MONTHYEARML20076E0951983-08-12012 August 1983 Forwards Revised Inservice Insp Program.Upgraded Program Will Go Into Effect on 840101 Project stage: Other ML20091M3201984-05-31031 May 1984 Recirculation,Rhr & Reactor Water Cleanup Weld Joint Insp Program - 1984 Maint/Refueling Outage Project stage: Other ML20091M3071984-05-31031 May 1984 Forwards Program for Insp of Recirculation & Other Coolant Boundary Stainless Steel Piping Sys for 1984 Maint/Refueling Outage.Criteria Consistent W/Generic Ltr 84-11, Insp of BWR Stainless Steel Piping. Outage Scheduled for 840901 Project stage: Other ML20094B6211984-07-27027 July 1984 Forwards Discussion of Exams Conducted on Six Inlet & Outlet Nozzles & safe-end & Recirculation Sys Jet Pump Instrumentation Inconel 182 Nozzles.Exams Prompted by Cracking Problems Discussed in IE Info Notice 84-41 Project stage: Other ML20098C8121984-09-19019 September 1984 Requests Info Re Status of 1984 Refueling Outage Insp Program Approval & Issuance of SER for Second Cycle Operation W/Weld Overlays.Maint/Refueling Outage Tentatively Scheduled to Begin on or About 840929 Project stage: Other ML20098F0701984-09-26026 September 1984 Responds to 840917 Request for Addl Info Re 1984 Refueling Outage Insp Program for Stainless Steel Piping.Topics Addressed Include Sampling Plan,Qualification of Exam Personnel,Leak Detection & Leakage Limits Project stage: Request ML20101C6571984-11-21021 November 1984 Responds to IE Bulletin 80-13, Cracking in Core Spray Spargers. Visual Insp of Core Spray Spargers & Associated Piping Performed.Circumferential Crack Discovered in heat- Affected Zone of Lower Sparger to T-box Weld Project stage: Other ML20108E1261984-11-30030 November 1984 Core Spray Sparger Crack Analysis for Ei Hatch Nuclear Power Station,Unit 1 Project stage: Other ML20108E1231984-12-0606 December 1984 Forwards NEDO-30825, Core Spray Sparger Crack Analysis for Ei Hatch Nuclear Power Station,Unit 1, in Response to IE Bulletin 80-13, Cracking in Core Spray Spargers Project stage: Other ML20100M5261984-12-10010 December 1984 Forwards Inservice Insp Rept Re Stainless Steel Piping & Corrective Actions Taken for Cracked Welds Reported During Fall 1984.Insp Performed During 1984 Refueling Outage Project stage: Other ML20101E3541984-12-19019 December 1984 Submits Addl Info on IGSCC Evaluations of Repairs to Welds in Recirculation Sys Piping,Per 841217 Telcon Request. Summary of Total Stresses Encl Project stage: Other ML20101L4521984-12-21021 December 1984 Advises of Intent to Submit Rept During Second Quarter 1985 Re Recirculation Sys Piping Replacement During 1984 Maint/ Refueling Outage Project stage: Other ML20112G1551985-01-0909 January 1985 Informs That Hydrostatic Test Cannot Be Performed as Indicated in 841210 Submittal.Required Removal of Main Steam Safety/Relief Valves from Svc Would Violate Tech Specs Requiring Valves to Be Operable W/Irradiated Fuel in Vessel Project stage: Other ML20132C5581985-05-17017 May 1985 Rev 0 to Design Rept for Evaluation & Disposition of IGSCC Flaws at Plant Ei Hatch Unit 1 Project stage: Other ML20132C5191985-09-17017 September 1985 Forwards Rev 0 to XGP-09-106, Design Rept for Evaluation & Disposition of IGSCC Flaws at Plant Ei Hatch Unit 1, to Complete All Necessary Submittals to NRC Re Piping Insps & Repairs During 1984 Maint/Refueling Outage Project stage: Other 1984-12-06
[Table View] |
Similar Documents at Hatch |
|---|
|
Text
.
.,7
. Georgia Power Cc7npany 333 Ndrnont Avenue Attanta, Georg'a 30308 TeW 404 5264526 Madrxj Address:
Post Offce Box 4545 Atlanta. Georgia 30302 GeorgiaIbver anage 'aclear Engineenng and Chief Nuclear Engineer NED-84-498 Septenber 19, 1984 Director of Nuclear Reactor Regulation Attention: Mr. John F. Stolz, Olief Operating Reactors Branch No. 4 Division of Licensing U. S. Nuclear Regulatory Camission Washington, D. C.
20555 NRC DOCIG7f 50-321 OPERATING LICENSE DPR-57 EDWIN I. HA'IGI NUCILAR PIANr UNIT 1 1984 REFUELING OUTAGE INSPECTION PROGR/M APPROVAL Gentlemen By letter dated May 31, 1984, Georgia Power Cm.pany (GPC) subnitted for your review and awroval its inspection plans for the recirculation and other reactor coolant boundary stainless steel piping systens at Hatch Unit 1 during its 1984 maintenance / refueling outage. 'Ibe subject letter was
'sutaitted pursuant to the re;uitenents of your February 11, 1983 letter requiring GPC to subnit its plans for modification or inspection three (3) months prior to the start of the outage. Our May 31 subnittal also provided our justification for the adaluacy of weld overlays for a second cycle of operation.
'Ib date, GPC has not received any notification of approval of our inspection plans nor have we received any notification regarding the issuance of a safety evaluation report (SER) allowing use of the weld overlays for a second cycle of operation.
Please advise us of the status of the approval of our inspection plans and issuance of an SER for a second cycle of operation with weld overlays.
GPC wishes to advise NPC that the Hatch Unit 1 maintenance / refueling outage is tentatively scheduled to begin on or about September 29, 1984.
Any questions that NRC may have regarding the proposed inspection progran and justification for continued use of the weld overlays should be brought to our innediate attention.
'Ihe staffs of GPC and its consultants are available for additional discussion should NRC so desire.
Oh3 1 PDR
\\ O
c e;
,2 Georgia PowerA Director of Nuclear Reactor Regulation Attention: Mr. John F. Stolz, Chief
- Operating Reactors Branch No. 4 Septainber 19, 1984 Page Two Should you have any questions in this regard, please contact this office.
Sincerely yours, f C &m t.. T. m a JAE/mb J. T. Beckhan, Jr.
H. C. Nix, Jr.
J. P. O'Reilly (MtC-Region II)
Senior Resident Inspector I'
-