MONTHYEARML20080G8541983-09-14014 September 1983 Advises That Actions Required by 830708 Generic Ltr 83-28, Items 2.2.2,4.2.3,4.2.4 & 4.3 Re Reactor Trip Breakers Currently Being Reviewed.Response Will Be Provided Upon Completion Project stage: Other ML20086A8401983-11-0404 November 1983 Forwards Response to Generic Ltr 83-28, Required Actions Based on Generic Implications of Salem ATWS Events. Proprietary List Rules Will Be Forwarded Separately Project stage: Other ML20093G5671984-07-16016 July 1984 Forwards Responses to NRC Questions Re Preliminary Design for Automatic Shunt Trip Feature Per Generic Ltr 83-28.Shunt Trip Mod Will Be Installed During Fifth Refueling Outage Project stage: Other ML20113D6941985-01-14014 January 1985 Forwards Response to Conditional Items Per 841108 SER on Generic Ltr 83-28,Item 4.3 Reactor Trip Breaker Automatic Shunt Trip. Addl Info Justifying Addition of Status Lights for Bypass Breakers Also Encl Project stage: Other ML20113A5021985-01-14014 January 1985 Forwards Current List,As of 850111,for 58 Outstanding SER Issues.Specific Description of Unresolved Issue,Safety Evaluation for Issues Identified in Generic Ltr 82-33,SER, Safety Implementation Rept for SPDS & ACRS Items Requested Project stage: Request ML20100B1091985-03-20020 March 1985 Forwards Addl Info Re Six Backfit Requirements,As Discussed in Util .Meetings Re Resolution of Items Requested.Agenda Should Include Major Points of NRC Basis (Improvement to Safety) Project stage: Request ML20117L9181985-05-10010 May 1985 Forwards Revised Response to Generic Ltr 83-28,Item 4.3 Re Bypass Breaker Status Indication.Rev to Design Concept for Shunt Trip Attachment Automatic Actuation Includes Status Indication for Reactor Trip Bypass Breaker Project stage: Other ML20135A7951985-09-0303 September 1985 Responds to 850816 Telcon Request for Addl Info on Generic Ltr 83-28,Item 4.3 Re Bypass Breaker Status Lights & Seismic Qualification of Shunt Trip Attachment.Diagram of Revised Design of Control Room Status Lights Encl Project stage: Request ML20138K9041985-10-0909 October 1985 Forwards Supplemental Safety Evaluation Accepting 850114 & 0510 Responses to Generic Ltr 83-28,Item 4.3 on Proposed Design Mods for Automatic Shunt Trip.Tech Spec Changes Should Be Submitted Project stage: Approval ML20138A2941986-03-0404 March 1986 Advises That Shunt Trip Attachment & Automatic Shunt Trip Panel Seismically Qualified Per 840716 Commitment Re Generic Ltr 83-28,Item 4.3 & Listed Responses to 841108 Safety Evaluation.Qualification Based on Westinghouse Tests Project stage: Other ML20202C5541986-04-0303 April 1986 Forwards Sser Accepting Util 860304 Response to Generic Ltr 83-28,Item 4.3, Seismic Qualification of Shunt Trip Components Project stage: Other 1985-10-09
[Table View] |
Text
S.1
$YL
'Af Telephorie (412) 393-6000 Nuclear Grcup shpSn'op' ort, PA 15071-0004 Director of Nuclear Reactor Regulation U.
S. Nuclear Regulatory Commission Attn:
Mr. Peter S. Tam, Project Manager Project Directorate No. 2 Division of PWR Licensing Washington, DC 20555
- Mail Stop 340 -
Reference:
Beaver Valley Power Station, Unit No. 1 Docket No. 50-334, License No. DPR-66 Generic Letter 83-28, Item 4.3 seismic Qualification of Shunt Trip components Gentlemen:
By letter dated July 16, 1984, we provided a response to Generic Letter 83-28, Item 4.3 in which we committed that the shunt trip l
cttachment and automatic shunt trip panel would be seismically qualified.
Supplemental information on our actions was provided in letters dated January 14, 1985, May 10, 1985 and September 3, 1985 in response to your Safety Evaluation (SE) dated November 8, 1984.
Westinghouse has performed generic qualification tests for the Wes-inghouse owner's Group (WOG) and the results of these tests were issued by the WOG in February 1985.
Also, at our request, the WOG prcvided additional information on the qualification methodology and the in-equipment seismic levels at the mounting locations in
- November, 1985.
We have reviewed these reports and concluded that the shunt trip attachment and automatic shunt trip panel are ceismically qualified for use at Beaver Valley Power Station Unit 1.
If there are any questions, please contact my office.
very truly yours, T.
a 8 0 0 L
G6031401Er7 060304 PDR ADOCK 05000334 P
PDR
March'4, 1986 Beaver Valley Power Station, Unit No. 1 Docket NO. 50-334, License No. DPR-66 Generic Letter 83-28, Item 4.3
. Seismic Qualification of Shunt Trip Components Page 2 cc:.Mr. W. M. Troskoski, Resident Inspector-U. S. Nuclear Regulatory Commission Beaver Valley Power Station Shippingport, PA 15077 U. S. Nuclear Regulatory Commission i
c/o Document Management Branch Washington, DC-20555 l
Mr. D. R. Lasher Instrument and Control System Branch i
Mail Stop P-1030 l
U. S. Nuclear Regulatory Commission l
11asFington, DC 20555 Director, Safety Evaluation and Control Virginia Electric & Power Company P. 0.. Box 26666 i
One James River Plaza l
. Richmond, VA 23261 l
l l
l t
l l
l l
l 1
l l
i 1
1 i
i
)
l
\\'
9