ML20076E09512 August 1983Southern Nuclear
Beckham J
Forwards Revised Inservice Insp Program.Upgraded Program Will Go Into Effect on 840101Other
ML20091M32031 May 1984Southern NuclearRecirculation,Rhr & Reactor Water Cleanup Weld Joint Insp Program - 1984 Maint/Refueling OutageOther
ML20091M30731 May 1984Southern Nuclear
Gucwa L
Forwards Program for Insp of Recirculation & Other Coolant Boundary Stainless Steel Piping Sys for 1984 Maint/Refueling Outage.Criteria Consistent W/Generic Ltr 84-11, Insp of BWR Stainless Steel Piping. Outage Scheduled for 840901Other
ML20094B62127 July 1984Southern Nuclear
Gucwa L
Forwards Discussion of Exams Conducted on Six Inlet & Outlet Nozzles & safe-end & Recirculation Sys Jet Pump Instrumentation Inconel 182 Nozzles.Exams Prompted by Cracking Problems Discussed in IE Info Notice 84-41Other
ML20098C81219 September 1984Southern Nuclear
Gucwa L
Requests Info Re Status of 1984 Refueling Outage Insp Program Approval & Issuance of SER for Second Cycle Operation W/Weld Overlays.Maint/Refueling Outage Tentatively Scheduled to Begin on or About 840929Other
ML20098F07026 September 1984Southern Nuclear
Gucwa L
Responds to 840917 Request for Addl Info Re 1984 Refueling Outage Insp Program for Stainless Steel Piping.Topics Addressed Include Sampling Plan,Qualification of Exam Personnel,Leak Detection & Leakage LimitsRequest
ML20101C65721 November 1984Southern Nuclear
Gucwa L
Responds to IE Bulletin 80-13, Cracking in Core Spray Spargers. Visual Insp of Core Spray Spargers & Associated Piping Performed.Circumferential Crack Discovered in heat- Affected Zone of Lower Sparger to T-box WeldOther
ML20108E12630 November 1984GENERAL ELECTRIC CO.
Gridley R
Brandon R
Core Spray Sparger Crack Analysis for Ei Hatch Nuclear Power Station,Unit 1Other
ML20108E1236 December 1984Southern Nuclear
Gucwa L
Forwards NEDO-30825, Core Spray Sparger Crack Analysis for Ei Hatch Nuclear Power Station,Unit 1, in Response to IE Bulletin 80-13, Cracking in Core Spray SpargersOther
ML20100M52610 December 1984Southern Nuclear
Gucwa L
Forwards Inservice Insp Rept Re Stainless Steel Piping & Corrective Actions Taken for Cracked Welds Reported During Fall 1984.Insp Performed During 1984 Refueling OutageOther
ML20101E35419 December 1984Southern Nuclear
Gucwa L
Submits Addl Info on IGSCC Evaluations of Repairs to Welds in Recirculation Sys Piping,Per 841217 Telcon Request. Summary of Total Stresses EnclOther
ML20101L45221 December 1984Southern Nuclear
Gucwa L
Advises of Intent to Submit Rept During Second Quarter 1985 Re Recirculation Sys Piping Replacement During 1984 Maint/ Refueling OutageOther
ML20112G1559 January 1985Southern Nuclear
Gucwa L
Informs That Hydrostatic Test Cannot Be Performed as Indicated in 841210 Submittal.Required Removal of Main Steam Safety/Relief Valves from Svc Would Violate Tech Specs Requiring Valves to Be Operable W/Irradiated Fuel in VesselOther
ML20132C55817 May 1985INC.
NUTECH ENGINEERS
Gustin H
Wenner T
Acojido B
Rev 0 to Design Rept for Evaluation & Disposition of IGSCC Flaws at Plant Ei Hatch Unit 1Other
ML20132C51917 September 1985Southern Nuclear
Gucwa L
Forwards Rev 0 to XGP-09-106, Design Rept for Evaluation & Disposition of IGSCC Flaws at Plant Ei Hatch Unit 1, to Complete All Necessary Submittals to NRC Re Piping Insps & Repairs During 1984 Maint/Refueling OutageOther