Forwards Addl Info Re Six Backfit Requirements,As Discussed in Util .Meetings Re Resolution of Items Requested.Agenda Should Include Major Points of NRC Basis (Improvement to Safety)
ML20100B109
Person / Time
Site: Beaver Valley
Issue date: 03/20/1985
From: Carey J
DUQUESNE LIGHT CO.
To: Thompson H
Office of Nuclear Reactor Regulation
References
2NRC-5-047, 2NRC-5-47, NUDOCS 8503260376
Download: ML20100B109 (10)


Text

$VL

'Af Duquesne U@t umu

)92 N 960 Nuclear Construction Diosion ec W

2) 787-2629 Robinson Plaza.Buildag 2. Suite 210 Pittsburgh, PA 15205 March 20, 1985 United States Nuclear Regulatory Commission Washington, DC 20555 ATTENTION:

Mr. Hugh L. Thompson, Jr., Director Division of Licensing Office of Nuclear Reactor Regulation

SUBJECT:

Beaver Valley Power Station - Unit No. 2 Docket No. 50-412 Duquesne Light Company Backfits

REFERENCES:

(1) NRC letter (G. W. Knighton to E. J. Woolever) dated 2/5/85 (2) NRC letter (G. W. Knighton to E. J. Woolever) dated 1/10/85 (3) DLC letter 2NRC-5-003 dated 1/8/85 (4) NRC letter (G. W. Knighton to E. J. Woolever) dated 2/13/85 (5) DLC letter 2NRC-5-038 dated 3/5/85 (6) DLC letter 2NRC-5-015 dated 2/1/85 (7) DLC letter 2NRC-5-025 dated 2/14/85 (8) DLC letter 2NRC-5-019 dated 2/11/85 Centlemen:

In a rece nt le t t er (Reference 1), the NRC transmitted to D uque sn e Light Company (DLC) a brief discussion of six backfit requirements which the NRC staf f intends to impose on Beaver Valley Power Station - Unit 2 (BVPS-2).

Attachments to this letter provide the following:

(1) DLC positions with respect to the staf f positions transmitted in Reference 1 (Attachments 1 through 6)

(2) Proposed sched ule fo r ap pe al meetings on un res o lved backfit issues (Attachment 7)

(3) List of those issues on which the NRC and DIE have reached agree-ment (Attachment 8)

DLC has not provided responses to the staf f's positions on two of the issues scheduled for appeal meetings in A ttachment 7. The psition statenent/

appeal request for "4th Stean Generator Level Channel" issue will be trans-mitted to the NRC in approximately one week.

The position on " Air Drye rs fo r Emergency Diesel Cenerators" will be delayed until DLC receipt of alditional information from contractors / suppliers.

Th is information should be available to DLC within 3-4 weeks.

DLC, as evidenced in A ttachments I through 6, perceives the need for further clari fica t ion of several requirements and their justification in 8503260376 050320 1

PDR ADOCK 05000412 g (I PDR A

_ - -. _ _ ~ _

c_

.Unitid. States Nuclear R2gulctory Commincion

. Mr..Hugh L. Thompton, J r., Diractor Duquesne Light Company Backfits Page 2-order to f acilit ate meaningful appeal meetings.

NRR has developed a very workable procedure to implement the requirements of NRC Manual Chapter 0514.

- We. believe NRR's procedure intends that the appeal meetings provide a forum for. evaluating the postulated increase in plant safety to determine whether the new requirement should be impo sed.

Without an outline of the rationale by which the staff concluded that the proposed requirement is necessary to achieve an acceptable level of saf ety, DLC is unable to formulate and submit the well-defined position which is requisite to product ive discussion of these issues.

In' spite. of these ' concerns, DLC shares the staf f's desire to resolve the backfit issues promptly.

DLC, therefore, agrees that the meetings should be scheduled.

In order to-facilitate the preparation required for the appeal meetings, DLC requests that the major points of the staf f's basis (improve-ment to safety) be included in the agend as for the meetings, and that the agendas be provided to DLC at least one week prior to each meeting.

~

required, to expedi te the resolution. of My staff is available, as these issues.

DUQUESNE LIGHT COMPANY By

/

J. 3. 06 rey V

Vice President RW/wjs Attachments cc:

Mr. S. Chesnut, Technical Assistant (w/a)

Mr. M. Clausen, Technical Assistant (w/a)

Mr. H. Denton, Director NRR (w/a)

Mr. V.. Nerses, Project Manager (w/a) l Mr. T. Novak, Assistant Director (w/a)

Mr. B. K. Singh, Project Manager (w/a)

Mr. V. Stello, DEDROGR (w/s)

Mr. J. Tourte110tte, Chairman RRTF (w/a)

Mr. G. Walton, NRC Resident Inspector (w/a) i i

l l

I l

r l

n ATTAotME1T 1 PACE 1 OF 1 Unde res t imat ion of A tmo s phe ric I

IS SUE : Dispersion Conditions BACKFIT ISSUE NO. :

TO DLC RESPONS2 TO NRC LETTER DATED 02/05/85 DLC BACKFIT N0.4 29 11/08/84 02/05/84 Back f ic NRC Rqmnts Appe al Pos it ion Meeting First Minutes &

Second Meeting Second MTnut es &

Formal l

Ide nt if ied Letter Filed Statement Agenda A ppe al Decision A p pe al A ge nda 4 ppe al Decision A ppe al Submitted I ssued Meeting Is s ued Requested I s sued Meeting Issaed Req ue s t to Dir NRR e

NRC POSITION DIE POSITION COMMENTS i

DLC has provided aldi t ion al information c cern-N sem, utN.c. innet r rses ca. tem ene miscot s wesent mt ws.

ing atmospheric diffusion pa rase t e r est ima t es j

PROPOSED iam e a=*ee of e.ssentias tut oaen". cefam tan e=c tien es tme nwuneet.of et essneew (letter nos. 2NRC-5-015e dated February 1,1985, t

REQUIREMENTS Nw mie.ses +

en t*e ref e.=es m.t eae.

roe esis umw

t. n.te ene enne es t*e t

einnie cac. tim..se of t*e s== g.*e ace t ees. s.** t.tesi *** "'*

and 2NRC,5-025,e dated February 14. 1985).

It is uen reews +=

ex ae.* aoo

.nees.f met, mee.e ie.ger minien me om ein, me e n.61sta, une aw etste.ces snee enceme tv tae the ap pl ac a nt s unde rs t and ing that after review The sten of this a!ditional information by the staf f e this a e=ntsw; eae e ieta ttee oesten.mnts item will t>e closed, neates,ces (m.e*-c.oate. actiee.t..s to the se-car,= no.to c,ms. **e eri er eree of stuoneamat is et.ej T.e eet,ws m e to twe c.e.wa**c *$f fes**a to eetta, t*m +3 e diffm.c. of esme= ea t*e ees ee. nis.etes fwa uweeis seee$ s f actw me ** tae ne ej.<tta uc58a*t mirs's.

e st+ce.t.is r e=te.e.to e.e ie, a in.ts.c ust t. t,=

n.

8 ta e

sefat f e.e.s. metemiaev eae sistecn to tw v.ct.o m e

a.

nfe-smt euamtet.

c.

.,a...

e,ee so 4m

'f all see e. tee knuadecy of the to. Dep.let te. fan. {LPZ) eee s.ff tc s et a

two tea e, jo se, sows.e, tme t*7 ea en w+..

si ee me enses et

  • e pr et ta

.n.v.

t of waste.etes.e yo r

.n,

.e er n.tw s, wow see.,. en.,

e.cuca et een f tme con.

,. i,n,.

eee. ant.,uc sonte e ntin of fus t o. ee.e.cn.,

nn e.",n. t,,e og

,,ce., t.t,.

ein j

occ se.e.ce eam t e c.,w useesen.

et t=,

s io..

t. fi.e t.o,,*

=,i.c.,o. s e.c mee n.nn

..t v

m. co. #a i.

.i<c*

.. iw e,,.i.e d

.. to r.w.<

.e n f..c.,.,.,.,,

.o..euei.c

.. e.s e

.o sr.,.e.

.es.

tw e.ca. w eu.

.ae w...u.

See above.

HO'J PROPOSED Not pr av ided.

REQU!REMENT WOULD IMPROVE SAFETY RELATION OF

%, 3,p, e, onesa ents me.*t. t>e4un, ta 1 s

  • wt of h wm
  • ess**t'oas f** t,.*s t er ecc.io".t we.e.e.e *e u.ae twe.e*,sical c,a.wou. aces n *=e 3 '< ' r 'at***

MEW REQUIRE-

t. to,s vac e,, e

,.e, ess,,ni e.oof i

t

.t,

it ss e,e c,,tes,s,,ev s,p ni, we.

r m

  1. ew nsa. te w ovat ec. N encotir s.e MENT TO

,. if

,e co, s.we *.e tw.ast e c are us eight, strisne ce EXISTitec g.c,. e' t**ga tw, also

.e*, the i rcp.ec.at'ses. *cw.ee, er. e put of tae Commessta.'s ime s,,.wn t e

REGULATORY nt,

N eweette es t%mtee, to POSITIONS "eaewg setto.e* eefew ** *ett.a,fece res 14 the e.estat+a.s unict tectose tw ues er. see t 9 f *.e ** t*e N CF# 53Jf.h 10 CFe 50. eso ets e. G.aecel nestem Cetteeie Pf 21. et, e**.e.=es to seewie'ae. G. tees e2 ene e); maa 10 (fe inn.itf e1411 rt se e.cs 1.e.1.23 1.'T east steadece *6.*-te'9..ae 1.ie5 see sten twettesco) ead fiee,,*m.g swei.ee s,c in s n es.co

  • 3.e. 4.5 6 eae 15.6.5.

N eselicottee of requietary pewtice to the revt of B.ee V.1 lee Upts 2 h s be.e essessed be the staff as toteil, ca.ststemt.sts the That is a.

ne<*fitt+=g an t eer tem eomn., i ncow mt.etteas.

re.w. of at t etner.

ett etee.

SUGCESTED Not h ovided.

No comment.

TIME FOR IM PLE".E NTA -

TION

l y

A ATTACHM2Nr 2 PACE 1 OF 1 r

4 ISSOE: A ppl ic at ion o f CDC 5 t o com um ic at ion s Sy s t ems BACKPIT !$ SUE CD.:

TO DLC RESPONSE g

TO NRC LETTER IRTED 02/05/85 DLC BACKFIT NO. - 24

}

/

ll/os/se.

02/0s/8s Back f it NRC Kpat e A p pe al Po s it ion Meet ing First Minutes &

Second Mee t ing Second F.tes &

Formal Identifiwt Letter Filed Statement Agenda A ppe al Decision A ppe al Agenta A ppe al Dec i s io n A p pe al Submitted Issued Meeting Issued Requested issued Meeting Issued Req ue s t to Dir. NRR NRC POSIYton DLC POSITION COMMENTS PROPOSC)

SRP 9.5.2 states. "There are no general de s ign CEQUIREMENTS

              • . cw w.

s si,e 3. ww,w.. u <.tv ele'.d.c..s criteria or regulatory guides that da rect ly apply eu -. e=.e % s

-.t w-<

+ s t ce t

  • e.c.t.c.e c.u.ev u
t. *.actim '. ***

to the safety-related performance req ui rerae nt s

+

e

st.e.s ** c v s.

for the communicat ion system."

t.o.

nn. er u.e w.

888*@'.at se th.t a. CM ra.c ?ae. et t.

nt %.it t a.

.e.19e

i. en. rsa.., e..e ent.i.e.s %

,tn.

th

.e. c.t.f. F,e.t t.c. le Detail in excess of SRP 9.5.2 guidance has geen j

u

.sa.-ee sert e.r en. ict,m

.w. c.t.,..

.w.

2

.e u, u

  • e, ts
e. see= units t e st.n..e i. oc s.

Prowided to the reviewer.

. ea t e r

e..w.e=iut.

cuur, u r t.,t..

n.v.4**

  • Postulation of simultaneous event s in Units 1 & 2 CDC 5 states "... acci-i i

sasuin e et a

t n tu u=, es. e a r e t u,.e.n. < c t s,* e **.

exceeds CDC-5.

dent in one unat, an cnue, u+.t, e s c.

e-c.

e.

c ooldown of the rema i n-l ing units."

HOW PROPOSED Not pr ov ide J.

The staff has not demonstrated that appl ic a t ion I

REQUIREMENT of CDC-5. together with ps tulat ion of simult ane-WOULD ous ac cident s, is required to achieve an ac ce p t-f l

IMPROVE able level of safety, i

SA FETY 1

i RELATION OF No coaument.

5'.**.**e "t ' ee

.F"r.* s et e "e. arew e d.08"e'""w.*c'"e s.".**.b'ee**t '.'e "smu."ic.'t s

NEW REQUIRE-

'"' " ** W

    • 2" c.

s 5*

MENT TO

.g.m t, et t-i.-ge

.t. cm

,ue.m e.,tr c

s

-t ei t EXISTING

"."c 'i.'e'g'i.s s.*." .'*e"

  • m.'*s o.'"*s**t n.' *"s'. e.s e==

e

, r R2CULATORY cw.ut taa s,st.= +s ecc.st.e:e s e t=e e.

r.e.1 easie.7 ene spo.=

". * "n'"* '** '.* "I s"*i "t,a

-*"." e s.e.g' ' '*.' *% H'*. "*.c t ru."."*

POSITIONS c.

t,-

l wg.

l

.c 4e.at ec..eio e e e t t e.c'.e.g vor,i e.,

c.u. eet es t SUCCESTED Not provided.

No comment.

TIME FOR IMPLEMENTA-TION f

2

[

w g

Application o7 CDC 2 acd CDC &

ATTACHMENT 3 PACE 1 Or 1

}

ISSUE: to Comu,icat iors Sys2 ems BACKFIT ISSUE CD.

  • TO DLC RESPONSE 4-TO NRC LETTER DAT2D 02/05/85 t

DLC BACKFIT No.: 23

}

11/03/ %

02/05/85 Backf at 16KC Rqm t s A ppe al Pasition Meeting First Minutes &

Second Meeting Second Minutes &

Formal Idea t i f ied Letter Filed St at eme nt Agenda A ppeal Decision A ppe al Agenda A ppe al Decision A ppe al Submitted Issued Meeting Issued Reque s t ed lesued Meeting issu*d Req ue s t to Dir, NRR NRC POSITLON DLC POSITION COMME NTS e

PROPOSO SRP 9.5.2 states. "There are r.o ge ne r al desi n

    1. .,"*.*"n,*****',,.~,5",,'**",*,'.",'*c",*,*,",*c*,*,*,,'"""."*p"".*'.'*..

crateraa or regulatory guides that direct ly apply o,.

e,.,,.

R tSIR EMEN TS

..e se.t ten e c.o.es t ity to a.r*.c= t

.e u* e,

  • c t to the safety-related pe r f o rmance req uir eme nt s W e st tn i. e.et "struce,.. intem e c for the communication system."

s.*.*, s t i.n..n is e t. ucu a.te tw.**.m ts 6.o rt..t te wen *>.

e.t ce.

  • s ti.,.i c do.n.usc i...e e e..c es.*..e t.n.

i ca tist. -= e*. en.

.e= 1 per.i.e.e uc+4 ts v.ct 3%

Ne ithe r "ade qua t e communications" nor "enough

'ns r.c t t.u.a.t.-

information" cle arly define the scope of this requirement.

{

Aaem,. c=

ut.ve s, it n. r cene i. s.*,t cet.eee.<ns to k

.u.

te.

. t.

c.,

.unu,, u

.t. c, t. s <.,..,

r gwee. Sesse. 9.us !

t D4E L 4

'w mnce.

e e.t t

s e e.r.co.4 e.we

..s, ua e

.oows te s.-9c.c.m.cuur,.c e...it.. to the rs. er t es t.e = c.

i t*

.*we, use, tw t,+.s ter ery cw. mtf.

f e en e en

e. ca e.t +.n u n.' tr e !.ve ere.* ree av.etw.

et. *: c-e n ca.c'.aee en. t cnu.y urety f es s n

. awe 1r ser%ews.

HO'4 PROPOSED Not provided.

The staff has not demons t r at ed that appl ic a t ion REQt!IREMENT of CDC 2 and CDC 4 is required to ac h ieve an WOULD acceptable level of safety.

IMPROVE SA FETY RELATION OF No cotusent.

NE'4 REQUIRi-c '*".a.ut i t.

.#'-=e.**n.

".'e'.,5.? *Ca==."'a'.'a'. 5"s**ic.=i e i e"*****"****eu f

9 5.******

MENT TO 4.

~4 c

.c e.

et s..

< *s, c. o

.,..e... sw..,,.

EXISTING

.e

"..*"s.",*".'i.*****"*'s'.'*",.'.***'.'v'.'"*"*""'********'""*

REG'I.ATORY c

w.e

s. s,te,5 u.c e.e.v... see 4, se e., e. c

.u.

., n,****wsn,'%t t.,,

ti e.i r

s.

.c.re POSITIONS n er.c =.n.

~ t 4.

i.

av

.e s.w.,,..,.

,s, e,,

w.%

.c c.

o. < r.., t.s..,

e.,

p.t

,.. t

..i SUCCE STED Not provided.

No comment.

TIME FOR IMPLEMENIA-TION I

I ATTACHMENT 4 PACE 10F 1 ISSUE: Application of CDC 4 to Lighting Systems BACKFIT ISSUE, No. :

TO DLC RESPONSE j

TO NRC LETTER EATED 02/05/85 DLC BACKFIT NO.:

25 f

11/08/84 02/05/85 Backfat NE Equat s A pp. 41 PoWt'io n Meeting First Minutes &

Second Meeting Second Minutes &

Formal Ide nt i f ied Letter Fited Statement A genda A ppe al Decision A ppe al A gend a A ppe al Decis ion A ppe al Submitted Issued Meeting Issued Reque s t ed issued Meet ing Is sued Request to Dir, NRR I

NRC POSITtori DLC FOSITION COMMENTS I

(

PROPOSE 3 SRP 9.5.3 states, "There are no ge ne ral de s ign

~(,,, l*}"

d 't

,, "*,Cl?aN 'cNetante criteria or regulatory guides that directly apply

. tm t,e c.C C[*,7, ties an.cieeee..t. av,.et e.,eratie.

REQUIRDtENTS I

to the safety-related pe r fo risance requirements

.ene.tescee ce entelet 4 ecc*een tact.a q 1 ss-af-coate.e for the lighting system."

1 in fo rma-i

% e tegntia, e se se ere.ta e ta se*et* rotere.d vees ead accen sad

    • et t*. *o,*eter ua e e*se ace.ssery se'ety clearly def s. lighting" nor "enough Neither " adequate i

l

.geet s *een,to..s.re, v 3 siga suis Eme (Dao.

tnon" ne the sc ope of this require-eec t

.s es l

ment.

Extensive detail of the BVPS-2 1ighting i

e.e not tuat mes aet pre.'a s e e **4r.et++a ** **. rsaa e, et,ee,% rt.se te t ca. ca c t.a. t*e,r n..o t me en.were t + sat **g 'e system has been provaded to the reviewer.

'm ae e

ccur,s.v.tv Nactim re e, gi a :n.

a l

l

e. tna.: ea
c. t +et,ae +a se..,,ie#e ere.s #4., e, e+ea IW. 't l

ceaa e se cw t.e e taet t=e anew <. u*

, Nact.aas ca *. eda.cet e se-%

s.

l l

HOW PROPOSED Not provided.

The staff has ot demonstrated that application of REQUIREMENT CDC 4 is required to ach ieve an accep t able level WOULD of safety.

l IMPROVE SAFETY l

RELATION OF No coannent.

NEW REQUIRE-MENT TO 411 tae-

,,,3,,,,,,.,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,

s.,,13.t.b,t a cuestitty of ene mer t honesa, systee(s) to eee.'de EXISTING RECCLATORY

            • 'l'ity ev"t=e e "-eeacy i te'**tta,"syste"'te" era."io"'m'aa.ete t eet + g d'

emi caria, e e

n slet oo.-enas coaditteas. *acteesa, etc.. tresiets eae POSITIONS e.c,*.e ceae>+ie.s. saa tae e fat et tass- *-ef fsete ne'- r aa t*e ec r

I

-gecy tieteae syse.*

9 i

I l

1 SCCCESTED No comunent.

l TIME FOR l

IMPLEMENTA-TICN a

l

. /.TTACHMEIT 5 PACE 1 OF 'l ISSUE: Illumination Levels in Excess of SRP Criterist BACKFIT ISSUE NO.4

'TO DLC RESPONSE

.02/05/85 TO NRC LETTER DATED DLC BACKFIT NO.4 26 11/08/84 02/05/85 l

Back f it hRC Rgiunts Appeal Position Meeting First Minutes &

Second Meeting Second Minutes &

Form al l

Identified Letter Filed Statement Agenda A ppe al Decision A ppe al A ge nd a A ppe al -

Decision A p pe al Submitted Issued Meeting Issued Requested Issued MeetinR Issued Request to Dir. NRR NRC POSITION DLC POSITION COMMENTS PROPOSED DIE.has addressed illumination le vels in areas

.N ntiu,..e mes n, hee tae t e c tiete., s. cts.< ei. Its i

required for control of safe shutdown operations

[

REQUIREMENTS

t. in,$ eu. 9,.e.cu. n tn, oei, tw. suff's eme.r. ss.

.n.,

.i.un

, ut

i. u e, e.tu.e.rus e e.g t as welI as acce s s and egress in res ponse to s

l Quest ion 430.65.

i l

.c.ts.ity 1 is +=.us t, =1.t.a. u.cn.s ce.ge.n u e.et e w tw a

e fer cute nieu.tte 1.wis %, ms BVPS-2 light ang design fully conforms to the IES l

. ncue ce

. n s ie w l

.tta :=e its mee se me to c handbook recommendations.

m.i tite tie.1.wi tw ep.c.

nei

.e en

.=t.=t is e.tw. u 7 t

,r-7. ** I,ts mae e ne m.tr.is.,

n t

.c ss os. i. n,..p.e.* in. rts Figure 2-2 provides nominal minimum, average l ;

me.e o.2.tsfcu%,iteeu i

maintained illumination levels.

Figure 2-6 i.

.rens we. gens to t.=.w er st 6 pe

+e e.r s,e ty ret.t.e e s e Provides absolute minimum illumination levels am t.tue ts i ts.

s j

et.

e. p.r*.m

.cnu,,

u% y *,ct +.= ew. y st=.n tsest,. seses ta.eto(onth available at the locatson of the hazard.

, }

i t

~

nc n :,,.. e m.

4. e

.s.,.

.t.s.ti DLC has ful1y afdreased NRC questions reIated to j

  • s em.
u. unei.e. t*.t w.*i ? *.o,.e c

n1,

i

%wis t. enfm.w. suey uv.tr ctim fee.. c ont*

e l

illumination levels and Regulatory Cuide 1.70, vite.:.a%.t. en.s ti i.wis c.

c. sue,, u.t.t. nin.e.ms s

s e m

w. sin. cor,et u.et w e i.e.e en en cc ury u*.e, Illumination levels an ac co rda nce with the IES e cts s u. a..mmateis perf.. e.

h andbook have been prov ided and as s ure that necessary safety f unc t ioris can be adequately l

performed.

l i

HOW PROPOSED Not pr ov id ed.

The staff has not demons t r a t ed that inc reased REQUIREMENT illumination levels are req uired to ach i eve an WOULD acceptable level of safety.

IMPROVE SA FETY

, tm. m,s m n nt, s,se s.t.

==t tw No comment.

saa e.s 3.t,e,+.,

RELATION OF o

t. t,,n.,e c.s.,.i t e e.,mt.i., cean,m f s) t ee

+a

..bty of aw

=n iieting s.sv.

%n s.:

t 1)

NEli REQUIRE-a.e

m. h@t i.g a.

s

'*****'.,"*ita.=

  • * *
  • P*C F hetta, mt. t pr.i t

MENT TO ca m s. e t c ett +ws. m t.as.* fie.. *e.m '.*** e

%e s.g p

.t $ag EXISTING

.n.ee of tms-f * % ++. pwe a. tw

.cr.

REGUIATORY

  • * ' " ' ' "9*"** *"t" POSITIONS

!.*.*,*c 4 is6 st.tes

  • .*e net t., s.yst s.e.=*ws.ont be ecc.e.t.61 19 A3
  • Ine+uti g tage.en.

sac i.t Uts) tien.

.ec..s e.te.t s.a.er 1.en stm.. s sesse. ed t' tw*

t+

1.*1s ru.mae.e T t e e. sysu vr e

StC ESTED Sot prov id ed.

No comment.

T DE FOR IMPLEMENTA-TION l

t 1

I

f I

e Applicat ion of R.C.1.26 to ATTACHMENT 6 PACE l ' C F 1 I'

ISSUE: Areas Euc tuJed by R.C.

1.26 BACitFIT ISSUE NO.-

TO Dt4 RESPONSE f

TO [RC LETTER DATED C2/05/85 E

Dif BACKFIT NO.:

28 11/03/8:

02/05/85 6

Backfic NRC itqsmat e A ppe al Position Meeting Farst Minutes &

Second Meeting Second Minutes &

Formal ~

Ident i f ied Letter Filed S t a t me nt Agend a A ppeal Decision A ppeal A ge nd a A ppe al Decision A p pe al Submitted Issued Meeting Issued Requested issued Meeting lasued Request to Dir, NRR.

i NRC FOStrioN DLC POSITION COMMENTS PROPOSED R.C.

1.26 provides guidance of application of REQUIREMENTS A SME Itt Codes to equipment not covered by 10CFR g.

. +, a in 50.55(a). R.C.1.26 speca f scalty addresses dtesel w. s.e., w e.e.w,...w. r -....y

c. _.-. m. e

.t..,,.

..r. w

.,. e.,

c ei n..

., i s. -.o s

cooling vater and spcci f ically exeludes the

.. s.o

..... a..

t. c.re.

.~.t..t..,,....#..w..e.

,. %. e

.t diesel engines, generators, and support sy s t eis s.

Since the NRC int entionally excluded these compo-n ent s from its guidance for applicat ion of ASME lit, it is reasonable to infer that the Commis-sion did not intend that ASME lt! be applied to "t "' cem e te-s n e ~ e

.. t....,,,.;.,n.,'* ** o '*'l

** *ac '*' e f a t s A t.?s e

., co.

diesel systems ot her than cooling water.

SRPs

  • Y.I.Y$. Ns$.YOc"d.*s*.*t,M,,,#,',"QS *.

9. 5.4,

9.5.5, 9.5.6, ard 9.5.7 list R.C.

1.9,

gQ* CC L t emre t=.t - ei

, m,,,,. = e n IEEE 337, and DEMA Standards as guidance used in

[*,* *y.

sYs5cceN,*N Nhg determining compliance of the design with CDC 17, 7 W 8 t 'w ~.es -.g..e t c.

however, none of these SRPs indicate that R.C.

1.26 should be apptied.

The goidance of R.C.

['*5*"*'"* ""*:** s.' e.m. e-,, on a s*% e 3.c,.e.,,,,

i

    • '~p***.c wie+.

3,s p,,,,,g,,,,,,n.a.

1.9 IEEE 387, and DEMA Standards has been used

    • s' '< ee n.$ -se

.e in the design and f abrication of the BV-2 diesels

],',,,,,"*[ * '** * ***
  • av uw,... t

,,,,,,,,,,,g,,,,"'

. s. * -. n u,.t, e e t,,,,.,

and support systems. CDC 17 lists three specific criteria for the onsite power supplies : (1)

N DwY.c.Y**.*], *3* '**

I"d*Penden,ce; (2), Redu dancy; (3) Testability.

It as DLC s position that neither R.C. 1.26 nor ASME 111 is ap propr i at e for de t e rmin at ion of compliance with any of the three criteria of CDC 17.

HOW PROPOSED Not pr ov ided.

The staf f has not demo ns t r a ted that the applica REQUIRDtENT tion of R.C.1.26 to diesel piping is required to WOULD achieve an acceptable level of safety.

IMPROVE SA FETT l

GlIC 17 *Eiectr.c P e S,ees s" s.tates to s.et..*e. site electric ares.*

The BV-2 emergency dtesel systems conform to CDC est REIJLTION OF syst.....sm t

e. se
t. p m e c cti

... ser.cw. snt,

e se, f cue......she11 n. to 17,

  • * * * ~

~5****"******.u.

fu e

NEW REQUIRE-

.see..e.-.cf 6ce c o.cetr.es e.e.e.e.f it, to nw.

  • nee i L.1.o c eci.e i

s l

MENT TO ce. state f.et aese, i e.

. e e.s,i en.eie s a n.

eowe t ta.'t".'a

w'es. e r "+1+ c

.s.,u,.i.'*.".e c..".'.'*.e'**

EM STINC e

,e RECUI.A TORT

"'*.e t, e egn..nai e, t., m..

4 tw e

            • "**~"

P03IT10NS SUGGESTED Not provided.

No counsent.

TIME FOR l

IMPLEMENTA-I TIOM L

I l

ATTACHMENT 7 Proposed Backfit Appeal Schedule Week of Issue 3/25-3/29 Probable Maximum Precipitation 4/1-4/5 4th Steam Generator Level Channel 4 /15-4 /19 Application of GDC 2 and GDC 4 to Communication Systems 4 /15-4 /19 Application of GDC 4 to Lighting Systems 4/29-5/3 Illumination Levels in Excess of SRP Criteria 5/13-5/17 Application of R.G.1.26 to Areas Excluded by R.G.1.26 5/27-5/31 Air Dryers for Emergency Diesel Generators 1

l l

1

o ATTACHMENT 8 Resolved Backfit Issues The following backfits have not been included in the proposed appeal meeting schedule:

1.

Motor Operated Accumulator Isolation Valves (withdrawn by Reference 2) 2.

Rocker Arm Lube Oil Reservoir Alarm (withdrawn by Reference 2) 3.

Spent Fuel Pool' Heat Loads (Reference 2 indicated that this issue would be withdrawn upon docketing of information docketed by Reference 3) 4.

Diesel Lube Oil Fill Procedure (withdrawn by Reference 2) 5.

IE Powe r for Lighting and Communications (satisfactcry resolution ind i-cated by Reference 4) 6.

Application of GDC S to Communication Systems (Reference 1 indicated that this issue would be withdrawn upon docketing of inf o onat ion docke t ed by Reference 5) 7.

Atmospheric Dispersion Calculations (Reference 1 indicated that docketing of info rmation provided in References 6 and 7 should provide basis for withdrawal of thi4 issue) 8 Roof Snow Loading (NRC indicated at meeting with DLC on January 15, 1985, that info rmation later docketed in Reference 8 appeared to resolve this issue)