MONTHYEARML20076E0951983-08-12012 August 1983 Forwards Revised Inservice Insp Program.Upgraded Program Will Go Into Effect on 840101 Project stage: Other ML20091M3201984-05-31031 May 1984 Recirculation,Rhr & Reactor Water Cleanup Weld Joint Insp Program - 1984 Maint/Refueling Outage Project stage: Other ML20091M3071984-05-31031 May 1984 Forwards Program for Insp of Recirculation & Other Coolant Boundary Stainless Steel Piping Sys for 1984 Maint/Refueling Outage.Criteria Consistent W/Generic Ltr 84-11, Insp of BWR Stainless Steel Piping. Outage Scheduled for 840901 Project stage: Other ML20094B6211984-07-27027 July 1984 Forwards Discussion of Exams Conducted on Six Inlet & Outlet Nozzles & safe-end & Recirculation Sys Jet Pump Instrumentation Inconel 182 Nozzles.Exams Prompted by Cracking Problems Discussed in IE Info Notice 84-41 Project stage: Other ML20098C8121984-09-19019 September 1984 Requests Info Re Status of 1984 Refueling Outage Insp Program Approval & Issuance of SER for Second Cycle Operation W/Weld Overlays.Maint/Refueling Outage Tentatively Scheduled to Begin on or About 840929 Project stage: Other ML20098F0701984-09-26026 September 1984 Responds to 840917 Request for Addl Info Re 1984 Refueling Outage Insp Program for Stainless Steel Piping.Topics Addressed Include Sampling Plan,Qualification of Exam Personnel,Leak Detection & Leakage Limits Project stage: Request ML20101C6571984-11-21021 November 1984 Responds to IE Bulletin 80-13, Cracking in Core Spray Spargers. Visual Insp of Core Spray Spargers & Associated Piping Performed.Circumferential Crack Discovered in heat- Affected Zone of Lower Sparger to T-box Weld Project stage: Other ML20108E1261984-11-30030 November 1984 Core Spray Sparger Crack Analysis for Ei Hatch Nuclear Power Station,Unit 1 Project stage: Other ML20108E1231984-12-0606 December 1984 Forwards NEDO-30825, Core Spray Sparger Crack Analysis for Ei Hatch Nuclear Power Station,Unit 1, in Response to IE Bulletin 80-13, Cracking in Core Spray Spargers Project stage: Other ML20100M5261984-12-10010 December 1984 Forwards Inservice Insp Rept Re Stainless Steel Piping & Corrective Actions Taken for Cracked Welds Reported During Fall 1984.Insp Performed During 1984 Refueling Outage Project stage: Other ML20101E3541984-12-19019 December 1984 Submits Addl Info on IGSCC Evaluations of Repairs to Welds in Recirculation Sys Piping,Per 841217 Telcon Request. Summary of Total Stresses Encl Project stage: Other ML20101L4521984-12-21021 December 1984 Advises of Intent to Submit Rept During Second Quarter 1985 Re Recirculation Sys Piping Replacement During 1984 Maint/ Refueling Outage Project stage: Other ML20112G1551985-01-0909 January 1985 Informs That Hydrostatic Test Cannot Be Performed as Indicated in 841210 Submittal.Required Removal of Main Steam Safety/Relief Valves from Svc Would Violate Tech Specs Requiring Valves to Be Operable W/Irradiated Fuel in Vessel Project stage: Other ML20132C5581985-05-17017 May 1985 Rev 0 to Design Rept for Evaluation & Disposition of IGSCC Flaws at Plant Ei Hatch Unit 1 Project stage: Other ML20132C5191985-09-17017 September 1985 Forwards Rev 0 to XGP-09-106, Design Rept for Evaluation & Disposition of IGSCC Flaws at Plant Ei Hatch Unit 1, to Complete All Necessary Submittals to NRC Re Piping Insps & Repairs During 1984 Maint/Refueling Outage Project stage: Other 1984-12-06
[Table View] |
Similar Documents at Hatch |
|---|
|
Text
_._
m Georg'a Power Company 6
- 333 Piedtront Avenue Atlanta. Georgia 30308 -
Teleptme 404 526 6526
. Maihng Address:.
Post Office Box 4545 At!anta. Georgia 30302 3'l NOV 29 Afg.
Georgia Power L T. Gucwa the sauthern eiectrc system.
Manager Nuclear Eng neenng NED 84-588 and Chief Nucfear Engineer Novenber 21, 1984 i
~ U.' S. Nuclear Regulatory Consission REE'ERENCE:
l Office of Inspection and Enforcement RII: JPO 1
-Region II - Suite 2900 50-321 101 Marietta Street, IM I&E Bulletin f
Atlanta, Georgia 30323 80-13 ATTENTION: Mr. Janes P. O'Reilly i
GENIUMEN:
. Pursuant to the requirenents of I&E Bulletin 80-13, " Cracking in' Core Spray Spargers", visual inspection of the Hatch Unit 1 core spray spargers
[
and associated piping has been performed during the, refueling /naintenance outage currently in. progress.
A renote, underwater. television canera (having the required capability of in situ viewing of 0.001 inch fine wires) was used for the inspection.
. A circtnferential crack was discovered in the heat-affected zone of the lower sparger to T-box weld (approximately 1/8 inch fra the weld).
It spans at least 1800 of circumference and is approximately 0.010 inch wide, i
i.
Evaluation of the cracking has been performed by General Electric Company.
%e cause is suspected to be stress corrosion cracking resulting-
.from cold work and sensitization during fabrication and installation of the sparger.
An analysis was performed to determine the acceptability of continued operation, using the conservative asstaptions that the crack spanned 3600 of circtanference, was through-wall, and that no clanping device was installed on the sparger.
%e analysis considered structural effects, the -possibility of loose parts, and the effect on IDCA analysis.
It was denonstrated - that operation with the core spray sparger in the conservatively assmed condition would not result in any safety concern.. A report doctmenting ' the evaluation performed will be transnitted prior to 4
j
. unit startup.
s 5
m**d8ait'otna G
PDR
i l
GeorgiaPower d U. S. Nuclear Regulatory Comission Office of Inspection and Enforcement Region II - Suite 2900 November 21, 1984-Page 2 Although the analysis shows that it is not necessary, GPC has elected to install a clanping device designed to maintain the structural integrity of the sparger.
Installation of this device will provide added assurance that continued operation will result in no safety concern.
Please contact this office if there are any questions.
Very truly yours, W *[ Q:
?
L. T. Gucwa JH/jh xc: J. T. Beckham, Jr.
H. C. Nix, Jr.
Senior Resident Inspector NRC Office of Inspection and Enforcetent, Division of Reactor Operations Inspection
- -... ~. -.