ML20098C812

From kanterella
Jump to navigation Jump to search

Requests Info Re Status of 1984 Refueling Outage Insp Program Approval & Issuance of SER for Second Cycle Operation W/Weld Overlays.Maint/Refueling Outage Tentatively Scheduled to Begin on or About 840929
ML20098C812
Person / Time
Site: Hatch Southern Nuclear icon.png
Issue date: 09/19/1984
From: Gucwa L
GEORGIA POWER CO.
To: Stolz J
Office of Nuclear Reactor Regulation
References
NED-84-498, TAC-55236, NUDOCS 8409270216
Download: ML20098C812 (2)


Text

.

. .,7 . Georgia Power Cc7npany 333 Ndrnont Avenue Attanta, Georg'a 30308 TeW 404 5264526 Madrxj Address:

Post Offce Box 4545 Atlanta. Georgia 30302 GeorgiaIbver anage 'aclear Engineenng and Chief Nuclear Engineer NED-84-498 Septenber 19, 1984 Director of Nuclear Reactor Regulation Attention: Mr. John F. Stolz, Olief Operating Reactors Branch No. 4 Division of Licensing U. S. Nuclear Regulatory Camission Washington, D. C. 20555 NRC DOCIG7f 50-321 OPERATING LICENSE DPR-57 EDWIN I. HA'IGI NUCILAR PIANr UNIT 1 1984 REFUELING OUTAGE INSPECTION PROGR/M APPROVAL Gentlemen By letter dated May 31, 1984, Georgia Power Cm.pany (GPC) subnitted for your review and awroval its inspection plans for the recirculation and other reactor coolant boundary stainless steel piping systens at Hatch Unit 1 during its 1984 maintenance / refueling outage. 'Ibe subject letter was

'sutaitted pursuant to the re;uitenents of your February 11, 1983 letter requiring GPC to subnit its plans for modification or inspection three (3) months prior to the start of the outage. Our May 31 subnittal also provided our justification for the adaluacy of weld overlays for a second cycle of operation. 'Ib date, GPC has not received any notification of approval of our inspection plans nor have we received any notification regarding the issuance of a safety evaluation report (SER) allowing use of the weld overlays for a second cycle of operation.

Please advise us of the status of the approval of our inspection plans and issuance of an SER for a second cycle of operation with weld overlays.

GPC wishes to advise NPC that the Hatch Unit 1 maintenance / refueling outage

  • is tentatively scheduled to begin on or about September 29, 1984. Any questions that NRC may have regarding the proposed inspection progran and justification for continued use of the weld overlays should be brought to our innediate attention. 'Ihe staffs of GPC and its consultants are available for additional discussion should NRC so desire.

Oh3PDR 1 \O

c e; ,2 Georgia PowerA Director of Nuclear Reactor Regulation Attention: Mr. John F. Stolz, Chief

- Operating Reactors Branch No. 4 Septainber 19, 1984 Page Two Should you have any questions in this regard, please contact this office.

Sincerely yours, f C &m t.. T. m a JAE/mb

  • J. T. Beckhan, Jr.

H. C. Nix, Jr.

J. P. O'Reilly (MtC- Region II)

Senior Resident Inspector I'

-