A 11/28/95 IVVI NRI IWI SILS88 BLT-PI N/A IWI VT-3 VT-CNS-202VO R.0 N/A 11/28/95 IWI CRACK ON ALIGNMENT PIN AT 90 deg.
SEE CR # 1-14960 1
10 COMPONFNTR EXAMINED FOtt CATEGORY IWI i
l i
l I
' \\
l l
l
,p%
fI r
( /
/
NPPD Cooper Nuclear Statior. Unit 1
'x. / GE Nucirr En:rgy
,.,.7,c,,,,,,
m.,es,1,, m e, o,e.,,,,,,,,,
ABSTRICT of EXAMINATIONS Refueling Outage RF016 03/17/1996 PAGE 35 of 47 j
{
CAL COMP.
ASME COMPONFNT / CONFIGURATION SI F.E REPORT EXAM PROCEDUPE PEV B!hCK DATE ISO.
COMMENTS 7 COMPONENTS EXAMINED FOR CATEGORY IV-tTT IV-ITT SIL433.S1 SHD-BL N/A SHB-001 0 (TT-CNS-501V2 R.0 120 10/26/95 IVVI EXAMINED 25 90LTS #
j 1,4,5,6,7,8,9,12,13, l
14,15,16,17,18,19,20 21,22,23,24,26,29,30 32 and 36 BOLTS 15,30,32 & 36 WERE CRACKED.
19 & 29 WERE SUSPECT SEE CR # 1-14951 6 BOLTS REPLACED IV-tTT WELD # 1 e 170 TS-S 6
RCS-101 80L UT-CNS-507VO R.0 2070 11/22/95 730E854 LINEAR INDICATION BOL UT-CNS-507VO R.0 2070 190 TO 350 Deg.
80L ITT-CNS-507VO R.0 2070 SEE CR # 1-14998 1
I IV-UT WELD # 21 e 10 TS-S 6
RCS-101 00L ITT-C2iS-507VD R. 0 2070 11/22/95 730E854 LINEAR INDICATION 80L ITT-CNS-507VO R.0 2070 280 to 350 Deg.
j 80L ITT-CNS-507VD R.0 2070 SEE CR # 1-14998 IV tTT WELD # 6 e 170 TS-TS 6 RCS-101 80L UT-CNS-507VD R.0 2070 11/22/95 730E854 NRI 80L UT-CNS-507VD R.0 2070 80L UT-CNS-507VO R.0 2070 SEE CR # 1-14998 I
IV-tTT WELD # 12 e 270 P-TDX 5 RCS-101 80L UT-CNS-507VO R.0 2070 11/22/95 730E854 NRI 80L UT-CNS-507VD R.0 2070 225 Deg. EXAMINED 80L ITT-CNS-507VO R. 0 2070 SEE CR # 1-14998 IV-tTT WELD # 7 e 170 TS-P 6
RCS-101 80L LTT-CNS-507VO R. 0 2070 11/22/95 730E854 NRI 80L UT-CNS-507VD R.0 2070 80L UT-CNS-507VO R.0 2070 SEE CR # 1-14998 IV-UT WELD # 15 e 10 TS-P 6
RCS-101 80L LTT-CNS-507VO R.0 2070 11/22/95 730E854 NRI 80L UT-CNS-507VO R.0 2070 80L UT-CNS-507VO R.0 2070 SEE CR # 1-14998 7 COMPONENTS EXAMINED FOR CATEGORY IV-tTT l
l t
.-w y
f
- / - -
NPPD Cooper Nuc1str Stttion Unit 1
'n," GE Nucl: rEn:rgy c _,c,,,,,,,, we,,,,,,,,,,
ADSTRACT of EXAMINATIONS Refueling Outage RPOl6 03/17/1996 PAGE 36 of 47
(
CAL COMP.
ASME COMPONENT / CONFIGURATION SIZE REPORT EXAM PROCEDURE REV BfDCK DATE ISO.
COMMEffTS 3 COMPONENTS EXAMINED FOR CATEGORY NBI-SE NBI-SE SIL571.N10 N-SE 2
R-128 PT PT-OiS-100V1 R.0 N/A 11/6/95 X2512-200 N10 SAFE END EXAM NBI-SE SIL571.N11A N-SE 2
R 160 PT PT-CNS-100V1 R.0 N/A 11/17/95 X2512-219 N11A1 SAFE END EXAM NBI-SE SIL571 N16A N-SE 2
R-012 PT PT-CNS-100V1 R.0 N/A 10/21/95 X2512-219 N16Al SAFE END EXAM 3 COMPONENTS EXAMINED FOR CATEGORY NDI-SE I
1 i
I l
l l
l
.~..a..~
_a u..
. -. _.... ~ ~. - - - ~. _ _. -
-. ~...,. -. -. -
l J
'M NPPD Cooper Nuclear Station Unit 1 i
1 GE NucInr Encrgy ATTACHMENT 1 CommetCial Sarvice Date July 1974 MSTRACT of EXAMINATIONS Refueling Outage RFOl6 l
03/17/1996 PAGE 37 of 47 I
f CE COMP.
ASME Gerunrau / CONFIOURATION SIZE REPORT EXAM PROCEDURE REV BI,0CK DATE ISO.
COP 91EfrTS
\\
l 12 umrvor.niS EXAMINED FOR CATEGORY 0619 0619 NVIR-BD N4A NIR 12 RG-002 21 UT-CNS-703V0 R.0 16 11/18/95 CE.232-231
- SEE SPECIE EXAMS 21 UT-CNS-311VD R.0 16 SECTION FINE REPORT p
22A UT-CNS-311VO R.0 16 TAB # 22 22A ITT-CNS-703VO R.0 16 100% COVERAGE 1
i 0619 NB-N4A N0ZBOR 12 RG-002 Z2B (TT-CNS-703VD R.0 16 11/18/95 CE.232-234
- SEE SPECIE EXAMS Z3 LTT-CNS-703VO R.0 16 SECTION FINE REPORT Z4A UT-CNS-703VO R.0 16 TAB # 22 24B ITT-CNS-311VO R.0 89 SEE R-164 FOR ES E5 LTT-CNS-208V0 R.0 89 DATA 0619 FWA-BJ-111 SE-N 14 R-164 Mr MT-CNS-100V1 R.0 N/A 11/11/95 2509-1 0619 EXAM PERFORMED 45S (TT-CNS-208VO R.0 89 ON SAFE END 0619 NVIR-BD-N4B NIR 12 RG-003 21 tTT-CNS-703VO R.0 16 11/18/95 CE.232-231
- SEE SPECIE EXAMS 22A ITT-CNS-703VO R.0 16 SECTION FINE REPORT Z1 UT-CNS-311VD R.0 16 TAB # 23 i
Z2A ITT-CNS-311VO R.0 16 100% COVERAGE
+
l 0619 ND-N4B N0ZBOR 12 RG-003 Z2B UT-CNS-703VO R.0 16 11/18/95 CE.232-234
- SEE SPECIE EXAMS E3 ITT-CNS-703VO R 0 16 CECTION FINE REPORT j
l '
Z4A (TT-CNS-703VO R.0 16 TAB # 23 Z29 UT-CNS-311VO R.0 16 Z3 UT-CNS-311VO R 0 89 24B ITT-CNS-311VO R.0 89 25 (TT-CNS-208VO R.0 89 SEE R-171 FOR 25 25 ITT-CNS-106VD R.0 89 DATA 0619 FWB-BJ-111 SE-N 14 R-171 MT MT-CNS-100V1 R.0 N/A 12/1/95 2509-1 0619 EXAM PERFORMED
(
45S ITT-CNS-208VO R.0 89 ON SAFE END 45S UT-CNS-106VD R 0 89 NCR # 95004 i
0619 NVIR-BD-N4C NIR 12 RG-004 21 tTT-CNS-703VO R.0 16 11/18/95 CE.232-231
- SEE SPECIAL EXAMS Z2A ITT-CNS-703VO R. 0 16 SECTION FINE REPORT l
[
Z1 UT-CNS-311VO R.0 16 TAB # 24 I
Z2A UT-CNS-311VO R.0 16 200% COVERAGE 0619 NB N4C N0ZBOR 12 RC-004 22B UT-CNS-703VD R.0 16 11/16/95 CE.232-234
- SEE SPECIE EXAMS Z3 UT-CNS-703VD R.0 16 SECTION FINE REPORT Z4A ITT-CNS-703VO R. 0 16 TAB # 24 Z4B (TT-CNS-311VO R.0 89 SEE R-166 FOR 25 25 UT-CNS-208VD R.0 89 DATA 0619 FWC-DJ-111 SE-N 14 R-166 MT MT-CNS-100V1 R.0 N/A 11/11/95 2509-2 0619 EXAM PERFORMFD i
j 45S UT-CNS-208V0 R.0 89 ON SAFE END 1
1 1
fe ~%
/
V
\\
v /
NPPD CoopIr Nucisar Stttion Unit 1 j
GE Nucirr En:rgy
,m
,,7 1
m,ci,1 S m ic, o t., au1y 1,74 ABSTRACT of EXAMINATIONS Refueling Outage RFOl6 03/17/1996 PAGE 38 of 47 CAL COMP.
ASME COMPONENT / CONFIGURATION SIZE REPORT EXAM PROCEDURE REV BLOCK DATE
- ISO, COM4ENTS l
0619 NVIR-BD-N4D NIR 12 RG-005 21 UT-CNS-703VO R.0 16 11/18/95 CE.232-231
- SEE SPECIAL EXAMS 22A UT-CNS-703VO R.0 16 SECTION FINAL REPORT TAB # 25 100% COVERAGE 0619 NB-N4D N0ZBOR 12 RG-005 Z2B ITT-CNS-703VO R.0 16 11/18/95 CE.232-234
- SEE SPECIAL EXAMS Z3 UT-CNS-703VD R.0 16 SECTION FINAL REPORT 24A UT-CNS-703VO R.0 16 TAB # 25 Z2B ITT-CNS-311VD R. 0 16 Z3 LTT-CNS-311VD R.0 89 24B (TT-CNS-311VD R.0 89 Z5 UT-CNS-208V0 R.0 89 SEE R-203 FOR 25 ZS ITT-CNS-106VO R 0 89 DATA 0619 FWD-BJ-ill SE-N 14 R-203 MT MT-CNS-100V1 R.0 N/A 12/1/95 2509-2 0619 EXAMS PERFORMED 45S LTT-CNS-208VO R. 0 89 ON SAFE END.
l 0
ITT-CNS-106VO R.0 89 NCR # 95004 12 COMPONENTS EXAMINED FOR CATEGORY 0619
(
l l
I
.,,.>.-~.~..,-a-
-x
= ~ ~ - - ~ "- """ ~^~'~* ~ ~ " " ^
~ ~ '
'~ "^
'~
9
.,e1w:-
- U<
C GE NuctorrEn:rgy -
NPPD Coopsr Nuclesr Station Unit 1
,,,,,,1 c _,1,1,,,,,,
o,,,,,,37,,,,
ABSTRACT of EXAMINATIONS Refueling Outage RFOl6 i
03/17/1996 PAGE 39 of 47 CAL COMP.
l ASME COMPONENT / CONPIOURATION SIZE REPORT EXAM PROCEDURE REV BIACK DATE
- ISO, CGGE;;TS 68 COMPONENTS EXAMINED FOR CATEGORY REC REC 2848-2-W10 FL-RE 6 R-275 45S UT-OIS-102VD R.0 126 11/22/95 CNS-REC-37 GEOMETRY l
60S (TT-CNS-102VD R.0 126 RECORDED 0
17T-CNS-102VO R.0 126 r
REC 2848-2-W102 FL-E 10 R-271 45S UT-CNS-102VD R.0 129 11/22/95 CNS-REC-37 GEOMETRY 60S UT-CNS-102VD R.0 129 RECORDED 0
UT-CNS-102VO R.0 129 REC 2848-2.W11 RE-P 6
R-277 45S UT-CNS-102V0 R.0 128 11/30/95 CNS-REC-37 LINEAR INDICATION l
60S 17FaCNS-102VD R.0 128 0
IJr-OIS-102VD R.0 128 i
R-341 45S LTf-CNS-102VO R.0 128 PSI FOR WELD REPAIR 60S ITT-CNS-102VD R.0 128 NRI REC 2848-2-W112 RE-FL 6 R-200 45S UT-CNS-102VO R.0 126 11/30/95 CNS-REC-37 LINEAR INDICATION 60S UT-CNS-102VO R.0 126 0
UT-CNS-102VO R.0 126 R-340 45S UT CNS-102VO R.0 126 PSI POR WELD REPAIR 60S UT-CNS-102VO R.0 126 NRI REC 2848-2-W2 RE-P 8
R-115 45S Iff-CNS-102VO R.0 128 11/7/95 CNS-REC-37 NRI
{
60S tTr-CNS-102VD R.0 128 REC 2848-2-W43 R-T 12 R-261 45S ITT-CNS-102VO R.0 124 11/22/95 CNS-REC-37 NRI 1
l 60S LFT-CNS-102VO R.0 124 j
45S UT-CNS-102VD R.0 130 l
60S UT-CNS-102V0 R.0 130 L
REC 2848-2-W44 R-FL 16 R-267 45S ITf-CNS-102VD R.0 132 11/22/95 CNS-REC-37 GEOMETRY 60S UT-CNS-102VO R.0 132 RECORDED 0
LTT-CNS-102VD R.0 132 I
REC 2848-2-W46 E-P 12 R-272 45S UT-CNS-102VO R.0 130 11/22/95 Dis-REC-37 GEOMETRY 60S ITT-CNS-102VD R.0 130 RECORDED 0
UT-CNS-102VD R.0 130 REC 2848-2-W52 P-E 12 R-227 458 (Tf-CNS-102VO R.0 130 11/14/95 CNS-REC-37 NRI 60S UT-CNS-102VD R.0 130 REC 2848-2-W56 E-P 6
R-222 45S ITf-CNS-102VD R.0 126 11/14/95 CNS-REC-37 GEOMETRY 60S LTf-CNS-102VD R.0 126 RECORDED 0
UT-CNS-102VD R.0 126 REC 2848-2-W57 P-E 6
R-221 45S (TF-CNS-102VO R.0 126 11/14/95 CNS-REC-37 GEOMETRY 60S UT-CNS-102VO R 0 126 RECORDED f
0 UT-CNS-102VO R.0 126 l
.~---.-- - ---
.~-- -
--- - - ~ ~ + - ~ - - - - - - -
- - - - - - ~ - ~ - - - - "-
- ' %l i
,+
NPPD Cooper Nuclear Station Unit 1
~
u WY ATTACuME,rr 1 Co erci.1 S.rvic. Dat., auty 1974 1
ABSTliACT of EXAMINATIONS Refueling Outage RFOl6 03/17/1996 PAGE 40 of 47 l
ASME COMPONENT / CY)NPIGURATION SIZE REPORT EXAM PROCEDURE REV BIDCK DATE ISO.
CODNENTS REC 2848-2-W60 P-E 6
R-219 458 UT-CNS-102VO R 0 126 11/19/95 C2(S-REC-37 GEOMETRY l
60S ITT-CNS-102VD R.0 126 RECORDED I
(
0 tTF-CNS-102VD R.0 126 l
REC 2848 16-W71 E-P 10 R-162 45S LTF-CNS-102V0 R.0 127 11/14/95 CNS-REC-37 NRI 60S UT-CNS-102VO R 0 127 REC 2848-2-W75 E-P 4
R-080 45S UT-CNS-102VD R.0 127 11/9/95 CNS-REC-37 NRI 60S ITT-CNS-102VD R.0 127 CR # 1-14749 i
f
(
REC 2848 2-W96 FL R 10 R-242 458 (TF-CNS-102VD R.0 129 11/22/95 CNS-REC-37 GEOMETRY 60S tTT-CNS-102VO R.0 119 RECORDED 0
UT-CNS-102VD R.0 129 l
1 i
REC 2848-2-WF V-P 8
R-113 45S ITF-CNS-102VO R.0 128 11/7/95 CNS-REC-37 NRI 60S ITT-CNS-102VD R.O 128 1 SIDE i
REC 2848-2-WK V-V 6
R-274 45S UT-CNS-102V0 R.0 73 11/24/95 CNS-REC-37 NRI 60S UT-CNS-102VC R.0 73 l
REC 2848-7-A V-P 6
R-225 45S ITT-CNS-102VD R.0 126 11/14/95 CNS-REC-38 NRI
(
60S UT-CNS-102VO R.0 126 0
tTI-CNS-102VD R.0 126 i
REC 2848-7-W2 P-E 6
R-226 45S UT-CNS-102VO R.0 126 11/14/95 CNS-REC-38 NRI 60S UT-CNS-102VD R 0 126 REC 2848-8-WI P-E 8
R-210 45S LTF-CNS-102VO R.0 128 11/14/95 CNS-REC-39 NRI 60S UT-CNS-102VD R.0 128 j
0 UT-CNS-102VD R.0 128 REC 2848-8-WL P-E 8
R-192 45S ITF-CNS-102VO R.0 128 11/9/95 CNS-REC-39 GEOMETRY 60S ITf-CNS-102VD R.0 128 RECORDED l
0 UT-CNS-102VO R,0 128 REC 2848-9-W12 P-E 4
R-279 45S UT-CNS-102VO R.0 127 11/24/95 CNS-REC-40 GEOMETRY 60S tTT-CNS-102VD R.0 127 RECORDED 0
LTF-CNS-102VO R.0 127 REC 2848-9-W17 E-P 4
R-276 45S LTT-CNS-102VO R.0 127 11/24/95 CNS-REC-40 NRI 60S ITT-CNS-102VD R.0 127 REC 2848-9-W19 P-E 4
R 283 45S UT-CNS 102VO R.0 127 11/24/95 CNS-REC-40 GEOMETRY t
l 60S ITI-3(S-102VD R 0 127 RECORDED l
0 ITF-CNS-102VD R.0 127 I
REC 2848-9-W31 P-P 4
R-281 45S Iff-CNS-102VO R.0 127 11/24/95 CNS-REC-40 GEOMETRY l
60S ITI-CNS-102VO R.0 127 RECORDED l
0 LTI-CNS-102VD R.0 127 l
l l
I i
.. - - -. -.. - - ~. _. - - - - - - - -
SGENucteerEnntgy h
NPPD Cooper Nuclear Station Unit 1 I
c _,,1,1,, y,,,,,,,,17 1,,,
ABSTRACT of EXAMINATIONS Refueling Outage RFOl6 03/17/1996 PAGE 41 of 47 ASME COMPONENT / CONFIGURATION SIZE REPORT EXAM PROCEDURE REV BIDCK DATE ISO.
COM4ENTS REC 2848-9-W34 E-P 4
R-269 45S tff-CNS-102VD R.0 127 11/22/95 CNS-REC-40 WRI 60S UT CNS-102VD R.0 127 REC 2848-9-W44 P-E 4
R-282 45S LTT-CNS-102VD R.0 127 11/24/95 CNS-REC-40 GEOMETRY 60S LTI-CNS-102VO R.0 127 RECORDED 0
UT-CNS-102VO R.0 127 l
REC 2848-9-W55 P-E 4
R-278 45S UT-CNS-102VD R.0 127 11/24/95 CNS-REC-40 NRI 60S ITI-CNS-102VD R 0 127 REC 2848-9-W1 T-P 4
R-312 45S UT-CNS-102V0 R.0 127 11/29/95 CNS-RIC-40 NRI h
60S UT-CNS-102VD R.0 127 REC 2848-9-WN P-V 3
R-273 45S CT*CNS-102VD R.0 122 11/22/95 CNS-REC-40 NRI 60S (TT-CNS-102VO R.0 122 I
l REC 2848-14-W14 T-P 6
R-073 45S UT-CNS-102V0 R.0 127 11/28/95 CNS-REC-41 LINEAR INDICATION 1
60S (TT-CNS-102VO R.0 127 CR S 1-14937 l
0 ITT-CNS-102VO R. 0 127 CR # 1-14749 I
R-250 45S UT-CNS-102VO R.0 127 PSI OF WELD REPAIR
[
60S UT-CNS-102VO R.0 127 l
REC 2848-14-W15 P-E 4
R-251 45S (Jf-CNS-102VO R.0 127 11/22/95 CNS-REC-41 PSI DUE TO REPAIR OF 1
60S UT-CNS-102VO R.0 127 WELD 2848-14-W14 i
0 UT-CNS-102VO R.0 127 CR # 1 14937 j
GEOMETRY RECORDED REC 2848-14-W28 EP 4
R-264 45S ITT-CNS-102VD R.0 127 11/22/95 CNS-REC-41 NRI l
60S ITI-CNS-102VO R.0 127 REC 2848-14-W29 P.E 4
R-263 45S LTI-CNS-102VD R. 0 127 11/22/95 CNS-REC-41 GEOMETRY l
60S Ifr-CNS-102VO R.0 127 RECORDED 0
UT-CNS-102VO R.0 127 REC 2848-14-W30 E-P 4
R-260 45S LTT-CNS-102VO R. 0 127 11/28/95 CNS-REC-41 LINEAR INDICATION 60S Ifr-CNS-102VO R.0 127 CR # 1 15289 0
UT-CNS-102VO R.0 127 R-339 45S Lfr-CNS-102VD R.0 127 LTP EXAM OF REPAIR j
60S LTT-CNS-102VD K.0 127 AREA REC 2848-14-W31 P-E 4
R-265 45S LTT-CNS-102VD R.0 127 11/22/95 CNS-REC-41 NRI 60S LTI-CNS-102VD R.0 127 REC 2848-14-W56 E-P 12 R-190 45S ITT-CNS-102VD R.0 130 11/9/95 CNS-REC-41 NRI l
60S Ifr-CNS 102VD R,0 130 l
I REC 2848-14-W57 FL-P 12 R-191 45S LTI-CNS-102VD R.0 130 11/9/95 CNS-REC-41 NRI 60S LTT-CNS-102VO R. 0 130 l
i l
l
I f /'\\
I
/
sV GENuc/ crEnrrgy NPPD Coopar Nucisar Stttion Unit i 3m _ 1 Co
,ci.1 S,yie,o t.,
,uty 1,74 ABSTRACT of EXAMINATIONS Refueling Outage RFOl6 03/17/1996 PAGE 42 of 47 CAL COMP.
ASME COMPONPNT / CONFIGURATION SIZE REPORT EXAM PROCEDURE REV BIOCK DATE ISO.
COMMENTS REC 2848-14-W63 V-P 8
R-212 45S W-CNS-102V0 R.0 128 11/14/95 CNS-REC-41 NRI 60S UT-CNS-102VO R.0 128 0
UT-CNS-102VO R.0 128 REC 2848-14-WC V-E 6
R-074 45S W-GS-102VD R. 0 126 11/5/95 CNS-REC-41 NRI 60S UT-OS-102VO R.0 126 CR N 1-14749 REC 2848-14-WF P-V 4
R-262 45S W-CNS-102VO R. 0 127 11/22/95 CNS-REC-41 NRI 60S UT-CNS-102VD R.0 127 REC 2848-15-W11 P-R 4
R-268 45S W-CNS-102VO R. 0 127 11/22/95 CNS-REC-42 NRI 60S W-CNS-102VO R.0 127 REC 2848-15-W20 P-E 3
R-266 45S UT-CNS-102VO R.0 122 11/22/95 CNS-REC-42 NRI 60S UT-CNS-102VD R.0 122 REC 2848-21-W4 E-P 2.5 R-069 45S UT-CNS-102VD R.0 129 11/22/95 CNS-REC-42 PARTIAL EXAM DUE TO 60S W-OS-102VO R. 0 129 HANGER. REPLACED WITH 2848-15-W21 i
REC 2848-15-W21 E-P 3
R-338 45S W-CNS-102VO R. 0 122 11/30/95 CNS-REC-42 NRI SELECTED FOR 60S W-CNS-102VO R. 0 122 EXAM IN LIEU CF l
2848-21-W4 i
(
REC 2848-15-W32 E-P 4
R-270 45S UT-CNS-102VO R.0 127 11/22/95 CNS-REC-42 NRI 60S W-CNS-102VO R. 0 127 REC 2848-15-WA P-E 4
R-303 45S UT-CNS-102VO R.0 127 11/25/95 CNS-REC-42 NRI 60S UT-CNS-102VO R.0 127 REC 2848-16-W69 E-P 4
R-139 455 W-CNS-102VO R. 0 127 11/9/95 CNS-REC-43 NRI 605 UT-CNS-102VO R.0 127 REC 2848-16-W70 P-E 4
R-142 455 UT-CNS 102VO R.0 127 11/9/95 CNS-REC-43 NRI 60S UT-CNS-102VO R.0 127 REC 2848-2-W71 T-E 4
R-304 455 UT-CNS-102VO R 0 126 11/28/95 CNS-REC-43 NRI 605 UT CNS-102VO R.0 126 REC 2848-16-W74 P-E 4
R-141 45S W - CNS - 1,,2 VO R. 0 127 11/9/95 CNS-REC-43 NRI 60S W-CNS.0 2VO R. D 127 REC 2849-16-WB T-P 3
R-071 455 UT-CNS-102VO R.0 122 11/5/95 CNS-REC-43 NRI 60S UT-CNS-102VD R.0 122 CR # 1-14749 REC 2846-16-W2 E-E 3
R-111 45S L% CNS-102VO R.0 122 11/7/95 CNS-REC-44 NRI 60S UT-CNS-102VO R.0 122
?
I
.m k,
,l
/#
5# '/
%/ GE NucI=r En:rgy NPPD Cooper Nuc1tir S ution Unit 1 ATTACHMENT 1 Commercial Sarvica Date July 1974 ABSTRACT of EXAMINATIONS Refueling Outage RF016 03/17/1996 FACE 43 of 47
(
CAL COMP.
ASME COMPONENT / CONFIGURATION SIZE REPORT EXAM PROCEDURE PEV block DATE ISO.
COMMENTS REC 2848-16-W3 P-E 3
R-097 45S ITT-CNS-102VO R.0 122 11/7/95 CNS REC-44 NRI 60s ITF-CNS-102VD R.0 122 REC 2848 21-WAA P-V 2.5 R-065 45S W-CNS-102VO R.0 123 11/28/95 CNS-REC-45 LINEAR INDICATION 60S LTF-CNS-102VO R.0 123 CR # 1-14937 R-252 45S UT-GS-102VO R.0 123 PSI OF REPAIR AREA 60S LTF-CNS-102VO R.0 123 REC 2848-21-WAB P-V 2.5 R-064 45S ITI-CNS-102VD R.0 123 11/28/95 CNS-REC-45 2 LINEAR INDICATIONS 60S LTr-CNS-102VO R 0 123 CR # 1-14937 R-256 45S (TT-CNS-102VO R. 0 123 PSI OF WELD REPAIR 60S ITF-CNS-102VD R. 0 123 REC 2848-22 W13 R-T 3
R-072 45S tTT-O!S-102VO R.0 122 11/9/95 CNS REC-46 NRI 60S ITY-CNS-102VO R. 0 122 CR # 1-14749 REC 2848-22-W15 P-E 4
R-143 45S ITI-CNS-102VO R.0 122 11/9/95 CNS-REC-43 NRI 60S (TI-CNS-102VO R. 0 122 REC 2848-22-W17 P-T 3
R-070 45S UT-CNS-102VD R.0 122 11/9/95 CNS-REC-46 NRI 60S UT-CNS-102VO R.0 122 CR # 1-14749 REC 2848-22-W19 P-V 3
R-063 45S UT-CNS-102VO R.0 122 11/28/95 CNS-REC-46 LINEAR INDICATION 60S LTF-CNS-102VO R.0 122 CR # 1-14937 CR # 1-14749 R-253 45S ITT-CNS-102VO R.0 122 PSI OF REPAIR AREA 60S ITI-CNS-102VO R.0 122 REC 2848-50-WK P-E 4
R-314 45S LTr-CNS-102VO R.0 127 11/29/95 CNS-REC-47 GEOMETRY 60S UT-CNS-102VD R.0 127 RECORDED 0
UT-CNS-102VD R.0 127 REC 2848-50-WM P-V 4
R-313 45S ITr-CNS-102VO R.0 127 11/29/95 CNS-REC-47 NRI 60S LTF-CNS-102VO R.0 127 REC 2848-51-FJA P-P 8
R-213 45S (TT-CNS-102VO R 0 128 11/14/95 CNS-REC-52 GEOMETRY 60S UT-CNS-102VD R 0 128 RECORDED 0
UT-CNS-102VO R.0 128 REC 2848-51-WU E-V 8
R-211 45S (TT-CNS-102VD R. 0 128 11/14/95 CNS-REC-52 GEOMETRY 60S UT-CNS-102VO R.0 128 RECOPSED 0
UT-CNS-102VC R.0 128 REC 2848-51-WVV E-P 8
R-218 45S ITI-CNS-102VO R. 0 128 11/14/95 CNS-REC-52 GEOMETRY 60S LTT-CNS-102VD R.0 128 RECORDED j
0 tTF-CNS-102VO R.0 128 l
J r
l l
y NPPD Cooper Nuclser Stttion Unit 1 GE Nucirr Energy 3m Em 1 C-erci.1 Suvice me., ouiy 1924 ABSTRACT of EXAMINATIONS Refueling Outage RF016 03/17/1996 PAGE 44 of 47 f
CAL COMP.
ASME COMPONENT / CONFIGURATION SIZE REPORT EXAM PROCEDURE REV BIDCK DATE ISO.
COMMENTS REC 2848-51-WY P-E 8
R-214 45S LTT-CNS-102VO R. 0 128 11/14/95 OIS-REC-52 GEOMETRY 60S LTT-CNS-102VD R.0 128 RECORDED 0
LTT-CNS-102VO R.0 128 REC RCC2848-4-34-SW-W1 E-P 6
R-254 45S UT-CNS-102VO R.0 126 11/22/95 CNS REC-41 PSI OP REPAIR OF 60S UT-CNS-102VO R.0 126 1994 INDICATION GEOMETRY RECORDED REC RCC2848-4-38-SW-W2 E-P 6
R-255 45S (fr-CNS-102VO R.0 126 11/22/95 CNS-REC-41 RE-INSPECTION OF 60S UT-CNS-102VO R.0 126 1994 INDICATION NO CHANGE NOTED 1
(
l l
l
NPPD Cooper Nuclear St& tion Unit 1 GE NucirrEnrrgy
,m _,
_,1,1, m i,,,,,, 33,3,,,
ABSTRACT of EXAMINATIONS Refueling Outage RF016 03/17/1996 PAGE 45 of 47
(
CAL COMP.
ASME COMPONEFT / CONFIGURATION SIZE REPORT EXAM PROCEDURE REV BIDCK DATE ISO.
COfMENTS 3 COMPONENTS EXAMINED FOR CATEGORY REX REX NVE-BD-N4A N-VE 6.2 RG-001 0 UT-CNS-702VO R.0 16 12/6/95 CE.232-231
- SEE SPECIAL EXAMS 45S UT-CNS-702VO R.0 16 SECTION FINAL REPORT 60S UT-CNS-702VO R.0 16 TABS 20 & 21 FOR 0
UT-CNS-300VO R.0 16 RECORDED INDICATIONS' 45S UT-CNS-300VO R.0 16 AND RESOLUTIONS 60S UT-OIS-300VO R.0 16 27.3% COVERAGE REX NVE-BD-N4C N-VE 6.2 RG-006 0 UT-CNS-702VD R.0 16 12/6/95 CE.232-231
- SEE SPECIAL EXAMS 45S UT-04S-702VO R.0 16 SECTION FINAL REPORT 60S UT-CNS-702Y0 R.0 16 TABS # 20 & 26 FOR 0
UT-CNS-300VO R.0 16 RECORDED INDICATIONS 45S UT-CNS-300VO R.0 16 AND RESOLUTIONS 60S UT-CNS-300VO R.0 16 27.3% COVERAGE REX NVE-BD-N4D N-VE 6.2 RG-007 0 UT-CNS-702VO R.0 16 12/6/95 CE.232-231
- SEE SPECIAL EXAMS 45S UT-CNS-702VD R.0 16 SECTION FINAL REPORT 60S UT-CNS-702VD R.0 16 TABS 20 & 27 FOR RECORDED INDICATIONS AND RESOLUTIONS 31.7% COVERAGE f
3 COMPONENTS EXAMINED FOR CATEOORY REJ l
e NPPD Cooper Nuclear Station Unit 1 GENuclurEn:rgy
~
,,.7,,,,,
w,en,1,,m e, ue,, u1,,,,,
ABSTRACT of EXAMINATIONS Refueling Outage RF016 03/17/1996 PAGE 46 of 47 f
CAL COMP.
ASME COMPONENT / CONFIGURATION SIZE REPORT EXAM PROCEDURE REV BLOCIC DATE ISO.
COP 94ENTS 38 COMPONENTS EXAMINED FOR CATEGORY F-A l
l F-A RRH-20 HGR-SP N/A R-011 VT 3 VT-OIS-103VO R.0 N/A 10/21/95 X2512-200 SAT F-A RAH 20A HGR-SP N/A R-010 VT-3 VT-CNS-103VO R.0 N/A 10/21/95 X2512-200 SAT FA CUH-220 VS N/A R-078 VT-3 VT-CNS-103V0 R.0 N/A 11/1/95 X2503-220 SAT F-A CUH-222 VS N/A R-079 VT-3 VT-CNS-103VD R.0 N/A 11/1/95 X2503-220 SAT I
I I
F-A LC-HIS VS N/A R-129 VT-3 VT-CNS 103VD R.0 N/A 11/6/95 X2504-200 SAT i
i l
I l
F-A LC-H23 vs N/A R-116 VT-3 VT-CNS-103VO R.0 N/A 11/7/95 X2504-201 SAT I
i F-A If-H28 VS N/A R-117 VT-3 VT-CNS-103V0 R.0 N/A 11/7/95 X2504-201 SAT l
F-A LC-H32 HS N/A R-118 VT-3 VT-CES-103VO R. 0 N/A 11/7/95 X2504-201 SAT i
F-A LC-H33 HS N/A R-119 VT-3 VT-CNS-103VO R.0 N/A 11/7/95 X2504-201 SAT F-A MS GA1 HS N/A R-055 VT-3 VT-CNS-103VO R.0 N/A 10/25/95 N06731E671 SAT I
1 F-A MS-GB1 HS N/A R-056 VT-3 VT-CNS-103VO R.0 N/A 10/25/95 GE731E671 SAT F-A MS-GC1 HS N/A R-057 VT-3 VT-CNS-103VD R.0 N/A 10/25/95 GE731E671 SAT F-A MS-GD1 HS N/A R-058 VT-3 VT-CNS-103VO R.0 N/A 10/25/95 GE731E671 SAT i
F-A RR-SB1-A HS N/A R-177 VT-3 VT-CNS-103VO R.0 N/A 11/17/95 ISO-RL-A SAT i
F-A CSS-10 HS N/A R-132 VT-3 VT-CNS-103V0 R.0 N/A 11/7/95 2602-2 SAT F-A RCH-34 VS N/A R-092 VT-3 VT-CNS-103VO R.0 N/A 11/7/95 2628-3 SAT F-A CSH-1A VS N/A R-337 VT-3 VT-CNS-103VD R.0 N/A 11/29/95 2603-2 SAT F-A CSH-12 VS N/A R-308 VT-3 VT-CNS-103VD R.0 N/A 11/27/95 2602-1 SAT R-309 VT-4 VT-CNS-104VO R. 0 N/A IMPROPER SETTINGS USE AS IS PER NPPD ENGINEERING REVIEW I
F-A RHH-45 VS N/A R-317 VT-3 VT-CNS-103VO R.0 N/A 11/30/95 2624-3B SAT R-318 VT-4 VT CNS-104VD R.0 N/A IMPROPER SETTINGS USE AS IS PER NPPD ENGINEERING REVIEW i
i i
i i
.----a
~ ~ - - - - - - - -
- - - ~ - - -
. ~ _.9GENucinrEnergy NPPD Cooper Nuclear Station Unit 1 e
m,,1,1
,,,,,.ic,,,,,,,,1,1,,,
ABSTRACT of EXAMINATIONS Refueling Outage RFOl6 03/17/1996 PAGE 47 of 47 CAL COMP.
&Bfg COMPONENT / CONFIGURATION SIZE REPORT EXAM PROCEDURE REV BIACK DATE ISO.
Cope 4ENTS F-A RHH-55 VS N/A R-310 VT-3 VT-CNS-103VD R.0 N/A 11/27/95 2624-3A SAT R-311 VT-4 VT-CNS-104VD R.0 N/A IMPROPER SETTINGS USE AS IS PER NPPD ENGINEERING REVIEW F-A VRH-61C HS N/A R-054 VT-3 VT-CNS-103VO R.0 N/A 10/25/95 2628-3 SAT F-A RCC-H-24A VS N/A R-322 VT-3 VT-CNS-103V0 R.0 N/A 11/29/95 2848-2 SAT
(
(
F-A HPH-55A VSL-SP N/A R-035 Vi-3 VT-CNS-103VO R.0 N/A 10/21/95 2612-2 SAT F-A SW-H-256 VS N/A R 106 VT-3 VT-CNS-103VO R.0 N/A 11/7/95 2852-55 SAT F-A SW-H-181A HS N/A R-068 VT-3 VT-CNS-103VO R.0 N/A 10/25/95 2851-1 SAT F-A SW-H-62A VS N/A R-066 VT-3 VT-CNS-103VD R.0 N/A 10/25/95 2851 2 SAT i
F-A SW-16 VS N/A R-294 VT-3 VT-CNS-103VO R.0 N/A 11/29/95 2851-2 SAT l
t F-A ECST-1A VS!,-SP N/A R-037 VT-3 VT-CNS-103VO R.0 N/A 10/21/95 2821-12 FAT l
l F-A RPV SKIRT VS N/A R-093 VT-3 VT-CNS-103VO R.0 N/A 11/7/95 CE232 235 SAT l
s l
F-A REC-TK-ST-S VS N/A R-034 VT-3 VT CNS-103V0 R.0 N/A 10/21/95 2848-7 SAT l
F-A.
REC-HXA-S1 VS N/A R-323 VT-3 VT-CNS-103VD R.0 N/A.11/29/95 2852-9 SAT l
F-A REC-HXA-S2 VS N/A R-324 VT-3 VT-CNS-103VO R.0 N/A 11/29/95 2852-9 SAT l
1 I
F-A REC-HKA-S3 VS N/A R-325 VT-3 VT-CNS-103VO R.0 N/A 11/29/95 2852-9 SAT F-A REC-HXA-S4 VS N/A R-326 VT-3 VT-CNS-103VO R.0 N/A 11/29/95 2852-9 SAT F-A REC-PA-S1 VS -
N/A R-033 VT-3 VT-CNS-103V0 R.0 N/A 10/21/95 2848-2 SAT I
F-A SW-BPA-S1 VS N/A R-061 VT-3 VT-CNS-103VD R.0 N/A 10/25/95 2851-6 SAT j
F-A SW-PA-Si VS N/A R-109 VT-3 VT-CNS-103V0 R.0 N/A 11/7/95 2852-3 SAT l
F-A SW-STRA-Si VS N/A R-110 VT-3 VT-CNS-103VD R.0 N/A 11/29/95 2852-3 CORROSION NOTED
{
USE AS IS PER NPPD CR 8 1-14953 38 COMPONENTS EXAMINED FOR CATEGORY F-A i
Attachment to NLS960048.1 - Abstract of Examinations (NPPD,2 Pages) l i
f t
i
l l
ATTACHMENT 1.1 NPPD Cooper Nuclear Station Unit 1 i (
Abstract Of Examinations cornrnercial Service Date: July 1974 Outside General Electric RF016 scope H* fueling Outage RF016 3/14/96 Page 1 of 2 I
COMP.
ASME COMPONENT CONFIGURATION SIZE REPORT EXAM PROCEDURE REV DATE ISO COMMENTS Feedwater Spercer R-302 WeWed Breckets VT-06 with Examined in 1993 but not credited B N-2 A"*C
- "' 80 A
3 0
3/26/93
,,,ckets for (bra VTD-76, FRR-93-05 on 1993 NIS-1 Reactor Vessel 77J8J9 sper9ers)
Sp*C W "
Attachtnant at 30*
c nt to B-N 2 Holder #1 NA VT 1 hector Vessel R
Brecket VTD-80 whhin Bett%ne on 1993 NIS-1 Welded Attachment at 120' 8-N-2 Holde NA VT-1 0
3/26/93 NA R oct nel R 3 5 Brecket VTD 81 Exemined in 1993 but not credited wh* Nhh on 1993 NIS-1 Specimen Attachtnent at 300*
oc nt to 8-N-2 Ho6 der #3 NA VT-1 O
NH Nector Vessel R 3 05 Deocket VTD-82 Exe M h W W M W W within Benline
'" 1883 NIO'l 4 COMPONENTS EXAMINED FOR CATEGORY B-N-2 Performed by CNS Personnel during All Class 1 SP 95-128 0
B-P NA NA NA VT 2 12/20/96 NA Components Procedure 7.0.8 used to supplement SP 95-128 for e portion of Class 1 SLC.
ALL CATEGORY B-P COMPONENTS EXAMINED C-C H PlD-CC-5 Welded Stanchion 10 EOS 242 PT IP-W12 1
11/20/86 2009-1 on 1986 S1 1 COMPONENT EXAMINED FOR CATEGORY C-C 6.1 CS.501 1,1.1 Performed by CNS Personnel during 0'
the operating cycle prior to end All Class 2 during RFV16.
C 50 C-H NA NA NA VT 2 6
C.50 0
Various NA Procedure 7.0.8 and SP 95-128 Components
""P'
'"*"I 6.2RHR.601 1,1.1 et n I prenure tut SP 95-128 0
pr cedures.
7.0. 8 8
ALL CATEGORY C-H COMPONENTS EXAMINED i
ATTACHMENT 1 1 NPPD Cooper Nuclear Station Unit 1
(
Abstract of Examinations Comrnerciel Service Date: July 1974 Outside General Electric RF016 Scope Refueling Outege RFOl6 3/14/96 Page 2 of 2 COMP.
ASME COMPONENT CONFIGURATION SIZE REPORT FXAM PROCEDURE REV DATE ISO COMMENTS 6.HPCI.501 0
AN Qess 3
- 6. REC.501 0
Performed by CNS Personnel during 0-8 NA NA NA VT 2 6.1SW.501 0.1 Various NA the operating cycle prior to and N*t 6.2SW.501 0.2 during RF016.
Components 6.NBL501 1
ALL CATEGORY D-B COMPONENTS EXAMINED G
100 R476 with FRRs Examined in 1993 but not credited F-A SW-H-223 Rod Henger NA VT-3 0
3/15/93 2400-4 9129 and on 1993 NIS-1 D-114 91 36 GE-VT 100 with FRRs l'8
3/10/93 2851 1
' #8
- 0-052 91 36 GE-VT 100 Examined in 1993 but not credited F-A SYl-H-46 Stenchion NA VT 3 O
3/20/93 2851-6 D-139 91 36 GE-VT 100 with FRAs Examined in 1993 but not credded F-A SW S-69 NA VT 3 0
3/20/93 2052 19 Structural Frame 9129 and on 1993 NIS-1 D-139 91-36 4 COMPONENTS EXAMINED FOR CATEGORY F-A i
d
1 Attachment to NLS960048 j - Examination Personnel (GE,1 Page)
f A i l AbrilVit:N 1 Z l
This is a listing cf GE personnel that performed eximinations or signed riports during RFOl6. The certification rscords tre aYtllable and are included in the Final RIport for RFO16 under ttnir rispective TAB number.
i EYE Auto Auto Shroud Nott CERfS
(
Tab Name rest arr er ur ICsCC ces Anal oper.
size in oper.
Vr.r/d tvvr 1
Bailey, E.P.
7/19/96 til ill gli its 4
Bolt, Tracy 9/22/96 i
X YES Bonntwell, Jerome 7/26/96 H
YES YES l
6 Bowne, Lowell 9/22/96 H
ll YES YES VES YES YES l
7 Briggs, Jake 3/10/96 Hi Hi IN Hi HI 1
8 Catron, Earnest 9/22/96 H
in YES YES YES YES YES 10 Crane, Marty s/10/96 IT I
N YES YES YES YES 13 Donley, Mike 9/23/96 11 14 DuBose, George 2/9/96 lit YES YES YES YES
.I 15 Dummer, Brad 2/7/96 lu IH in YES 19 Ginder, Todd 1/5/96 11 II H
YES VT.1/H 1
20 Hammond, Kent 5/25/96 H
23 Jasken, Rich 1/12/96 8
it U
YES 24 Kegel, Joel 5/23/96 H
26 Krueger, Victor a/3/96 H
H 11 27 Labella, N/ck 12/5/95 11 H
H YES YES YES II 28 Lockler, Kevin 8/11196 11 YES 30 Mcdonald, Mike ti2/96 H
31 McKean, Chris 8/11/96 1
11 11 YES YES YES YES 32 MI,1or, Chris 7/2s/96 lu HI in YES YES 34 Morey, Milton A.
1/3/96 II 35 Morris, David T.
6/10/96 H
J 36 Neau, Steve 7/13/96 H
37 Neville, Kent 8/14/96 II H
11 YES X
j 38 O' Bannon, Tom 9/22/96 18 ft n
YES YES 11 39 Perry, Tollte 9/22/96 H
YES YES 42 Rockwood, Terry 7/14/96 Ill YES YES YES 43 Romano, Joe s/21/96 H
ll YES YES 44 Schlorff, Hermann 10/26/96 til lil 111 YES YES YES YES YES 111 47 Smith, Michael 6/12/96 H
YES YES 48 Stanford, Steve 8/17/96 BH Hi HI YES YES YES YES HI 49 Tipton, Mike 7/20/96 H
H 11 YES 50 Torok, Mark 7/26/96 til YES 51 Webster, Michael 9/22/96 H
11 11 YES YES YES YES 52 Winterhalter, Hugo l 8/10/96 tl YES YES i
i Page 1 of 1 12/13/95 PER_ CERT.XLSCerts
..A.,,.m 4
..>.A4.h a
m..
4,s,-9.4-a
++w-...a.
r.2 m__
w_.
Attachment to NLS960048.1 - Examination Personnel (GE and NPPD,3 Pages) i 1
l 1
1
ATTACHMENT 2.1 3/14/96 Page 1 of 3 l (
Examination Personnel For Examinations Outside General Electric RF016 Scope Name Company Certification and Level PT, Level 11 MT, Level 11 UT, Level ll Carl Bortman Genera 1 Electric (1986)
VT-1. Level 11 VT-2, Level 11 VT-3, Level 11 VT-4, Level ll PT, Level 11 John Filson General Electric (1986)
MT, Level I UT, Level i VT 1, Level 11 Kent Hammond General Electric (1993)
VT 3, Level ll IVVi Qualified PT, Level lli MT, Level 111 Michael Heath General Electric (1986)
Le I lli VT-2, Level lli VT-3, Level til VT-1 Level 11 Vitus Hurtiburt General Electric (1993)
VT-3, Level 11 IVVI Qualified PT, Level il MT, Level 11 UT, Level ll ll Jeffrey Kieffer General Electric (1993)
VT-4, Level 11 EPRI Manual Detection EPRi System 2000 Detection / Analysis PT, Level ll MT, Level 11 Nicholas Labella General Electric (1993)
UT, Level i VT-1, Level ll VT-3, Level 11 l
PT, Level ill UT, Level 111 lll l
Steven Meeker Gemaral Electric (1993)
VT VT-3, Level 111 VT-4, level lil I
~. _. -
I ATTACHMENT 2.1 3/14/96 Page 2 of 3 j
4 j
i Examination Personnel For Examinations I
Outside General Electric RF016 Scope Name Company Certification md Level PT, Level til MT, Level 111 UT, Level ill i
VT-1, Level lil L],"l,I Michael Stamm General Electric r. ' 33) 3 VT-4, Level ill EPRI Manual Detection i
EPRI Manual Sizing IVVI Qualified VT-1, Level il Daniel Thomas General Electric (1993)
VT-3, L evel 11 IVVI Qualified Glenn Alexander NPPD VT-2, level 11 Steve Anderson NPPD VT-2, Level 11 Clinton Bantz NPPD VT-2, Level ll Nathan Beger NPPD VT-2, Level 11 Charles Behr NPPD VT-2, Level 11 Jeffrey Bratrsovsky NPPD VT-2, Lr Kent Chrisp NPPD VT-2, '
, 11 John Collins NPPD VT-2, Level 11 Lee Connor NPPD VT-2, Level 11 Dale Cunningham NPPD VT-2, Level 11 Jeff Domino NPPD VT-2, Level ll Douglas Hakenewerth NPPD VT-2, Level il Jim Hall NPPD VT-2, Level 11 Joe Harpham NPPD VT-2, Level 11 Vince Hartman NPPD VT-2, Level !!
Mark Hendrickson NPPD VT-2, Level 11 Michael Herold NPPD VT-2, Level 11 Bob Nogrefe NPPD VT-2, Level 11 Ron Hoyle NPPD VT-2, Level II Harvey Hyde NPPD VT-2, Level 11 John Kaharra NPPD VT-2, Level 11 Kcith King NPPD VT-2, Level 11
.. ~.....
i ATTACHMENT 2.1 3/14/96 Page 3 of 3
(
Examination Personnel For Examinations Outside General Electric RF016 Scope Name empany Certification and Level Mark Knopik NPPD VT-2, Level II l
Terrance LaPlant NPPD VT-2, Level 11 t
j Todd LaVigne NPPD VT-2, Level li I
Darrell Lisec NPPD VT-2, Level II l
Richard McKay NPPD VT-2, Level 11 Jeff McWilliams NPPD VT-2, Level 11 Todd Mertes NPPD VT-2, Level 11 Timothy Mueller NPPD VT-2, Level 11 Marie Murphy NPPD VT-2, Level 11 Steve Norris NPPD VT-2, Level 11 Rod Pebley NPPD VT-2, Level ll Rod Penfield NPPD VT-2, Level il Gary Perry NPPD VT-2, Level 11 Rob Piveral N"E D VT-2, Level 11 Clint Reeves NPPD VT-2, Level ll Corky Reimers NPPD VT-2, Level 11 Robert Sailors NPPD VT-2, Level 11 Gerard Schmidt NPPD VT-2, Level ll Bill Siske NPPD VT-2, Level ll Tim Slenker NPPD VT-2, Level 11 Dennis Stahlecker NPPD VT-2, Level 11 Kim Sullwold NPPD VT-2, Level ll 1
Rick Tanner NPPD VT 2, Level 11 Paul Tetrick NPPD VT-2, Level 11 Daniel Umschler NPPD VT-2, Level !!
Josh Whister NPPD VT-2, Level ll Keith Williams NPPD VT-2, Level ll Charlie Zable NPPD VT-2, Level 11
I Attachment to NLS960048 - Examination Procedures (GE,3 Pages)
t- '
GE NucI::rEn:rgy ATTACHMENT 3 l
(
PROCEDURE LIST IAR P_BQCEauRE NO. & REV.
TITLE 1
ADM-CNS-1001VO Procedure for Performing Linearity Checks on Ultrasonic l
Revision 0 instruments 2
ADM-CNS-1002VO Procedure for Data Review and Analysis of Recorded Revision 0 Ultrasonic Indications 3
GE-ADM-1005 Procedure for Zero Reference and Data Recording for Version 0 Non-Destructive Examinations 4
ADM-CNS-1006VO Procedure for Compliance with USNRC Regulatory Revision 0 Guideline 1.150 5
GE-ADM-1010 Procedure for Hydrolazing of RPV Nozzles Revision 0 6
ADM-CNS-1011R0 RPV Component Vacuum instructions Revision 0 7
GE-ADM-1016 Operational Guidelines for the Smart 2000 Ultrasonic
(
Version 0 System 8
ADM-CNS-1022VO Procedure for Cooper Shroud Accessibility Study Revision 0 9
MT-CNS-100V1 Procedure for Magnetic Particle Examination Revision 0 (Dry Particle, Color Contrast or Wet Particle, Fluorescent) 10 MT-CNS-100V1 Procedure for Magnetic Particle Examination Revision 1 (Dry Particle, Color Contrast or Wet Particle, Fluorescent) 11 PT-CNS-100V1 Procedure for Color Contrast Liquid Penetrant Revision 0 Examination (Visible Dye, Color Contrast, or Fluorescent) 12 UT-CNS-102V0 Procedure for Manual Ultrasonic Examination of Similar Revision 0 and Dissimilar Metal Piping Welds 13 UT-CNS-104VO Procedure for Manual Ultrasonic Planar Flaw Sizing Revision 0 14 UT-CNS-104VO Procedure for Manual Ultrasonic Planar Flaw Sizing Revision 1 15 UT-CNS-1uSV0 Procedure for Manual Ultrasonic Examination of Dissimilar 1
Revision 0 Metal Nozzle to Safe End Welds Page 1 of 3
- s. $. < '
V GE Nuct=r Energy ATTACHMENT 3
(
PROCEDURE LIST CONT'D IAB PROCEDURE NO. & REV.
TITLE 16 UT-CNS-106VO Procedure for Manual Ultrasonic Examination of Ferritic Revision 0 Piping Welds 17 UT-CNS-106VO Procedure for Manual Ultrasonic Examination of Ferritic Revision 1 Piping Welds 18 GE-UT-207 Procedure for Examination of Automated Planar Haw Version 0 Sizing 19 UT-CNS-208V0 Procedure for Automated Ultrasonic Examination of Revision 0 Similar and Dissimilar Metal Piping Welds 20 UT-CNS-209VO Procedure for Automated Ultraronic Examination of Revision 1 Dissimilar Metal Nozzle to S-Je End Welds 21 UT-CNS-300VO Procedure for Manual Examination of Reactor Pressure Revision 0 Vessel Assembly Welds 22 UT-CNS-301V0 Procedure for Manual Ultrasonic Examination of Pressure Revision 0 Retaining Vessel Welds Less Than 2" In Thickness
(
23 UT-CNS-308V0 Procedure for Manual Examination of the RPV Flange Revision 0 Ligaments 24 UT-CNS-309VO Procedure for Manual Ultrasonic Examination of Planar Revision 0 Flaw Sizing for Nozzle inner Radius and Bore Regions 25 UT-CNS-311VO Procedure for Manual Ultrasonic Examination of Nozzles Revision 0 Inner Radius and Bore 26 UT-CNS-501V2 Procedure for Remote Ultrasonic Examination of Shroud Revision 0 Head Hold Down Bolting 27 UT-CNS-503V4 Procedure for Automated Ultrasonic Examination of the Revision 0 Shroud Assembly Welds 28 UT-CNS-507VO Procedure for Remote Smart UT 2000 Examination of the Revision 0 CS Piping Internal to the RPV 29 UT-CNS-600R0 Procedure for Ultrasonic Thickness Measurements of l
Revision 0 Nuclear Components.
i 30 UT-CNS-603V0 Procedure for Ultrasonic Demonstration Showing Revision 0 Acoustically Similar Material Characteristics
\\
1 Page 2 of 3 l
/. #
GE NucIntEn:rgy ATTACHMENT 3 i
PROCEDURE LIST CONT'D TAB PROCEDURE NO. & REV.
TITLE 31 UT-CNS-702VO Procedure for GERIS 2000 Ultrasonic OD Examination of Revision 0 RPV Assembly Welds 32 UT-CNS-703VO Procedure for the GERIS 2000 Ultrasonic Examination of l
Revision 0 RPV Nozzle Inner Radius and Bore Regions l
l 33 UT-CNS-706VO Procedure for RPV Flaw Sizing with the GERIS 2000 OD Revision 0 System 34 VT-CNS-101VO Procedure font-1' Examination Revision 0 35 VT-CNS-103VO Procedure for VT-3 Examination Revision 0 l
l 36 VT-CNS-104VO Procedure for VT-4 Examination l
Revision 0 37 VT-CNS-201VO Procedure for invessel Visual inspection (IWI) of RPV Revision 0 Core Shroud Welds 38 VT-CNS-202VO Procedure for invessel Visual Inspection (lWI) for BWR 4 Revision 0 Reactor Pressure VesselInternals 39 386HA480 Certification of Non-Destructive Test Personnel Revision 14
- This is a listing of NDE procedures used by GE to perform examinations during RFO16. Copies of these procedures are available and are included in the Final Report for RFO16.
l Page 3 of 3
_. ~....
. ~. - - - -
~.--.-.--.----
l Attachment to NLS960048 l
l l.1 -Examination Procedures l
(NPPD,1 Page) l l
i l
i w
- -.=
l I
l l
i ATTACHMENT 3.1 3H 4/96 Page 1 of 1 l
Procedure List For Examinations Outside General Electric RFOl6 Scope i
l Procedure Number and Revision Title 6.1CS.501, Revisions 1 and 1.1 ASME Section XI Periodic Pressure Test of the Class 2 Core Spray System Loop A 6.2CS.501, Revision 0 ASME Section XI Periodic Pressure Test of the Class 2 Core Spray System Loop B 6.HPCl.501, Revision 0 ASME Section XI Periodic Pressure Test of the Class 2 High Pressure Coolant injection System and Class 3 Emergency Condensate Storage 6.NBl.501 Revision 1 ASME Section XI Periodic Pressure Test of the Class 3 Nuclear Boiler Instrumentation System l
- 6. REC.501, Revision 0 ASME Section XI Periodic Pressure Test of the Class 2&3 Reactor Building Closed l
l Cooling Water (REC) System l
6.RCIC.501, Revision 0 ASME Section XI Periodic Pressure Test of the Class 2 Reactor Cooling isolation Cooling System 6.1RHR.501, Revision 1 ASME Section XI Periodic Pressure Test of the Class 2 Residual Heat Removal System Loop A 6.2RHR.501, Revisions 1 and 1.1 ASME Section XI Periodic Pressure Test of the Class 2 Residual Heat Removal l
System Loop B j
6.1 SW.501, Revision 0.1 ASME Section XI Periodic Pressure Test of the Class 3 Service Water System Loop A 6.2SW.501, Revision 0.2 ASME Section XI Periodic Pressure Test of the Class 3 Service Water System LoopB
)
7.0.8, Revision 8 Pressure Testing Special Procedure 95-128, Revision 0 ASME CLASS 1 Hydrostatic Pressure Test G"
tnc ocedure IP-W12, e is n
( gg Liquid Penetrant Examination of Nuclear Power Plant Components General Electric Procedure GE-VT-100, Revision 0 with FRRs 91-29 and 91-36 Procedure for VT-3 Examination l
(1993)
)
General Electric Procedure VT-06, Procedure for Cooper Nuclear Station Reactor Pressure Vessel (RPV) Internals Revision 0 with FRR 93-05 (1993)
Invessel Visual Inspection (IVVI) l 1
I
Attachment to NLS960048 - Equipment and Materials (GE,3 Pages) 4
i j
ATTACHMENT 4 l
g Approved Equipment and Materials List -Inservice inspection Cooper Nuclear Station Unit 1 RFO16 Fall 1995 Type Manufacturer /
Serial Number Size Frequency Cat Date Cai Due Date Model (MHz)
Scopes Krautkramer 27276-4946 L-002 8/31/95 8/30/96 USK7 Krautkramer 27276-4646 L-001 2/9/95 2/8/96 USK7
)
Staveley 7711 L-003 8/16/95 8/15/96 Sonic 136 Staveley 786 J L-004 8/16/95 8/15/96 Sonic 136 Staveley 689 H _,
L OO5 9/28/95 9/27/96 Sonic 136 Staveley 909 K L-008 8/31/95 8/30/96 Sonic 136 Staveley 1152M L 007 3/28/95 3/28/96 136 Plus Staveley 136P991A091220 L-OO6 8/31/95 8/31/96 Sonic 136 Staveley 709 H L 011 8/16/95 8/16/96 i
Sonic 136 Tecred TTS10091108 L 009 1/25/95 1/24/96 Tomoscan Thermometers PTC 149673 4/4/95 4/4/96 PTC 149699 4/4/95 4/4/96 PTC 154776 8/25/95 8/25/96 PTC 154784 8/25/95 8/25/96 PTC 154788 8/25/95 8/25/96
)
PTC 154821 8/25/95 8/25/96 PTC 154839 8/25/95 8/25/96 PTC 154999 8/25/95 8/25/96 i
PTC 155007 8/25/95 8/25/96 PTC 155008 8/25/95 8/25/96 PTC 155028 8/25/95 8/25/96 l
PTC 155029 8/25/95 8/25/96 PTC 154835 8/25/95 8/25/96 PTC 155003 8/25/95 8/25/96 PTC 154596 8/25/95 8/25/96 PTC 154994 8/25/95 8/25/96 Reference Biks CAL-i!W2-013 CS CAL-OPTH 034 SS CAL-RHOM401 CS CAL-RHOM 011 SS CAL-RHOM-024 SS CAL-RHOM-026 CS CAL-RHOM-031 CS CAL-STEP-005 CS CAL-STEP-018 SS CAL STEP-036 SS CAL STEP-039 SS CAL STEP-079 CS CAL-STEP-081 CS CAL-WLLY-023 SS Page 1 of 3 12/12/95 EPIP_lSI.XLS
[
ATTACHMENT 4 1
Apprsvad Equipm:nt and Mat:rirla LIIt -Intervics inspection Cooper Nuclear Station Unit 1 l
RFO16 Fall 1995 I
i Type Manufacturer /
Serial Number Size Frequency Cal Date Cat Due Date Model (MHz)
Transducers Staveley Harisonic H9080 2(.25x.50)in 3.50 Staveley Harisonic H9076 2(.25x 50)in 3.50 Staveley Harisonic H9083 2(.25x.50)in 3.50 KBA 00864 2(.433")
2.00 KBA
.00984 2(3.5X10)mm 4.00 KBA 01113 2(.43x.22)in 2.00 KBA 00884 2(.433")
2.00 KBA B21400
.25" 2.25 KBA K10845
.25" 2.25 KBA A23028
.25" 2.25 KBA B03420
.25" 2.25 L
KBA C15962
.2 5" 2.25 KBA D19642
.25"
'2.25 KBA LO5759
.25*
2.25 KBA 016543
.25" 2.26 KBA B24674
.25" 5.00 KBA F12230
.375" 2.25 KBA D02326
.375" 10.0 KBA C17412
.50" 1.50 KBA F18618
.50" 1.50 KBA K10903
.50" 1.50 l
KBA L29936
.50" 2.25 KBA C28414
.50*
2.25 KBA M17325
.50" 2.25 KBA G28248
.50" 2.25 KBA M19401
.50" 2.25
(
KBA F26268
.50*
2.25 l
KBA C29407
.50" 2.25 KBA G12404
.50*
2.25 l
KBA B30601
.50" 5.00 KBA 028733
.25" 5.00 l
KBA 001349
.50" 10.0
(
KBA J01201 1.0" 2.25 KBA E13607 1.0" 2.25 Megasonics D0422
.250" 5.00 Megasonics E1166
.250" 5.00 l
Megasonics E1173
.250" 5.00 l
Megasonics 00915
.375" 2.25 j
Megasonics D0217
.375" 2.25 Megasonics D0916
.375" 2.25 Megasonics F0977
.375" 2.25 Megasonics F0976
.375*
2.25 l
Megasonics 91038
.375" 2.25 Megasonics D0914
.375" 5.00 Megasonics DO913
.375" 5.00 Megasonics E0581
.375" 5.00 Megasonics E0585
.375" 5.00 Megasonics A0870 2(.25")
4.00 Megasonics E0578
.375" 5 00 Panametrics 92 897 2(18x10)mm 2.00 Panametrics93-858 218.0x7.5)mm 3.00 RTD 92-899 2(6x18)mm 2.00 RTD 92 344 2(10x18)mm 2.00 RTD 88 275 2(10x18)mm 2.00 i
RTD 92 704 2(6x13)mm 4.00 RTD 94 706 2(8x14)mm 2.00 RTD 94 713 2(8x14}mm 2.00 f(
RTD 94 730 2(/X12)mm 2.00 HTD 91 314 2(10x18)mm 2.00 Page 2 of 3 12/12/95 EPIP_tSI.XLS l
lE
ATTACHMENT 4 Approvad Equipmsnt and Mitsrirla List -In2srvico insp:ction Cooper Nuclear Station Unit 1 RFO16 Fall 1995
(
Type Manufacturer /
Serial Number Size Frequency Cal Date Col Due Date Model (MHz)
Couplant Sonotech 94165 Humex Sonotech 93865 Humex Sonotech 92265A Humex KBA 09285301 Exosen KBA 08235301 l
Exosen
- All Couplant is furnished by the customer.
j MT Equipment Parker Research Lot 04 TB-10 CAL-10MT-003 i
l Radiometer Spectronics 412304 8/11/95 2/11/96 DSE-100X Sensor Spectronics 412264 8/11/95 2/11/96 DIX-365 l
Probes Parker 4793 8/8/95 2/8/90
(
B-300 PAR-ACMT 015 i
Parker 5501 8/8/95 2/8/96 I
(
B-300 PAR-ACMT-028 Parker
$502 8/8/95 2/8/96 B-300 PAR-ACMT-030 Mag Powder Magnaflux 92C055 8A Red Magnaflux 92G022
- 1 Gray Mag Bath Magnagio 938034 14AM
- All Mag powder and Prepared Bath is fumished by the l
customer.
l i
f PT Equipment Magnaflux Cleaner 93A05K SKC-S Magnaflux Cleaner 93LO1K SKC-S I
Magnaflux Pen.
93A02K SKL-SP Magnaflux Dev.
93A03P SKD-S2
- All PT materialis furnished by the customer.
This is a listing of materials and equipment used by GE personnel to perform the examinations and inspections during RFO16. The records and certifications are available and are included in the
]
l Final Report for RFO16 Page 3 of 3 12/12/95 EPIP_lSI.XLS 1
l l
=. - _.
~
Attachment to NLS960048 i
i 4
t i
4.1 - Equipment and Materials (NPPD,1 Page)
ATTACHMENT 4.1 3/14/96 Ps0e 1 of 1
(
Materials List For Examinations Outside General Electric RFOl6 Scope Type Manufacturer Batch Number j
PT Equipment (1986)
Magnaflux Cleaner - SKC-NF/1C-78 85LO22
)
Magnaflux Penetrant - SKL-HF/S 83C046 Magnaflux Developer - SKD-NF 82E109 l
I l
I i
l l'
l
)
Attachment to NLS960048 - Ultrasonic Calibration Standards (GE)
ATTACHMENT 5 ULTRASONIC CAUBRATION STANDARDS USED BV GE DURING ISI EXAMINATIONS DURING RF016 CAL I
NOMINAL MATERIAL SNDENTIF6 CAT 10N NEAT i
STD NO.
SIZE SCHEDULE THICKNESS TYPE STAMP NO. -
i
{
2 4
100
.531' P1 CNS GE-4144C L45042 15 RPV N/A 4 000" N/A CNS. CAL.STD.HO.15 C-2274-1 l
16 HPV N/A 7.100*
N/A CNS CAL.STD.HO.16 C 2274-1 18 4
160
.531' P12 CNS-GE4160 SS M2857 20 6
160
.700" RPV1/P18 CRD CAP 15342/NX8608 I
40 46 N/A
.750' P1 CNS. CAL.STD.NO.40 J21586 42.
8 80
.500" P1 CNS.CALSTD.NO.42 N98280 48 0
80
.432" P20 CNS484-80.SS D411303 49 10 80 593*
P20 CNS-49-1484SS D460703 50 12 80
.687*
P20 CNS-541240 SS D431804 52 14 140 1.280" P20 CNS-5214-144SS D421504 i
53 20 80 1.030" P20 CNS-5420-80-SS D421504
$5 24 80 1.218" P20 CNS 55-2444SS D421504 l
I 56 26 NIA 1.250" P20 CNS-5428-1.25-SS D421504 73 8
100
.593" Pi CNS-73-8-1004S 21285 t
77 10 100
.718' P1 CNS-7710.719 44581 1
79 10 80
.718" P2 CNS 79-10.631 51075 83 12 120 1.000" P2 CNS44121.00 7LO49 89 14 100
.938" P1 CNS-8414-100.CS N08190 1
97 18 160 1.781*
P1 CNS-9718-164CS 651695 102 20 40
.594*
P1 CNS-102-2040 CS 651314 103 20 80 1.031*
P1 CNS-103-2040-CS 953042 104 24 30
.562" P1 CNS-104-24-30-CS 54t702 106 24 80 1.218*
P1 CNS-1042440-CS 652031 108 9
N/A 1.575*
F27 CNS 108-9.1.574SS 1G5038 110 4
4
.337' F27 CNS-113-4 84SS DCN 113 24" N/A 1.063*
P2 CNS-113-24-1.063 L25740 5
115 24 N/A 1.593*
P3 CNS-115-24-1.593 KSSI 120 N/A N/A 13 0" INC 12D4724 NX5561 l
121 12 N/A 1.300" (NC GEINC182SENOZNO.001 N/A 122 3
STD
.216" P1 CNS 122 3.214CS L42671 123 2.5 STD 203-P1 CNS-123 2.5 203 CS N07998 i
124 12 80
.688*
P1 CNS-124-12.688-CS 30417 126 6
STD
.280" P1 CNS-1246.280-CS 405000 127 4
40
.237" P1 CNS-1274.237 CS N/A 128 8
40
.322" P1 CNS-1248.322 CS N/A 129 to 40
.365" P1 CNS-12410.365-CS N/A 130 12 STD
.375*
P1 CNS-13412.374CS MIA 131 14 30
.375*
P1 CNS-131 14.375-CS N/A 132 16 40
.500" P1 CNS-13216.504CS N/A 133 20 20
.375*
80
.432' P2 CNS-135-6. 432CS N/A 136 Ft.A7 N/A 1.750" RMKS CNS-136-48-1750-CS N/A 137 FLAT N/A 1.5" 304L CAL.SHRD-017 3Y167 138 14 30 375*
N/A IE-48 N/A 1
i l
I Page 1 of 1 THE ABOVE USTED CAUBRATION STANDARDS WERE FURNISHED AND OR APPROVED BY NPPD COOPER STATION CAL _STD.XLS j
12/12/95
Attachment to NLS960048 i
l i
NIS-2 Form and Summary Table (NPPD,13 Pages)
FORM NIS-2 OWNER'S REPORT FOR REPAIRS OR REPLACEMENTS As required by the Provisi:ns cf the ASME Ccde Sectim XI 1.
Owner N,br==b= TMhli, Dnu.c ni=h4c+
Date F,hniarv 100A TO hv OR Rrnumt411, Mehrmake AR171 Sheet I of 11 2.
Plant ennnar M",1aar R'a'ian Unit nn, TO hv QR nrnumt411, M,hrnekn AR171 N/A I
I Repasr Orsanizanon, P.O. No., Job No., etc.
3.
Work Performed by Mppn Type Code Symbol Stamp N/A Authorization No.
N/A l
p n h v oR nrnue,14il, u,hr..k. ARi?1 Expiration Date N/A 4.
Iderdfication of System
^ = =hnum in +h, ^ *+=rk,A Taki, l
S.
(a) Applicable Construction Code
^ = hnum in th, Attach,A Tahi, i
(b) Applicable Edition of Section XI Utilized for Repairs or Replacements: t oRn FAhinn Winter 10R1 A AAenam j
6.
Identification of Components Repaired or Replaced and Replacement Components: Rhnum an ^+tark,a Tahl, l
7.
Description of Work ^ = <hnum in th, ^'tarF ra Tahl, 8.
Tests Conducted:
^ = Rhnu n in th, ^ach-A Tahl, 9.
Remarks Th, rntinu4ngena, c..,. ii.',a in th, g,,nna T,n.ynor interv.1 prnorom u.,r, ne,a rne r, noir ona renlocom,nt.
N489, N-416, N.448, and N-449. The deferred hydrostatic test of Class 1 RWCU piping installed per DC 89-256 in 1990 was also performed during this outage.
CERTIFICATE OF COMPLIANCE We certify that the statements made in this report are correct and these repairs and replacements conform to the rules of the ASME Code,Section XI.
Type Code Symbol Stamp N/A Certificate of Authonzation No.
N/A Expiration Date N/A b20Ob Signed Date g 3 w or w.oe nce. we
(
)
V CERTIFICATE OF INSERVICE INSPECTION I, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the State of Nebraska and Employed by llartford Steam Boiler Inspection and Insurance Company ofIlartford, Connecticut have inspected the components described in this Owner's Report during the period September 1,1993 to December 30,1995, and state that to the best of my knowledge and belief, the Owner has performed examinations and taken corrective measures described in this Owner's Report in accordance with the requirements of the ASME Code,Section XI.
By signing this certificate neither the Inspector nor his employer makes any warranty, expressed or implied, concemmg the examinations and corrective measures described in this Owners's Report. Furthermore, neither the Inspector nor his employer shall be liable in any manner for any personal injury or property damage or a loss of any kind arising from or connected with this inspection.
b!bSNkA AlS'l$Yl VYk f
- 71 Commissions Inspectos's S' e'
Natu4al Board, State, Province, and Endorsementa f
Date
-.._...___.~.-._..m__
COOPER NUCLEAR STATION OWNER'S REPORT FOR REPAIRS AND REPLACEMENTS-1995 REFUELING OUTAGE Work Name ofComponent Sys.
Cl Name of Mfgr.
Nat'l Description of Work Applicable Year Repaimi ASME Pressure Document Manufacturer Serial Board Construction Built or Code Tests I
(MWR)
No.
No.
Code Replaced Stamp Conducted 93-1843 PC-V-400 PC 2
Dresser N/A N/A Replaced Valve B31.7-l%9 1992 Replace i No liydro 93-2505 MS-V-105 MS 1
RockwellInt.
N/A N/A Replami Valve and B31.7-l%9 1982 Replaced No liydro Studs j
93-3623 IIPCI-MOV-MO20 IIPCI 2
Anchor-Darling 7617-69 N/A Machine Bonnet B16.5-l%8 1974 Repaired No leak Test
[
93-4521 CS-MOV-MO5B CS 2
Anchor-Darling 8577 N/A Replaced Stem B16.5-l%8 1974 Replaced No leak Test 94-1016 RCIC-MOV-MOl6 RCIC 1
Anchor-Darling N/A N/A Replaced Valve B31.7-l%9 1988 Replaced No flydro r
94-1229 NB-VES-RPV NB 1
Combustion CE66106 20762 Repaired Steam Cut III 1%9 1974 Repaired Yes liydro Engineenng 94-1335 IIPCI-IIOV-HOV10 IIPCI 2
Schutte &
N67441 N/A Replaced Valw Stem B16.5-l%8 1974 Replaced No leak Test Koerting 94-1537 SW-AOV-850AV SW 3
Ilills-McCanna N/A N/A Replaced Vr.lve B31.7-l%9 1992 Replami No liydro l
94-1634 MS-SNUB-BS-Sl(BR)
MS I
PSA 353 N/A Replaced Snubber B31.7-l%9 1974 Replaced No N/A 94-1983 CS Pump Suction Piping CS 2
Jelco N/A N/A Replaced Studs and y R16.5-l%8 1974 Replaced No leak Test Nuts 94-1983 CS-A Spool Piece CS 2
NPPD N/A N/A Replaced Studs &
B31.7-l%9 1994 Replaced No I.eak Test Nuts 94-1984 CS-B Spool Piece CS 2
NPPD N/A N/A Replaced Studs &
B31.7-l%9 1994 Replaced No leak Test Nuts 94-2362 RF-CV-15CV RF 1
Ancher-Darling N/A N/A Repair Steam Cut B16.5-l%8 1974 Repaired No Leak Test 94-2475 RHR-RV-11RV RIIR 2
Crosby 2115 N/A Replaced 2 Nuts B31.7-l%9 1974 Replaced No Leak Test j
94-2711 PENE-X-218 PC 2
CBal N/A N/A Replaced Cap B31.7-l%9 1974 Replami No Leak Test 94-3040 PENE-X-45A PC 2
CB&I N/A N/A Replaced Flange B31.7-l%9 1974 Replami No leak Test i
i
(
94-3041 RW-FLG-PEN 43 RW 2
CBal N/A N/A Replaced Flanges, B31.7-l%9 1974 Replaced No leak Test i
RW-FLG-PEN 44 Studs and Nuts i
i Page 2 of 13 f
l l
i COOPER NUCLEAR STATION OWNER'S REPORT FOR REPAIRS AND REPLACEMENTS-1995 REFUELING OUTAGE Work Name of Component Sys.
Cl Name of Mfgr.
Nat'l Description of Work Applicable Year Repaved ASME Pressure Document Manufacturer Serial Board Construction Built or Code Tests (MWR)
No.
No.
Code Replaced Stamp Conducted l
t 94-3131 SA-V-647/648 SA 2
Rockwell CEO23 N/A Replaced Check B31.7-l%9 1992 Replacal No liydro Valves t
I 94-3131 IA-CV-78CV IA 2
Anderson-N28777 N/A Replaced Check B31.7-l%9 1995 Replaced No Ilydro Greenwood Valves 94-3264 PC-PENT-X44 PC 2
CB&l N/A N/A Repair Weld B31.7-l%9 1974 Repaired No Hydro i
t 94-3265 DW-PENT-X20 DW 2
CB&I N/A N/A Repair Weld B31.7-l%9 1974 Repaired No liydro j
94-3266 RW-PENT-X18 RW 2
CB&I N/A N/A Repair Weld B31.7-l%9 1974 Repaired No Hydro I
94-3319 RIIR-MOV-MO39B RIIR 2
Anchor-Darling 7708-69 N/A Lapped Seat, Replaced B16.5-l%8 1974 Replaced No leak Test Disc & Studs l
94-3382 NM-PENF-X35A NM 2
CBal N/A N/A Replaced Flange III-l%5 1974 Replaced No Leak Test l
94-3383 NM-PENT-X35B NM 2
CB&I N/A N/A Replaced Flange 111-l % 5 1974 Replaced No leak Test 94-3384 NM-PENT-X35C NM 2
CB&I N/A N/A Replaced Flange 111-l % 5 1974 Replaced No Leak Test 94-3385 NM-PENT-X35D NM 2
CB&I N/A N/A Replaced Flange III-l%5 1974 Replaced No Leak Test 94-3386 NM-PENT-X35E NM 2
CBal N/A N/A Replaced Flange 111-l % 5 1974 Replaced No Leak Test 94-3400 PC-PENF-X19 PC 2
CB&l N/A N/A Replaced Pup Piece B31.7-l%9 1974 Replaced No flydro 94-4787 MS-IINGR-S75 MS 1
ITF Grmnell N/A N/A Replaced Jam Nut B31.7-l%9 1974 Replacal No N/A 94-5076 MS-SNUB-VR-S62B MS I
PSA 403 N/A Replaced Snubber B31.7-l%9 1974 Replaced No N/A 94-5078 PC-SNUB-PV-SI AB PC 2
PSA 393 N/A Replaced Snubber B31.7-l%9 1974 Replaced No N/A j
94-5079 MS-SNUB-VR-S8 MS I
PSA 471 N/A Replaced Snubber B31.7-l%9 1974 Replaced No N/A 94-5080 RF-SNUB-RF-S19 RF 1
PSA 416 N/A Replaud Snubber B31.7-l%9 1974 Replaced No N/A l
94-5081 RWCU-SNUB-CU-S3B RWCU 1
PSA 455 N/A Replaced Snubber B31.7-l%9 1974 Replaced No N/A l
94-5082 MS-SNUB-VR-S31 MS 3
PSA 25256 N/A Replaced snubber B31.7-l%9 1974 Replaced No N/A l 94-5083 RIIR-SNUB-RII-S29 RilR 2
PSA 398 N/A Replaced Snubber B31.7-l%9 1974 Replaced No N/A Page 3 of13
COOPER NUCLEAR STATION OWNER'S REPORT FOR REPAIRS AND REPLACEMENTS-1995 REFUELING OUTAGE Work Name ofComponent Sys.
Cl Name of Mfgr.
Nat1 Description of Work Applicable Year Repaned ASME Pressure Deument Manufacturer Serial Board Construction Built or Code Tests (MWR)
No.
No.
Code Replaced Stamp Conducted 94-5098 CS-SNUB-CS-S3 CS 2
PSA 7784 N/A Replaced Snubber B31.7-l%9 1974 Replaced No N/A 94-5099 MS-SNUB-VR-S19 MS 3
PSA 7778 N/A Replaad Snubber B31.7-l%9 1974 Replaced No N/A 94-5100 RIIR-SNUB-Ril-S22 RIIR 2
PSA 7734 N/A Replaced Snubber B31.7-l%9 1974 Replaced No N/A 94-3101 MS-SNUB-VR-S70A MS 3
PSA 399 N/A Replaced Snubber B31.7-l%9 1974 Replamd No N/A 94-5102 MS-SNUtl-VR-59-7-X MS 3
PSA 475 N/A Replaced Snubber B31.7-l%9 1974 Replaced No N/A 94-5103 MS-SNUB-VR-S85 MS 3
PSA 4883 N/A Replaced Snubber B31.7-l%9 1974 Replaced No N/A 94-5104 MS-SNUB-VR-S2 MS 3
PSA 7804 N/A Replaced Snubber B31.7-l%9 1974 Replaced No N/A 94-5105 RR-SNUB-SS-3A2 RR 1
PSA 355 N/A Replaced Snubber B31.7-l%9 1974 Replaced No N/A 94-5109 MS-SNUB-VR-SSI MS 3
PSA 547 N/A Replaced Snubber B31.7-l%9 1974 Replaced No N/A 94-5111 RII-SNUB-RII-S68 RIIR 1
PSA l
417 N/A Replaced Snubber B31.7-l%9 1974 Replaced No N/A 94-5112 RR-SNUB-VR-SS-2B RR 1
PSA 12444 N/A Replaced Snubber B31.7-l%9 1974 Replaced No N/A 94-5113 MS-SNUB-VR-S7A MS 3
PSA 34i N/A Replaced Snubber B31.7-l%9 1974 Replaced No N/A 94-5121 RF-CV-14CV RF 1
Anchor-Darling N/A N/A Replaced Ilinge Pin B16.5-1968 1974 Replaced No Leak Test Cover & 8 Nuts l
r 94-5124 1IPCI-CV-15CV HPCI 2
Anchor-Darling N/A N/A Replace Bonnet Stud B16.5-1968 1974 Repaired No Leak Test
& Machined Disc Stud Replaced
[
94-5230 IIPCI-SNUB-HP-SIS IIPCI 2
PSA 10058 N/A Replaced Snubber B31.7-l%9 1974 Replaced No N/A f
94-5349 RR-SNUB-SS-SA RR 1
PSA 12645 N/A Replaced Snubber B31.7-l%9 1974 Replaced No N/A f
94-5359 RR-SNUB-VR-S5B RR 1
PSA 13063 N/A Replaced Snubber B31.7-l%9 1974 Replaced No N/A 94-5622 RCIC-MOV-MOl31 RCIC 2
Anchor-Darling 7621-69 N/A Machine Disc B16.5.1968 1974 Repaired No Leak Test 94-5775 CS-SNUB-CS-Si l CS 1
ITT Gnnnell 7731 N/A Replaced Snubber B31.7-l%9 1974 Replaced No N/A 94-5925 RIIR-FLG-15RV RHR 2
NPPD N/A N/A Installed Testable B31.7-l%9 1974 Replaced No llydro Flange i
l Page 4 of13
1 I
COOPER NUCLEAR STATION OWNER'S REPORT FOR REPAIRS AND REPLACEMENTS-1995 REFUELING OUTAGE Work Name ofComponent Sys.
Cl Name of Mfgr.
Nat'l Description ofWork Applicable Year Repaired ASME Pressure i
Document Manufacturer Serial Board Construction Built or Code Tests (MWR)
No.
No.
Code Renlaced Stamp Conducted 94-5926 RilR-RV-15RV RIIR 2
Consolidated N/A N/A Replaced Valve B31.7-l%9 1991 Replaced No Imk Test Safety Valve 94 4 172 RIIR-SNUB-Ril-S3A RIIR 2
PSA 13795 N/A Replaced Snubber B31.7-l%9 1974 Replaced No N/A 94 4 439 CS-CV-18CV CS 1
Atwood-Morrill N/A N/A Install LLRT Test B31.7-l%9 1974 Replamd No Imk Test l
, CS-CV-19CV Connections per l
DC-94-330 94-6446 CS-RO-29A CS 2
NPPD N/A N/A Replaced Restricting B31.7-l%9 1994 Replaced No Imk Test CS-RO-29B Orifices and Modified CS-IINGR-II29A Supports per DC CS-IINGR-Il7A 046 i
r CS-IINGR-lil3 CS-IINGR-II9A CS-IINGR-VE6 CS-IINGR-VE7 CS-IINGR-VE3 CS-IINGR-II35A CS-SNUB-SI-B&R 94-6498 MS-RV-71ARV MS 1
Target Rock 379 N/A Replaced Studs 1I1-1970 1974 Replaced No Leak Test t
94-6499 MS-RV-7IBRV MS 1
Target Rock 380 N/A Replaced outlet studs III-1970 1974 Replaced No Imk Test t
& nuts 9A4500 MS-RV-71CRV MS I
Target Rock 383 N/A Replaced valve with 111-1970 1974 Replaced No Leak Test l
S/N 385,2 inlet studs
& 4 nuts, and outlet i
studs & nuts i
94-6501 MS-RV-71DRV MS 1
Target Rock 387 N/A Replaced pilot disc,4 111-1970 1974 Replaced No Leak Test i
inlet nuts, and outlet studs & nuts 94-6502 MS-RV-71ERV MS 1
Target Rock 386 N/A Replaced valve with III-1970 1974 Replaced No Leak Test S/N 3787,2 inlet studs
& 5 nuts, and outlet studs & nuts Page 5 of13
COOPER NUCLEAR STATION OWNER'S REPORT FOR REPAIRS AND REPLACEMENTS-1995 REFUELING OUTAGE Work Name of Component Sys.
Cl Name of Mfgr.
Nat'l Description of Work Applicable Year Repaired ASME Pressure Document Manufacturer Seriel Board Construction Built or Code Tests (MWR)
No.
No.
Code Replaced Stamp Conducted 94-6503 MS-RV-71FRV MS I
Target Rock 381 N/A Replaced pilot disc,4 III-1970 1974 Replaced No Imk Test inlet nuts, and outlet studs & nuts 94-6504 MS-RV-7IGRV MS 1
Target Rock 382 N/A Replaced valve with III-1970 1974 Replaced No Leak Test S/N 376,12 inlet studs
& 24 nuts, and outlet studs & nuts 94-6505 MS-RV-711RV MS 1
Target Rock 385 N/A Replaced valve with Ill-1970 1974 Replaced No leak Test S/N 378,7 inlet nuts, outlet studs & nuts 94-6546 RHR-CV-13CV RIR 2
Anchor-Darling N/A N/A Replaced Hinge B16.5-1968 1974 Replaced No Leak Test 94-6547 MS-MOV-MO77 MS 1
Anchor-Darling N/A N/A Relace and Relocate B31.7-l%9 1974 Replaced No flydro Valve per DC-94-029 94-6548 RIR-RV-19RV RIIR 2
Consolidated TC80935 N/A Replaced 1 Stud B31.7-l%9 1974 Replaced No leak Test Safety Vahe 94-6684 SLC-SQBV-14A SLC 2
Conax Corp.
529 N/A Replaced Vahes B31.7-l%9 1995 Replaced No 1xak Test SLC-SQBV-14B
$38 94-6883 RIR-RV-18RV RIIP 2
Consolidated TC80936 N/A Replaced Studs B31.7-l%9 1974 Replaced No leak Test
, safety Vahe 94-6885 CS-MOV-MOSA CS 2
Anchor-Darling N/A N/A Replaced Valve B31.7-l%9 1987 Replaad No llydro 94-6985 CS-MOV-MO26B CS 2
Anchor-Darling 7729 N/A Machined Dise B16.5-l%8 1974 Repaired No leak Test 95-0306 MS-RV-71 SPARE MS I
Target Rock 383 N/A Replaced 1 Bolt B16.5-l%8 1974 Replaced No Deferred 95-0318 CRD-ACC-1:X50-31)
CRD 2
GE N/A N/A Replaced Aa:umulator Vill-1992 1992 Replaced Yes leak Test 95-0319 CRD-ACC-125(14-11)
CRD 2
GE N/A N/A Replaced Accumulator VIII-1992 1992 Replaced Yes leak Test 95-0443 CRD-ACC-125(46-15)
CRD 2
GE N/A N/A Replaced Accumulator VIII-1992 1992 Replaced Yes Leak Test 95-0547 CRD-ACC-125(38-35)
CRD 2
GE N/A N/A Replaced Accumulator VIII-1992 1992 Replaad Yes Leak Test 95-0555 MS-CV-30CV MS 3
GPE Controls N/A N/A Replaced Vahe 111-1978 1978 Replaced No Leak Test Page 6 of 13
COOPER NUCLEAR STATION OWNER'S REPORT FOR REPAIRS AND REPLACEMENTS-1995 REFUELING OUTAGE Work Name ofComponent Sys.
Cl Name of Mfgr.
Nat'l Description of Work Applicable Year Repaimi ASME Pressure Document Manufacturer Serial Board Constructen Buik or Code Tests (MWR)
No.
No.
Code Replaced Stamp Conducted 95-0623 MS-CV-30CV MS 3
GPE Controls N/A N/A Replami Valw 111-1978 1978 Replaced No ImkTest 95-0708 MS-CV-29CV MS 3
Anderson-N/A N/A Replaced Valve with 111-1992 1992 Replaced No leak Test MS-CV-30CV Greenwood New Model 95-0742 REC-HX-A REC 3
SWECO 27030 N/A Replaced Studs VIII-1968 1974 Replaced Yes Leak Test 95-0744 SW-P-C SW 3
Byron-Jackson N/A N/A Replaced Bowl B31-7-l%9 1974 Replaced No leak Test Assembly 95-0875 SW-V-91 SW 3
IIenry Pratt N/A N/A Replaced Valw &
B31.7-l%9 1974 Replaced No IIydro Studs 95-1074 SW-P-C SW 3
Byron-Jackson N/A N/A Replaced Sole Plate to B31.7-1%9 1974 Replami No Leak Test Discharge Head Studs 95-1218 CS-IINGR-MISC CS 2
flT Grinnell N/A N/A Replaced U-bolt B31.7-l%9 1974 Replaced No N/A 95-1469 RWCU-CV-15CV RWCU 1
Anchor-Darling E9769-3 N/A Replaced Valve B31.7-l%9 1994 Replaced No Hydro 95-1488 MS-SNUB-VR-S20 MS 3
PSA 336 N/A Replaced Snubber B31.7-l%9 1974 Replaced No N/A g
95-1489 MS-SNUB-VR-S80 MS 3
PSA 12982 N/A Replaced Snubber B31.7-1%9 1974 Replaced No N/A 95-1490 MS-SNUB-VR-S73 MS 3
PSA 13064 N/A Replaced Snubber B31.7-l%9 1974 Replaced No N/A 95-1491 MS-SNUB-VR-SSA MS 3
PSA 10797 N/A Replaced Snubber B31.7-l%9 1974 Replaced No N/A 95-1492 RR-SNUB-SS-3Al MS 1
PSA 6877 N/A Replaced Snubber B31.7-l%9 1974 Replaced No N/A l
95-1494 RIIR-SNUB-RII-S98 RilR 2
PSA 7768 N/A Replaced Snubber for B31.7-l%9 1974 Replaced No N/A Testing 95-1495 RHR-SNUB-RH-S24 RHR 2
PSA 8187 N/A Replaced Snubber for B31.7-l%9 1974 Replaced No N/A Testing j
95-1496 RHR-SNUB-RH-S55 RilR 2
PSA 8119 N/A Replaced Snubber for B31.7-l%9 1974 Replaced No N/A
[
Testing 95-1544 MS-SNUB-VR-S43 MS 3
PSA 30546 N/A Replaced Snubber B31.7-l%9 1974 Replaced No N/A 95-1545 RWCU-SNUB-CU-S3A RWCU 1
PSA 460 N/A Replaced Snubber B31.7-l%9 1974 Replaced No N/A l
Page 7 of 13
i f
COOPER NUCLEAR STATION OWNER'S REPORT FOR REPAIRS AND REPLACEMENTS-1995 REFUELING OUTAGE i
i Work Name ofComponent Sys.
Cl Name of Mfgr.
Nat'l Description of Work Applicable Year Repaired ASME Pressure Document Manufacturer Serial Board Construction Built or Code Tests (MWR)
No.
No.
Code Replaced Stamp Conducted 95-1546 MS-SNUB-VR-S83B MS 3
PSA 17201 N/A Replaced Snubber B31.7-l%9 1974 Replaced No N/A 95-1547 MS-SNUB-VR-62-17-X MS 3
PSA 5219 N/A Replaced Snubber B31.7-l%9 1974 Replaced No N/A 95-1548 MS-SNUB-VR-S74 MS 3
PSA 463M N/A Replaced Snubber B31.7-l%9 1974 Replaced No N/A 95-1549 MS-SNUB-VR-S24A MS 3
PSA 456M N/A Replaced Snubber B31.7-l%9 1974 Replaced No N/A 95-1550 MS-SNUB-VR-S24B MS 3
$891 N/A Replaced Snubber B31.7-l%9 1974 Replaced No N/A 95-1551 MS-SNUB-VR-S23B MS 3
PSA 455M N/A Replaced Snubber B31.7-l%9 1974 Replaced No N/A 95-1552 MS-SNUB-VR-H62C MS 3
PSA 410 N/A Replaced Snubber B31.7-l%9 1974 Replaced No N/A 95-1553 MS-SNUB-VR-56-12-Y MS 3
PSA 5897 N/A Replaced Snubber B31.7-l%9 1974 Replaced No N/A l
I 95-1554 MS-SNUB-VR-S42A MS 3
PSA 17207 N/A Replaced Snubber B31.7-l%9 1974 Replaced No N/A 95-1555 MS-SNUB-VR-II63C MS 3
PSA 17199 N/A Replaced Snubber B31.7-l%9 1974 Replaced No N/A j
95-1556 PC-SNUB-PV-SI AA pc 2
PSA 15142 N/A Replaced Snubber B31.7-l%9 1974 Replaced No N/A
[
f f
95-1557 RF-SNUB-RF-58 RF 1
PSA 17206 N/A Replaced Snubber B31.7-l%9 1974 Replaced No N/A 95-1558 RilR-SNUB-Ril-S69A RIIR 1
PSA 6995 N/A Replaced Snubber B31.7-l%9 1974 Replaced No N/A l
L 95-1667 MS-SNUB-VR-S23A MS 3
PSA 5900 N/A Replaced Snubber B31.7-l%9 1974 Replaced No N/A 95-1682 REC-IIX-B REC 3
SWECO 27030 N/A Tube Plugging XI-1980 1974 Repaired No Leak Test 95-1683 REC-IIX-A REC 3
SWECO 27031 N/A Tube Plugging XI-1980 1974 Repaired No leak Test j
l 95-2010 RF-CV-13CV RF 1
Anchor-Darling N/A N/A Replaced flinge Pin B16.5-1968 1974 Replaad No flydro Cowrs l
[
95-2012 RF-CV-15CV RF 1
Anchor-Darling N/A N/A Replaced flinge Pm B16.5-l%8 1974 Replaced No liydro Covers 95-2013 RF-CV-16CV RF 1
Anchor-Darling N/A N/A Replaced Ilinge Pia B16.5-1968 1974 Replaced No liydro Covers, Machmed Seal Ring Mating Surface Page8 of13
COOPER NUCLEAR STATION OWNER'S REPORT FOR REPAIRS AND REPLACEMENTS-1995 REFUELING OUTAGE Work Name of Component Sys.
Cl Name of Mfgr.
Nat1 Description of Work Applicable Year Repaired ASME Pressure Deument Manufacturer Serial Board Construction Built or Code Tests (MWR)
No.
No.
Code Replacal Stamp Conducted 1
95-2023 MS-RV-71 ARV MS 1
Target Rock 382 N/A Replaced W N Studs III-1970 1974 Replaced No leak Test
& Nuts t
95-2024 MS-RV-7iBRV MS 1
Target Rock 384 N/A Replaced Valve, Studs 1I1-1970 1974 Replaced No Leak Test
& Nuts 95-2025 MS-RV-71CRV MS 1
Target Rock 383 N/A Replaced Valve, Studs III-1970 1974 Replaced No Leak Test
[
& Nuts 95-2026 MS-RV-71DRV MS 1
Target Rock 387 N/A Replaced Valve, Studs III-1970 1974 Replaced No leak Test
& Nuts 95-2027 MS-RV-71ERV MS 1
Target Rock 377 N/A Replaced Valve, Studs 111-1970 1974 Replaced No leak Test
& Nuts 95-2028 MS-RV-71FRV MS 1
Target Rock 381 N/A Replaced Valve, Studs 111-1970 1974 Replaced No leak Test
& Nuts 95-2029 MS-RV-71GRV MS 1
Target Rock 376 N/A Replaced Valve, Studs 111-1970 1974 Replaced No Leak Test
& Nuts 95-2030 MS-RV-711IRV MS 1
Target Rock 386 N/A Replaced Valve, Studs 111-1970 1974 Replaced No leak Test
& Nuts 95-2093 MS-RV-70ARV MS Consolidated 2463 N/A Replaced Studs &
111-1970 1%8 Replaced No leak Test i
Safety Valw Nuts i
I 95-2270 SW-V-78 SW 3
Anchor-Darling N/A N/A Replaced Valve B31.7-l%9 1990 Replaced No ifydro l
i 95-2394 SW-V-92 SW 3
Anchor-Darling N/A N/A Replaced Valw B31.7-l%9 1990 Replaced No liydro 95-2579 IIPCI-110-IlOV10 IIPCI 2
Miller Fluid Power 68172955 N/A Replaced Disc B16.5-l%8 1974 Replaced No leak Test 95-2909 MS-SNUB-BS-S2A IIPCI 2
NPPD N/A N/A Prefab Base Plate III-1983 1995 Replaced No N/A l
95-2922 MS-SNUB-BS-S2A IIPCI 2
PSA N/A N/A Replaced Snubber per III-1983 1983 Replaced No N/A MM-95-090 95-2959 MS-IINGR-HISSA MS 3
NPPD N/A N/A Install Reinforemg B31.7-l%9 1974 Replaced No N/A Plates per MM-95-100 t
Page 9 of13
COOPER NUCLEAR STATION OWNER'S REPORT FOR REPAIRS AND REPLACEMENTS-1995 REFUELING OUTAGE Work Name ofComponent Sys.
Cl Name of Mfgr.
Nat1 Description of Work Applicable Year Repamxi ASME Pressure Doctment Manufacturer Serial Board Construction Built or Code Tests (MWR)
No.
No.
Code Replaced Stamp Conducted 95-2959 MS-IINGR-lil55A MS 3
NPPD N/A N/A Install Baseplates per B31.7-l%9 1974 Replaced No N/A MM-95-100 95-3374 MS-SNUB-MS-S3 MS 1
PSA 10048 N/A Replaced Snubber B31.7-l%9 1974 Replaced No N/A 95-3375 MS-SNUB-MS-S25 MS 1
PSA 8085 N/A Replaced Snubber B31.7-l%9 1974 Replaad No N/A 95-3445 PC-MOV-1302MV PC 2
Anchor-Darling 4399-03 N/A Added i1RT Test 111-1974 1974 Replaced No liydro PC-MOV-1306MV Anchor-Darling 4399-04 Connections and PC-MOV-305MV Anchor-Darling 4656-01 Modified Supports per PC-MOV-306MV Anchor-Darling 4656-01 DC-93-050, also PC-AOV-245AV Allis-Chalmers repiced blind llange PV-IINGR-HI18 ITT Gnnnell with butt welded cap.
PV-IINGR-lil19 ITT Grinnell SBNI-IINGR-II53 flT Gunnell 3* BLIND FLANGE 95-3490 MS-CV-20CV through MS 3
Anderson N/A N/A Replace Vacuum 111-1977 1995 Replaced No leak Test MS-CV-35CV, and Greenwood Breakers with New MS-IINGR-VR-II60 Design and Modify MS-IINGR-VR-IISS Supports per DC MS-IINGR-VR-II49 044-1. 'Ihis DC MS-IINGR-VR-il59 includes installation of MS-IINGR-VR-II64 blind flanges on old MS-IINGR-VR-Il52 unive locations and MS-IINGR-VR-II46 tees and weld neck MS-IINGR-VR-Il47 flanges for new vahe MS-IINGR-VR-H48 locations.
MS-HNGR-VR-Il61 MS-SNUB-VR-S30 MS-SNUB-VR-59-7-X MS-SNUB-VR-SSA MS-SNUB-VR-SSB 4
MS-SNUB-VR-S70 MS-SNUB-VR-S80 MS-SNUB-VR-62-8-X 95-3491 SW-MOV-36MV SW 3
Ilenry Pratt N/A N/A Replaced Vahe per 111-1977 1977 Replaced No leakTest DC 93-150 Page 10 of13
N s
COOPER NUCLEAR STATION OWNER'S REPORT FOR REPAIRS AND REPLACEMENTS-1995 REFUELING OUTAGE Work Name ofComponent Sys.
Cl Name of Mfgr.
Nat'l Description of Work Applicable I Year Repaimi ASME Pressure Document Manufacturer Serial Board Constructmn Built or Code Tests (MWR)
No.
No.
Code Replamd Stamp Conducted 95-3501 CS-liGH-MISC CS 2
NPPD N/A N/A Repluml Support B31.7-l%9 1974 Replaced No N/A 95-3563 RHR-HX-A RHR 2
SWECO 27051 N/A Weld Buildup, and Vill-1968 1974 Repair /
Yes leak Test Replaced Studs &
Replaced Nuts 95-3571 CS-RO-29A CS 2
NPPD N/A N/A Replaced Restrictiw B31.7-l%9 1974 Replamd No leak Test Orifice 95-3586 SW-MOV-MO89A SW 3
Anchor-Darling N/A N/A Replaced Disc B16.5-1968 1974 Replaced No leak Test 95-3587 SW-MOV-MO89B SW 3
Anchor-Darling N/A N/A Replaced Disc, Weld B16.5-1968 1974 Repaired No leak Test Buildup Body Replaced 95-3614 HPCI-CV-24CV HPCI 2
Borg-Wamer N/A N/A Replaced Valves and III-1977 1995 Repaired No Leak Test IIPCI-CV-25CV Piping With Larger Replaced iIPCI-CV-26CV Size per DC 95-101.
1IPCI-CV-27CV Replaced pipe support per SKE-HPCI-l12.
Removed blind flange and replaced with flush patch. Repaired vahe disc.
95-3626 PC-V-61 PC 2
Posi-Scal 13619-N/A Replaced Bolts and B31.7-l%9 1974 Replaced No leak Test IA Nuts on Spool Piece 95-3639 CS-CV-18CV CS 1
Atwood-Morrill N/A N/A Replaced Disc and B16.5-1%8 1974 Replaced No leak Test Bonnet Bolts 95-3681 RWCU-MOV-MOI 8 RWCU 1
Anchor-Darling EB813-1 N/A Replaced Valve Disc B16.34-1977 1977 Replaced No leak Test 95-3726 HPCI-MOV-MOl9 HPCI I
Anchor-Darling N/A N/A Machmed Bonnet, B16.5-1968 1974 Repaired No leek Test RCIC-MOV-MO21 RCIC Modified Disc per DC 93-050-1 95-3761 Weld 2848-22-W19 REC 3
Jelco N/A N/A Weld Repaired UT B31.1-l%7 1974 Repaired No Ilydro Indication 95-3766 Weld 2848-21-WAB REC 3
Jelco N/A N/A Weld RepaimilJr B31.1-l%7 1974 Repaired No Hydro Indication Page1I of13
w e -
t COOPER NUCLEAR STATION OWNER'S REPORT FOR REPAIRS AND REPLACEMENTS-1995 REFUELING OUTAGE l
Work Name ofComponent Sys.
Cl Name of Mfgr.
Nat'l Description of Work Applicable Year Repaired ASME Presswe IAsument Manufacturer Serial Board Construction Built or Code Tests (MWR)
No.
No.
Code Replaced Stamp Conducted 95-3767 Weld 2848-21-WAA REC 3
Jelco N/A N/A Weld Repaired (Jr B31.1-l%7 1974 Repaired No Hydro i
Indication 95-3768 Weld 2848-14-Wl4
,C 3
Jelco N/A N/A Weld Repaired UT B31.1-l%7 1974 j Repaired No Hydro Weld 2848-14-W15 Irdi-4m, Replan i
RCC-S$2 Pipe 95-3806 CS-MOV-M012A CS I
Anchor-Darling 7845-69 N/A Machined Bonnet, B16.5-1968 1974 Repaired No leak Test Modified Disc per DC 93-050 f
95-3808 CS-MOV-MOl2A CS 1
Anchor-Darling 7845-69 N/A Machined Bonnet B16.5-1968 1974 Repaired No leakTest 95-3850 IIPCI-MOV-Mol4 IIPCI 2
Anchor-Darling N/A N/A Machined Disc, B16.51%8 1974 Repaired No leak Test Replaced Bonnet 95-3860 SW-V-78 SW 3
Anchor-Darling 7647-69 N/A Replaced Disc Gt ides, B16.5-1968 1974 Replaced No leak Test l
Machmed Disc l
l 95-4007 MS-AOV-A086C MS I
Rockwell N/A N/A Replaced Stem & Disc B16.5-1968 1974 Replaced No leak Test t
Ilills-McCanna N/A N/A Replaced h e, B16.5-1968 1994 Replaced No ifydro Nipple, Firge and Acutator Bolting.
l SW-AOV-850AV Replaced Ball & Seats 95-4061 RCIC-CV-21CV RCIC 2
Rockwell N/A N/A Replaced Valw Disc III-1990 1980 Replaced No leak Test i
95-4092 Weld 2848-14-W30 REC 3
Jelco N/A N/A Weld Repaired Ur B31.1-l%7 1974 Repaired No flydro Indication l
95-4155 RF-SUPPORT-S16 RF 1
flT Griimell N/A N/A Added StilTener Plates B31.7-l%9 1974 Replaced No N/A t
Jelco N/A N/A Weld Repaired UT B31.1-l%7 1974 Repaired No Hydro Weld 2848-2-W12 Indications
.. ~.
95-4227 CS-MOV-MOl2B CS 1
Anchor-Darling 7844-69 N/A Machmed Bonnet, B16.5-l%8 1974 Repaired No leak Test Modified Disc per DC 93-050 95-4312 SW-RV-11RV SW 3
Consolidated TG10736 N/A Machmed Nozzle VIII-1968 1974 Repaired Yes LeakTest Safety Valw Page 12 of13
l COOPER NUCLEAR STATION OWNER'S REPORT FOR REPAIRS AND REPLACEMENTS-1995 REFUELING OUTAGE p
Wxk Name ofComponent Sys.
Cl Name of Mfgr.
Nat'l D
- piow f N k Applicable Year Repairal ASME Pressure Document Manufacturer Serial Board Construction Built or Code Tests (MWR)
No.
No.
Code Replead Stamp h u ai l
95-4314 RCIC-RV-10RV RCIC 2
Consolidated TG94532 N/A Machmed Seat VIII-1968 1974 Repaired Yes Imk Test L
Safety Valve 95-4320 llPCI-l!NGR-BS-S68 IIPCI 2
NPPD N/A N/A Add Pipe Support per B31.7-l%9 1995 Replaced No N/A DC-95-101-1 95-4370 MS-1INGR-S82 MS 2
flT Grmnell N/A N/A Cut out Cross Piece B31.1-l%7 1974 Repaired No N/A and Reweided for 11RT 95-4462 3 NPS Elbows SW 3
Jelco N/A N/A Replace ERows and B31.1-l%7 1974 Replaced No flydro j
Piping
, 95-4508 RIIR-V-80 Piping RIIR 1
Jeico N/A N/A Repaired Ink on Test B31.7-l%9 1974 Repair No Imk Test g
Valve Connection I
Page 13 of 13 i
l
- - -