MONTHYEARML20076E0951983-08-12012 August 1983 Forwards Revised Inservice Insp Program.Upgraded Program Will Go Into Effect on 840101 Project stage: Other ML20091M3201984-05-31031 May 1984 Recirculation,Rhr & Reactor Water Cleanup Weld Joint Insp Program - 1984 Maint/Refueling Outage Project stage: Other ML20091M3071984-05-31031 May 1984 Forwards Program for Insp of Recirculation & Other Coolant Boundary Stainless Steel Piping Sys for 1984 Maint/Refueling Outage.Criteria Consistent W/Generic Ltr 84-11, Insp of BWR Stainless Steel Piping. Outage Scheduled for 840901 Project stage: Other ML20094B6211984-07-27027 July 1984 Forwards Discussion of Exams Conducted on Six Inlet & Outlet Nozzles & safe-end & Recirculation Sys Jet Pump Instrumentation Inconel 182 Nozzles.Exams Prompted by Cracking Problems Discussed in IE Info Notice 84-41 Project stage: Other ML20098C8121984-09-19019 September 1984 Requests Info Re Status of 1984 Refueling Outage Insp Program Approval & Issuance of SER for Second Cycle Operation W/Weld Overlays.Maint/Refueling Outage Tentatively Scheduled to Begin on or About 840929 Project stage: Other ML20098F0701984-09-26026 September 1984 Responds to 840917 Request for Addl Info Re 1984 Refueling Outage Insp Program for Stainless Steel Piping.Topics Addressed Include Sampling Plan,Qualification of Exam Personnel,Leak Detection & Leakage Limits Project stage: Request ML20101C6571984-11-21021 November 1984 Responds to IE Bulletin 80-13, Cracking in Core Spray Spargers. Visual Insp of Core Spray Spargers & Associated Piping Performed.Circumferential Crack Discovered in heat- Affected Zone of Lower Sparger to T-box Weld Project stage: Other ML20108E1261984-11-30030 November 1984 Core Spray Sparger Crack Analysis for Ei Hatch Nuclear Power Station,Unit 1 Project stage: Other ML20108E1231984-12-0606 December 1984 Forwards NEDO-30825, Core Spray Sparger Crack Analysis for Ei Hatch Nuclear Power Station,Unit 1, in Response to IE Bulletin 80-13, Cracking in Core Spray Spargers Project stage: Other ML20100M5261984-12-10010 December 1984 Forwards Inservice Insp Rept Re Stainless Steel Piping & Corrective Actions Taken for Cracked Welds Reported During Fall 1984.Insp Performed During 1984 Refueling Outage Project stage: Other ML20101E3541984-12-19019 December 1984 Submits Addl Info on IGSCC Evaluations of Repairs to Welds in Recirculation Sys Piping,Per 841217 Telcon Request. Summary of Total Stresses Encl Project stage: Other ML20101L4521984-12-21021 December 1984 Advises of Intent to Submit Rept During Second Quarter 1985 Re Recirculation Sys Piping Replacement During 1984 Maint/ Refueling Outage Project stage: Other ML20112G1551985-01-0909 January 1985 Informs That Hydrostatic Test Cannot Be Performed as Indicated in 841210 Submittal.Required Removal of Main Steam Safety/Relief Valves from Svc Would Violate Tech Specs Requiring Valves to Be Operable W/Irradiated Fuel in Vessel Project stage: Other ML20132C5581985-05-17017 May 1985 Rev 0 to Design Rept for Evaluation & Disposition of IGSCC Flaws at Plant Ei Hatch Unit 1 Project stage: Other ML20132C5191985-09-17017 September 1985 Forwards Rev 0 to XGP-09-106, Design Rept for Evaluation & Disposition of IGSCC Flaws at Plant Ei Hatch Unit 1, to Complete All Necessary Submittals to NRC Re Piping Insps & Repairs During 1984 Maint/Refueling Outage Project stage: Other 1984-12-06
[Table View] |
Similar Documents at Hatch |
|---|
|
Text
.
- - ~-,
. ~. ~
Georgia Power Corppany :
333 Piedmont Avenue Atlanta, Georgia 30308 Telephone 404 526-6526 i
l Ma$ng Address:
Post Office Box 4545 Atlanta. Georgia 30302 i
GeorgiaPbwer
]
L. T. Gucwa. _
the sonna em elecinc system Manager Nuclear Erg <nt enng and Chief Nuclear Eng:neer i
f NED-84-623-
' December 21, 1984 i
Director of Nuclear Reactor Regulation i
Attention: Mr. John F. Stolz, Chief Operating Reactors Branch No. 4 Division of Licensing U. S. Nuclear Regulatory Comission Washington, D. C.
20555 NRC DOCKET 50-366 OPERATING LICENSE NPF-5 l
EDWIN I. HATCH NUCLEAR PLANT UNIT 2 i
NOTICE OF INTENT TO SUBMIT RECIRCULATION j
SYSTEM PIPING REPLACEMENT REPORT l
Gentlemen:
Georgia Power Company will submit for your information and use a report on the results of the replacement of the main recirculation and attached j
systems' piping at Plant Hatch Ur it 2 during our 1984 maintenance / refueling outage.
It is expected that the report will be submitted to you during the second quarter of 1985.
Please note that the submittal of the report is voluntary and not a requirement of any commitment or other licensing condition.
No further reporting (aside from in our annual operating report) i will be made regarding the piping replacement.
i Should you have any questions in this regard, please contact this office.
Sincerely yours,
/7 Qm i
L. T. Gucwa
}